QM : Post goods to unristricted stock while doing Usage decession in QA32

Hi Gurus,
    FG1 - finished
   SFG - Semi finished
   RM1 - raw material
now i am doing inprocess inspection for SFG, I selected inspection lot in QA32 and clicked Results then i selected usage decession now i want to post this to unrestricted stock and then again i issued them for FG1.
now when i saw in MMBE of SFG, i got that quantity 10 is in Reservation.
please guide me how to post them to unrestricted stock
regards
venkat

Hi,
In inprocess inspection you can do UD. But goods movement will not happen.
For SFG you may have assigned 03,04 insp types for the last operation.For last opn only 04 ins type will work.
After giving UD system showing the stock in MMBE means it is 04 ins type. But your problem is this stock is reserved.
Parent order ie, FG order if you released, the dependent requirement gets reserved.
So SFG reserved against parent order.This is not a problem.
Even now you can issue the SFG to this parent order or some other order also.
Regards,
Dharma

Similar Messages

  • How to post goods to unrestricted while doing usage decession in QA32

    Hi Gurus,
    FG1 - finished
    SFG - Semi finished
    RM1 - raw material
    now i am doing inprocess inspection for SFG, I selected inspection lot in QA32 and clicked Results then i selected usage decession now i want to post this to unrestricted stock and then again i issued them for FG1.
    now when i saw in MMBE of SFG, i got that quantity 10 is in Reservation.
    please guide me how to post them to unrestricted stock
    please respond immediatley
    regards
    venkat

    Hi YM Reddy, Thanks for responding.
    for SFG its ok, then what about FG1 i activated 04 inspection type for FG1 in QM View in Material Master of FG1.
    i done converssion of Planned order to Prduction Order, then released and confirmed also.
    But i had not done GR
    I gone to inspection lot selection QA32 but i am not finding any lot of FG1 there.
    please guide me what the mistake i am doing while posting GR.
    Regards
    Venkat

  • Getting serial number box while transfer post in MB1A but not while doing MIGO

    Hi Team
    I am getting serial number box while transfer post in MB1A.
    But getting below error under serial number tab while doing GR through MIGO of outbound delivery.
    Issuing plant and receiving plant, material, batch, qty are same in both cases.
    How can I get serial number box when doing GR? Does any customizing changes needed?
    Br, Kiran U

    Movement type is different for those two screen shots, also you are saying you are using MB1A, but you are using 301 movement type. Generally 301 movement type is not allowed from MB1A t-code.
    Please check these SAP notes if relevant for your case.
    856548 - MIGO: you cannot enter serial numbers
    856662 - T156Q: Missing entries

  • Post Goods Issue - error : Class type does not exist - Message no. VK662

    Hi,
    I am trying to do Post Goods Issue and getting this error: Class type does not exist
    When double click on the error, it shows it is a message no vk662.
    Any help to resolve it is appreciated. Thanks in advance.
    -Sri

    Sri
    There is a problem in batch determination.
    The batch you assigned to the material does not have a class or if it has a class, that class does not exist.
    Display the batch from the delivery item  using MSC3N and go into the Classification tab. You should have a class of class type 22.  See if that class exists in CL03 and its status in basic data tab. Work on these lines and revert.
    Hope this helps.

  • While doing usage tracking

    Hi everyone,
    when i am doing usage tracking i am getting below error
    [2012-12-11T15:39:11.000+00:00] [OracleBIServerComponent] [ERROR:1] [] [] [ecid: 919a4c7b38fb3847:-5476f916:13b8a33ecad:-8000-0000000000000b78] [tid: e9c] [nQSError: 17011] SQL statement execution failed. [[
    [nQSError: 17001] Oracle Error code: 984, message: ORA-00984: column not allowed here
    at OCI call OCIStmtExecute: INSERT INTO "S_NQ_ACCT" (USER_NAME, REPOSITORY_NAME, SUBJECT_AREA_NAME, NODE_ID, START_TS, START_DT, START_HOUR_MIN, END_TS, END_DT, END_HOUR_MIN, QUERY_TEXT, QUERY_BLOB, QUERY_KEY, SUCCESS_FLG, ROW_COUNT, TOTAL_TIME_SEC, COMPILE_TIME_SEC, NUM_DB_QUERY, CUM_DB_TIME_SEC, CUM_NUM_DB_ROW, CACHE_IND_FLG, QUERY_SRC_CD, SAW_SRC_PATH, SAW_DASHBOARD, SAW_DASHBOARD_PG, PRESENTATION_NAME, IMPERSONATOR_USER_NAME, NUM_CACHE_INSERTED, NUM_CACHE_HITS) VALUES('weblogic','Star','AGG','instance1:corea',convert(datetime, '2012-12-11 21:09:11', 120),convert(datetime, '2012-12-11 00:00:00', 120),'21:09',convert(datetime, '2012-12-11 21:09:11', 120),convert(datetime, '2012-12-11 00:00:00', 120),'21:09','SET VARIABLE PREFERRED_CURRENCY=''AUD'';SELECT 0 s_0, "AGG"."AGG_ST_DATES_OBIEE"."DAT" s_1, "AGG"."AGG_ST_DATES_OBIEE"."DAY" s_2, "AGG"."AGG_ST_DATES_OBIEE"."MONTH" s_3 FROM "AGG" ORDER BY 1, 4 ASC NULLS LAST, 3 ASC NULLS LAST, 2 ASC NULLS LAST','SET VARIABLE PREFERRED_CURRENCY=''AUD'';SELECT 0 s_0, "AGG"."AGG_ST_DATES_OBIEE"."DAT" s_1, "AGG"."AGG_ST_DATES_OBIEE"."DAY" s_2, "AGG"."AGG_ST_DATES_OBIEE"."MONTH" s_3 FROM "AGG" ORDER BY 1, 4 ASC NULLS LAST, 3 ASC NULLS LAST, 2 ASC NULLS LAST','92FBACEDD4F4F5F3C26F1B31C93C97CD',0,2,0,0,1,0,2,'Y','Report','/shared/CCD/WRITE BACK','','','AGG','',0,1).
    And i think it is happening due to these values
    ,convert(datetime, '2012-12-11 21:09:11', 120),convert(datetime, '2012-12-11 00:00:00', 120),'21:09',convert(datetime, '2012-12-11 21:09:11', 120),convert(datetime, '2012-12-11 00:00:00', 120)
    so plz suggest how to resolve this.
    thanks in advance
    Ashish Kumar

    Ok, when you say you merged the Usage Tracking rpd, where did you get it from? Also, which tables did you create in the database for Usage Tracking? Please try to use the rpd here since the one that comes with the installation had issues: http://total-bi.com/2011/09/obiee-11g-usage-tracking-rpd/

  • Automatic Post Goods Issue Of Stock Transport Order

    Here is the scenario:
    We are using stock transport order to logically move inventory from one company to another company inside the same physical location. The material# is the same but the plant# is different.
    Process is as follows:
    Associate enters the purchase order
    If inventory exists - delivery is created automatically
    The delivery is also auto picked
    Currently, we have the inventory to PGI in a batch job several times a day.
    However, the user would like to have the inventory - move as soon as the delivery is created.
    Does anyone know of any technique - to post the inventory immediately.
    I was thinking along the line of a workflow/create of an idoc (WHSCON) to faciliate this.
    Kind Regards, Steve

    You could simply scedule the batch job to PGI right after the delviery creation job runs (just delay it a few seconds after the longest period of time the delivery creation job runs).
    So there would only be a very short delay, Looking at vl10g now to see is auto PGI is an option but I am thinking it is not
    (I will update my post if I find it is)
    Edit: It doesn't look like a standard option but I would imagine you could change a function code profile with custom user exit to trigger goods issue

  • Post to quality in PO while doing GR

    Dear all,
    I want to create a raw material,that material while making goods receipt (GR) by using Purchase order number that stock should to be posted directly to quality.Kindly please let me know how to process it.
    Regards
    Rajasekaran

    Hi Sekaran
    Follow the below
    1) In material select qm view and assign inspection type 01 then tick active.(Ensure that Post to inspection stock should checked)
    2) Create MIC's in QS21.
    3) Create inspection plan with usage '5' and assign your MIC's in plan.
    4) Create Purchase order in ME21N.
    5) Do GR for PO in MIGO.
    6) Then look inspection lot in QA32.
    7) Check the stock in inspection stock in MMBE.
    8) Do result recording in QE51N.
    9) Do usage decision in QA11.
    You can create other master data like sampling procedure, inspection method if required.
    Regards
    Kesava

  • Item of sales order is so repeated post  goods issue that stock is negative

    dear expert:
    the stock value of  sales order is negative ,because the goods is post twice,i donn't know what' cause of question  .in schedule line of sales order ,order quantity is 1, confirmed qty 1,deliveried qty :2.
    so mska-KALAB is -1.
    please help me analyse it .
    best regards

    Check your other thread on the same subject
    [sales order is deliveried but stock is negative   |sales order is deliveried  but stock is negative;
    thanks
    G. Lakshmipathi

  • Posting goods to unrestricted stock after quality insp

    hi sap gurus,
    After i confirm a order with a final inspection confirmation(QM) ,when i check no finished goods has been shifted to unrestricted use stock(MMBE).can u suggest me how or what transaction i have go for this.In make to stock scenario
    thanks

    which insp type is activated...03 0r 04
    if it is 03 then you need to perform the GR
    if it is 04 you need to goto QA32 and make UD and do the stock posting from that manu.
    see the help document in QM>quality inspection>insp lot complition --> stock posting and UD

  • Free goods structure not appearing while doing item proposal

    Free goods assigment have been done for a material with respect to customer/sales or/dist channel.During ordinary sales order creation va01,for the line item b-7000 free goods trigger for qty of 10.But when a item proposal is created & called in the order.Free goods doesn't trigger(even the qty is same 10).
    what adjustment have to be done for the free goods to trigger.

    Hi Pradeep,
    My Answer is CORRECT.
    Please find the below link which will gives a clear idea
    http://wiki.sdn.sap.com/wiki/display/ERPLO/FreeGoodsDetermination.
    ORNORMFREE+TAN=TANN.
    In this case OR document type Category is u201CCu201D.
    Thanks
    Dasaradha

  • Error while doing usage decison using moment type 321

    Hi,
    I have created a batch by confirming process order
    (t code COR6). But when I do usage decision for this batch using transaction QA11, material stock from batch created by order gets transferred to new batch.
    When I checked material document, there is complimentory movement for batch created with process order.
    For ex.
    I have created batch 000400 by confirmation of process order.
    Batch stock is in quality stock. Now I want to move this stock to unrestricted, for this I did usage decision using transaction code QA11. After usage decision when I checked material documents then I found that there is only one movement for 321 movement for batch 000400 i.e. for debit no credit (that means there is no complimentary moment) & credit movement exists for new batch 000401 which is created by sytem itself.
    My requirement is that system should not create new batch for material posting while using moment type 321, it shoud post material stock to same batch after usage decision.
    It is urgent issue.

    In the SAP IMG configuration,
    Material Management ->Inventory Management and Physical Inventory -->Movement types --> Copy and Change Movement type(OMJJ)
    In the field screen, select movement type and then "321" and getinto the definition.
    Please verify the field "Create new batch" is empty.
    Other reason could be user-exit or custom code which during material movement does the new batch creation.
    Thanks,
    Srinivas Karri

  • Automatic storage location selection while doing usage decision

    hi gurus,
    My client wants to do automatic determination of storage location depending upon usage decision.
    i.e. if usage decision is reject than gr to be done at rejection storage location. if usage decision is accepted than gr to be done at respective storage location.
    The storage location can be changed manually but they require automatic determination of storage location.
    Regards,
    Deven

    hi, deven,
    go to qs51, select catalog 3 enter plant
    select selected set that u used for the plant that u select
    in posting proposal ud tab u select inventory posting automatically for return delivery , unrestricted stock etc
    u just r & d with in that t code
    if u get solution please share with me too
    regards,
    umesh

  • Delivery document is completed,but post goods issue.

    dear :
    devlivery docuemnt is set  completed by  Manually closing completed deliveries(programme:SHP_DELIVERY_COMPLETE),but it cann't post goods issue .so stock is exist .
    how can i consume the stock ?
    please help me analyse it .
    best regards.

    hello,
    Check whether there are confirmed schedule lines in the sales order for which the delivery is made.
    Also check if the storage location is there in the sales order
    Regards
    Mahesh

  • Update termination error when posting goods issue

    Helllo
    I have a strange problem I can not figure out.  We have serial numbers like 12345/345.  When trying to post goods issue I get an update termination error  for invalid character. This only happens if the quantity is more than 1 each.  A quantity of 1 each works fine and receives no update termination when post goods issue...only recieve termination error if the post goods issue is for a qty of 2 each.
    I searched the SAP site found OSS note 40355...applied the note.  The note also mentions the chaging print paramters to include "/ _"  this is all done.
    I tried doing a ABAP Debug in SE38 (for the delivery note print program) and setting the breaking point, but when I go to run the transaction after the setting break point...when I hit post goods issue...SE38 does not return back to its screen.  So not sure if I am running the correct program there...or if this works for the update terminations?
    So strange I do not get this for a qty of one each only when it is greater than that.  I am stumped need help....
    Any advice wiould be GREATLY appreciated....

    Looks like there is an error in the delivery (or material movement ?) print program. Easiest would be to disable these outputs for test purposes. When no dump then the error is somewhere in the print program an could be analysed by triggering the print separately with ABAP RSNAST00.
    regards Jack

  • Accounting document while doing Post Goods Receipt

    Hi,
    The scenario is like this.
    1.     Sales order1 is created.
    2.     Delivery document created; PGI (post goods issue) is done. Here the movement type is 601.
    I want to get back the material (equipment) for some reason; I want to check the material for its condition. If there is any damage, I have to charge the customer.  So, the material will be received to Return stock by return sales order with reference to the first sales order1 (Movement type 651); then will be sent to Quality (Movement type 457); if it is not damaged will be sent to unrestricted stock (Movement type 321) by transaction code MB1B.
    When I am doing the PGI, the accounting document is created; the Inventory account is credited and COGS (Cost of goods sold) is debited.
    When I am doing PGR (Post Goods Receipt), the accounting document is not created (Movement type 651).
    I have created a new u2018Schedule line categoryu2019 (YL) for the return process with the movement type 651.
    I want to get an accounting document while doing PGR. The inventory account is to be debited; the COGS is to be credited.
    Can I get the accounting document by changing the movement type in Schedule line category u2018YLu2019?
    Please guide me in this regard.
    Regards,     
    K Bharathi

    Hi
    Can I get the accounting document by changing the movement type in
    Schedule line category u2018YLu2019?
    Yes in your schedule line category if the movement type is not 651 then an accounting doc will be created
    For movement type 651 there wont be any accounting document
    In returns (651M.Type)  If a returns delivery exists, the return should be posted in the Sales (SD-SLS) component, not in the Inventory Management component.
    Depending on how Customizing for Sales is configured (the movement type is configured in the step Define Schedule Line Category), the delivery is posted to the following stock:
    - Blocked stock returns (non-valuated, not unrestricted-use) (movement type 651)
    - Unrestricted-use stock (movement type 653)
    - Quality inspection stock (movement type 655)
    - Blocked stock (movement type 657)
    If the given quantity is posted to blocked stock returns first, you can make a manual goods movement posting in the Inventory Management component to transfer the quantity to valuated stock.
    So, when the goods arrives in so called "Block stock returns" it is not your property, it belongs to the customer (the ownership has not changed) - it is not valuated. Whiles you post the goods to your own (plant) stock by 653/655/657 it becomes your property that's why it is valuated and material document will be created
    Regards
    Raja

Maybe you are looking for

  • Suggestions for current ANE development instructions

    Any recommended links for instructions on building ANEs ( android in particular )? I am looking for current tutorials if available. I was last looking at this this one by Mark Hood: http://www.adobe.com/devnet/air/articles/ane-android-devices.html bu

  • Enq wait events

    hi, Please could someone point me to some doc explaining enq events like: enq: AT - contention and how to interpret the name|mode parameter for such events (select event#,name,parameter1 p1, parameter2 p2, parameter3 p3 from v$event_name where name='

  • Imac won't boot when usb plugged in

    Hi all, I have a probleme since i got my Imac 27 Mid 2010. It just dont boot when a usb Drive is plugged in. I had i Firewire hard drive in the past and i had no problems to boot up on it. Turn the mac on, holding option key and bang !  BUT usb just

  • Remove Cell Selection Border in JTable

    Hi I have multiple columns in JTable populated with data. When the row is selected, the row changes colour. It also places a border around the cell that is selected within the row. Is there some way to remove this border? Any help would be appreciate

  • How to consolidate REFERENCED projects

    Note that for this question all of my projects/albums reference the original photos--I do not keep masters in the vault, by preference. Now I've sifted through the FAQs and I am now well familiar with Aperture 2's organizational structure. For instan