QM Usage Decision Query

Dear All,
I have activated QM for procurement & a inspection lot got generated at the time of GR.
I have given a sample size of 5 for the fixed sampling procedure which I have assigned in the inspection plan. As per the settings I can see the sample size 5 in my inspection lot.
Now can anyone guide me the further steps which I have to carry out in QM like Results & Defects Recording, UD etc.
Basically my doubt is whether UD will happen automatically if I do Results recording ?
Since I am new to QM, I m not aware of the config & entire process.
Appreciate your valuable time & solutions.
Thanks & Regards,

hi
1. Whether system will set the Reject indicator automatically if the result value falls outside tolerance limit ? if not whats the relevance of the reject indicator ?
Yes this will happen if manual valuation mode is not selected in Sampling procedure.
2. In the above case how will we do Defects Recording & what are the further steps after defect recording such Quality Notification, Returning the quantity to vendor through UD etc ?
if in customization of Inspection type (QCC3) you have assigned the default notification type say F2 in case of 01 inspection.-->system will generate F2 notification automatically in the background for defects recorded.
you can view this notification in QM10.
If you return the Qty to vendor then system will create a Unique document number  for mvt type 122 which can be seen in MB03.
As per the UD code & its quality score say 1 for Rejected system assign the Quality score for lot.
I hope this is clear

Similar Messages

  • Reports on usage decision

    Dears
    I have a usage decision code like
    1.Material passed in first test
    2.Material passed in second test
    3.Material passed in third test
    Now i need to get one report like
    How many UD i given by using 1.Material passed in first test,2.Material passed in second test, etc....
    and what are the material passed through that
    how i can have a report like...Any std report available
    Faisal

    Hi !
    What process are you following to define those 1st test/2nd test and 3rd test?
    Anyways, use UD code according to your need, like A1 - Passed 1st test, A2 - Passed 2nd test and A3 - Passed 3rd test. Athen in QA33 filter the lots according to UD code. otherwise, a simple query linking QALS and QAVE will give you a report for lot/material vs UD code. Put a simple formula to count the no. of times a particular UD code appears and you are done with your requirement.

  • Record usages decision- inspection lot stock

    hi gurus,
    when i am using a record usages decision screen (QA11) after putting my inspection lot number it show me only two tabs Defects and charterstics it didn't show me an inspection lot stock tab.
    Please suggest
    Regards
    Maashish

    Hi Maashish,
    I believe that your PO is for cost center.
    when you will recieve the material using MIGO for This PO, then matieal stock/Value will be posted to Consumtion Account ( Stck will not posted to store) and GR/IR for Vendor.
    In this case if Inpection lot generated,  then using QA11/QA32 you can records quality information in  Result & UD.
    In this case Transfer posting 321/105 for material will not take place.you can input quality inforamation only. 
    Hope this piece of info. will help to resolve your query..
    Cheers
    Manoj Singh

  • Customizing mmbe screen in order to display Usage Decision????

    Hello everyone,
    I am SAP QM/MM consultant..
    My client wants a customized mmbe screen, in which besides the Unrestricted and QI stock, there should be an additional column for Usage Decision in which the Usage Decision ( wrt QM ) for that particular batch should be displayed.
    I have never done this and have no idea how mmbe screen can be customized in order to display Usage decison..
    Please provide your valuable inputs to my query asap..
    I would really appreciate.
    Thanks n Regards
    Neha

    Hi Neha
    U have to custumize non standerd report (Z Report) .
    take the data of usage decision from table  QALS.
    Regards
    Sunil

  • Customizing mmbe screen to diplay Usage Decision????

    Hello everyone,
    I am SAP QM/MM consultant..
    My client wants a customized mmbe screen, in which besides the Unrestricted and QI stock, there should be an additional column for Usage Decision in which the Usage Decision ( wrt QM ) for that particular batch should be displayed.
    I have never done this and have no idea how mmbe screen can be customized in order to display Usage decison..
    Please provide your valuable inputs to my query asap..
    I would really appreciate.
    Thanks n Regards
    Neha

    Hi,
    Its not a good idea to customize MMBE screen with the field info that is not provided by standard SAP's configurable values.  Simply provide him a ZMBE report which you might have understood by now....Remember, MMBE would be used by your client's global users.  Just for his sake, if you attempt to change it, you would be facing the global users..If I were, I would never do it.
    Regards

  • No Stock posting before usage decision

    Hi,
    I am in process of implementating QM Module.
    I want to block stock posting from Inspection lot to unrestricted use (or any other use) before Usage Decision for the lot is taken.
    Can anyone give my solution for the same? Are there any SPRO settings for the same?
    Regards,
    Prashant Kolhatkar

    Hi Prashant,
    You must implement the User Status profile QM_L_003  No Stock Posting Before UD.
    Herewith I am pasting the ready made solution hoe to prevent UD before RR is done. What you need to do is change the Business transaction as per your requirement to this status profile.
    You can refer wither this [THREAD |DOCUMENTATION FOR THE BENIFIT OF ALL QM CONSULTANTS u2013USER PROFILE;or this [wiki |https://www.sdn.sap.com/irj/scn/wiki?path=/display/plm/setupofauserprofiletoavoidtheUDpriortoRR]to know the process step by step.
    If any query, pls revert with your detailed configuration of the status profile.
    Regards,
    Shyamal

  • Error while doing the Usage Decision in transaction QA32

    Hello Friends,
    While doing the goods receipt for customer returns from customer, system generated a inspection lot with inspection type 06.
    So in QA32 transaction, system is showing that inspection lot, but in same screen, against the column InspPlan: Material, system is not showing any entry.
    Later on after analysis, i found that no inspection plan was assinged to the material, Plant for which that inspection lot was created. When i checked that inpection lot in transaction QA03, in Insp. Specifications tab, agaisnt the Assigned Specification section, system was not showing any entry in fields Group, Group Counter, Plant, Usage.
    And against that inspection lot,status CRTD, PREQ, CHCR are active.
    Because of  which, when user is trying to do the UD against this lot system throwing the error message as Status check error.
    When i checked again i found that status CRTD is throwing the error message.
    Hence friend, i want to do the Usage decision  for that inspection lot than how to do?
    Now user has assigned the material, plant to the inspection plan in QP02.
    Should i go to QA02 transaction, and in Insp. Specification tab, for fields group, group counter, usage, Plant, maintain the values?
    Will this allow me to do the usage decision against the inspection lot which got generated when no inspection plan was assingned to that material, plant?
    Waiting for your valuable inputs.

    For Result Recording and Ud the inspection lot status must be REL as u told ur status is CRTD it Mean Some master
    is missing in inspection lot,generally inspection plan for that u run QA02 enter inspection lot no go to specification tab
    there a button assigned specification there click on that as u click on button u will find that plan for above material copied to lot and it will show u plan detail line group and group counter no.
    then go to next screen Sample if sample management is active and click on sample then system will calculate sample size then save ur lot. it would get Status As REL now ui can enter result or take UD
    for QM setting Refer
    http://sap-questions.blogspot.com/

  • QM_Follow up action in usage decision

    Dear QM Experts,
    1.     We can record the defects in inspection lot (01 origin) which creates quality notification in background under F2 type.
    2.     If the defects are recorded usage decision is given as Rejected.
    Requirement is auto email should be sent to predefined email addresses briefing defects and number of defects. This has to be done only for those lots whose UD have been given as Rejected. Question is which follow up action and which function module to be used for this?
    Best Regards,
    Anand Rao

    hi
    kindly check whether the following FM can be used
    QFOA_MAIL_REJECTED_RESULTS-Follow-Up Action Module: Send Mail for Rejected Characteristics
    QFOA_MAIL_SENDING-Send Info MAIL After Usage Decision (Mail Contains UD Data)
    QFOA_MAIL_SENDING_STANDARD-Send a Short Info MAIL After Usage Decision
    you have to assign these follow up actions with FM to the rejected UD code
    regards
    thyagarajan

  • Follow up action duriing usage decision

    I have done the necessary configurations for triggering followup actions after doing usage decision in the system like
    defined follow up configuration and assigned functional module to it
    defined codes and code groups in qs41
    defined selected sets with follow up actions in qs51
    and I would like to know why after these settings are made the followup action is not  getting triggered in the field followup actionwhile doing UD  after  providing valuation code .
    Is there any others settings i need to make after these is so please help me in getting this triggered
    Thanks in advance......

    HI
    Please find the below screen shots and please let me know your opinion about this.
    This is the  configuration I did

  • Mapping the Follow-up action to the Usage-Decision

    Hi All,
               I have a the following requirement in my development:
    The Usage decision needs three function-modules for the three cases of the follow-up process.
    In addition to that this ,service shall have a control table in Customizing, where the customer is able to decide which follow-up action should be made. (not standard customzing). The function-module for this process is not standard.
    1) Does the second requirement also require FM?
    2) Please give me the steps to map the Follow-up action to the Usage-Decision in SPRO
    Thanks,
    Vasuki

    Hi
    First create the follow up action which you want, and assign the same in QS51 t.code to your UD code group.
    Thanks
    S.Murali

  • Usage decision follow up action change of status in equipment

    Hello every one, I am having calibration scenerio in my project. All process is running properly but the issue which i am having is that when i am giving usage decision i should get a pop up to change the status of the equipment which is not coming in my case. i have checked followup action whch PM_QM there i have activated 2 Funtion modules one is for automatic TECO of order which is working properly and second is change to status in equipment master which is not working for me. Kindly give some guidance to me on same.
    Regards
    Abhishek

    Helloo,
    Please let me know the equipment type you are using.
    If you are using equipment type other than Q then u may get such type of issues.
    Please try out with equipmetn type Q or P
    Thanks

  • Automatic TO Creation for QM Usage Decision

    Dear Gurus
    We all know WM TO to releasing stock from QI to UU or return goods to vendor can be created automatically,
    My question is, when the usage decision is split into two, some material going into stock, and some returned to vendor. for return to vendor, SAP will do automatic transfer, but for material go into stock, SAP is not release Q status in WMS to unrestricted (blank), I have set the movement 321 to create TO automatically and post into same bin.
    FYI, if the transaction is separated, SAP perform well (transfer Q to unrestricted done automatically and return to vendor also done automatically)
    Is there any solution for this problem?
    Thanks and Regards
    CJ Lee

    Hi,
    In case of a usage decision for a partial quantity, it is not possible to create the TO for the generated posting change notice automatically. This is only possible when the full quantity is released. The same happens if you release a partial quantity and post the rest using a different stock posting. The reason is, there needs to be a user decision, which part of the quantity has to be posted, this is necessary for example when the quantity is distributed in the warehouse over many storage bins. But even if the full quantity is on one storage bin, there is no automatic TO creation. You can see this also in the online processing LT05), in case of partial quantities you have to enter the selected quantity in the quant list, for a full posting this is not necessary.
    Hope this helps.
    Regards,
    Sinéad Curran

  • Unable to change stock posting date at usage decision while inspecting HUs

    If we were using materials without WMS it's simple: thereu2019s a button in the screen for stock posting by which we're able to change document date and posting date; but we're using WM and the screen is slightly different: the button I'm referring it's gone!
    So, how to change the posting date at posting stock in QA11 when we're using handle units? Some end-user told me that in version 4.7 this was possible. I don't think so ...unless there was something customized at WM IMG...or maybe they were using a USER EXIT to bring a pop-up window for this (I'm starting to believe that this was implemented..). This is the first time I work with HUs, so I don't know how to manage this.
    Anyone?
    Seba
    Edited by: Sebastian Sniezyk on Apr 3, 2009 10:16 AM

    I solved it in this topic: Changing posting date at usage decision for handle units. How?

  • Issue while doing material posting through Usage Decision

    Hi all,
    I have an issue while doing material posting through Usage Decision. Please find below the details.
    Inspection Lot  10000604689
    Material        1730PCPBS.0031
    Batch           QP611097      GQ02
    Out of total qty of 2100 we need to post the following
    To unrestricted use                     2,098
    To sample usage                         2
    Following error appears,
    Deficit of SL Stck.in qual.insp 1,638 NO : 1730PCPBS.0031 62GQ GQ02 QP611097
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 1,638 NO.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    I have checked that quantity 2100 of material 1730PCPBS.0031 is in QI stock. Kindly advice what is the issue and why we are getting the error?
    Regards,
    Brijesh

    Hi Brijesh,
    What is the status of inspection lot?
    One of the possibilities I think could be inconsistencies between MM and QM.
    Have a look on SAP note 48815- Checking possible inconsistencies between MM and QM.
    Regards,
    Anand Rao

  • Error message during the usage decision

    Dear Gurus,
    While performing the usage decision in txn  code QA11, i entered the relavant quantities in unrestricted-use.
    Then when i tried to assign the UD code i am getting the following error message.
    "You have no authorization for this catalog entry Message no. QS291"
    But QA11 authorization is already there, apart from that which authorization is required.
    Please give your inputs
    Thanks and Regards
    Hari

    Hi,
    As the error message says Authorisation for Calatalg 3 and the related code group is missing.
    When u get this message just run /nsu53 on your screen so you know which objects are missing. Maintain those vlaues or ask Basis to mainatin these values.
    Regards,
    Nitin

Maybe you are looking for

  • Mac mini (Mid 2011) inexplicably running slow, especially videos, despite what I think is sufficient memory.

    I have a Mac mini (Mid 2011). It has become slow in some ways even though I have 8 GB 1333 MHz DDR3 memory and almost 250GB of free storage. I recently installed Yosemite 10.10.1 (14B25) but I had noticed the slow down prior to that. Notably, videos

  • Rendering alternate colors in JTree

    I have a JTree within a scrollpane. What I would like to do is have every alternate line on the JTree rendered with one of 2 colors, i.e. line 1 is blue, line 2 is yellow, line 3 is blue etc. The tricky bit is that I want this color to fill the width

  • IS-Retail:Definitions and Assignments in IS-Retail

    Hi All,          Can anybody explain me what are the "Definitions" that we do in IS-Retail and what are the "Assignments" that we do in IS-Retail just like we do in R/3.I want complete "Definitions" and complete "Assignments" in Retail.Reply sooon Th

  • Mountain Lion (Mac OSX v10.8) is recommended for Premiere Pro

    Mountain Lion (Mac OS v10.8) upgrade improves performance and stability with Premiere Pro. Be sure to check for drivers for third-party I/O hardware and such, since such drivers often lag the OS release. Mac OS X Mountain Lion (v10.8) compatibility F

  • Wrong upload setting.

    I think I uploaded my footage wrong into final cut. I use a DVX100 and shoot 24p and normally I get the interlaced look, where it looks like there's lines. Normally adding deinterlace into the footage corrects this, but this time, it actually makes i