I had a prolonged problem related to Quality Plan / Quality Stocks . We are a manufacturing firm procuring lot of components from outside (BOP). Some of the items are marked for quality inspection prior to be posted as Un restricted stocks .
The Problem is that I procured a item say "X" which is defined as Quality Inspected item in Material Master . At the time of Goods Receipt (MIGO) the document was generated wrongly eg the qty inwarded 40 against the actual 50 nos(mvt type 101) . The Document get generated and was approved in quality also and the stocks simply moved to unrestricted stocks . *Now when the problem was tracked and we tried to reverse the above MIGO document the system is unable to do the same as the MIGO doc is trying to trace the stocks as Quality inspection but against the " Quality Plan " it has already moved to Un restricted stocks .*
I am not able to find the solution for the same as I am not very much competent with Quality Module .
Pls revert back at the earliest with your suggestions as it is required to close the Year end activities
Rgds
Manoj

Dear Manoj,
                   Go to MIGO ---> Select A01(GOODS RECIEPT) & R01 (PURCHAGE ORDER) -> Enter PO no. & select the item to be reversed.-> Movement type -- 102 -> Enter Delivery note no.-> Enter Quantity to be cancelled ---> Select stock type where stock is available /posted previously (Unrestricted) ---> POST IT & note the no. Then go to QA12 -> Enter its inspection lot no. -> go to Usage decision--> Functions -> Cancel Lot--> Then SAVE it. Thus the inspection lot also cancelled.
Check this Reversed Quantity in PO by T-Code ME23N. This quantity will reversed in to that PO. Now you can again do the GR of correct Quantity.
Please check & revert.

Similar Messages

  • Quality Plan issue

    Hi,
    I have subcontracting material which was processing from one subcontractor,I have created quality plan for the material.
    For such subcontractor, material posting to QA after GRN, Also There is no issue of UD,
    But When I receive same material from another subcontractor, Material posted to QA, But when i go to RESULT tab , system give message as NO CHARACTERISTICS ARE CREATED. I have already created quality plan  & inspection characteristics.
    Ihave also attached Quality info records for the subcontractor,
    Regards,
    Deven

    Hi,
    If you have same material code for all the vendor and you have activated QM view the system will post the stock to quality.And there should not be any error like this.Still check the QM activation and quality plan assignment date as well as GRN date for the reffered P.O in terms of posting date.
    If you have different material for all vendor then assign all the materials seperately to the inspaction plan.
    Hope this will help.
    regards,
    kaushik

  • Error while creating Quality Plan

    Dear Experts,
    While creating the Quality Plan following error is coming -"Error occured when checking type "
    In the log of task list following error is appearing - "Op. 0060, CH 0060:char. iden % used for QDI several times in task list"
    Please give your valuable suggestion onto this.
    Thanks
    Sumit

    It means you are sending down the same characteristic to an external system like LIMS more then once. 
    I believe this is a warning.  Not a hard error but I'm not 100%sure.
    Craig

  • I want to add LOV of Contract Number in quality plan.

    need helping query to add LOV of Contract Number in quality plan which is dependent on invoice number

    FYI - the OP has failed miserably to provide even enough information for us to recommend the proper forum.
    Is it:
    {forum:id=82}
    {forum:id=83}
    {forum:id=210}
    {forum:id=137}
    or something else?

  • Quality plan deleted  can it be retrieved? URGENT please

    dear qm friends,
    by mistake instead of deleting a material assigned to a quality plan the user deleted the quality plan  group
    can it be retrieved?
    when trying to create or copy similar quality plan again it is giving another group counter number  
    is there any way to retrieve the deleted quality plan group ?
    regards,
    madhu kiran.

    depending on how your account is set, maybe.
    In the mail app you will see the account, and then below that, the account listed again. Tap on the lower one and you may see a trash folder. You may find your mail in there.
    Also, depending on your account and how it's set up you may be able to access the trash via safari. for example I can go to yahoo.com and access my trash. However stuff stays in there a random amount of time. And if you account is set to delete it off hte server when you delete it from the mailbox then it may be gone.

  • Want to add LOV in Contract NUmber in Quality Plan.

    need some helping query to add LOV in Contract Number in Quality plan which have relation with invoice number.

    usman777 wrote:
    need some helping query to add LOV in Contract Number in Quality plan which have relation with invoice number.What is an LOV?
    What is a contract number?
    What is a quality plan?
    This is an SQL and PL/SQL forum..
    Better you put the issue in relevant forum. This is the Forum Home, where you can find all the available forum links
    if you mean, a list of value in oracle Forum, check in Forms forum:{forum:id=82}
    I would also suggest you to read the FAQ - {message:id=9360002}

  • Quality Plan

    Hi All,
              I have a query,I have a scenaro where the one material is supplied by 4 different vendors,my client is asking me to creat one quality plan.And each vendor's material need to be inspected with different MIC,like 1,2,3.......10.For first vendor 1,3,5.second with different MIC.
             Please let me know how this can be achieved with one Plan,is this possible,if yes please let me know how to be achieved.If not please let me know what to do ?
    Thanks and Regards,
    vj

    Hi
    This is possible by two ways.
    1.first one is simple but in this case task list will be with one gruop & 4 different group counter.
    so there will be 4 task list with respective vendor MIC's
    Also in Material assignment tab of task list you have to put corrospending vendor.
    2.Use Dependet charecoristics:
    Make one task list ,But depending upon the vendor assign the dependent char(MIC's ) which will contain the vendor also.
    suppose the commn char are 4,6 & 10.Then in task list only maintain these char.
    now in dependent char you can put 1,3 & 5 with relevent vendor ...so for next vendor.
    But if char to be checked are drastically different then go for one group & 4 group counters.
    Regards
    Sujit

  • Changed MIC in quality plan for new lot.....

    Hi All,
    I created quality plan for one material and did result recording.
    Now again new lot is created for same material but this time I donu2019t want to check same MIC what I did last time.
    I deleted the pervious MIC and added new MIC what I want to check. After doing that again I went to QA32 to do RR for new MIC but its showing pervious one.  
    So what I have to do.
    Please suggest me.
    Regards,
    Siddharth shanker

    Dear Siddharth,
    I created quality plan for one material and did result recording.
    No issue this  is fine.
    Now again new lot is created for same material but this time I donu2019t want to check same MIC what I did last time.
    If you don't want to check same MIC's there are two options :
    a) Go to insp plan delete / overwrite the MIC and save,  please ensure that  your lot is generated after this change is made. new plan will be applied.
    b) Make a separate  task list  with  other set of MIC's  and while assigning the task list  to inspection lot you can select the desired one.
    I deleted the pervious MIC and added new MIC what I want to check. After doing that again I went to QA32 to do RR for new MIC but its showing pervious one.
    Pl check when  the lot has been generated, if it is generated  before you have done the changes  then  lot will not show new MIC's. for that you have to go to QAC3 to reset the insp lot.
    Best Regards,
    Shekhar

  • Quality planning

    Hi, What are the types of quality planning in QM Module and where to set those in master data?

    Hi Yadav YS,
    These link should provide you the requested information.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a6/df293581dc1f79e10000009b38f889/frameset.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/61/2db434d6e3681ae10000009b38f83b/frameset.htm
    assign poins if usefull
    Thanks and Kind Regards
    Mohan
    Edited by: Mohan Kumar K on Sep 15, 2008 1:09 PM

  • Quality data for stock uploading using movement type 561

    Hi,
    As system Go-Live business wants to have quality certificate for all FG from SAP. But part of data for quality certificate is of intermediate materials which is already conumed for production of FG so stock is zero for batch of consumed SFG. (ALL FG AND SFG IS BATCH MANAGED). We can upload FG part of quality data require for certificate as FG stock with batch number will be uploaded as initial stock upload with 561 goods movement. But how to manage SFG part of quality data, as stock for consumed batch of SFG will be zero and hence can not have inspection lot for SFG batch.
    Can anyone suggest how to upload quality data for material?
    Help to resolve this issue will be rewarded with points.
    Thanks and regards,
    Devang

    Hai PK,
    For Plant to plant stock transfer, follow the below steps,
    1) create STO in ME21N with Item category U
    2) create delivery document
    3) PGI
    4) create Excise Invoice
    5) create Billing document
    6) GR at receiving plant referring delivery doc. and perform Excise capture simultaneously or separately
    Hope it will helps you..
    Thanks & Regards,
    Kumar

  • Quality plan as per production version

    Hi SAP gurus,
    My client has multiple Production versions and they want to use different Quality plan as per version , how  I can map this process in SAP.
    I tired using in production version by putting Qualiity plan instaed of routing,  Inpection lot is created but when it come for the production order it was asking for the routing / or operation generation.
    As few specfication of Quality plan is different , that is the reason Plan has to be specific to PV.
    Thanks in advance.

    Hi
    Even if you create a Inspection plan you might have observed in the production version you have to specify the Routing.
    Reason is syem will check the routing for cost collector in production order.
    what you can do is may be you can carry out inprocess inspection with routing & specify the char in the task list
    or
    You may have to go for userexit while selection of the task list you will select the appropriate task list with appropraite prod version
    Also if you creat two inspection plan with two gr counters & do not tick on "Auto Assign" in the QM view,
    System will create a lot of 04 with CRTD status.
    In QA02 you can go & manually attach the relevent task list.
    What you can do is create a Group with name of "prod version" itself.This will ease the attaching of the tak list to the the lot.
    I hope this will add some value.
    Regards
    Sujit

  • Quality plan shud attached automatically .....

    helloo ...
    here i am using make to order stratergy , in this lot size created for perticular process order , I want after lot size  has been created , QUALITY PLAN should get attached automatically to lot size  for the perticular custmer .
    pls reply me .
    AMOL WAGH

    dear ...
    I have already activated auto asssignment indicator , still it is not picking inspection plan & also, i will narrate the in brief i have created inspection plan & assigned customer to that inspection plan. when i am creating lot for that customer inthat lot that customer specific inspection plan not appearing for manual selection also. if it won't get attach automatically to that lot then atleast it should appear for manual selection, in my case it is not appearing
    waiting...
    amol

  • Mass Change of Uses in Quality Plan

    Dear SAPians,
                         How can we make a mass change in uses ( i.e. from '05' to '03' in Quality plans ) other then a use of LSMW. 
    Thanks.

    Dear Atul,
    It think if you are trying to copy the plan with CWBQM, don't try it. It will not work like that.
    But yes if you want to change any field of the inspection plan in mass it will work perfectly.
    You asked to change the usage of the inspection plans in mass, then it will surely work.
    Current Working Are: It defines.........
    - Which focus is to be used, that is which object type the selection criteria refer to.
    - Which object types can be displayed and processed.
    - Whether objects are automatically locked for changing by other users, and which objects these are.
    You can select any of the Wrok Area
    "Q_OPR_000000000010" Will have the focused are at Operation level of the Inspection plan and will lock the Operation level data for the Task list while you will be executing the workbench. at the other hand "Q_TSK_000000000010" will have focus at Header level data only and will lock the Header level details while working at CWBQM.
    Now it you have to decide what you want to do If you need only the operation level details to be locked for the Inspection plan and go with Q_OPR_000000000010 and If you wish the entire task list get locked, no one should access the task list from header level it self during the CWBQM execution, go with Q_TSK_000000000010.
    Don't put any data at "BASIC Selection Criteria"
    Where you have enter the task list type "Q", see just above this section, there is a Button "ADDITIONAL SELECTION CRITERIA"  is there, click on it and you will have more selection fields available.
    To change (Again I will say to change  not to Copy) the details at MIC level don't execute the "Load Task list" instead press "Ctfl + F7"
    Regards,
    Shyamal

  • Change Quality plan by changing MIC

    hi all,
    pls anybody can help me in following matter.
    my MIC is incomplete copy model and i have used it in 1000 Quality plans.
    now i want to make few changes in mic which i want in all 1000 plans.
    how can i do that with minimum efforts?

    Sandip,
    I would suggest you to create a new MIC and use transaction "QS27" to replace the old one with new one.
    Hope this helps...Reward your points and close the thread,
    Regards,
    Prasobh

  • Unable to pick correct quality plan

    Hi all,
    Z8 inspection type created (copying 08) and for the same material we have used std. STO inspection type 08.
    we have created Z09 movement type (copying 309 movement type). we have done 311 movement type(insp. type 08 activated )
    For a material we have activated both 08 and Z8 inspection type,  I have not done any preferred inspection type in the material master
    parallelly I have created task list z5 usage  for z8 inspection type and 05 usage for 08 insp. type.
    now my requirement is to pick z5 usage quality plan for z09 movement type + z8 inspection type combination
    already system is picking 05 usage quality plan for 311 movement type + 08 inspection type combination
    how to bridge this gap ?
    thanks and regards
    SARAVANAKUMAR. P

    Both the 309 and 311 material movements have an inspection origin of 08.  So your Z09 movement type will also have an 08 inspection origin.
    You have two inspection types (08 and Z8) assigned to the inspection origin.  The problem is that the system, regardless of the movement type, is just looking for an inspection type with an 08 origin.  It will find two.. 08 and Z8.  so it won't know which to take unless one is marked as preferred.
    If you want to pick the inspection type, then you would need to use a user exit to do this for you.  Probably user exit  QAAT0001 Inspection type determination different from variant 01.