Quantity proposal in batch selection

In batch search strategies you can select a quantity proposal routine to be used to allocagtge qtys to the proposed batches in a specific manner.
I'm trying to locate where you add/change/modify these routines.  The help file indicates these are maintained via transaction VOFM.  But under that I can't locate the specific quantity routines for the batch search strategies.  Maybe I'm just not seeing it or I'm in the wrong place.
Can someone point me in the right direction for this?  We need to config in custom quantity routines for our project.
This is an ECC 6.0 system.
Thanks,
Craig

Custom routines can be configured using VOFM but Standard SAP doesn't allow u to configure Quantity proposal in VOFM.We can configure Quantity Proposal Routine ....When u double click the Strategy type in the Quantity proposal Routine U have the Option to Maintain. Using this you can configure your requirement.
Reward Points If helpful.
Thanks,
Sudheer

Similar Messages

  • Quantity proposal in Batch determination

    Hi,
    We are doing the batch determination in Process order for Batch and HU managed Raw materials.
    I created two Process Orders
    Requirement for Raw Material A in Process Order 1 = 1000 Lbs
    Requirement for Raw Material A in Process Order 2 = 1200 Lbs
    Stock of Batch 101 for Raw Material A = HU Quantity = 1500 lbs
    When i do batch determination for Process Order 1, Batch 101 gets assigned for Qty = 1000 Lbs. I release the Process Order.
    But when i do Batch determination for Process Order 2, the entire quantity of 1500 Lbs shows available, instead of remaining qty of 500 Lbs, as 1000 Lbs is already reserved for Process Order 1.
    How do i make sure, that only difference is available for Process Order 2, i.e. only 500 Lbs?
    I checked the scope of availability check and found to be OK. I also tried different Quantity Proposals 1, 2, 3, 4, and 600. But ii does not give the desired result.
    Thanks in advance for your time.
    With Regards,
    Mangesh Kulkarni

    Hello Pavan and Sanil,
    Thanks for the response.
    Yes...if i create the Transfer Order (as the Raw Materials are HU managed), then the remaining quantity is proposed for the 2nd Process Order.
    But we want to do batch determination and release the all the Process orders, one day in advance for next day. Also we would like to create a collective Pull List for all the process orders for tomorrow and move all the materials together, instead of order by order.
    Is there any User Exit in quantity proposal, where it would check if that particular batch is already assigned to a process order and reduce it and make the leftover quantity available to the 2nd process order?
    GI through MB1A would happen after the production is executed and it would be too late then to propose the leftover quantity to the next process order, create a pull list and then stage the material to the shop floor storage location. Ours is a continous production.
    Appreciate your feedback in advance.
    With Regards,
    Mangesh Kulkarni

  • Batch Quantity Proposal during SL Transfer

    Hi
    In MIGO, when moving a material which is stored in batches from one storage location to another (mvt 311), is it possible to have the system propose the quantity to be moved, based on the batch number entered?
    The reason for this is that we are always moving full batches, and would like to avoid the step of looking up the quantity in each batch, before having to enter it in MIGO.
    Best Regards
    Nicolai

    Hi,
       System wont know the quantity to be moved and hence the system wont propose the quantity to be moved. It is the user who decides the quantity to be moved and he has to enter the quantity manually.
       If you are always transferring the full batch quantity, you may go for development if required. Check the stock quantity for the material and batch in the supplying storage location from MCHB table and propose the quantity by default when the movement type is 311. I would recommend to make the quantity field editable, even if you propose the default full quantity. Please note that the same batch can exists in different stock types / special stocks etc. These cases also should be taken care.
    Regards,
    AKPT

  • Same batch selected in two different Deliveries

    Dear all
    I have a problem in Outbound delivery creation..
    I have created 2 different outbound deliveries. While creating & Batch determination of first outbound delivery  Batch number X with qty 100 is selected. Then it is saved with out PGI.
    when i create the second outbound delivery also the same batch number X with qty 100 is selected. Actually it should not happen. Because i have total stock of Batch no X is only 100.
    Please guide me how to solve this issue.
    Regards
    Bala

    you might have selected bacth but not completed picking thats why system allowed another batch selection with same quantity. pIcking reserves the quantity. Hope this will help you.
    Thanks & Regards
    Amit

  • In prod order multiple batch selection for my raw material /sf possible

    Dear All,
    One of problem I am facing is regarding multiple batch selection .
    Scenario is like this
    Finished prdt _ FMBLD003         
    RAW matl  -      2RCH001
    In prodn order my BOM requirement quantity for 2RCH001 IS 75 kg , I have material available in stock in  three diffrent batches
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg  
    I can select any one batch at a time. Is there any option or possibility available wherein we can select multiple batches .
    or Is there possibility that system should automatically split bom quantity as per the batch quantity available shown below
    40       0000111
    15       0000112
    20       0000113
    I tried but didnt found possible solution.
    Please suggest .
    Edited by: sapitheprabhu on May 3, 2011 7:28 AM
    Edited by: sapitheprabhu on May 3, 2011 7:48 AM

    Dear Prabhu,
    When do batch determination you maintain req qty against to batch number in batch determination co: select batch.
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg
    Jainashu

  • Auto batch Selection in MB1B

    Hi All,
    We want Auto Batch selection on FIFO Basis while transfering the Material to Sub Contracting Vendor through TCode MB1B.
    Thanks in Advance........
    Sanjay

    Hi,
    I'm addin to Mr. Jürgen L. input. once you will put * and execute system will brin all live batches with quantity and will do the spliting of it also. but it will not in FIFO based.
    So Lets try this and see how system behave
    1. Do the setting on 541 movment in "Logistics - General-> Batch Management-> Batch Determination and Batch Check->Batch Search Procedure Allocation and Check Activation->Allocate IM Search Procedure/Activate Check" Here allocate your IM seach procedure & put check batch tick on.
    2. maintain the batch serch strategy in MBC1 with the ME01 or if you are having any customized condition type then maintain for it.
    now try MB1B
    Rgds
    S

  • Batch Selection

    Dear everyone,
      I set the company use the Batch to handle the items.  Therefore,  when i set the quantity in good receipt or good issue.  The batch selection or creation form is shown.  In SDK, how could i know this batch form is triggerd by which module or parent form??
    Regards,
    Kit

    Hi Kit,
    You could catch the form deactivate event on the forms you are interested in and set a global variable that you read in the batch selections form.
    Regards
    Ad

  • Where can I find 'Exit to quantity proposal' routine in 3.1i

    Hi All
    I'm working on 3.1i and trying to create new routine for automatic batch determination process. But I'm unable to find its transaction code.  I have verified VOFM, it is not there .
    Please inform tcode or path where I can find batch determination routines.
    ThanQ

    Custom routines can be configured using VOFM but Standard SAP doesn't allow u to configure Quantity proposal in VOFM.We can configure Quantity Proposal Routine ....in SPRO when u double click the Strategy type in the Quantity proposal Routine U have the Option to Maintain. Using this you can configure your requirement.

  • Batch Selection config. in Excise Invoice Creation (J1IJ) at Depot in CIN

    Hi,
    In the business scenario that I have to map in SAP system stock transfer occurs from Plant to Depot. Then the batch is split at the Depot and minor changes are made to characteristic. These individual small batches and then sold to the end customer from depot.
    <b>Problem:</b> If the batch number is kept the same at depot as the incoming batch number, system is able to find the incoming invoice in J1IJ. If the batch number is changed (to mark individual characteristic) then the system in not able to idetify the incoming batch.
    Please help...
    In SAP help link http://help.sap.com/erp2005_ehp_02/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm I could find mention that "You can also automate this procedure, using the batch selection program (J_1IJCHK), by making the appropriate Customizing settings in the Country Version India (CIN) Implementation Guide (IMG)." Can anyone help by elobarinting what specific configuration is to be made for batch selection?
    Thanks
    Rajat

    Hi,
    SAP has released a SAP note 1001446 which can be implemented for your requirement. There is an user exit J_1I7_USEREXIT_BATCH_CHK_FLAG which has the parameter NO_BATCH_CHK_FLAG. If you pass the value ' X' to the parameter NO_BATCH_CHK_FLAG then the batches will not be  checked during J1ij. you can implement this user exit through SE37.
    Regards,
    Murali

  • BAPI for Automate direct debit proposal creation for selected customers.

    Hello ABAP Gurus,
    Requirement is - Changing the process for Automate direct debit proposal creation for selected customers from a custom BDC program to a BAPI.
    Explanation -
    Currently as per the process, we are using a BDC call transaction program for F110 - Automate direct debit proposal creation for selected customers. The main pupose of this BDC program is to automate F110 Bank Run for A/R (Selected Customers Only). It creates payment proposal which is the first step in order to create payment runs.This program will run in background.
    We wanted to change the process from a BDC call transaction process to a BAPI call . In this process I am trying to chase for a valid BAPI in order to sync to my requirement.
    It would be appreciate for your << removed >> response.
    Thank you.
    Regarsd,
    Kumar.
    Edited by: Rob Burbank on Nov 11, 2009 3:33 PM

    Hello gurus,
    Is there any implicit or explicit enhancement point for F110 process or is there any alternative for payment proposal creations?
    is there any BAPI for F110 functionality?
    can you please let me know.
    Thank you
    Regards,
    Kumar.

  • Sourcing: Propose sources for selected items

    Hi
    I am running SRM 7.0 in classic scenario - for now in a demo environment. I try to figure out how the sourcing work if I have contracts.
    I creates a central service contract in SRM. This is not replicated to backend at the moment but do it have to be replicated to backend to be proposed as source for my shopping cart in the sourcing cockpit?
    I have created a contract in backend (and only in backend) and this is visible in "Propose sources for selected items"
    Another issue I have is in the following process.
    1. A user creates a SC with a service item (text item)
    2. This goes to Purchasers worklist
    3. Purchaser creates RFx and select bidders
    4. The bidders respond
    5. The Purchaser select the best offer and creates a contract.
    6. The SC is not possible to order anymore so the Purchaser creates a copy of the original SC (on behalf of the user who create  the SC in the first place).
    7. I expect that the contract I created in bullet 5 would be proposed as source of supply in the new SC but it isn´t :-(
    I therefore wondering if it is because the contracts is not replicated to backend at the moment?
    Note:
    I order a text service item and I have filled the Supplier Part number in both the contract and SC but this do not help.
    Hope anyone can help me

    Hello,
    If you are using classic scenario, only backend contracts will be proposed as SOS.
    This means that if you create a central contract in SRM, it should be replicated to ECC in order to be used as source of supply.
    SRM contracts can be used as SOS only in case of extended classic and local scenarios.
    Regards,
    Ricardo

  • Batch selection as per expiry date

    Hi,
    Please have alook at my requirement and suggest the possible solution.
    We have raw material which is handles in batches. Let's say a raw material has three batch in the stock M1, M2 and M3.
    M1 expiry date is on march10,  M1 expiry date is on april10,  M1 expiry date is on June 10.
    So when i create a process order system should always pick a batch for which expiry date is close. That is it should select batch M1.
    Please let me know if it is possible.
    Thanks,
    Dutta

    Hi Debasish,
    Please follow the given below link. I hope this will serve your purpose.
    Re: BATCH SELECTION DURING ISSUE
    Regards,Kundan

  • Constrain delivery quantity "0" in Batch Split item of DN

    Hi all,
      I have been done a "0" constrain on delivery quantity in items of DN which means there will never be "0" delivery quantity in item of DN. But in Batch Split situation , user can still make the delivery quantity "0" in batch split item and save the DN.
      So, can anyone tell me how to constrain the "0" in batch split situation.

    Hi..
    In 0VLP Check configuration related to BOM..
    Test the possibility...
    Reward if u finds this as USEFUL...
    Regds
    MM

  • Automatic Batch Selection.

    Dear Frndz,
    For a production order, all the raw materials are kept backflush, these raw materials are also batch controlled.Now while reporting the production order, the system throws error in material movement to choose the batch numbers of the rawmaterials.Can we make this batch selection to be done automatically based on some factors.If so, pls help with step by step procedure to do it.
    Regards,
    Srini

    Hi,
    pls refer
    /community [original link is broken]
    Regards,
    Sheik

  • Batch selection in production order compoent overview

    Dear Friends,
    when i see production compoent view ,inwhich there is selection for storage location & batch.
    when F4 for storage location field ,i get storage location available qty
    but when F4 in batch selection field,i dont get batch available stock,just showing batch number
    How can i get batch numebr along with storage loacation qty & also if batch have classification values
    how can i see them with batch stock
    We dont using batch determination.
    Thanks in advance
    Umesh
    Edited by: umesh kadu on Nov 23, 2010 4:01 PM

    Hello Umesh,
    you can create a special search help using a view on MCHB structure, selecting only those records with CLABS > 0 eg. View: Z_MCHB_F4HELP with fields MANDT. MATNR, WERKS, LGORT, CHARG, CLABS, MEINS and condition CLABS > 0.
    Then create an elementary search help using this view and add it to the collective search help MCH1.
    If you press then F4 on the batch you can choose the new search help and select the batch of the materials with stock.
    Best regards
    Rabanus Diehl

Maybe you are looking for