Reg Completion of 57F(4) Challan

Dear Gurus,
                    In our plant for internal / external job 57f4 challan will be made, and while receiving the stores person doesn't mention the challan no . in the grn so unable to de reconcilation and completion of the challan, the stock provided to vendor also not consumed. Kindly help me to reduce the stock provided to vendor and completion of challan
Thanks in advance
Vasant

Cancel GR,It will reverese,if not post error message here.
or
Get a confirmation from subcontractor,stock is not lying with them,then discuss with FI peoples,
Consult with excise consultants for excise impact.
Do physical inventory adjustment for special stock - 'O'.
Do necessary settings for movement 701 along with movement type group.
Reconcile challan using J1IFQ & complete it.
Edited by: Jeyakanthan A on Apr 7, 2011 11:44 AM

Similar Messages

  • Reg completion of PI sheet

    Dear all,
    When  should  we complete a PI sheet in a process order.
    Thanks in advance

    Hi,
    You cannot "complete" a PI Sheet if there are open entries i.e. if fields are not locked you cannot "complete" a PI Sheet.
    However, even with open entries you can "Technically Complete" a PI Sheet.
    You can complete the PI sheet there are no open entries

  • Reg:challan creation for 701 movement type

    Dear All,
    Is there any possibility to create challan referring to the 701 movement type I've included the movement type for sub transaction type in SPRO but even then it is not allowing is there any possibility ?
    Reg
    VVK

    Hi
    U can create challan for 701 mvt.
    Make sure the mvt 701 is included in subcontracting issues group type with spl stock indicator O.
    make sure all other settings for subcontracting are correct like number ranges for series group of subcontracting, excise a/c for 57fc with subtrabsaction 01.
    Check  and revert with the problem u face bcoz i tried in my system and it worked.
    Reg
    Raja

  • 57FC Challan Reconcillation Completed.

    From last 4 days while creatiing GR with 101 movement agaisnt subcontact purchase order, we are not able to enter subcontract challan, system is giving error. " Document Number .......... not valid for reconcillation : already completed.
    After checking table J_1IEXCHDR in T-code SE16N, it has been observed that all 57FC challan has been changed on 07.03.2010 by one of our SAP user id. Status field is 'C' completed for all 57FC challan. Due to this system is not allowing to enter 57FC doc. number in MIGO refer subcontacting challan.
    User has used the following T-codes on 07.03.2010, also he is not able to tell how this completed indicator status has been updated to all 57FC challan.
    J1IF11
    J1IF12
    J1IF13
    J1IFQ
    J1IFR
    Please give your valuable comments on above, we want to find out How the mass changes has happen to 57FC challans.
    Regards,
    Shekhar Gaikwad

    hii
    SOme time this will happen in out statndard SAP system.
    This because of program problem with other scenario or some indirect affect in system will cause this kind of problem.
    So better take of help of technical consultant and do changes in the table of challan status , do necessary changes and then follow the reconciliation procees .
    Revert any clarification.

  • Removing complete Challan Mapping data from system

    Dear Consultants,
    My client has entered erroneous data for challan mapping. When I checked the data, I found that there is some difference in the Challan amount & available amount. It means there are some employees mapped for these challans. but the main page of CMAP shows employees mapped = 0. When I tried to delete the challan data, system says, there are some employees mapped to these challans.
    When on the last node of CMAP, I tried to select all employees on the right hand & click on the arrow from right to left, no amount of challans was changed.
    May I know how to delete the entire mapping data from the system?
    regards,
    Bindumadhav

    Dear MVR,
    The reply by Mr.Deepak is as follows. :
    Dear,
    Regarding your query, the issue reported by you basically happens due to inconsistent mapping or unmapping of the employees to the Challan.
    We would suggest you to kindly delete of the negative entry from the table 'T7INTE'. You also need to delete the entries from the table PCL4 as well for the corresponding challan for which the negative entry has been created. Performing the above suggested steps will remove the reported inconsistencies. After deleting the entries completely, kindly perform the Challan mapping for the employees again. Please make sure that you are not deleting the entry from the table for which Form24Q
    has already been generated. The deletion process can be explained as such:
    1. Execute the transaction 'se16'. Go to the tables mentioned above. You can execute the table 'T7INTE' with the TAN number. On execution, a negative entry will be displayed for a particular challan. Select that entry and delete of the entry from the table.
    2. Go to table PCL4. Execute the table with relid as 'I1' to 'I2' and the TAN number in the field 'SRTFskindly performing the mapping action again. Hopefully, following the above mentioned steps will resolve the reported inconsistency and you will be able to perform the mapping successfully.
    Best Regards,
    Deepak..
    I can see some entries. But the system does not allow me to delete the table entry from T7INTE & PCL4.
    Regards,
    Bindumadhav

  • Error: subcontracting challan - J1IF01 / J1IF

    Dear SAP Gurus,
    While creating subcontracting challan through tcode: (J1IF01), i am getting following error.
    "Error Msg: 8I802: Please specify the number of line items for the challans". for which I have maintained the following setting in subcontracting attributes
    "57FC-57FC CHALLAN-180-0001-0002-999-01-Assessable value Table First then Excise Invoice-J1IF"
    Also I tried the Solution suggested in the forum, using Tcode: J1IF - its giving following error msg as
    *"Error Msg: 8I402:Excise modvat accounts not defined for 57FC transaction and excise group". *
    But I have defined the modVAT account for the combination of excise group, ETT-57FC and G/l Account in path Specify G/L a/c for excise transaction
    Kindly suggest the solution.....
    Regards,
    Prashanth Pai

    Hi
    57CM     57F CHALLAN COMPLETION
    57FC     57F CHALLAN CAPTURE/CHANGE
    57NR     57F NON RECEIPT
    ARE1     EXPORT PROCESSING UNDER ARE1
    ARE3     DEEMED EXPORTS UNDER ARE3
    CAGI     CAPITAL GOODS ISSUES
    CAPE     CAPITAL GOODS
    CEIV     CANCELLATION OF EXCISE INVOICE
    DIEX     DIFFERENTIAL EXCISE THROUGH JV
    DLFC     GOODS REMOVAL THROUGH SALES
    EWPO     EXCISE INVOICE WITHOUT PO
    GRPO     EXCISE INVOICE FOR GOODS RECEIPT/PO
    MRDY     REVERSAL WITHOUT REFERENCE
    MRRD     REVERSAL INCASE OF COMSUMPTION OTHER THAN PRODUCTI
    MRWO     CENVAT REVERSALS FOR WRITE OFF
    OTHR     EXCISE INVOICE FOR OTHER MOVEMENTS
    TR6C     PLA ACCOUNT ADJUSTMENT THROUGH
    UTLZ     FORTNIGHTLY PAYMENTS
    Also maintain the accounts against the subtransaction types.What I see in your case is that you have not maintained the subtransaction type 01 against your suncontracting attributes
    Regards
    Sandeep

  • Subcontracting challan reconcilation & re credit

    Hi,
    Please suggest me about Subcontracting challan reconcilation & re credit in case material is recieved after 180 days. how challan is handled & regarding credit what needs to be done.
    We can reverse challan & reconcile using j1ifq but what steps to be followed in case of paying excise amount.

    Hi,
    follow following steps-
    1.TCode-j1if13.-Complete/Reversal/Recredit- Reverse challan.
    All duties will get reversed.
    2.TCode-j1if13.-Complete/Reversal/Recredit- Recredit challan.
    All duties will get recredited.
    3.Create GR for the purchase order and provide the reference of Challan created.
    4.Reconcile and Complete the Challan
    5.Check RG23A part 2 entries for transaction type 57NR and 57RC in table J_1IPart2
    6.Extract RG23A Part 2 register and download the entries in excel through J2I6
    regards

  • Challan Reconcilation after 180 days.

    Hi all,
    How to Reconcile the material document with Challans
    what is the process if the challan is not completed within 180 days.
    case -01   FG material document is posted after 180 days completion after making the challan.
    case-02     FG material document is posted within 180 days but challan is not reconciled  (or) not Completed, Can it be reconciled after 180 days completion.
    With Rgds,
    Krishna

    Hi Piyush,
    whether the challan is tobe reconciled even after Reversing or what?
    I have one more query ,
    One of my user in MIGO for a particular material document have un-checked the components @  the time of receipt of a particular FG item.  where as for the remaining FG parts  - components exist within a material document.
    but my problem is system is not allowing me to reconcile the remaining component , it is throwing warning message for the FG material for which  components are not consumed.
    With Rgds,
    Krishna.

  • Prob. in challan de mapping

    When de map the challan of March month
    It shows
    Unable to save challan mapping due to negative entry in Total Number of Employees Partially Mapped

    Hello
    Regarding your query, the issue reported by you basically happens due to inconsistent mapping or unmapping of the employees to the Challan.
    We would suggest you to kindly delete of the negative entry from the table 'T7INTE'. You also need to delete the entries from the table PCL4 as well for the corresponding challan for which the negative entry has been created. Performing the above suggested steps will remove the reported inconsistencies. After deleting the entries completely, kindly perform the Challan mapping for the employees again. Please make sure that you are not deleting the entry from the table for which Form24Q
    has already been generated.
    The deletion process can be explained as such:
    1. Execute the transaction 'se16'. Go to the tables mentioned above. You can execute the table 'T7INTE' with the TAN number. On execution,a negative entry will be displayed for a particular challan. Select that entry and delete of the entry from the table.
    2. Go to table PCL4. Execute the table with relid as 'I1' to 'I2' and the TAN number in the field 'SRTFD' as 'TAN number'. On Execution, you will find all the employees mapped to that particular TAN with the corresponding period dates. Delete of the entries for the period for which there existed a negative entry in the table 'T7INTE'.
    3. After deleting the entries successfully from both the above tables, kindly performing the mapping action again.
    Thanks and Kind Regards
    Ramana

  • Material return challan

    Hi Guru's,
                   I have to make material return challan in smartforms. plz provide detail step by step.
    Thanks & Regards,
    Tekchand
    Edited by: Tekchand on Dec 8, 2011 8:39 AM
    Moderator message : Requirments dumping not allowed, show the work you have already done.  Thread locked.
    Edited by: Vinod Kumar on Dec 8, 2011 1:14 PM

    Hello,,
    usualy subcontractor doesnt return or Cancel the component
    u need to follow following steps-
    TCode-J1IF13.-Complete/Reversal/Recredit- Reverse challan.
    All duties will get reversed.
    TCode-J1IF13 Complete/Reversal/Recredit- Recredit challan.
    All duties will get recredited.
    I  mean first cancel challanJ1IF11check--and cancel the challan and through MIGO cancell Material; document.
    or  As per excise saturatory norms rules u have to sell this material to vendor for this Create Outgoing excise invoice through J1IS.
    Regards
    Mahesh Naik.

  • Automatic Reconciliation of Subcontracting Challans

    Dear SAP Gurus,
    Is at possible to reconcile and complete/reverse the subcontracting challans automatically after MIGO?
    If yes, please guide me over this.
    Regards,
    nitin
    Edited by: NITIN RAUT on May 6, 2008 12:55 PM
    Edited by: NITIN RAUT on May 6, 2008 12:58 PM

    Hi
    Challan numbering will be per excise series group.
    Please check the org data fed during creation of challan through J1IF01.
    Warm regards
    sairam akundi

  • Deleting challan details in PC00_M40_CMAP

    Hi SAP Gurus,
    when I am trying to delete challan details in the 3rd step of pc00_m40_cmap, it is showing the following message "first unmap all the personnel numbers mapped with the challan" and in the 4th step after selecting all the tax deduction details and all the challan details and clicking the left sided arrow in between it is not unmapping and the message is "challan mapped to tax deductions of ofcycle run".
    Can anyone find solution how to delete the challan details in 3rd step ?
    Thanks in advance.

    Dear,
    Regarding your query, the issue reported by you basically happens due to inconsistent mapping or unmapping of the employees to the Challan.
    We would suggest you to kindly delete of the negative entry from the table 'T7INTE'. You also need to delete the entries from the table PCL4 as well for the corresponding challan for which the negative entry has been created. Performing the above suggested steps will remove the reported inconsistencies. After deleting the entries completely, kindly perform the Challan mapping for the employees again. Please make sure that you are not deleting the entry from the table for which Form24Q
    has already been generated. The deletion process can be explained as such:
    1. Execute the transaction 'se16'. Go to the tables mentioned above. You can execute the table 'T7INTE' with the TAN number. On execution, a negative entry will be displayed for a particular challan. Select that entry and delete of the entry from the table.
    2. Go to table PCL4. Execute the table with relid as 'I1' to 'I2' and the TAN number in the field 'SRTFD' as 'TAN number'. On Execution, youwill find all the employees mapped to that particular TAN with the corresponding period dates. Delete of the entries for the period for which there existed a negative entry in the table 'T7INTE'.
    3. After deleting the entries successfully from both the above tables, kindly performing the mapping action again. Hopefully, following the above mentioned steps will resolve the reported inconsistency and you will be able to perform the mapping successfully.
    Best Regards,
    Deepak..

  • Excise Trasaction types for Part II

    Dear All,
    which trasaction types are considered in RG23A - part II register.
    Regards,
    Vimlesh

    thanks this is useful information to me, but can you reply me from below total list of transactions which one are relavant to RG23A-part II entries.
    57CM      57F CHALLAN COMPLETION
    57FC      57F CHALLAN CAPTURE/CHANGE
    57NR      57F NON RECEIPT
    ARE1      EXPORT PROCESSING UNDER ARE1
    ARE3      DEEMED EXPORTS UNDER ARE3
    CAGI      CAPITAL GOODS ISSUES
    CAPE      CAPITAL GOODS
    CEIV      CANCELLATION OF EXCISE INVOICE
    DIEX      DIFFERENTIAL EXCISE THROUGH JV
    DLFC      GOODS REMOVAL THROUGH SALES
    EWPO      EXCISE INVOICE WITHOUT PO
    GRPO      EXCISE INVOICE FOR GOODS RECEIPT/PO
    MRDY      REVERSAL WITHOUT REFERENCE
    MRRD      REVERSAL INCASE OF COMSUMPTION OTHER THAN PRODUCTI
    MRWO      CENVAT REVERSALS FOR WRITE OFF
    OTHR      EXCISE INVOICE FOR OTHER MOVEMENTS
    TR6C      PLA ACCOUNT ADJUSTMENT THROUGH
    UTLZ      FORTNIGHTLY PAYMENTS
    Regards,
    Vimlesh

  • Sub-transaction type configuration in CIN..?

    Hi all
    Can anybody explain me , how to configure the subtransaction type in CIN-MM.
    Please explain me step by step with example.
    Thanks
    sap-mm

    hi
    Use of sub transaction type is to assign different account for the same excise transaction type.
    e.g
    say for inport Purchase u want ADC account instead of AED account .
    but excise transaction type is same which is GRPO.
    now u can create one sub transaction type 01 by coping GRPO and its account assignment then u can change AED account by ADC.
    so when u post Import Excise invoice then by putting GRPO 01 as the combination values posted to the ADC account instead of AED account.
    57CM     57F CHALLAN COMPLETION
    57FC     57F CHALLAN CAPTURE/CHANGE
    57NR     57F NON RECEIPT
    ARE1     EXPORT PROCESSING UNDER ARE1
    ARE3     DEEMED EXPORTS UNDER ARE3
    CAGI     CAPITAL GOODS ISSUES
    CAPE     CAPITAL GOODS
    CEIV     CANCELLATION OF EXCISE INVOICE
    DIEX     DIFFERENTIAL EXCISE THROUGH JV
    DLFC     GOODS REMOVAL THROUGH SALES
    EWPO     EXCISE INVOICE WITHOUT PO
    GRPO     EXCISE INVOICE FOR GOODS RECEIPT/PO
    MRDY     REVERSAL WITHOUT REFERENCE
    MRRD     REVERSAL INCASE OF COMSUMPTION OTHER THAN PRODUCTI
    MRWO     CENVAT REVERSALS FOR WRITE OFF
    OTHR     EXCISE INVOICE FOR OTHER MOVEMENTS
    TR6C     PLA ACCOUNT ADJUSTMENT THROUGH
    TR6C     PLA ACCOUNT ADJUSTMENT THROUGH
    check following doc
    http://help.sap.com/bp_bblibrary/600/html/J05_EN_IN.htm
    page no 153
    regards
    kunal

  • EXCISE MODVAT ACCOUNTS NOT DEFINED

    Dear all,
    At the time of goods receipt, I am getting the following error:
    "Excise modvat accounts not defined for GRPO"
    Can anyone suggest me a solution for this problem?
    Regards,
    A.Anandarajan.

    Hi Anand,
    SPRO>Logistics - General>Tax on Goods Movements>India>Account Determination>Specify G/L Accounts per Excise Transaction
    You assing GL accounts for for  your transaction
    57CM     57F CHALLAN COMPLETION
    57FC     57F CHALLAN CAPTURE/CHANGE
    57NR     57F NON RECEIPT
    ARE1     EXPORT PROCESSING UNDER ARE1
    ARE3     DEEMED EXPORTS UNDER ARE3
    CAGI     CAPITAL GOODS ISSUES
    CAPE     CAPITAL GOODS
    CEIV     CANCELLATION OF EXCISE INVOICE
    DIEX     DIFFERENTIAL EXCISE THROUGH JV
    DLFC     GOODS REMOVAL THROUGH SALES
    EWPO     EXCISE INVOICE WITHOUT PO
    GRPO     EXCISE INVOICE FOR GOODS RECEIPT/PO
    MRDY     REVERSAL WITHOUT REFERENCE
    MRRD     REVERSAL INCASE OF COMSUMPTION OTHER THAN PRODUCTI
    MRWO     CENVAT REVERSALS FOR WRITE OFF
    OTHR     EXCISE INVOICE FOR OTHER MOVEMENTS
    TR6C     PLA ACCOUNT ADJUSTMENT THROUGH
    UTLZ     FORTNIGHTLY PAYMENTS
    Best Regards
    Ashish Jain
    Message was edited by:
            Ashish Bohara

Maybe you are looking for

  • Problem in setCursor as WAIT_CURSOR

    I have one swing application in which cursor is changed through setCursor() at every action_performed. My problem is if When some process is going on the Cursor changes successfully to Wait Cursor but if during the process if i move cursor to the Tit

  • Flatfile/ XML upload for Measure Builder ...

    Folks, I was wondering if a mechanism exists to undertake Flatfile/ XML upload of Measures without having to create individual Measures in the Builder ... I'm assuming that someone (or several people) must've encountered and addressed such situations

  • Twitter crushed and can't do anything

    after i sign in to my twitter account , it's shows all things are normal and fine , <br /> but if i went to " @CONNECT , #Discover , ME " <br /> i can't reply , i can't retweet , i can't click on the tweet to show images <br /> also i tried so hard t

  • Mission Control - What a horrible experience

    First off, I am a long time OSX user dating back to the initial release. Each iteration of the the OS has generally built upon the features of the prior version, and usually included new, exciting, usable features. Mission Control in Lion adds some n

  • Why does the clone tool not work? I just installed elements 9.

    I bought photoshop elements through an online vendor and just trying to put it to use. The clone tool does not work at all. I have photoshop elements 5 on my computer, which I kept even after installing version 9. It works.