hi,
i know how to give dynamic values to the dates in a variant
but when the same thng i am trying in ECC 5.0 then a diiferent screen is coming and while assigning dynamic values to the dates, whenever i am giving a date less than the system date its always saying
<b>lower limit is greater than upper limit</b>
even when in the date from i am giving ( system date - 60 ) and in date to i am giving  ( system date + 45 )
its saying lower limit is greater than upper limit.
Can anybody help me in this issue
if anyone can try it out in ECC 5.0 and send me the screen shots that will be a great help
waiting for your reply

Hi Ashish,
Following are the steps :
1. While saving the variant, Goto the Selection Variable column in the table and specify the value as 'D' after selecting from the F4 Help given for the column.
2. Then in the last column 'Name of Variable' , click on the F4 Help provided.
3. In the given options select the option Current Date - xxx, current date + yyy.
4. When u double click on the option it asks for the values of xxx and yyy.
5. Give values say xxx = 3 and yyy = 4.This will display the current date - 3 days and current date + 4 days as the select-option parameters.
6. Save the variant.
Hope this helps u.
Regards,
Himanshu

Similar Messages

  • Regarding dynamic values of dates in variant

    hi,
    i am assigning dynamic values to the dates in my variant
    but i am unable to give the date more than the system date,if am am giving dates less than the system date it is accepting but when i am givng a date that is greater than the system date then it is not taking the values and saying please assign a numeric value.
    so please can anyone help me in this

    its now was doing a silly mistake
    but now its working fine

  • Company code ZG01 is not assigned to a fiELD status variant

    HI,
    I have created company called 'zg01'.
    when i try to create a GL ACCOUNT FOR this company using (FS00) i am getting the following error.
    Company code ZG01 is not assigned to a fiELD status variant.
    FOR YOUR INFORMATION I HAVE CREATED COA  and assign the same to the company ZG01.
    Please suggest....
    also suggest  how to i transport GL Accounts used by other companys of my system to my newly created company code : zg01.
    so that i can save creation of GL ACCOUNT.

    You have to maintain field status variant and assign it to your company code. This is required for GL master data.
    1. Define Field status variant in SPRO>Financial Acctg>Financial Acctg Global Settings>Document>Line Item>Controls>Define Field status variant. You create the field status variant and the field status group.
    2. Assign the Field Status group to your company code SPRO>Financial Acctg>Financial Acctg Global Settings>Document>Line Item>Controls>Assign Company Code to Field Status Variants
    Once you have defined this you will be able to assign field status group to your GL master data.
    The use of Field Status Group is to determine the required/displayed/optional fields during posting transactions.

  • Re-assign automation data

    Would anybody know a quick way of re-assigning automation data, for instance from volume information to filter up and down?

    Nothing personal meant here, on the contrary, thanks are always much appreciated. And though it is in the manual, that doesn't mean you will find it easily (especially if you use the hard copy only).
    BTW, RTMMH is my polite alternative to RTFM.
    (Reading The Manual Might Help)
    regards, Erik.

  • Regarding the Query Creation Date

    Dear All,
    How Can I find the creation date of querries which I have done in query designer. Is there any Infoobject keeping track of this data (SAP DEFINED). Pls post msg as soon as possible.

    Welcome on SDN!!
    In Bex analizer, open the query in modify mode, than choose properties and you will find creation date.
    Hope it helps.
    Regards
    PS: assign points if helpfull

  • One data source and assign multiple data target in BI?

    Hi all,
    Is it  possible is to assign one data source to multiple data targets in BI? Not like  in BW 3.X ; one data source can assign only one Info source. I am bit confused about it, let me know about this ?
    Regards.
    hari

    Okay, I must have misunderstood your message, I was thinking BI 7 and data targets .. like cubes and DSO's.
    In 3.x, assign your datasource to a single infosource.  Then assign that infosource to multiple data targets by creating update rules and assigning your infosource to each/all of them.
    In this way, you shouldn't need multiple infosources per datasource unless you have a special situation that calls for it.
    Brian

  • Activating dynamic date calculation in variant

    Per the link below, I used to be able to activate "dynamic date calculation" in variant.
    <link to blocked site removed by moderator>
    Our system has been upgraded to 6.0 and now we do not the same variant attribues screen where I can activate the "D" variable.  It brings me to program/screen SA38/281. 
    Any suggestion how I may activate the "D" dynamic date calculation variable in a variant?
    Edited by: Thomas Zloch on Oct 14, 2011 11:34 AM

    Actually I meant the relevant code of your custom report, you just provided me with the info of the standard variant screen.
    You can go to SE38, enter your custom report name, display the code, and paste the definition of that parameter. (It would be something like
    PARAMETERS: P_DATEHG TYPE XXX_TYPE.
    What I am interested in is to know which data type is being used, since this functionaliy will only apply to date type fields. So, bottom line: this field must definitely be a date, which makes me think that either something has changed in the custom report or after the upgrade to ECC 6.0 this data type might have changed as well.
    Best regards.
    Edited by: Jose Maria Otero on Oct 14, 2011 5:26 PM

  • Dynamic Date calculation in Variants

    Dear SAP Guru's,
    I am creating variant for Planning Run by maintaining the . I n this, I want to select the horizon as from 1st day of next month and to date as last day of next month. But I am not finding the Last day os next Month in the F4 list.
    Please any one explain me the way of creating the "Last day of Next month".
    The available list is like below..
    Current Date
    Current date +/- ??? days
    current date +/- ??? work days
    First day of current month
    nth working day of current month
    First day of next month
    First day of previous month
    Last day of previous month
    Last Day of the Current Month
    How can I create, one more like 'Last day of Next month'?
    Regards,
    Sree

    In the dynamic date period selection options there is also an option for " (Beginning of mth-xx months, end of mth+yy months)"  You can double-click on this line and enter in a value for xx and yy.  If you enter "1" in for the yy value, then the end of the range should be the end of the next calendar month.

  • Tcode for Assign CoCode to a Workflow Variant for Parking Document

    HI, what is is the Tcode and path for Assign CoCode to a Workflow Variant for Parking Document.
    regards
    JK

    HI Aravindh Ji,
    Thanks for ur reply.. my company currency code is SGD... iam trying to assigning sap standard workflow variant 0001 to my company code its showing error message ur COMPANY CODE CURRENCY IS NOT SAME AS WORKFLOW CURRENCY. In our group remaining company codes using same work flow...their currency codes also SGD.. cu plz advice me to solve this problem.
    regards
    JK

  • Assigning a Data Source to a Chart via JavaScript

    Dear all,
    Is it possible to assign a Data Source to a Chart via coding ?
    something like :
    CHART_1.setDataSource ...
    Many thanks
    Hans

    I ran into the same problem.  You can't dynamically switch DataSources for a chart, however, you can re-assign a DataSource to a different query.
    I have a chart assigned to DS_1:
    On startup, I need to check a flag, and use a different query based on the value of the flag.
    Since I can't dynamically switch the DataSource for the chart, I simply switch the query that feeds the DataSource like this:
    I hope this helps.

  • Labview How to specify 1d array of clusters as data types for variant to data

    Hi, I'm new to labview. Can anyone tell me how to specify 1d array of clusters as data types for variant to data?

    First of all, you should be sure that there is such a data type within the variant; otherwise, you will run into errors.
    I recommend you to create the cluster and create a type definition from it. Then drop an array shell from the array palette and drop the cluster type into that array.
    Connect that constant to the data type input of the Variant To Data function.
    Norbert
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • Oracle how to assign a date value in a parameter declaration

    How can I assign a date value to a parameter declaration in SQL?
    Here's my existing script.
    CURRENT:
    select distinct summary as "iCash EAD Error Summary",count(*)
    from AAA.BKS_ICASH_EAD_ERRORS
    where creation_date > to_date('5/26/12 8:50','mm/dd/yy HH24:MI')
    group by summary
    I'd like to assign the date I'm searching for into a parameter and use the parameter in my query.
    GOAL:
    DECLARE
    pCreateDate DATE;
    exec :pCreateDate := '5/26/12 8:50';
    select distinct summary as "iCash EAD Error Summary",count(*)
    from AAA.BKS_ICASH_EAD_ERRORS
    where creation_date > to_date(:pCreateDate,'mm/dd/yy HH24:MI')
    group by summary

    Hi,
    In SQL*Plus, you can do this:
    VARIABLE     pcreatdate     VARCHAR2 (20)
    EXEC           :pcreatedate := '5/26/12 8:50';
    SELECT    summary          AS "iCash EAD Error Summary"
    ,       COUNT (*)          AS "Total Count"
    FROM        aaa.bks_icash_ead_errors
    WHERE       creation_date  > TO_DATE (:pcreatedate, 'MM/DD/RRRR HH24:MI')
    GROUP BY  summary
    ;"GROUP BY summary" means you'll get one output row for each distinct value of summary. There's no need to SELECT DISTINCT since the GROUP BY is already making sure the rows are distinct.
    There are no DATE bind variables in SQL*Plus, so you have to use a VARCHAR2.
    If you do something similar in PL/SQL, then you can use a DATE variable. Make sure you don't call TO_DATE on something that's already a DATE.
    Edited by: Frank Kulash on Jun 26, 2012 2:01 PM

  • Is it possible to convert LabView data into OLE variant?

    Hi. I'm using Activex Data Objects (ADO) to communicate with MySQL. Some ActiveX methods give OLE variant output, with "Variant Type" like "VT_ARRAY|VT_UI1", "VT_UI1" or "VT_BSTR". With some deduction and trial and error is relatively simple to extract data from this OLE variants and convert them to LabView data types. The problem is when I try to input variant data to some ActiveX methods, it almost always give me errors, I suppose because it expects the same type of the outputs, this is: OLE variants. Now, the question is: ¿Is there any way to convert LabView data into OLE variant data? ¿How?
    I've been searching and found a lot of posts about problems when passing variant data into ActiveX, saying that sometimes SAFEARRAYs are needed, sometimes saying that there were some bugs in LV6, giving some workarounds to this bug and saying that it is fixed in LV7.1, but the supposed workarounds don't work and the bug is still present in LV7.1, if it is really a bug.
    I think that if I could put LV data into OLE variant shape I may find an answer and solution to this matter.
    Thank you
    Daniel R.
    UdeC - Chile

    Below I describe how to handle OLE Variants, but I wanted to mention that LabVIEW does have a Database Connectivity toolkit (http://sine.ni.com/nips/cds/view/p/lang/en/nid/6429) that has already created a set of VIs for ADO. You might check that out first.
    However, handling OLE Variants in LabVIEW is automatic. LabVIEW itself has a variant datatype. When you use the ActiveX property or invoke nodes and one of the parameters is an OLE Variant, it is automatically converted to a LV Variant. You can then use the LV Variant VIs (such as "Variant to Data" and "To Variant").
    Brian Tyler
    http://detritus.blogs.com/lycangeek

  • Date changes for variant in se38

    Hi Experts,
    Can you please share me the reasons how release dates changes in variant while downloading CSV file for PO in se38.
    In our system automatically release ddates has changed to past in the varainat in se38.
    Will tehre be any effect while downloading CSV files for PO? What might be reasons for dates changes? And how can system pick the dates abnormally??
    Thanks,
    Shruthi.

    Hi,
    Appreciate for the response.
    Actually our system is POs which cretaed in SAP picks up automatically through programs running on daily basis. There is a middleware connector which picks this POs in CSV format and send to the vendor.
    If some times program fails to pick them, we will manually download CSV file and transmit manually through middle ware connector.  We use se38 for this purpose.
    We do this activity regularly. But now we are facing  a problem like release dates got updated in this variant which are in Past ( 6months) back dates got updated and the POs relased on that dates transfreed to vendor. (There is a check with release date in programming).
    Now my questions are:
    1) How those past dates got updated?
    2) Is there any relation ship with manually downloading to update these dates?
    Please clarify.
    Thanks
    Swetha.

  • Loading data to created variant

    HI,
    I have created a variant to transaction cji5 using RS_CREATE_VARIANT. How do we load data to this variant. I need to fill the data programatically after some processing

    HI,
    I'm trying to load data to variant while creating the variant. But in cji5 transaction one of my required screen field is more than 8 chars. I thnk bcoz of this I'm not able to submit the report with this created variant. My code is
          i_rsparams-kind    = 'P'.
          i_rsparams-selname = 'D0700_USEDB'. 
          i_rsparams-low     = 'X'.       
          APPEND i_rsparams.
    Here 'D0700_USEDB' is more than 8 chrs
    Thnx in advance

Maybe you are looking for

  • How do you exit out of full screen mode for FCPX? ESC does not work.

    Hi guys. I cannot seem to find the exit to full screen viewing mode in final cut pro x. Escape key doesn't do the trick. There are no "exit full screen" buttons that pop up. It is confusing and I have to force quit the program every time I use full s

  • Word - Pages and image in the header

    Morning. I've opened a Word file in Pages. The Word file contains in the header of the first page an image (corporate logo). In Pages 3.0.2 the image isn't adjusted on the right place but one line beneath. The problem is: I can not select the image t

  • Help with C# and Flash ActiveX

    Hello, I want to ask if anyone knows a way to know when a flash movie has been played completly one time in a C# form. The main idea is to make a flash movie playlist and when a movie finish change the activex control to the next movie in the list. I

  • Error in Federated Search

    Hi, I have writte a federated search to search for external search engine (Verity). When i run the search it is calling the basicSearch method implemented in the remote server but after that it is throwing SAXParserException (Pasted the exception dow

  • Need StackTrace For Single request till Response

    As we all know in Jdevloper if we want to see the StackTrace we need to put a dubug point and then we can see the StackTrace for that request. but i need a StackTrace for Every single HTTP Request till Response that means no need to put break point.