Regds : Adapter modules and custom modules

Based on which criteria, we will start working towards custom and adapter modules

Hi praveen,
   There is no specific criteria on which the adapter modules have to be developed.The only criteria is the Business requirement.SAP ships the Ready to use adapter modules to enchance the functinalities of Available Adapters.
Ex: There is a Adapter module called ZIP bean that can ZIP the files that have been received on the target side .Simlilary there are about 9 SAP provided modules which can meet certain business requirement.
  If u like to have ur own u can develop one and go ahead.So many Giudes are available in SDN for that.to get an idea.
Please refer the followig links .Hope this is useful
http://help.sap.com/saphelp_nwpi711/helpdata/en/fd/16e140a786702ae10000000a155106/frameset.htm
http://help.sap.com/saphelp_nwpi71/helpdata/en/8b/895e407aa4c44ce10000000a1550b0/content.htm
Thanks,
Ram.

Similar Messages

  • Current list of all SAP modules and sub-modules

    Can anyone point me to a current and comprehensive list of all available SAP modules and sub-modules?  Currently, the best source I have found for this list is SAPNote 36677, which lists all the structure of components for customer incidents.  However, this SAPNote list is over 23K line items and includes information outside of the modules and sub-modules, in a format that is difficult to normalize.

    Eric,
    a similar question was posted in this link: http://scn.sap.com/thread/3652322
    Assuming you are looking for an overview on the modules for the SAP Business Suite, personally I like the list in the SAP help
    Also a valuable resource is the SAP Release Strategy webpage, which provides link to the Solution Explorer, which shows the available modules by LoB Line of Business or Industry solution, and the official Product List called PAM Product Availability Matrix, which is pretty technical.
    thank you
    erich

  • PS module and SD Module are integrated?

    Dear All,
    How is the PS module and SD Module are integrated?
    I am thinking  the linjk is only through the WBS element .please guide me if am wrong.
    But I am not able to get the data flow across these two modules.
    Is there any other setting to be done in the IMG ?
    My client scenario needs a close interaction(flow) of data from PS to SD
    I am trying to establish this llink through DIP profile and RRB .As i am not familiar
    either with DIP Profile or with RRB.In these circumstances i seek your help.
    Rewards are assured for timely & valuable help.
    Thanking you,
    Best Regards,
    R.Srinivasan

    Hi Ramanujam,
    Please find below the complete stuff reg PS integration with SD Module:
    SD INTGRATON WITH PS (Project Systems)
    PS SD integration happens during Milestone billing...
    Below is whole process-
    Billing Plan for Milestone Billing
    Milestone billing means distributing the total amount to be billed over multiple billing
    dates in the billing plan.
    As each milestone is successfully reached, the customer is billed either a percentage of
    the entire project cost or simply a pre-defined amount.
    During sales order processing, the system determines from the item category whether a
    billing plan is required and, if so, which type of plan
    The type of billing plan that is determined at this point is set up in Customizing and
    cannot be changed in the sales document.
    Billing plans for periodic billing and milestone billing plans for project-related milestone
    billing have different overview screens so that you can enter data relevant to your
    processing.
    For example, for milestone billing, you must be able to enter data to identify the
    individual milestones.
    IMG configuration requires:-
    1. Maintain billing plan types for milestone billing in OVBO.
    2. Define date description in SM30 - V_TVTB.
    3. Maintain Date Category for Billing Plan Type IN OVBJ.
    4. Allocate date category in SM30 - V_TFPLA_TY.
    5. Maintain date proposal for Billing Plan Type in OVBM.
    6. Assign Billing Plan Type to Sales Documents Type in OVBP.
    7. Assign Billing Plan Type to Item Categories in OVBR.
    8. Define rules for determining the date in OVBS.
    Milestone billing is typically used for billing projects, such as plant engineering and
    construction projects. Such projects often include a series of milestones that mark the
    completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones
    are also assigned to the billing dates in the billing plan.
    Each milestone-related billing date is blocked for processing until the Project System
    confirms that the milestone is completed.
    Delivery-relevant order items for which a milestone billing plan applies are billed on the
    basis of the requested delivery quantity and not on the total of the confirmed quantities.
    The connection between the project and the sales document item is made in the individual
    schedule lines of the item. Each schedule item can be assigned to a network in a project.
    To display the project-related data for a schedule line, proceed as follows:
    In one of the overview screens of the sales document, select
    1. Item -> Schedule lines.
    2. Mark the schedule line and select Procurement details.
    The following figure shows an example of milestone billing where only the Contract have
    been billed :
    Order Item Turbine 100,000
    Billing Plan
    Billing date Description % Value Billing Block Milestone Billing Status
    01-10-94 Contract 10 10,000 - x x
    01-03-95 Assembly 30 30,000 x x
    01-04-95 Maintenance 30 30,000 x x
    01-05-95 Acceptance 30 30,000 x x
    01-06-95 Final invoice .. .. x
    Network/Activities
    Milestone Estimate Actual
    Assembly 01-03-95 01-03-95
    Maintenance 01-04-95
    Acceptance 01-05-95
    For each billing date in a milestone billing plan, you can specify whether the billing
    date is:
    1. fixed
    2. Always updated with the actual date of the milestone
    3. Updated with the actual date of the milestone, if the date is earlier than the
    planned billing date for the date
    Following is the SD & PS integration scenarios where milestone billing & Periodic billing plays the important role for these integration:
    Milestone billing is typically used for billing projects, such as plant engineering and
    construction projects. Such projects often include a series of milestones that mark the
    completion of different stages of the work. In the SAP R/3 System, milestones are defined
    in a network along with planned and actual dates for the completion of work. The milestones
    are also assigned to the billing dates in the billing plan. The connection between the project and the sales document item is made in the individual
    schedule lines of the item. Each schedule item can be assigned to a network in a project.
    PS-SD Integration as below:
    A) Billing plan, at each WBS element, network and Activity level.
    B)DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).
    C)sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.
    D)BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.
    Further pls provide ME ur mail id , will mail some zip files regarding integration of SD module with all other module including PS.
    Project System(PS) works for any project e.g construction, operation or any large projects where project management tools are required. it integrates all modules may be like MM for vendor process or for RFQ etc or say may be SD for Resource related quotation with the help of DIP profile or Milestone process etc. IT is largely used in construction projects. IT helps in controlling the whole of project from one single screen and it works with 3 elements WBS element ( work break down structure), Network and Activity.
    Please go throgh this Please check this links perhaps they may help.
    http://help.sap.com/bp_imcv1500/IMC_US/HTML/preconfigured_scenarios.htm
    ETO:
    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E83_EN_DE.htm
    http://help.sap.com/bp_bblibrary/500/HTML/E46_EN_DE.htm
    MTO:
    http://help.sap.com/bp_bblibrary/500/HTML/V66_BB_EN_US.htm
    http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E70_MTOQuotProc_EN_DE.htm
    PS - SD integration are on
    1.Billing pan, at each WBS element, network and Activity level.
    2. DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).
    3.sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.
    4. BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.
    5. resource related Billing
    The specified item was not found.
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Integration on quality module and sd module

    Hai experts
    Any integration on quality module and sd module in sap if yes where the integration point..........
    thanking u.....
    regards
    anjan

    SD module is highly integrated with the other modules in SAP.
    Sales Order –
    Integration Points                      Module
    •Availability Check             -       MM
    •Credit Check                   -       FI
    •Costing                        -       CO/ MM
    •Tax Determination              -       FI
    •Transfer of Requirements       -       PP/ MM
    Delivery & Goods Issue –
    Integration Points                      Module
    •Availability Check             -       MM
    •Credit Check                   -       FI
    •Reduces stock                  -       MM/ QM (Inspection before moving stock to unrestricted Stock / before despatching the material)
    •Reduces Inventory $            -       FI/ CO
    •Requirement Eliminated         -       PP/ MM
    Billing -
    Integration Points                      Module
    •Debit A/R                      -       FI/ CO
    •Credit Revenue                 -       FI/ CO
    •Updates G/ L                   -       FI/ CO
      (Tax, discounts, surcharges, etc.)
    •Milestone Billing              -       PS
    Return Delivery & Credit Memo -
    Integration Points                      Module
    •Increases Inventory            -       MM/ QM (For Inspection)
    •Updates G/ L                   -       FI
    •Credit Memo                    -       FI
    •Adjustment to A/R              -       FI
    •Reduces Revenue                -       FI

  • List of SAP B1 modules and sub module required

    Hi Experts
    Can you tell me where I can find a complete list of all the module and sub modules available in SAP B1?  I have tried to run a query on table OPRM which is displayed in System Information when I am in Auhtorisations table but SAP B1 and SQL server doesnt recognise the table name either in my SAP B1 database or in SBO Common.
    Thanks
    Jon

    Hi Jon,
    You may check this thread:
    Table Name for Authorization
    Thanks,
    Gordon

  • SD module and PS module

    Dear Experts,
    How integration is taken pace with SD module and PS module?
    Can you explain the process detail?
    Regards
    Ishikesh

    Hello
    What kind of integration do you want ? there can be many levels of integration
    at milestone in PS which triggers billing
    activity confirmation which creates invocie
    requriements trigger
    delivery create from PS
    etc are some of them . all the process cannot be detailed out .check hlpe .sap.com for a comprehensive description of the integration
    hope this helps
    Thanks
    akasha

  • P/S Modules and Process modules

    Hi All,
    Can anybody tell me the difference between P/S Modules and Process modules? I came across these when I tried to implement a BTE. I could only do FIBF->Settings->P/S module and was successful in that. So please let me know what is the basic difference and also how to go about enhancement using Process modules.
    Thanks,
    Sowrabha.

    P/S - Publish and Subscribe Interface
        You cannot use external software
    Process Interfaces
         Allows external sotware or external developments that intervene the standard process

  • P/S module and Process Module

    hi,
    could someone tell me what the difference is between P/S module and Process Module?
    in BTE ( T-code FIBF), i saw the two terms but i have no idea abot team.
    thanks in advance

    P/S - Publish and Subscribe Interface
        You cannot use external software
    Process Interfaces
         Allows external sotware or external developments that intervene the standard process

  • CIDX Adapter and Custom Modules

    Dear,
    We were wondering whether the PI CIDX sender adapter supports the usage
    of custom modules ?
    We have created a small module which basicaly simply logs a message in
    the audit log ... that module works fine with the file adapter ...
    When we send a CIDX message from an external system towards PI via the
    CIDX adapter then nothing happens ... Traces do not seem to contain any
    reference at all towards the module ...  It just seems that the module is never called ...
    Looking at the adapters/module documentation it somewhere mentions briefly that adapters can choose on whether to implement the standard module chain processor or basicaly do something else ...
    Does anyone know whether the CIDX adapter supports the usage of custom modules ? 
    Thanks,
    Steven

    Adapter modules cannot be used in CIDX or RNIF sender adapters.
    Regards
    Stefan
    Edited by: Stefan Grube on Jun 24, 2008 3:15 PM

  • Spark skins, modules and custom themes: linking issues?

    I've read some other threads on this topic that were related to the pre-release versions, but I can't get a complete answer get. I also opened an issue in the bug tracker (https://bugs.adobe.com/jira/browse/SDK-30748), but I'm also posting here, hoping to get some help.
    Basically, I have a bunch of skin classes for the standard Spark controls (e.g. s:Button), as well as other skin classes for my custom SkinnableComponent objects. I need to reuse those skins in many projects, so I created a theme: I put in a Flex Library Project all my skin classes, all related graphical assets, and a defaults.css stylesheet that associates each component with its correct skinClass.
    Now, in my modular application project, what is the correct method to link this compiled theme SWC? I tried different ways, and found some issue for each one:
    In <app>-config.xml, using the <theme> compiler option: this way, modules don't pick up the skinClass correctly (default components use the standard Spark skin, and for custom components I get many skinNotFound errors).. its a pity, I like this method because command-line invocations of MXMLC (build scripts) automatically apply the settings in the config.xml file, while I have to manually keep in sync any additional compiler argument.
    In <app>-config.xml, using the <theme> compiler option and add -compiler.isolated-styles=false: seems to work, but not always.. moreover, the option must be put in additional compiler argument, and not in <app>-config.xml, to have effect... I understand that the config.xml file, in a modular application, is only applied to the main application (or that it must replicated with correct name for each module)?
    In additional compiler arguments, using the theme+= option.. these arguments should be used also for modules compilation, and this seems the most effective solution at the moment (swf size of compiled modules has slightly increased), but skinNotFound errors still happens sometimes, usually going away after a clean build.. maybe this has something with the incremental build performed by Flash Builder and/or optimization of modules?
    Right now, I've tried adding also -keep-all-type-selectors in the compiler arguments to see how it goes...
    Is my scenario supported by Flex 4? How should I setup my environment? I read how to create custom themes in the official documentation (http://help.adobe.com/en_US/flex/using/WS2db454920e96a9e51e63e3d11c0bf69084-7f85.html) and a specific help section exists about using styles with modules (http://help.adobe.com/en_US/flex/using/WS2db454920e96a9e51e63e3d11c0bf69084-799a.html#WSda 78ed3a750d6b8f1b97f82d12508050aa0-8000), but it only cover simple style sheets, no specific information about compiled themes and the suggested linking strategy.
    I'm using Flash Builder 4.5.1 and compiling with Flex SDK 4.5.0 (both application and theme), the project use some Halo components (e.g. DateField) but almost all components are Spark, and I use Spark component for <s:Application> and <s:Module>. Modules are optimized for the main application, and are loaded using the ModuleManager.
    Thanks in advance for any help.
    Cosma Colanicchia

    I'm not sure Spark components will work if the compatibility mode is set to
    3.

  • Reg: Oracle Module to custom module movement

    Hello Team,
    Could you please understand the below requirement and give us some ideas on it.
    We have one module which is registered with Oracle where it has Oracle forms and reports. Now, we have license problems with them and planning to create it as a custom module objects.
    I am sure, my explanation won't help you to understand better. We have one customized module with oracle, which needs to be independent now.
    Any idea/any suggestions are most welcome.
    Thanks/Suresh

    Hi Suresh,
    Pl.visit following links which surely help to register your custom module/application to oracle.
    http://onlineappsdba.blogspot.in/2007/10/creating-custom-application-in-oracle.html
    http://beginapps.blogspot.in/2007/09/oracle-application-server-10g.html
    HTH
    Sanjay

  • Color shift between Develop Module and other modules in Lr 5.7.1

    Hello,
    I'm getting a color shift between the devolop module and any other module in Lr.
    It's a recent problem that I've been experiencing since the last update.
    I'm using Lr as part of the Adobe Photographers Bundle in a Windows 8.1 pro.
    Below I have an example for the kind of color shift i'm seeing. The image on the left is from the Devolop Mobule and the one on the right is form the Library Module.
    Is this happening to any one else? Does any one know why?
    I would appreciate any help.

    Gautam is correct in that the preview mechanism isn't the same in Develop and the other modules and, you must view the color in Develop at 1:1 to see an accurate preview. The color space is different that's probably why you see this difference in reds (especially if you use a wide gamut display).
    IF you build your own ICC profiles for your display, be sure the software is not building a V4 (version 4) profile, stick with V2.
    As for exporting and comparing, be sure the secondary application is color managed! Otherwise it's expected that there is a visual disconnect between LR and that app.

  • Assortment Module and Layout Module

    Hi Champs,
    I would like to know the process of listing the articles "assortment layout" through one common step. I tried thru "assortment module"  and was able to do it successfully.
    Please help me with process of layout functionality in SAP.
    Assigning the new article to the layout module in transaction WLWBN (Assortment layout workbench)
    I saw in some other SDN that,  Running transaction WSM4L (mass relisting by changing layout data) for the layout module
    But i could not do so it is giving me a error message...Start conversion report for layout listi
    conditions (note 659692)
    Would appreciate if i can get the steps for listing thru Layout module....
    thanks in advance.
    Regards,
    SD

    Run program RWLAYLIST_CONVERT to convert your assortments. Then you should be able to list via the layout workbench.

  • Optical Fiber connection between GBIC module and SFP module

    Hi
    I am in need of help.
    I have a 3750 24TS-S, 2 port SFP, switch at the edge. And i have a 4507R switch at the Distribution layer. In 4507 switch I have WS-X4515 Sup IV supervisor engine with 2 GBIC Port and also have WS-4306-GB 6 port GBIC module. I am using WS-G5486 Single mode connector, LX/LH tranceiver to connect to this port.
    This is the scenario.. i want to know is it posible to conect one end of the fiber cable to connect to a SFP Module ( 3750-24TS-S, 2 Port SFP) and other end ( WS-X4515 Sup IV supervisor engine with 2 GBIC Port or WS-4306-GB 6 port GBIC module) at the WS-G5486 Single mode LX/LH connector ?????
    Plz let me now asap.. i need to give a solution imdtly.
    Thanks & regards
    Jacob

    Discussion is never a problem ....;-}
    The issue is that the signal is "too loud" and is distorted (or, more correctly, is so loud it overloads the receiver).
    The operational envelope for nearly every receiver of any kind includes a bottom number (too weak to hear) and a top number (too loud to understand).
    As an example, think about an system where you have a hearing aid that would let you hear someone speaking in a normal voice from 100 feet away ... then having someone scream the same words into the hearing aid from 6 inches away ... the sound would be distorted and you would have difficulty understanding them ... after a while, you'd begein to go deaf and eventually, it would sound normal (until you became completely deaf).
    So, what you need to do is look at the transmitter power, and the envelope/range of acceptable power the receiver can hear.
    Normally that difference is the optical budget ... given the loss numbers of the media between the two, you can determine if you have enough power to make the trip.
    In a Lab environment, you still have to hit the receiver's budget number, but from the other end (the "too high" side).
    If you know the transmitter puts out X, and the receiver can accept from Y to (X-50), then you need to add enough attenuation to get X down to (X-50)or lower (but still more than Y).
    When you have a transmitter powerful enough to drive tens of kilometers, putting one two meters away from the receiver will pretty much guarantee a burnout (unless you install optical attenuation).
    Good Luck
    Scott

  • Problem with combination of LabVIEW classes (dynamic dispatch), statechart module and FPGA module

    SITUATION:
    - I am developing a plug-in-based software with plug-ins based on LabVIEW classes which are instanced at run-time. The actual plug-in classes are derived from generic plug-in classes that define the interfaces to the instancing VI and may provide basic functionality. This means that many of the classes' methods are dynamic dispatch and methods of child classes may even call the parent method.
    - Top-level plug-ins (those directly accessed by the main VI) each have a run method that drives a plug-in-specific statechart.
    - The statechart of the data acquisition plug-in class (DAQ class) calls a method of the DAQ class that reads in data from a NI FPGA card and passes it on to another component via a queue.
    PROBLEM:
    - At higher sampling rates, an FPGA-to-host FIFO overflow occurs after some time. When I "burden" the system just by moving a Firefox browser window over the screen, the overflow is immediately triggered. I did not have this kind of problem in an older software, where I was also reading from an FPGA FIFO, but did not make use of LabVIEW classes or statecharts.
    TRIED SOLUTIONS (WITHOUT SUCCESS):
    - I put the statechart into a timed loop (instead of a simple while loop) which I assigned specifically to an own core (I have a quad-core processor), while I left all the other loops of my application (there are many of them) in simple while loops. The FIFO overflow still does occur, however. 
    QUESTION:
    - Does anybody have a hint how I could tackle this problem? What could be the cause: the dynamic dispatch methods, the DAQ statechart or just the fact that I have a large number of loops? However, I can hardly change the fact that I have dynamic dispatch methods because that's the very core of my architecture... 
    Any hints are greatly appreciated!
    Message Edited by dlanger on 06-25-2009 04:18 AM
    Message Edited by dlanger on 06-25-2009 04:19 AM
    Solved!
    Go to Solution.

    I now changed the execution priority of all the VIs involved in reading from the FPGA FIFO to "time critical priority (highest)". This seems to improve the situation very much: so far I did not get a FIFO overflow anymore, even when I move around windows on the screen. I hope it stays like this...

Maybe you are looking for

  • Hard drive installation issue.

    I'm replacing the internal hard drive on my 24" duo core Intel iMac (EMC 2134). The new drive is a 1TB Seagate Barracuda 720.12 and everything appeared to be going well, old drive out new drive in, everything back together and healthy bong on start-u

  • Problem with URLDecoder.decode(s, enc)

    Hi! I'm having problems with the URLDecoder.decode(s, enc) method... When I send a string, encoded with the Javascript escape() function, to the server side of my application, I get a problem decoding it using this: myString = URLDecoder.decode(myStr

  • Cannot see data in SAP.Web.UI.Controls.Table

    Hi,I have created a portal project and dragged a sap table into the design area. then i call a webservice and bind the resulting dataset to the table. the dataset seems to bind, since i can see there are the right number of pages in the table, but i

  • Want to change the client in UME j2ee engine

    Hi Experts, In new installation of SAP pi 7.4. We have changed client at all places now we want to change the UME client. For changing clients i refered notes: 940309 - Change PI default client after NW 7.0 Installation Change UME master: To do this

  • How to make entry in a table e.g. vbak table

    how make entries in a table. what is the procedure. can i do it in  production directly?