Required start date in a services purchase requisition. How?

When hiring equipment (eg. a tower wagon), it is required to specify in the purchase requisition on what date the equipment needs to be available and on what date the equipment needs to be picked up again. So basically, the required start and end date of a service need to be captured in the purchase requisition (and copied to the PO and subsequently sent to the vendor).
The end date of the service is already recorded in the delivery date field. The start date can be entered in the item text.  But since it is required to report on the start date of services, it is desirable to record the start date in a separate field in the purchase requisition. This way a list could be created with all the equipment that should have been made available by the vendor on a certain date.
Does anybody have any good suggestions on how to make such a 'required start date' field available? N.B. To make things more complex, the requisitions are raised in Plant Maintenance, so ideally the start date would be filled from the PM-order too.

The validity dates in the PO are maintained at header level. The required start and end date for an equipment should be maintained on item level, as there can be multiple items in one PO each with different start and end dates.
Also, the validity end date in the PO has the functionality that "No further service entry sheets can be created after this date." It is very common that a Service entry sheet is raised after the hire period is ended.
So using the validity dates in the PO is not a good option.

Similar Messages

  • How to de-activate Qty and Price fields for Service purchase requisition

    Dear all,
    We have a request to de-activate (leave it as "Display") the fields of quantity and gross price when changing a service purchase requisition of a specific document type.
    In example: We want that purchase requisition type NB, allows in change mode (ME52 or ME52N) to change the quantity and gross price of the services. On the other hand, these two fields must be only visible for order type ZNB. Besides this must be happening only for services.
    Changing PT9 or PT9B will affect also the creation, and if we only configure based on transacction and document type does not work.
    Any help will be highly appreciatted.
    Cheers

    Hi,
    You may have to write a output requirement routine and assign the same to the output type in NACE.
    But i don't think you will get the old and new data of Purchase order in requirement routine (program : SAPLV61B).  You may have to export the data into memory from either a BADI method or User exit and then import the same in requirement routine.
    Regards
    Vinod

  • Material Number mandatory for PR exceptP for Service Purchase Requisition

    Hi All,
         Our client's new requirement is we need to give material number mandatory for Purchase Requisition. But it should not affect for Service Purchase Requisition (as we don't have material number with material type DIEN. Till now, we were using Acc Assignment Category K and Item Category D with only Short Text description). We have separate document type for Service Purchase Requisition(ZSRV).
        In order to make Material number mandatory, in PR, we need to give in "Define Screen Layout  at Document Level for PR",right? Is there any way to give, "Material Number Mandatory at Document Type Level"?
    Please suggest.
    Regards,
    rosh

    hi sridhar,
      Thank you for your answer. So as you said, there is no possibility to make material number as mandatory at DOCUMENT TYPE level through Customzining, right?
    Regards,
    Rosh

  • Converting Service Purchase requisition to Purchase order

    Hi,
    In our scenario the service requsitions are generating from Project order (PS module). We have to give multiple purchase orders against this service purchase requisition. System is not allowing to do so.
    Viv

    Hi,
    ***As you creates purchase orders in ME21N  WRT Purchase requisitions
    ***Use t.code:ME5A & execute by entering u201CProcessing status u2013 B u201Cin dynamic selection--> Purchase requisition.
    ***As you needed restrict PO creation with more than PR Quantity and set error message follow path: 
    SPRO->Materials Management->Purchasing->Environment Data-->Define Attributes of System Messages
    06 076 as Error messages.
    when all the PR quantity already converts to PO, system will not allow to create a another PO from that same PR again.
    Regards,
    Biju K

  • Service Purchase Requisitions not being transferred

    Dear Experts,
    I'm not able to transfer the service purchase requisitions with service master but it is working fine for standard purchase requisitions with material master in SRM 7.0 using report bbp_exttransfer_req. Also how to address different purchasing organization and purchase groups with different company codes and plants, as the transferred PR is being defaulted by the channel values in the srm organizational structure. For Service purchase requisitions I'm receiving error as " Define Transaction type for local system" in the srm system and in ecc it is as ANOENTRY.
    Note : Apart from using BBP_DOC_CHANGE BADI looking for a standard way of meeting this requirment.
    Thanks and Regards,
    Venkata Koppisetti.

    Hi
    Follwoing is what I can think in your scenario:
    1. Check if the service master is replcated from ECC to SRM, if at all you have service master in your ECC PR.
    2. Maintian all the Org. structre elements of ECC(PUR org, Pur grp and Co.Code) of ECC in SRM using transaction PPOCA_BBP. This will take care the same Pur. Group you have on PR of ECC will also moved into SRM documents(RFx or SC sent to SOCO).
    3. Since your syaing you are getting an error for define transaction type, check in the attribute "Define transaction"  has been mainiantiend.
    with regards
    Manjunath

  • Required Start date in Notification

    Hi All,
    Maint order is assigned as a call object for a maint plan. After scheduling the maint order is generated with the basic date as per the planned date in maint plan. But the notification generated along with the order has the required start date same as that of the notification generated date (due to call horizon) instead of the planned date in maint plan. Kindly give me the config steps to set the notification reqd start date as per the planned date in maint plan.

    Hi Pushpa,
    Thx.,
    I had done that.
    But i'm getting it right only when the priority in maint plan is not selected.
    If priority is selected then i'm getting it wrong...
    Kindly revert back !
    Prabhu

  • QM_Control on Required start date in quality notifications

    Dear QM experts,
    Requirement is,
    For Q2 notification type the entries in required start date filed (QMEL-STRMN) to be restricted in such a way so that user can not do entry for last month.
    Foe example,
    1.     Today is June 12, 2009. If a user is creating Q2 notification today he/she may change the required start date in the past but not before 1st June 2009.
    2.     User should be in a position to enter back date in required filed only for the current month
    3.     The concept is just similar to period closing activities.
    I tried through SPRO-Quality Management-Quality notifications-Notification creation u2013Notification types-Define screen templates-Field Selection: General Screens. Here there is facility to make the field grey, hide or required. One of the limitations is that this is client level setting.
    Can the requirement be mapped for particular plant and for perticular notification type?
    Thanks is advance
    Best Regards,
    Anand Rao

    Dear Anand
    Here are some of the thoughts. Please check and then come back with your feedback
    1) Make Priority button mandatory for Q2 notification .VIQMEL-PRIOK. You can do only for Notification type Q2 by using the influencing fields
    2) Make required date in grey so that no changes can be done . do this notification Q2
    2) Maintain QM priorities SPRO >Quality Notifications > Notification Processing>Response Control> Define Priorities
    3) Maintain Priorities in the QM priority in the same config
    When you set the priority in the notification required from and end date is updated in the system automatically
    4) Use this exit QQMA0018  Deadline setting based on entered priority  to make sure that always the date doesnt fall on past date
    Hope this gives some idea
    Regards
    gajesh

  • Create a Service Purchase Requisition using BAPI_PR_CREATE

    Hi Everyone,
    I am using BAPI_PR_CREATE.
    I am able to create Standard Purchase requisition.
    But while creating Service Purchase Requisition, i am not able to create.
    I am getting no errors for the PR Item, but even after entering Services for the PR Item i am getting error message in return table of bapi "Please Maintain Services or limits'.
    Do i have to pass value to Package_No field in the item level table of BAPI_PR_CREATE.
    Please help.
    Regards,
    Akash

    Hi,
    Check this link for creation of services.
    Bapi_pr_change in services
    PO Upload through BAPI_PO_CREATE1 - Problem in Service Item
    BAPI_PO_CREATE1 Error
    Hope it helps
    Sujay

  • Delivery date blank in PR (Purchase requisition)

    Dear All,
    I have got a requirement that Delivery Date should be blank instead of sy-datum in Purchase Requisition (ME51N), so that user can enter his date .
    I tried BAPI and user exits for PR, but the structures used there do not contain the Screen field EEIND. So I m unable to handle it.
    Please suggest me what else i can do.
    Thanks
    -Harshita Saxena

    Done same for PO:
    Implemented badi : ME_PROCESS_PO_CUST
    method : OPEN
    METHOD if_ex_me_process_po_cust~open.
       DATA: lv_del TYPE char1 VALUE 'X'.
       lv_del = 'X'.
       EXPORT lv_del = lv_del TO MEMORY ID 'POD'.
       EXPORT lv_itm = '00010' TO MEMORY ID 'ITM'.
    ENDMETHOD.
    Method : Process_item
    METHOD if_ex_me_process_po_cust~process_item.
    DATA: lv_del TYPE char1,
             lv TYPE char1,
             lv_itm TYPE char5,
             lv_ebelp TYPE char5.
       IMPORT lv_del = lv_del FROM MEMORY ID 'POD'.
    ls_mepoitem = im_item->get_data( ).
       ls_mepoitem-eeind = ' '.
       ls_mepoitem-eindt = ' '.
       IMPORT lv_itm = lv_itm FROM MEMORY ID 'ITM'.
       lv_ebelp = ls_mepoitem-ebelp.
       IF lv_del = 'X'
         OR lv_itm NE lv_ebelp.
         CALL METHOD im_item->set_data
           EXPORTING
             im_data = ls_mepoitem.
         lv_del = ' '.
         EXPORT lv_del = lv_del TO MEMORY ID 'POD'.
         EXPORT lv_itm = lv_ebelp TO MEMORY ID 'ITM'.
       ENDIF.

  • Service purchase requisition/order with Material group optional

    Is it possible to create a purchase requisition/order with item category D (services) without entering any material group?
    We would like to enter only the G/L account but not the material group.

    Hi,
    It is not possible to create PR/PO without material / Service group & Item catagory D.
    Better create service groups like material group which will help you for reports also.
    Regards,
    Manish Jain

  • ME59N - Service Purchase Requisition..is it possible ?

    Dear friends,
    I'd like to know if is possible to create PO automatically via ME59N (job scheduled) from a purchase requisition with item category D-services.
    After to enter a sorce in the Purch.Requisition we are trying to create POs automatically to this service PR, same way we do this for materials.
    We got the error message saying that PR doesn't exist ...when we try that via ME59N , we only is allowed to create it via ME21N.
    best regards,
    Alessandro

    Hi,
    Yes, possible to create automatic Service PO from Service PR.You need to activate for  Service auto- PO,  Automatic Purchase order creation for Service requisitions in ML91. Create info record based on Material Group. For Automatic PO , info record is mandatory{ with other setting as material auto PO like example like  all setting we do  in material master & vendor master etc...).
    Also check OSS note 635511
    Regards,
    Biju K

  • Changing Required Delivery Date to the Existing Purchase Order date In VA01

    Hi All
        My requirement is while creating a sales order I want to know Is there any exit to move the PO date in Header details of VA01 to the Req Delivery Date in Sales tab or change the Req. Delivery date to the existing PO date in sales tab of VA01. And also please note that it should be triggered on save of VA01 transaction.
    Thanks in advance
    Shivakumar

    hi
    Hope this helps
    DTRM001            Reschedule schedule lines without a new ATP check
    45A0001            Determine alternative materials for product selection
    45A0002            Predefine sold-to party in sales document
    45A0003            Collector for customer function modulpool MV45A
    45A0004            Copy packing proposal
    45E0001            Update the purchase order from the sales order
    45E0002            Data transfer in procurement elements (PRreq., assembly)
    45L0001            SD component supplier processing (customer enhancements)
    45P0001            SD customer function for cross-company code sales
    45S0001            Update sales document from configuration
    45S0003            MRP-relevance for incomplete configuration
    45S0004            Effectivity type in sales order
    45W0001            SD Service Management: Forward Contract Data to Item
    46H0001            SD Customer functions for resource-related billing
    60F0001            SD Billing plan (customer enhancement) diff. to billing plan
    Regards
    Atul

  • Purchase Requisition Date is not updated with Scheduleline Delivery Date

    Hi,
      This is a third part Sales Scenario. The Delivery date on the schedule line is passed on to purchase requisition as the delivery date of that item. Due to some business requirement, the delivery date of the schedule line is changed just before saving the sales order in the BADI called through the userexit userexit_save_document_prepare. Now on saving the sales order, the purchase requsition is also created.The delivery date of the schedule line is changed but has not reflected on the Purchase Requision.
    If the Sales Order is opened in VA02 and the schedule line delivery date is modified, the Purchase Requisition delivery date is also getting modified.
    Why did it not happen at the time of saving the Sales Order.
    What is the structure into which the purchase requsition information is stored, so that on processing the sales order, this information is utilized to create the purchase requsition.
    Please help.

    Hi,
    Check the following table for the mentioned fields EBAN-BADAT and EBAT-FRGDT
    Thanksk and Regards,
    Hari Challa.

  • Delivery date mandatory in Purchase requisition .

    Hi all,
    I want to make the delivery date mandatory in the purchase Requisition and currently the current date is defaulted there , i want that nothing should be there initially.
    Please provide the configuration setting.
    Regards,
    Kapil.

    Hi,
    U can make the delivery date field as mandatory in PR , by setting delivery date field as required entry in PR sscreen layout in customization.
    Go to SPRO- MM - Purchasing - PR- Define screen layout at doc level - ME51N - Deadline monitoring - Delivery date ( Make this field as reqd entry ) and save it.
    And regarding ur second question the default date should be blank, the date gets calculated here based on the planned del time maintained in materila master in MRP2 view.
    So if the date showing is todays date when u r creating PR today means, the planned delivery time maintained in MMR is zero days.

  • Purchase requisition unit of measure  AU ( Activity unit) (Service PR)

    Hi!!Group Members!!
    When i create Service Purchase requisition from T code ME51N - Create
    I select k as account assignment category & D as item category system by default shows AU as unit of measure system does not allow me to change
    When i adopt the PR to PO same AU will be in gray & system does not allow me to change 
    Print out will be in days as service master & data for service is entered in days
    Pleas give your valuable inputu2019s so that I can solve my query
    Regards
    Shamulheq

    Hi11 Roy Anamika  
    Thank you
    I checked below configration screen in my system  & has Unit of measure at item level AU
    SPRO -- MM -- External Services Management -- Source Determination and Default Values and chage the UOM at client level or purchasing org level
    I dont want to change as it is defined @ client level, insted of changing here can i  come to know the fild which had become supress ( gray ) in PR & PO 
    regards

Maybe you are looking for

  • NW70 Installation Error - Central Instance

    Hi All I am trying to install the EP & BI and successfully finished Central Services Instance and and Database Instance, and when I started installing the Central Instance on App Server, after I entered the path of Oracle Client and click on next its

  • Tuxedo 10.0 for HP-UX 11.3

    Hello, can someone direct me to a link in order to download Tuxedo 10.0 for HP-UX 11.3 (Itanium 64-bit)? I have downloaded a file from Oracle E-delivery but after extractinh it from the zip the file says it is for HP-UX 11.2. Can I use this file in o

  • Sync ok but outlook 2003 contacts filed by first name

    I have a Treo 600 smartphone using the palm os and just bought BB Rim curve 8310. The sync went fine but all my contacts are filed by first name which is unacceptable.  The "file as field" in outlook does not come up in the advanced sync choices.  Pl

  • Midp 2.0 support

    Does only the newest devices support midp 2.0? Or can I run some midp 2.0 code on any device, like motorola i85s? The nokia 7650 does support midp 2.0? Thnks Ricardo

  • How to download WhatsApp into I-Phone 4S

    I can not download WhatsApp into I-Phone 4S. Can anyone help me please?