Resource Chart in DS board

Hi,
We are using DS Board (only resource chart), WE need to differenciate the following objects by different colors
1. Planned order
2. Production orders - released
3. Production order - created
Can someone post a step by step guide for this.
Cheers,
SM

Hi,
I cannot give you a complete step by step guide today.
The color of the operations of the orders you mentioned can be changed in the graphical objects of the Detailed Scheduling Planning Board Profile.
1.     To carry out the activity, choose one of the following navigation options:
SAP SCM Menu     Advanced Planning and Optimization® Production Planning  Environment  Current Settings  Maintain Detailed Scheduling Planning Board Profiles
Transaction          /SAPAPO/CDPSC2
2.     Select the profile SAP001 and choose Copy asu2026
3.     Make the following entry:
PlanBoardProf     Short description
DS001     DS Planning Board Profile
4.     Choose Enter.
5.     In the Specify Object to be copied dialog box, select copy all.
6.     Confirm the information dialog box u201CNumber of dependent entries copied:u2026u201D
7.     Choose Save.
8.     Enter a customizing request.
9.     Choose Save and go back.
10.     Select the profile you have created before (e.g. DS001) and double-click on the Chart folder in the Dialog Structure section.
Example:
for graphical objects
Graphical Objects Chart
46.     Select your profile again and double-click on the Graphical Objects folder in the Dialog Structure section.
47.     Double-click on the object OPR_DEF_1 - Operation (Texts in Graphical Objects) .
48.     Choose Field Selection and add one of the Product fields by moving it from the right table to the left.
49.     Choose Continue.
50.     Choose Save.
51.     Enter a customizing request.
52.     Choose Save and exit the maintenance of the planning board profile.

Similar Messages

  • MRS (Multi Resource Scheduling) - Manager Planning Board

    My understanding of the MRS Manager Planning Board is that it will only display those orders that have operations that have been assigned to a resource.  If true, this would mean that the Manager Planning Board would be of little value to an organzation that is only using MRS to schedule to a work center because there would be no demand that had been assigned to a resource.  It would only start to be of some value once the organization began to assign demands to resources.  Is this correct? Or, do you see other value in the Manager Planning Board for an organization that is only scheduling to a work center?
    I've also found that when I run the Manager Planning Board that the resources are displayed, however, I have to hit "refresh" in the Planning Board to get the orders/operations (demand) to display.
    Mark
    Edited by: Mark Scott on Aug 18, 2009 1:15 PM

    Hi Mark,
    As you already figured out correctly that the Manager planning board displays the resources (in display mode). It displays all the information about the resource: Its availability and assignments. since assignments are displayed, obviously the (related) demands are also displayed.
    If the fine grained planning ( planning at resource level ) does not happen, then obviously it does not make sense to use the manager planning board transaction.
    PS: As the name suggests this transaction is for managers who are not authorized to change anything but only for display. So they will see the resource availability and assignments in this transaction.
    Regards
    Varun

  • MRS (Multi Resource Scheduling) - Displaying Planning Board

    I've gotten the MRS planning board to function the way I want it in my sandbox, for example, when I run /MRSS/PLBOTIME the all the resources show up that are in the planning node the resource planner is assigned to and all subordinate resource nodes.  Also, the demand shows up.  I thought life was good.  I've now moved to my development box and configured the system the same as sandbox (to the best of my knowledge). 
    Now when I run /MRSS/PLBOTIME:
    1.  I get a popup window telling me that there are several valid resource planning nodes and requiring me to select one.
    2.  While the resources show up the demand does not.
    Now when I run /MRSS/PLBOSRV:
    1.  The demands I selected show up but none of the resources do.
    As I mentioned above, to the best of my knowledge, the MRS configuration is the same between the two boxes (e.g.,  work center types properly assigned, resource planning nodes and evaluation paths as delivered, user interface profiles, /MRSS/SGE_PN_MNT, etc.).  I can't figure out why the popup window is now showing up asking me to select a resource plannng node and, more importantly, why in one case the resources show up but not the demand and in the other the demand shows up but not the resources.  The only way I can now get both demand and resources to show up in the planning board is by running /MRSS/PLBOORGSRV.
    Mark
    Edited by: Mark Scott on Aug 13, 2009 8:58 AM

    Thanks for the response:
    /MRSS/PLBOTIME -->
    1.  What I had seen before in two other systems is that the org.units that are associated with me as the Resource Planner would show up, as well as all other subordinate org.units, both resources and demands.  In this system what I see is that the demands associated with  subordinate org.units are not showing up, only the resources.  I went into another system I have access to in order to confirm what I had been seeing.
    2.  Also, when launching the Planning Board using this transaction in other systems I had never seen a window pop up telling me there were "several valid resource planning nodes" and asking me to pick an org.unit from the list, it always just gave me the org.unit I was associated with plus any subordinate ones.  (We upgraded to SP06 last night and this morning this window didn't pop up, instead it gave me the resources and demand for the org.unit I am the Resource Planner for, as well as those for subordinate org.units....weird.)
    /MRSS/PLBOSRV --> Logical as you described is what I expected, however, what I was seeing was that the resources associated with the demands were not showing up.  After a closer look what appears to be happening is that the selected demands are being brought into the Planning Board but no resources unless the resource has previously been assigned to the demand.  In other words, resources associated with the work centers used in the operations (and their linked org.units) are not showing up in this Planning Board, they only show up if they had previously been assigned to a demand.  I can, of course, manually bring in resources once I'm in this Planning Board.  Is this what you meant?
    /MRSS/PLBOORD --> I followed your logic of "if I am responsible for the parent org.unit then I am responsible for the lower org.units also".  However, the logic escapes me as to why this only applies to resources and not demand.  Regardless, as long as I know that's how it works then I can deal with it.
    Mark
    Edited by: Mark Scott on Aug 18, 2009 9:57 AM
    Edited by: Mark Scott on Aug 18, 2009 6:18 PM
    Edited by: Mark Scott on Aug 18, 2009 6:25 PM

  • Scheduling comparision in Gantt Chart- Project planning board

    Hi All,
    I Need to use the "Scheduling comparision" in Project planning board gantt chart. This is to compare the original status of activities before and after scheduling.
    But the "Scheduling comparision" button in the PPB does'nt seem to work.
    ( I am selecting the activity and then pressing the button for"display original status" )
    How do I use this functionality?
    Thanks in advance.

    Hi Potluri Srinivas ,
    After some tests, I still donot get, how does this functionalties work either.
    I assume, it is linked with the setting in 'option' -> 'planning board' -> 'diagramm area' -> 'orginal schedule'.  But I donot know, how the two things linked directly.
    If you find it out, please post it.
    Thanks and  regards,
    Zhenbo

  • DEtailed scheduling planning board - scalling of objects in the charts

    Hi,
    I am wandering if there is a possibility of changing the scale in the graphical planning board in APO PPDS, eg. in the resource chart. in the way that I could change the scale just for a certain period of time or one object.
    for example:
    the planning period choosen is 10.09.14 to 01.10.14., scale unit is hour, but the duration of some orders or operations is less than a minute. Woud it be possible to somehow change the scale just for 1 day or 1 hour within the shown period? zooming in does not help as then I cannot see the other lines that I need to look at when scheduling that specific order or operation.
    thank's for any helpful hint!
    br,
    Wojtek

    Hi Mike,
    thank you for responding to my query.
    I know the functionality with the right-click. this unfortunately does not help as the whole time frame is stretched-out => they cannot seen some objects, while the planners would like to strech-out only part of the shown period.
    I also checked the possibility of changing the scale down to seconds cause some operations have a duration of less than a minute (timescale editor = double left-click on the scale). But the production is still unhappy. They have seen in some software such a possibility and wish the same in the graphical planning board. they want to see just part of the time frame in another scale so that the objects outside the scale remain in the same time unit but the objects within the considered time frame would be displayed in another time unit.
    In the resource chart if you right-click an operation you can select the option shrink/stretch operation => I am not sure if there is sth wrong with my connection but most of the time when I click this option nothing happens. Just a couple of times while clicking on the same operation I manged to get a pop up "change operation duration" where you can define in % the new duration. but have to choose a new duration between "min and max duration" that are in this pop up zero => so I cannot change anything and have no clue where this zeros for min and max come from and in the end if that might solve my problem.
    br,
    Wojtek

  • Resource capacity available in resource master but shows unavailable in DS board

    Hi Experts,
    We are facing an issue where we see that for a particular resource, capacity is avaliable in resource master till  end of the horizon but when we check the resource chart in detailed scheduling board there is no capacity shown there. The resource chart simply shows downtime.
    Appreciate your inputs on this issue.
    Regards,
    Shweta

    Hi,
    I think that your option for APO work center capacity is from external capacity (ECC system). Check this in the work center, tab External Capacity. If the check box External Capacity is selected this means that you use the capacity of the work center from the ECC system. This is the reason for why you have capacity in the work center (APO system).
    For downtime check the tab Downtime at work center level. Normally you will find Downtime defined for a period (with start & end date). This is the reason for why you see in the DS board just downtime period and no capacity for a certain period.
    You can also check the calendar resource on APO side!
    I hope this can help you!
    Thanks.
    Regards, Marius 

  • MRS - Resources and demands are not visible in the Planning Board

    Hi Friends - I am working on the the MRSS 610. We have installed it on the our ECC 6.0 as an add-on. We have configured the system as per the configuration guide.
    But when I am accessing Manageru2019s Planning Board -  /MRSS/PLBOMGR , using the Organization unit, I am getting Notification saying that the resources assigned to the Organization unit are not available in the MRS.
    "Resource 00000000010000000000000000000000 not yet created in the WFM Core"
    The details of the Error message
    "Resource 00000000010000000000000000000000 not yet created in the WFM Core
    Message no. /MRSS/SGE034
    Diagnosis
    Resource 00000000010000000000000000000000 has not yet been created in MRS.
    System Response
    No assignments have been created for resource 00000000010000000000000000000000, even though, according to the organizational model, this resource is to be taken into consideration in the planning board.
    Procedure
    Contact technical support.
    Procedure for System Administration
    Create the resource in question in MRS."
    I have run the Report
    /MRSS/HCM_RPTWFMIF : Transfers the HR data (availability times, qualifications and the resources itself) into the MRS Basis
    But even after that I am not getting the resources in the planning board.
    Also I am not able to view the Demands from PM/CS orders.
    I have created PM Orders and
    Assigned Work centres to the operations and
    assigned the Resources to the Operations.
    The HR assignment to the work center is also done.
    I have tried T Code   /MRSS/PLBOSRV - Enter the MRS planning board using a specified order
    to pull the order demand. But it is not working
    Its giving following message
    1004280 is not a valid demand
    Message no. /MRSS/SGU139
    Diagnosis
    The order does not exist in MRS.
    This may be because:
    The order number has an invalid format.
    The order does not exist.
    The order is not relevant for planning and has therefore not been transferred to MRS.
    The order has been deleted from MRS.
    Pls help me on this.
    Thanks in advance and warm regards
    Purnendu

    Hi Anil/Saurabh - Thanks a lot for your replies.
    I have checked the MRS configuration as per your suggestion.
    It looks fine as per the configuration guide. I have done the PM/CS integration for Orders as demand.
    But the Demands are not visible on the Planning Board.
    I have checked in the debugging mode what is causing the problem - It looks like
    "The Database Table: /mrss/d_dem_h  needs entry"
    But there are no entries in this table.
    I could not find any Customizing transactions or Application transactions for maintaining this table. This is an Application Table for Master and Transaction Data and its Display and Maintenance allowed with Restriction.
    I could not also find any transaction for transferring Demand from ECC(R/3) to MRS.
    How do I maintain entries in this table?
    How do I transfer Demand from ECC to MRS?
    Saurabh - I have also been not able to transfer HR Resources from ECC to MRS.
    We don't have WFM Core installed in our instance. But MRS should work fine without WFM. MRS Basis should take care of it.
    To transfer Employee resources i have run the Program " /MRSS/HCM_RPTWFMIF". But when I execute the transaction with the selection parameters system shows that it is processing (Clock at the bottom Status bar) but it does not shows any result or status.
    So I am not sure whether it is executing the program properly.
    Pls help me resolve these issues.
    Thanks and warm regards
    Purnendu

  • Printing options from Detailed scheduling board

    Hi All,
    HAs anyone found a decend method of printing the Resource chart from the Detailed Schedling board so that the printout looks like the interactive view. Currently when I attemt to print the board it comes out in a tiny font which is useless,
    Regards,
    Tony

    Hi Tony
    You can't print the same in one page
    It requires running pages
    You can do so by adjusting the FIT TO PAGE - may be more than 10 pages. It depends on the period of length of your resources
    Once you enter the fit to page, press Ok and then choose Single button on the print layout screen, You can see the content per page there
    I tried with big plotter like the one used for printing Engineering Drawings. it got printed
    Hope this helps
    regards
    Vijay

  • Color of graph obj. on DS plann board based on product/operation Character.

    Hi,
    We would like that the color of the graphical objects on the DS planning board, will be based on some "Characteristic" or any other value that is maintained for the product or the operation, for example the value of the setup group. Is it possible??
    Thank you,

    Hi
    In order to add or change the decsion group for tha graphical objects, I need to know what is the name of the Graph.Object ID that is shown on our resource chart. The Colour of this object I want change is of that object. But I can figure out what is the object ID that is used.
    Any Ideas?
    Thanks

  • ATP Category Filter for DS Board

    Guys,
    I use a single mixed resource. I do not want to see the SNP Planned Orders on the DS Board. This is in Resource Chart i.e. Chart Number 1.
    I tried using the SET/GET Parameter, but it seems this works only for non-resource charts.
    Kedar

    Hi Kedar,
    Under customisation, ie spro > sap guide > apo > ppds > detailed scheduling > settings for DS board > maintain planning board profiles
    select the profile, and click on chart, select chart no 3 ie orders chart, and double click on it, you will get a new screen, click on field selection, pull order category in livecache and you can exclude category for snp planned orders EE.
    Please confirm your findings
    Regards
    R .Senthil Mareeswaran.

  • Resource name

    Hi,
    I am working on a VB .NET/C# app to talk to NI PXI 2503 switch card. Is
    there any way I can query the card to get the resource name/topology
    before initializing the card? Thanks.

    Hi John123,
    You can access the recourse names and limited card info using the niModInst calls, but you will not be able to access the topology of the card before initialization. The function to scan the computer to give the resource descriptors of all boards specific to a Modular Instruments driver is called niModInst. The niModInst Open Installed Devices Session call will create a handle to a list of installed devices supported by the specified driver. Call this API and select the name of a National Instruments instrument driver, such as NI-SWITCH, from the driver control. This call searches the system and constructs a list of all the installed devices that are supported by that driver, and returns both a handle and the number of devices found. The handle is used with other functions to query for attributes such as device name and model, and to safely discard the list when finished.
    This is a link to the help files for available niModInst function calls.
    'Hope this helps.
    Regards,
    Natasa

  • How can I configure a third party VME board with A24 address space using a VME-MXI-2?

    Hi!
    We are trying to establish communications to a Galil Motion controller with a VME interface. Galil states that they are using a A24 address scheme with A16 data space for their board.
    I am confused how to configure that board in the VME chassis properly.
    The base address provided by Galil is 91Fxxx, I am assuming that the lower three nibbles are the registers that I can talk to?!
    How do I set the address range under the resource setting for that board?
    Also, I noticed in MAX that one board shows up with a slot number unknown, one with slot #0 and this board I have set to slot #1. I assume that the unknown part is for the PCI card that makes up for the 1/2 of the PCI to VME bridge?
    The VISA VIs (Register based access) returns either a bus error, an invalid offset specified or data. However, we are completely in the dark when it does return data, since the expected offset we are typing in causes one of the two errors.
    Our assumption of the problem is that we do not understand how to properly configure that third party board as a resource. It has also happened that the resource manager is hanging up the PC completely. Not even CTRL-ALT-DEL works and the MXI activity LED on the NI-VME-MXI-2 board stays on during the hand up.
    We would appreciate, if somebody could walk us through the configuration process, step-by-step. Specifically, please explain how to setup the base address and how the offsets relate to this on a A24 address scheme. We are completely new to the VME bus interface, so even trivial things may be unkown to us.
    We have browsed NI's page and manuals for explanations, however, we could not find any answers to our questions.
    We noticed a formula for an A16 board that takes the base address and adds the logical address to it plus 40hex. Do we have to do the same or something similar to the A24 board????
    We also came accross an option that would allow the board (NI VME controller) to share its memory with A24 or A32 space? Do we need to enable that? What is the purpose for that?
    Best,
    Markus Tarin
    www.movimed.com - Custom Imaging Solutions
    www.movitherm.com - Advanced Thermography Solutions

    When I did not get a response here, I had to open a ticket with support.  The short answer is that you cannot customize the SAML response when using Azure AD as an IdP.
    Response from support:
    I discussed the issue with senior engineers to get action plan for this issue. After doing research Senior engineers updated me that we cannot add a custom attribute to the default
    SAML response of Azure AD.
    Below is the link to get the list of available attributes
    https://msdn.microsoft.com/en-us/library/azure/dn195587.aspx
    As default SAML response from Azure AD , we have email address of the user sent out as attribute value for the Attribute " NAME ".
    They suggested me to configure the application we are trying to integrate with Azure AD in such a way that it transforms the Attribute  " NAME " into " EMAIL
    This was not particularly helpful in my case as I did not have any control over the 3rd party which specifically documented that they would not extract the email address from the name attribute.
    Cheers,
    Jeff

  • Creating "stickies" on LabVIEW board?

    Yesterday, someone (unfortunately, not me) had the good idea to start a thread on "Free online learning resources" on the LabVIEW board. I would like to suggest that this thread be made a stickie at the top of the board, in a bold black font, outlined with a red blinking box, since it would at least be useful to those getting into conversations with real newbies to point to for further information, at least on basic topics. (It would also be useful to those users like me, who don't want to clutter the board with those basic questions in the first place.)
    Who should I contact to make such a request, and how?
    Thank you,
    Cameron
    To err is human, but to really foul it up requires a computer.
    The optimist believes we are in the best of all possible worlds - the pessimist fears this is true.
    Profanity is the one language all programmers know best.
    An expert is someone who has made all the possible mistakes.
    To learn something about LabVIEW at no extra cost, work the online LabVIEW tutorial(s):
    LabVIEW Unit 1 - Getting Started
    Learn to Use LabVIEW with MyDAQ

    Thanks, crossrulz,
    FAQs are always good to see, but like you said, they often stick in "beta" for a long, long time, sometimes never to see the light of day for the larger community.
    I've found as a member of several nonrelated forums that sticky threads at the top of a board are often more useful, as they:
    (1) can be seen as soon as a member enters the board,
    (2) are often easier for respondants to questions to refer the OP to ("Go to the top of this board," FAQs seem to be relegated to other places, up two or more levels, or even in another subdomain completely), and
    (3) can be added to quickly by anyone who finds a relevant resource, whereas FAQs, by their nature, are slower to keep up with fast-breaking news, having to go through the FAQ maintainer(s)  and often some subset of the forum admin.
    But, any way to get the resources noticed by the members who need them the most would be appreciated.
    Cameron
    To err is human, but to really foul it up requires a computer.
    The optimist believes we are in the best of all possible worlds - the pessimist fears this is true.
    Profanity is the one language all programmers know best.
    An expert is someone who has made all the possible mistakes.
    To learn something about LabVIEW at no extra cost, work the online LabVIEW tutorial(s):
    LabVIEW Unit 1 - Getting Started
    Learn to Use LabVIEW with MyDAQ

  • Dp/snp changes in production support

    Hi sap gures
    APO DP/SNP- productionm support, which kind of changes or Enhancement we can do
    in DP/SNP, please let me know, i am new for this project..
    Regarding
    R.suresh Kumar

    Hi Suresh,
    BAPI  In SNP
    BAPI_PIRSRVAPS_GETLIST      Planned Independent Requirement i.e. Forecast
    BAPI_POSRVAPS_GETLIST3      Procurement Order (Purchase Requisition / Stock Transfer Requisition)
    BAPI_MOSRVAPS_GETLIST2      Planned / Production Order r
    BAPI_SLSRVAPS_GETLIST2      Sales Order / Deliveries
    BAPI_STSRVAPS_GETLIST2      Stocks
    BAPI_LOCSRVAPS_GETLIST2      Locations
    BAPI_PRDSRVAPS_GETLIST2      Products
    BAPI_RSSRVAPS_GETLIST      Resources
    BAPI_TRLSRVAPS_GETLIST      Transportation Lane
    BAPI_PROCRELATION_GETLIST2      Procurement Relationship
    And BADI
         Short Description      For Transaction
    /SAPAPO/DM_PO_OP_DA2      BAdI: Change Opening Period and Calendar      Product Overview, Product View, DS Planning Board, Interactive SDP
    /SAPAPO/CDPS_SIMCTRL      PP/DS Heuristic: Save/Merge/Delete Own Data      Product Overview, Product View, DS Planning Board
    /SAPAPO/PPT_TREE_COL      Additional Columns in Navigation Tree      Product Overview, Product View
    /SAPAPO/RRP_SRC_EXIT      BAdI for Selecting Source of Supply, Creating Planned Orders      Product Overview, Product View
    /SAPAPO/CULLRTOEXPL      Enhancement for PP/DS PDS Explosion      Product Overview
    /SAPAPO/POV_COL      POV: BADI for Columns      Product Overview
    /SAPAPO/RRP_COVPARAM      Time Parameters for Receipts in the Days' Supply Calculation      Product Overview, Product View
    /SAPAPO/RRP_IO_COL      User-Exit for Enhancement of the Order View      Product View
    /SAPAPO/CDPS_FT      Configuration of Interface for Error-Tolerant Scheduler      DS Planning Board
    /SAPAPO/PRODU_CONVEX      Product Number Conversion      DS Planning Board, Interactive SDP
    /SAPAPO/PROD_DEPOBJ      Product Usages (Deletion Blocks)      DS Planning Board, Interactive SDP
    /SAPAPO/CDPS_RC_CDAT      Change Curve Data for the Resource Utilization Chart      DS Planning Board
    /SAPAPO/CDPS_MC_CDAT      Change to Curve Data for Product Stock Chart      DS Planning Board
    /SAPAPO/SDP_INTERACT      SDP: Interactive Planning      Interactive S&D Planning
    /SAPAPO/SDP_COLWIDTH      Planning Period Column Width Default      Interactive S&D Planning
    /SAPAPO/SDP_SELECTOR      User Exits for SDP Selector      Interactive S&D Planning
    /SAPAPO/SDP_SAVE      Data Save Operation Check      Interactive S&D Planning
    /SAPAPO/ADVX      Use this BADI for complex calculations in Planning book      DP/SNP Macro Builder
    /SAPAPO/CURTO_CREATE, /SAPAP/CURTO_SNP      PPDS and SNP PDS Creation      
    Regards,
    MJ

  • PXI External Graphic Card

    Hi Guys,
    I have a PXIe system, currently running in RT. Now, there is a requirement for the PXIe system to have up to graphic output to control some instruments. I came across these cPCI cards:
    1. http://ekf.de/s/sv1/sv1.html
    2. http://ekf.de/c/cgxa/cv2/cv2.html
    Based from my understanding, SV1 is a card that acts as a garphic card for the system as you can insert an AMD card somewhere on the card. CV2 card, on the other hand, is just as an extended display output. I've emailed the OEM, and their feedback are as follows:
    "For CV2, VGA resources have to be released by the BIOS, we have the experience already that NI CPU boards are not able to release resources for our VGA board. Anyway, our hardware contains standard Intel hardware same as a PC. And we have customers, using cPCI serial http://ekf.de/s/sc1/sc1.html with a hybrid backplane for a PXIe DSP board and mixing with cPCI serial peripheral boards. This would be the right Graphics board: http://ekf.de/s/sv1/sv1.html"
    So, I'm not sure whether it can be used or not. If it is possible to use one of these two cards with a NI PXIe system, I'm also planning to convert my RT system to Hypervisor. The Windows portion is specifically meant to handle these cards while the rest of the program and processing resource still maintain in the RT system. Will this work?
    I'm attaching the datasheets for these two cards, for your reference. Any advice or feedback?
    Shazlan
    Attachments:
    sv1_pi.pdf ‏993 KB
    cv2_pi.pdf ‏677 KB

    Why not???
    If its possible to connect such card to the notebook, then I dont see any serious reasons why you shouldnt be able to use it.
    But as far as I know this external card can be used only with the external display (monitor) because the internal notebooks display is already taken by internal graphic card.

Maybe you are looking for

  • Getting FRM-40400 but data is not in table

    I have a form with three data blocks. The first one is Database Data Block = no because it is used for query purposes only. The second one is Database Data Block = yes and is the only data block in which data gets entered into a table. The final data

  • PO print ouu

    Hi friends We have created a PO and release effected and we have taken a printout.After a week we tried to take printout of the same PO but the output is in redlight when i go to processing log " No print-relevant changes to document 450.........8 ex

  • Data sources for infosource 0HR_PA_EC_01

    Mistake about this problem, you can close it, sorry! Edited by: Artur Rodriguez Coma on Feb 13, 2009 1:47 PM

  • Template Creation Problem

    Hello, I am using Dreamweaver CS5.  I have created an index file and one template based on the index file.  I created the template by: 1) Opening my index file 2) Clicking "File | Save as Template..." 3) Clicking save. 4) Made some changes to create

  • Software Lifecyle Manager Problem

    Hi, We have installed SOLMAN 4 ABAP+J2EE without SLD and Central SLD in standaone J2EE. we want to use SLM in the J2EE addin for solman. but the connection to SLD is not working even the SLD data supplier is configured correctly in the j2ee addin as