Dear Gurus,
I am geting the following ERROR
Value can't be interp. as floating-point number or longer than 22 charac.
Message no. BF020
I have maintain an MICs in the systam as BlankDie,and asigned in the Inspection Plan as my client wants to enter the die size in the Result-Recording.
But when i enter the die size for example: 60/33
I get above error.
Regards
Ram

Ram
Correct me if I am wrong
You always want to enter something like that 60/30 (means your die size or fixed like 60/30 , 29/15 like that)
If your MIC is Quantitative - then SAP will allow to enter either 60 or 30 and it will not allow you to enter 60/30 or 60by30 because these are all consider as Alphanumeric this is not allowed for MIC's.
for this you need to create catalogs1 and code group and codes
Create MIC as Qualitative and select catalog in QS21.
In Qe51N you can select your predifined codes (means your die sizes like 60/30) if you feel 500 - 600 die sizes it is very difficult to select.then ask your business is't it realy neccesarry for single material inspeciton they want to all size or depends material it may wary. if it is vary better to create more MIC based on that you can split catalog code group and code.
otherwise As i said create one code group and code.
or  if possible if 1 is equal to 30/60 and 2 equal to 70/50 -- something like that is ok then you can use quantitative MIC --- but I don't think your client will accept this?
this is the only solution
Try this and let me know if you have problem
Thanks
Sami
Edited by: sami sami on Mar 7, 2009 6:43 PM

Similar Messages

  • SAP QM: Copy Results recording error - Problem class medium

    Hi,
    Can anyone help me to resolve one error message u201CProblem class mediumu201D Number 1 during copying of Results recording from one IL to another IL as explained below.
    Origin IL and Target IL has same sample size qty:
    Origin IL - MIC's are valuated successfully in RR
    Please let me know if any other details required to resolve the error.
    Regards,
    Udaya Kumar

    Hi,
    Thanks for your response.
    Characteristics and MICs are properly assigned for  both Target and Origin Inspection lot materials, only thing is MICs are not in same order in both the inspection plans.. is this the reason for the error message.
    Regards,
    Udaya Kumar

  • Error in operation level result recording

    Hi,
    I need held; result recording of inspection type =03 (operation level Quality inspection)
    A product manufacture via three operations (10, 20, 30)
    All operation quality inspection active let operation no-10, all products reject and confirm as rework.
    Next operation level quality record is done but confirmation not allow Reason is operation -10, rework quantity, (Actual quantity is more than planned quantity)
    How to add the quantity after reworks for next operation quality inspection?
    Pl helps me finding the solution.

    Hi,
    As per your more clearence , As per Example  production order Quanity =1, passes 3 operation10,20,30
    Operation=10 require rework as per quality ,
    Operation =20 system raise the error message = Operation =10 rework .
    If want to operation =10 ok Quantity =1 then system raise error messges =Actual quanity more than planned Quanitity
    ( 1 Rework + 1 Ok ) .
    Supose rework order create and confirm then next 20 & 30 operation how complete .
    Real scenerio :- Rework on operation =10 then again Quality check then goes to 20 operation Quality check pass / Rework if rework then again quality pass then goes to next operation level
    I hope under stand my problem
    Need help- please

  • QM-Calibration Procedure -Error during Result Recording

    Dear Sir,
    During mapping of Calibration Process in SAP,I am getting error ( status check error ) for Result recording of Inspection lot (QM-Calibration).I have follow all the required steps,I am not getting reason of error,Please Advice.
    Thanks

    Dear
    Maintain in sampling procedure radio button palnt maintainance. then check if ur using inspection plan with inspection point.
    else make sampling management radio button on..
    regards
    SANIL

  • Runtime error for Inspection Point Results Recording

    Hi,
    I am changing the already done Results Recording for using already used Inspection Point.
    I am getting the runtime error. Anybody came across such error?
    Regards
    Ramakanth

    Hi,
    In the in-process inspection I am using Inspection Points. Initially I have done Results Recording once with quantities.
    And then again I wanted to change the quantities for the same Inspection Point. So, I went to Results Recording for same Inspection Point and changed the quantities and saving. At this event I am getting Runtime error.
    I  have even deactivated one BADI INSPECTIONLOT_UPDATE and tried again. Even then I am getting same error.
    Ultimately my requirement is this:
    My client wants UD at operation level. They want only quantity which is accepted in Results Recording to be moved to the next operation. In the operation level confirmation the system should only accept the quantity which is accepted in Results Recording.
    Any suggestion in this regard.
    Thanks
    Ramakanth

  • Error while Result Recording-QM

    Dear friends,
    While RR for inspection lot I faced this error.
    Characteristic results cannot be recorded for inspection lot 06000000764
    Message no. QE181
    Diagnosis
    You cannot record any characteristic results for this inspection lot. The material master has been set up for the existing inspection type in such a way that results recording is not supported.
    Procedure
    Confirm defects for this inspection lot or select another inspection lot in which you can confirm the characteristic results.

    Dear Vipul,
    Check the System Status, it will be CRTD.
    Now select the material and click on Inspection Lot button.
    In this window , click on the Inspection Specification tab.
    Now click on the Task List / Spec. button.
    If this button now appears fainted after clicking then it is ok, then click on the Sample button , here click on the Smpl. button and this button will shown in fainted look. Now click on the Save button. It will bring you on the main screen of QA32 , now click on the Refresh button , you will notice its Status will change.
    If clicked on Task List / Spec. button and it shows an error message that No Inspection Plan Exists , then you will have to make an inspection plan using T-Code QP01. After making the Inspection Plan then follow the above steps.
    Hope this solves your problem.

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • Error during result recording in QE71

    Hi Gurus,
    I am using inspection point (copy of 150) in my inpection plan. When i am trying to save my result recording in QE71 system giving below error message.
      Insp. Lot       Oper     Charac. no  Sample                    Message text                                        MsgType Message ID     Msg.No.
    80000000196 0010         10                2     You must enter a text for the characteristic result           E          QE             462       C60
    Though i have maintained the resuts.
    Please help to resolve this issue.
    Regards
    Sandip

    You need check the inspection characteristic's control indicator.
    Transaction QP03 (display inspection plan)
    If you set 'Docu. required' in control indicator of inspection characteristic, additional text must always be entered to document the inspection results during results recording for this characteristic.
    Try to change the indicator to 'No documentation' then there will be no more that message in transaction QE71.
    Regards
    Luke

  • Error while doing calibration (result recording)

    Hi friends,
    while doing inspection lot processing, when i do the result recording it is giving the error : selected set not assigned to inspection points.
    when i checked the setting in spro as:
    QM-- Quality Planning -- Inspection Planning - General - Define Identifier for Inspection Points
    300: Inspectio of Equipments
    Default for valuation inspection point
    Plant : 1000             Selected Set: 18 (created as an selected set )
    now the system is giving the following error:
    Entry 1000 3 18 does not exist in QAPM (Check entry)
    Gurus please suggest me where i am doing wrong. is there any other setting which i need to check.
    waiting for you prompt answer.
    Pankaj

    i solved the problem
    thanx

  • Result recording(QM) - Status check error

    Hi Friends,
    I can not perform Result recording(QE01) due to "status Check Error".
    Inspection lot was created through GR. And then i tried to do Result recording. But i am getting error "status check error-This function you selected cannotbe carried out".
    Appreciate your help.
    Thanks

    hi
    If no Inspection Plan is found,
    1. Inspection Plan is not available. Check in QP03 for the material/plant combination the availability of plan. If not available, create it using QP01.
    2. The date of creation of Plan is later that date of creation of Inspection Lot. In this case, in QA02 give the key date as before the date of creation of plan.
    Next, you can do the Result Recording (from QA32 screen or use QE51N)
    Once all results are entered and saved, the status become INSP.
    Now, do the Usage Decision (QA32 / QA11) and here give the acceptace code and post the stock into Unrestricted stock
    regards
    kunal

  • Duplicate Records error when processing transaction file....BPC 7.0

    Hi All,
    I have a situation. I am using BPC NW 7.0 and I have updated my dimension files. When I try to validate my transaction file every single record is validated successfully. But when I try to import the flat file into my application, I am getting a lot of dupplication records error and these are my questions.
    1. Will we get duplicate records in transaction files?
    2. Even if there are duplication, since it is a cube it should summarize not display that as a error and reject records?
    3. Is there something I can do to accept duplicates (I have checked the Replace option in the data package, to overwrite the simillar records, but it is only for account, category and entity only.
    5. In mycase I see identical values in all my dimension and the $value is the only difference. Why is it not summing up.
    Your quickest reply is much appreciated.
    Thanks,
    Alex.

    Hi,
    I have the same problem.
    In my case the file that I want to upload has different row that differ for the nature column. In the conversion file I map different nature to one internal nature.
    ES: cost1 --> cost
          cost2 --> cost
          cost3 --> cost
    In my desire was that in BPC the nature cost assume the result  cost = cost1 + cost2 + cost3.
    The result is that only the first record is uploaded and all other recorda are rejected as duplicate.
    Any suggestion?

  • Message in result recording

    Hi friends,
    I am using upper & lower plausibility limit in MIC, while result recording for this MIC a warning message is issued when user enters value which is not in the defined range, now i want to convert this warning message to error message.
    The mesasge is
    The input value 14 is too large. Check your entry
    Application Area: QE
    Message number : 405.
    Please guide me how to go about it.
    Regards,
    Amit Shirsath.
    Edited by: Amit Shirsath on Jul 15, 2008 6:36 AM

    Why would you want to change this to a warning only?  If the value is to large for the test being performed, it shouldn't be allowed to be enterred. 
    Unless you have done something strange with your master data, (like setting a spec on the characteristic itself), you should be able to enter an out-of-spec value but you should not be able to enter one that exceeds the capability of the test, i.e. the characteristic. 
    With a max value of 14 this sounds like a pH test.  You shouldn't ever have to enter a value over 14..
    Craig

  • 'Check  covered levels OKS'  process results in error during QA checkup

    Hi,
    The following process in QA test, before submiting a service contract results in error.
    'Check covered levels OKS' with the error message
    "Atleast one covered line is required".
    I'm not able to choose any product.
    How to set the covered level as product in service contracts?
    In the service contracts authoring window, under lines tab -->pricing/products-->
    effectivity
    line number
    level- covered product. But the lov in name field doesn't list any value ?
    what could be the possible reason for this?
    Regards,
    Nithya

    Well, I think I can only give some limited info about these questions since I am only a contracts user, not a developer or administrator.
    But here's a few things that might help.
    1 & 2) I have always created contracts from scratch where I work. They can't seem to get OM to create contracts correctly (so I can't help with question 2). I don't use OM except for inqueries.
    When you create such a contract, it should show up in the Install Base (IB) if you look up the IB record with the related Reference Number (which changed to Product Number in the IB when my company switched from 11.5.5 to 11.5.8). In my case it was the Contracts tab in 11.5.5 (Java interface) and the Contracts link in 11.5.8 (HTML interface).
    3) From my experience, the Contract Number is the Sales Order Number in View Transactions if you had the AR Interface checked in the contract.
    If you want to change from not having the AR Interface checked to having it checked, I think this works fine and the contract will bill the next time the Main Billing program is run after you make the change, as long as the Bill On Date (11.5.5) or Invoice Date (11.5.8) is set to the current date or earlier. An Invoice (INV line item with invoice # -99) will show up in the Billing History after the AR to Contracts Interface program is run. The actual invoice # will show up in this Billing History after the Invoicing programs are run.
    In 11.5.5, if our contract started in the future, we not only had to make sure the Bill On Date was current or earlier, but also run the Main Billing program on that contract with a date equal to or later than the end date of the contract we wanted to bill before it would work. Do not do this on all your contracts at once if you have recurring billing on any of them. You must run it on the individual contracts, otherwise the recurring contracts will bill in full. This is supposedly fixed in 11.5.8, since you can use offsets of more than 31 days on the invoice date, but we haven't billed any yet, so I can't say for sure.
    I had problems with billing when trying to change the ammounts in the line items after the billing program had already invoiced a contract in 11.5.5 and haven't tried this in 11.5.8 (it billed incorrect ammounts on the successive invoices).
    Note that we have a highly customized version of Oracle Applications 11i, so your results may differ somewhat.

  • Lock in the results recording in QE51

    Hi,I use a BAPI to do results recording in QE51,but when someone inside the characteristic,results recording does not happen, and there is no error message appears.What should I do to deal with the problem? Should I use 'lock object' method? I know nothing about 'lock', would you please tell me the method in detail?
    For example,the inspection lot number is: 10000006313, the operation number is:0080 and the inspection characteristic number is:0010, I am inside this characteristic,but I want to do results recording using a BAPI.Results recording doesn't happan,and there is no error message appears.How can I deal with the problems.Many thanks!

    CALL FUNCTION 'ENQUEUE_EQAVO'

  • User Exits for QE11 Results Recording

    Hi Experts,
    I'm having the scenario for results recording as follows.
    I'm using variant configuration, while creation of sales order user will enter the configuration i.e. Manfacturing range. Based on the manfacturing range system will calculate the remaining parameters like burst pressure maximum and minimum based on the dependencies we written.
    While doing the results recording, the system is giving error if out of the range values entered.
    But here, if suppose Manfacturing Range = -5% range
    Then the Burst pressure Maximum = 15 psig
    Burst Pressure Minimum = 12.5 psig
    For this range, they have some calculation while doing results recording.
    For this range +/- 2 % will be allowed i.e.
    Burst Pressure Maximum =  15.3 psig
    Burst Pressure Minimum = 12.25 psig
    This range will be applicable in Quality Department.
    So, while doing the results recording system has to give the error out of this range means.
    For this is there any User Exit or Enhancement is available or not.
    Please help me.
    Naren

    Hi
    I think you can use the multiple specification for the mareal function to meet this.
    Step1 : Quality Management -> Basic Settings -> Maintain Settings at Client Level
    Inspection Specification -> Multiple Specifications check box to be flagged.
    Step 2: Quality Management ->Quality Planning -> Inspection Planning ->General -> Multiple Specification->
    Define Object Types for Multiple Specifications e.g.Manufacturing range
    Step3 : Quality Management -> Quality Planning > Inspection Planning > General > Multiple Specifications
    > Define Objects for Multiple Specifications e.g. 5%, 10% etc
    Step 4 : Activate Multiple spec Quality Management > Quality Inspection > Inspection Lot Creation > Define Default Values for Inspection Type
    Step 5 : flag Multiple spec check box in material master inspection set up
    Step 6 : In quality plan header data click on multiple specification
    step 7 : Assign the material to the task list
    Step 8 > Enter the depedent characteristics for the specification

Maybe you are looking for

  • How do I fix missing icons after wake from sleep?

    This issue will not go away and continues as a significant bug in Mountain Lion 10.8.2. If I let the battery drain beyond 5% and put it to sleep. Or if it goes into hibernation automatically due to low battery power. Imust push the power button to wa

  • Timeout when using  ALV build-in functionality: exporting to Excel

    Hello, I have the following problem within one of my web dynpro abap applications: I need to be able to display data in a table that preferably should be via alv component. Then I shall also be able to download the displayed data via Excel. So I have

  • Image will not display in a jFrame

    So, I had this working, but then I resized the jFrame and the image, and now it doesn't work. I even tried setting it back to the original size and it still doesn't work. I changed nothing else in the code. I'm using Netbeans IDE and this is a java d

  • P6 EPPM configuration wizard won't connect to database server

    I have installed P6 8.3 and Weblogic on one server (application server). On another server SQL is installed. When i run the P6 EPPM Configuration Wizard i get as far as the step 'Database Type & Connection' where i can fill in the details of the serv

  • T410: display driver problem // display does not turn on again after turned of by e.g. (fn+F3)

    Hello, I have a problem with my T410 (model: 25223FG)with Nvidia NVS 3100M  (driver version 8.17.12.5738  (27.06.2010) ) . The Fn+F3 Key-Command is configured to turn of the display. In almost 50% of the cases where I use the Key-Command (fn+F3), the