Return Delivery and Subsequent Delivery part 2 updating

Hi Experts
I made GR for PO by capturing Excises as it is defective I have returned the stock to vendor in MIGO using Return Delivery against Material Document number, at this stage part 2 is deducing the G/L account of BED, ECS and SHCess and adding with G/L account of CENVAT Suspense account. Fine it is as I expected.
But the problem is, when I making subsequent delivery for the item instead of deducing with G/L account of CENVAT Suspense account and adding the G/L account of BED, ECS and SHCess IT IS DOING REVERSELY THAT IS AGAIN IT IS deducing the G/L account of BED, ECS and SHCess and adding with G/L account of CENVAT Suspense account.
Kindly where I've make the changes for it to capture correctly.
Regards
K.R.Srinivasan

not yet answered

Similar Messages

  • The Flash Player is not running but it is there and it is enabled and Active X is not checked. The Player version is 16.0.0.305.  I have the latest ie11 and the latest W8.1. I have used the Adobe tool to delete the Flash and subsequently I have updated or

    The Flash Player is not running but it is there and it is enabled and Active X is not checked. The Player version is 16.0.0.305.  I have the latest ie11 and the latest W8.1. I have used the Adobe tool to delete the Flash and subsequently I have updated or reloaded Flash using your updater.  I have gone into IE options and insured that the settings are supportive of Flash.  The Adobe mini Flash test program on your site says it not enabled or Active X is enabled - not true - all is set as it should be.  I have gone through your forums but to no avail.  I've looked in MS forums but nothing that made any difference.  What's going on and what can I do about it?

    Try using Firefox. Flash usually works on Firefox when it won't on Safari. I noticed that the Safari does not show the same version as Firefox does. Iwonder if that could be the problem. Safari on the left shows 10.1, Firefox show 10.3

  • Stock transfer order (STO) Without delivery and With delivery?

    Hi experts,
    Could any body explain step by step procedure
    Stock transfer order (STO) Without delivery and With delivery?
    Thanks
    Reddy

    Hi
    Stock Transport Order Without SD Delivery.
    U dont have to maintian sales view for the materials.
    1. Extend the material to those 2 plants.
    2. Create UB purch document.
    3. Goods issue wrt to the STO in the supplying plant ( 351 mvt type).
    4. Good Receipt in the receiving plant ( 101 mvt type ).
    5. Invoice verified (MIRO).
    U should have specific pricing procedure for STO. In MEK0 u have to choose the appropriate pricing procedure with the accrual key linked for freight charges.
    Vishal...

  • Under delivery and over delivery tolerances at prod order level

    Hi, Pls advise how to maintain the under delivery and over delivery tolearnce at production order level (other than maintaining material master)? is ther any setting at order type or order level? pls advise.

    Dear,
    Go to Co01or CO02 click on Good Receipt tab here you will get option to maintain the under delivery and over delivery tolerance at production order level. There is no other setting than this and material master.
    Regards,
    R.Brahmankar

  • Over delivery and under delivery tolarance limit.

    Hi all,
    I want to configure the over delivery and under delivery tolerance limit
    fix i.e. 5%.
    Any user can give tolerance up to 5% and not more than that.
    Please help me
    Regards,
    anant

    Hi,
    U can configure the same . Please refer
    SPRO-MM-PURCHASING--PURCHASE ORDER--SET TOLERANCE LIMITS FOR PRICE VARIANCE
    Here u can finalise the upper and lower limits as 5%. the PO shall automatically pick up the same.
    Hope this helps.
    Regards,
    Prasanna
    Award pls if helpful.

  • Authorization for PO fields of over delivery and under delivery tolerance

    Hi,Any one know how to set authorization for PO fields of over delivery and under delivery tolerance?
    For example to allow certain user to edit the these fields but other users will be only display mode.

    Better create variant for restricting fields over & under delivery tolerance for certain users than applying authorization.

  • Delivery and replenishment delivery

    hello all,
    I would like to know the difference between delivery and replenishment delivery. pl. let me know in which scenario replenishment delivery is used and how it is created.
    Thanks,
    Maxx

    Hi,
    Longman online dictionary:
    to put new supplies into something, or to fill something again
    Dictionary.com:
    to make full or complete again, as by supplying what is lacking
    Cambridge online dictionary:
    to fill something up again
    Well, I think in terms of SAP it is used in the same meaning: if you use a material somewhere continually (consume it continually) you need continually supply that material to be able to continue your consumption.
    In SAP you use this expression in connection with
    - storage location MRP scenario
    - fixed bin replenishment
    - KANBAN replenishment
    - generally in connection with material staging
    - etc.
    Please consider that characteristics of this processes: you "continually" produce / consume (e.g. raw) materials and that's why you need "replenishment".
    In connection with certain MTO scenario where certain raw materials are very specific and are used only once maybe there's no point in speaking "replenishment".
    The procurement of these goods seems to be a very simple process (very simple purchasing activity).
    So, I think delivery is delivery and there's no separate "replenishment delivery" type / document, a delivery becomes "replenishment delivery" because it is used for "replenishment".
    (E.g. delivery created with reference to STO can be called replenishment delivery if you provide the raw materials from one plant to another, or from one SLoc to another SLoc).
    Just my ideas..
    Regards,
    Csaba
    Edited by: Csaba Szommer on Jan 27, 2009 9:39 PM
    Edited by: Csaba Szommer on Jan 28, 2009 8:16 AM

  • How to track Delivery and Read Receipts, to update the e-mail status?

    Hi,
    I got bit confused, How can I came to know that my e-mail has been successfully sent or not without opening my inbox.
    Am sending 50,000 mails per day by using java mail sending program, while sending I am enabled Delivery and Read receipt and I saved message-id in database and I got that receipt back to my inbox.
    Then I am reading my Inbox using another java program based on message-id concept, And also I need to parse the body of the mail to update the reason if any message failed.
    Here my Inbox received more than 1 lac mails per day as receipts. Because am sending 50,000 mails, So, I got 2 receipt mails for 1 mail, totally 50,000*2=1lac mails in Inbox. My problem is, my reading Inbox java program not able read all 1lac mails at one day. It just reading 5,000 mails per day. When my next day mail sending process started, again i am getting another 1 lac receipts.
    Since I am not able to read and delete the receipts completely, mail counts in my inbox getting accumulated. So, I got stuck, How can I do this?
    If anybody have any other ideas please share with me.
    Already I surfed on net lot, but I can`t find solution for this concept.
    Thanks in advance.

    Hi EJP,
    step 2: Taking total inbox length using message.length
    The message count is available via Folder.getMessageCount*().//ok I will try this one.*
    step 3: In for loop, for(i=0; i < = n; i+){+ //--here we are getting mails one by one
    That should be i < n, not i <= n. *//here I was wrongly specified, I used i<n only.*
    step 5: In that mail body we are searching our own unique keyword(which we set for our unique mail reference)
    Searching how?
    In order to find the keyword, we are getting entire text/plain mail body using below method,
    //To get body plain/text body part start here
         public static void getTextPlainBodyPart(Part p) throws Exception {
              if (p.isMimeType("text/plain")) {
                   if (!(showStructure) && !(saveAttachments)){
                       lstr = (String)p.getContent();
              }else if (p.isMimeType("multipart/*")) {
                 Multipart mp = (Multipart)p.getContent();
                 level++;
                  int count = mp.getCount();
                  for (int i = 0; i < count; i++){
                 getTextPlainBodyPart(mp.getBodyPart(i));
                  level--;
    //To get body plain/text body part end hereAbove method will return entire body of the mail in one string variable, Eg: String mailBody;(*mailBody variable contains entire body)*
    Then using mailBody variable we are searching our own keyword(which we set for our unique mail reference while sending mail) using below technique,
    if(lstr.indexOf("!$*#*$") != -1 && lstr.lastIndexOf("$*#*$!") != -1){
    KeyWord = lstr.substring(lstr.indexOf("!$*#*$")+3,lstr.lastIndexOf("$*#*$!"));
    //to get reason alone
    if(lstr.contains("Reason:")){
         Pattern p = Pattern.compile("Reason:\\s([^\\n])*");
    Matcher m = p.matcher(lstr);
    boolean result = m.find();
         while(result) {
            reason = m.group();
             result = m.find();
    //System.out.println("Reason:>>>>"+reason);
    }else{
         reason = "";
    }After getting that keyword in KeyWord variable,
    then we are updating our database using that KeyWord,(here we are using KeyWord variable in where condition in update query)
    Note:_ KeyWord is nothing but, we were stored all our unique keyword against every mails while sending.So, If when get that keyword while reading the receipts,then we can update our table using that same keyword.
    guide how can I do this effieciently. And if you any other new concept please share with me.
    Thanks in advance..
    Edited by: EJP on 17/03/2011 16:54: added code tags. Please use them. Code is 100% illegible otherwise.

  • Subsequent delivery and subsequent debit

    Dear All,
    material type: NLAG
    account assignemnt (PO): cost center, non valuated GR
    Scenario:
    1. GR (MIGO) - material_document1, qty 100
    2. IR (MIRO) - invoice1 for material_document1, qty 100
    > vendor makes correction because qty is more or less than the original
    3. GR (MIGO) - material document2 - qty 20 (sum qty for PO item is 120)
    4. IR (MIRO) - subsequent_debit1 for 20 pcs
    These connections / links should exist:
    Material_document1 - invoice1
    Material_docuemt2 - subsequent_debit1
    My question
    How can I solve this? Is it posible to book the subsequent debit with reference to material_docuement2?
    If I create the subsequent invoice it is valid only for material_document1 EVEN IF I do material_document2 as SUBSEQUENT DELIVERY in MIGO (in this case the two material documents are connected). SAP expects an additional invoice for material_document2 (but it is linked to material_docuement1!).
    In my opinion it cannot be solved since the debit/credit memo refers to the "original" material document (1) and invoice (1).
    Thanks,
    Csaba
    My question was a little bit incoherent...
    I wanted SAP to suggest the to-be-credited qty&value automatically in case of returns to vendor - but it's not possible in standard system as per my best knowledge .
    Edited by: Csaba Szommer on Mar 4, 2009 9:18 PM
    Edited by: Csaba Szommer on Mar 4, 2009 9:22 PM

    Hi Bala krishnan,
    when there is a price difference this entry would takes place. while reversing the same should be reversed, in your case the system is posting to another account.
    please check the account key against the wrong line item ( this you can see with the help of changing layout), then goto OBYC and check the gl accounts assigned against that. To check either it is right or wrong compare with the standard/default company codes settings i.e 0001 co.cd.
    Thanks & Regards,
    Shashi Kanth.

  • Create STO,Delivery and PGI delivery from an interface

    Hi,
    We are using a third party WMS system to manifest and ship orders froma  distribution center to a store. The only data that is going to come into SAP is the Bill of Lading as to how much has shipped for a material to the store from the DC. This has to drive a Stock transport order cycle of creating an STO, create and PGI delivery. As we are building the interface,  I am a bit confused as to how we can make all this happen from one data feed.  Since there is only one feed and it has to trigger mutliple processes should we trigger multiple idocs (different types) to trigger the STO creation, create the delivery and PGI it (Delivery 03 idoc)?
    Will it be too cumbersome to build all this logic in the interface?
    Another option would be to create the STO using the feed, then run VL10B in a given time interval (Background) to create the delivery.
    However, I am not 100% sure how you can spawn off a PGI job? Even if I were to run the VL02n program in the background how can I populate the pick quantity?
    Any insight would be very useful.
    Thanks..

    My assumption is just you need to adopt delivery qty as pick qty.You are not doing any TR ,TO as your ware house is third party managed.
    you need to define the picking form EKOO to your shipping point type and then the quontity will copy
    You can do it in the difintion of the shipping point, you have to difine send time = 4
    I will explain how need to  set up this automatic picking, and then you can
    work backwards from there. The automatic picking you are experiencing
    is actually related to the output type EK00 assigned to your shipping
    point.
    Consider the following two setup steps which will result is automatic
    picking:
    Set the output type to EKOO, in the print picking list of the shipping
    point in customizing.
    Make sure the parameters below are set:
    Message Language
    Number of Messages
    Send Time <<<<<<<<<<< this must be set to 4 (send immed)!!
    Transmission Medium
    1) you have to set the parameters for EK00 in the shipping-point-
    maintenance in customizing:
    -> Enterprise Structure
    -> Definition
    -> Logistics Execution
    -> Define, copy, delete, check shipping point
    2) as second step you define the shipping-print-parameters in
    customizing:
    -> Logistics Execution
    -> Shipping
    -> Basic Shipping Functions
    -> Output Control
    -> Define print parameters shipping
    -> Shipping (Spec.case)
    Therein there should be an entry for every shipping-point, where
    you like to use the picking-list EK00!
    If you have 1 & 2 setup for a particular shipping point you will
    experience the "automatic" picking of deliveries.
    and finally picking storage  location determined as per storage conditions maintained in material master.

  • Uder delivery and over delivery tolerance....for matl

    Hi,
    Is it possible to maintain uder and over delivery tolerance for matl. If yes then please explain how?
    I will award for each points.
    regards,
    Imran Shek

    Hi,
    At Material master level:
    1. Maintain under delivery / over delivery tolerance in percentage in Material master Work scheduling view. U can use the indicator Unlimited instead of Over delivery tolerance if needed. (Indicator that specifies whether the quantity actually delivered may infinitely exceed the required production order quantity)
    At production order level:
    2 . Maintain Under delivery / Over delivery tolerance in percentage in Production Order Goods receipts tab for Finished/semi finished material.
    Customization settings to get warning message:
    In customization, OPK4(Parameters for Order confirmation), for the plant and order type, maintain Warning when Quantity falls below Under delivery tolerance and Warning when Over delivery tolerance is Exceeded.
    By these settings you can able to give over delivery quantity and System prompts you whether this quantity is within the specified delivery tolerance or not with Warning message.
    But If Delivery tolerance is varying from order to order it is suggestible to have the same settings at order level.
    Hope this clears all your doubts.
    Regards
    Venkat

  • Return delivery and Planned delivery costs

    Hi guru
    scenario: I create a PO (Vendor A) with Planned delivery costs on order item.
    I store planned delivery costs in the purchase order item on the Item conditions screen. ( I enter a different vendor for "freight vendor" - Vendor B, select the desired condition on the condition screen and choose Goto - Details. Overwrite the content of the Vendor field).
    I create GR. OK
    I create a return delivery (122) but I have to pay invoice for "freight vendor" to Vendor B.
    Can I make it?

    Hi,
    At the time of GR;
    Stock A/c - 110 - Dr
    GR/IR Clearing - 100 - Cr
    Freight Clearing - 10 - Cr
    And when you return it then same entry gets reversed.
    So at the time of MIRO, it will not propose the freight value automatically but you refer the PO and select "Planned delivery cost" and then under "GL Account" Tab, enter Freight Expense A/c - Dr and "Simulate", it will credit vendor and then Post

  • GI for over delivery and under delivery

    Could you please reply to the following query
    It should be possible to post the GI for an outbound delivery if the quantity effectively picked is over or under the requested quantity.
    where is the control for this?Where we set this in the standard SAP scenario?
    The goods isssue is applicable foe sales orders stock transport orders.
    Thanks

    Dear anil
    Go to 0vlp (zero), select your item category and click on magnifying lens on top. Now under the tab "Quantity", you can see a field "Check overdelivery". There if you want the system to give a warning message, maintain "A" and if you want to have error message without proceeding further, maintain "B" and save.
    thanks
    G. Lakshmipathi

  • Returns and subsequent FOC delivery

    Hi All
    I hav a scenario where i will be creating Return order and subsequent PGR
    now the company decides to replace the material for the return quantity
    the process will be
    Return Order(RE)>>Delivery(LR)>>Free of charge delivery(FD)>> PGI
    when i complete the process,the return order status will be BEING PROCESSED
    Please suggest any settings to to make status complete
    regards

    Hi,
    The process will be as follows:
    1. Create a return sales order with reference to the original invoice.
    2. Create the returns delivery with reference to the return sales order.
    3. Do the post goods receipt (PGR) for the return delivery.
    After this your company does not want to issue credit memo to the customer but instead wants to issue a replacement for the returned goods. So in this case because the credit memo is not created, the system will alweays keep the status of the return order as in process.
    Solution:
    1. Create a subsequent free of charge delivery order. In transaction code VA01 create a new sales order with order type as "KN" with reference to the return sales order.
    2. Create the delivery for the above order.
    3. Do the post goods issue (PGI) for the above delivery.
    Here no invoice will be generated as it is a replacement only & the order will have no value.
    At this stage be sure, however, that the sales document you are using as a reference (return sales order), is no longer valid due to this new free-of-charge delivery sales order, has its line items rejected. Should they not be rejected, it is possible that the return can accidentally create a credit memo.
    So you need to assign a reson for rejection to the return sales order item for:
    1. Closing the return sales order. The status will now be chnaged to Complete. As you are not going to give credit for the return, you need to close the return sales order otherwise, it may allow creating the credit memo.
    Hope this clarifies your doubt.
    With best regards,
    Allabaqsh G. Patil.

  • MD04-Returns PO and Delivery

    Hi All,
    Please help me understand stock/requirements list (MD04) with respect to return PO.
    when a return PO is created and a delivery is created for that, both the MRP elements (return PO and the delivery ) appear in MD04 screen.
    The stock/requirements calculation is done with the MRP element ( Return PO) and when a delivery is created for the return PO, the delivery is also displayed as MRP element. The return PO does not disappear and the stock/requirements calculation is not udpated with respect to the corresponding delivery.
    Why does the return PO not work in the same way as that of sales order (where the sales order disappears upon delivery creation)  or that of a planned order ( where the planned order disappears upon creation of production order).
    Is it possible to have only 1 requirement (either the return PO or the delivery), but not both together.
    Regards,
    CB

    Dear,
    You define whether you expect to receive substitute deliveries relating to the shipping notification. In other words, you define whether the shipping notification should become MRP active again so you do not, or no longer expect the difference quantity from the point of view of materials planning.
    ·        1. Do Not Close Inbound Delivery
    If you do not close the inbound delivery then you expect to receive further quantities/dates to the amount of the quantity that is still open. In other words, the shipping notification becomes MRP-active again.
    ·        2. Close Inbound Delivery
    If you close the inbound delivery then a shipping notification or order item is regarded as closed, even if the goods receipt quantity differs from the notified quantity. The remaining quantity is then no longer taken into account in MRP.
    In this case, you could also specify in the quantity difference profile whether or not the scheduled quantity should be adjusted.
    Create Return Delivery with Outbound Delivery
    You define whether a return delivery is created with or without an outbound delivery:
    ·        1. Return delivery without outbound delivery
    This means that a material document is generated immediately when you post the return delivery.
    In the purchase order history you see a material document for the goods receipt and one for the return delivery.
    ·       2.  Return delivery with outbound delivery
    This means that the system automatically creates an outbound delivery in the background when you post quantity differences in Goods Receipt Automotive.
    The material document is not generated until goods issue for the outbound delivery has taken place. In the purchase order history and the confirmation overview for the scheduling agreement you see the return delivery as a separate delivery.
    The MRP-reduced quantity does not change by the amount of the returned quantity until goods issue has taken place for the outbound delivery. The inbound delivery and the outbound delivery are then calculated in MRP terms.
    The quantity that is still open is proposed again when an inbound delivery (with reference to a scheduling agreement) is created.
    The inbound delivery and the related outbound delivery are displayed in the confirmation overview for the scheduling agreement. The External Document of the outbound delivery in the confirmation overview specifies the related inbound delivery.
    You have posted a goods receipt of 10 pc for an inbound delivery.
    Due to quality problems you return 2 pc.
    In the confirmation history you see two rows, one for the inbound delivery and one for the outbound delivery/return delivery. The MRP-reduced quantity is calculated by taking into account both the inbound delivery and the outbound delivery/return delivery, making the MRP-reduced quantity 8 pc.
    Also check the below link:
    http://www.sapgeek.net/2010/03/return-to-vendor-4/
    Hope it will help.
    Regards,
    Alok Tiwari
    Edited by: Alok Kumar Tiwari on Jul 12, 2011 3:17 PM
    Edited by: Alok Kumar Tiwari on Jul 12, 2011 3:25 PM

Maybe you are looking for

  • How can i unlock my phon if i forgot my password

    I made a new password for my phone lock, i forgot it and i have disabled it, can someone please tell me if they know how to help...?

  • Refurbrished! (Dont know if I spelt it right!)

    I have to questions. So okay first of all, I am getting a laptop for my birthday. I dont know if I want a refurbrished Powerbook G4 (15 inch, 1.67 GHz, 512 MB, 80 GB) or a new Macbook (13 inch, 2.0 GHz, 1 GB, 80 GB). My first question is should I get

  • Phone turned off and won't turn back on

    Hi, my z1 recently switched itself off without warning and now won't switch back on. I have tried to reset it with the power+volume up method, and also the red button under the sim flap. Also, when the charger is connected the notification led flashe

  • IMac G5 won't recognize firewire DVD burner

    Hello, all! I just purchased a LaCie+/-RW DVD drive (FA Porsche design) with firewire. From my first attempt to hook it up, my computer won't recognize the device. System profiler shows the firewire ports listed (400 speed) but the DVD drive doesn't

  • Why database cann't start

    Please Help me. os: RedHat Es2.1 + kernel update to kernel 2.4.9-e.48 oracle : oracle 10g ship.db.cpio.gz + ship.ccd.cpio.gz download from :http://www.oracle.com/technology/software/products/database/oracle10g/htdocs/linuxsoft.html install guide step