Hi experts,
We are trying to create a solution manager project and activating ChaRM for the project. Upon project creation, this error occurs:
Landscape being used is: SCM Dev > SCM Test > Virtual System PRD (based in the solman system where this project is created). RFC_NO_AUTHORITY issue is being faced under the SCM Dev System. (*DD)
Any help would be appreciated. Thanks!
Thanks!

Hi Luigio,
Please check the below note
93254 - RFC short dump RFC_NO_AUTHORITY
Rg,
karthik

Similar Messages

  • ChaRM activation in implementation project??

    HI
    I am quite new to solution manager , i want to ask that if we have created an Implementation Project in Solution Manager What is the pupose of activating ChaRM in it?? when i can do configuration directly from "Configuration" in Solution Manager itself and directly transport it to landscape by the transport option in "SPLAR_PROJECT_ADMIN"??
    Please guide
    Thanks

    Hi Sindra,
    When we have a normal correction we would normally use the Transport of Copies function to move developments into the QA system so we can check that we get the desired result.  If we need to change our development we can change the development and assign the changed development to a new task in the Transport Order. When we want to transfer the development we can then release the task, create a new TOC and import the TOC.  This can be completed as many times as required, the important point to remember is that we never release the Transport Order until we have completed the development.
    If during the project cycle we need to perform a correction to the development when we are in the test phase we can use Test Messages (SDTM) to control the creation of a new transport and the import process.
    If during the correction process you are finding that the status of the document is changing to a previous status then there could be a problem and you should have a warning or error message displayed in the ticket.
    Hope this helps,
    Rich Labib

  • Change Request Management for Implementation Project

    Hello gurus!
    I have a problem with execution change request in implementation project.
    I have created Implementation project and task list for him."Change request management" is active for this project.
    I can create document Change Request, but I can not to create Correction linked with Task plan...
    Dmitry.

    HI,
    Have you verified if your project definition is setup correctly ? Please verify with some of the steps available in the blogs
    First steps to work with Change Request Management scenario
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Change Request Management scenario: Usual questions
    https://weblogs.sdn.sap.com/cs/junior/view/wlg/15116
    Change Request Management scenario: Working examples
    /people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    Hope this helps.
    Cheers
    Sh

  • Project Plan for Solman- BPM,Service Desk and CHarm etc

    Hi Guys,
    if any one have project plan  for Solman, Can you please share with me. I have dead line  to prepare project plan for service desk, System monitoring ,ChaRM and Diagnostics etc
    I appreciate your help.
    Thanks,
    Hari

    Hi Hari,
    Could you forward project plan for CHaRM?
    Also, if you could help on the following:
    How exactly do we integrate with TMS after activating CTS in the maintenance project?
    Regards,
    Jamuna Nithyanandam

  • ChaRM taking standard SAP transport layer for a project

    Hi
    After creating transport request via ChaRM, we notice that the request is assigned to the transport group where standard SAP transport layer is assigned, and not to the respective project transport group.
    I activated ChaRM for a project, by assigning logical component DEV-100 -
    QAS-200 -
    PRD-300
    When creating transport request via CR, the request is created in D10-100 and assigned to /GLOBAL/ transport group instead of /PROJ01/ group. After debugging I notice that ChaRM is sending SAP transport layer and since SAP layer is assigned to /GLOBAL/, all requests are assigned to /GLOBAL/ group.
    Is there any report or missing step which I should execute?
    Thanks & Regards
    Madhu Bommala

    Hello Madhu,
    To define what should be the transport layer used by Charm you should execute the report /tmwflow/set_track_generation ,
    if you want to use your transport layer instead SAP layer, you should set the option NO_SAP in this report.
    I hope that this information can help you.
    Best Regards,
    Diego Fischer

  • Unable to click 'Set and save as my Active Configuration for this project'

    Environment: OWB 11.1.0.6 Client running on Windows XP Pro SP3 repository and targets on AIX (IBM UNIX).
    I have created a new Configuration under a specific Project and I'd like to make this configuration the default whenever I login and select this Project.
    There is a check box when I right click the Configuration and select 'Open Editor' that says 'Set and save as my Active Configuration for this project' but when I select the check box and try to click on 'OK' there is no response from the popup window and I have to click 'Cancel' to get out of the popup.
    Any ideas on why this is happening and how to get around it??
    Thanks very much.
    -gary

    Si
    Good catch!! Restarting the app???? What a waste of time!! :-(
    When I went back in the box was already checked! It must have known I was pissed at it!! :-)
    Thanks for the help.
    -gary

  • Charm implemenation for transports in solman 7.1

    Hi Guru's,
    Can anyone help me to get knowledge in charm implementation for transports in solman.
    I am new to solman , can anyone help here.
    Help is much appreicated.
    Thanks,
    Pradeep.

    Hi Pradeep.
    Please check the following blogs:
    http://scn.sap.com/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://scn.sap.com/people/dolores.correa/blog/2009/07/23/change-request-management-scenario-working-examples
    http://scn.sap.com/people/dolores.correa/blog/2009/07/22/change-request-management-scenario-usual-questions-and-known-errors
    Thanks
    Vikram

  • Changing activity id in proper sequence for entier project (or certain WBS

    Hi,
    Presently I am working on a schedule with more then 3000 activities. I need to delete a WBS with 200 activities and then paste another WBS with 200+ activities. The problem for me is that I need to change the activity ID so that the WBS should be align with the entier project. Is there any better way other then manually editing the Activity Id for entier project? I need to change the Activity Id so that it should reflect the proper sequence with the start date. Any help will be apreciated.
    Thank you

    2. you can also use a global change to change all activity id's. (no if line needed), by concatenating any 2 or more existing text columns or udf's you create for this purpose.
    e.g. create 2 text udf's named "Sort" and "Sort_txt".
    under edit/ user prefs / dates, uncheck month name and use MM-DD-YY format so that 30-Oct-09 displays as "10-30-09"
    in the "then" field of the global change add the following lines:
    sort_txt = Start Date (you need this to convert a date field to text)
    sort = leftstring(sort_txt,5) (to extract the first 5 characters of sort_txt as defined in the previous step, that is "10-30"
    sort = sort & '-' (to get "10-30-")
    sort = sort & WBS Code (to concatenate "10-30-" with WBS Code or any other field for that matter)
    you can always use "Start Date" or the newly created "Sort" to sort your activities. I wouldn't mess with Activity ID too much if I were you, but if you must..
    keep Activity ID as simple as possible as a project default option (0001, 0002, 000x...) and add a final line in the global change:
    Activity ID = Sort & Activity ID (that is because you need a unique Activity ID). you should get something like 10-30-AAA-0001.
    it is safer not to play with Activity ID too much in global changes. that's why i use as many udf's i need for intermediary steps and change Activity ID in just one final line.
    OR if you feel more comfortable to work with the udf in excel,
    export "Sort" as a column in xls
    populate it in excel with 0001 to xxxx with the activities sorted by Start Date (as explained earlier)
    reimport the project
    run a simple global change such as:
    Activity ID = Sort
    or
    Activity ID = Sort & <any field you want>
    caution: there is no undo for this. practise on a backup copy of the project. don't forget you need a unique Activity ID.
    good luck
    Edited by: Tibi on Oct 9, 2009 5:17 AM

  • CHARM- No task list found for implementation project

    Hi All,
    I created an implementation project, and created a task list for the implementation project.
    But when i create a change request with normal correction, The Task list is not getting displayed.
    I am facing a conflict also, When i directly create a correction document without creating a change request. I am getting the task list for implementation project.
    Why is it am getting the task list for Implementation project in correction document and not in change request.
    When i tried to explore. found that in change request it is getting the list of maintenance cycles(Maintenance projects) and not the tasklist for other type of projects.
    Our customized flows are all dependent on the change request. So Is there any configuration i can do to get the task list of implementation project also in the list.
    Kindly guide on this issue.
    Thanks in advance.
    Regards,
    Subhashini.

    Hi Xavier,
    I  was also checking that one only.
    For the standard transaction type SDCR, it is working perfectly as you toldh when i select development(Implementation).
    But the problem is, here we have customized SDCR to ZDCR with our follow up documents.
    When i try to include the Code group of implementation(Implmntn), Nothing is happening.
    The subject is getting included in the list. but iam getting only the list of maintenance project only.
    I have made the changes in copy nsontrol also. but i dont see any difference.
    I could not able to trace where exactly i need to do the customizing to bring the list of implementation projects in my change request(ZDCR) when i select the subject( Project-implementation(SDMI))
    Kindly advice.
    Regards,
    Subhashini.

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Charm configuration in solman 4.0 SP14

    Hello Gurus,
    I have to do Charm (Change Request Management) configuration in my landscape of
    SED-- SEQ,STQ-- STP.
    Solman - STM
    Can anyone of you please provide me step by step detail for this.
    Thanks in advance
    Jain Pankaj

    I am doing Charm configuration
    i am using Dolores Correa's Blog
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    Landscape i am using for  Charm config.
    SED:030 -
    > SEQ/275 -
    STP/275  ,Domain Controller is STP ( DOMAIN_SED)
    Solman --- STM:100 ,  Solman is in the same domain,Domain Controller is STP ( DOMAIN_SED)
    My doubts :
    Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System-> Generate RFC connection to 000
    Question 1- This RFC has to be genrated from solman STM:100 to Domain Controler (STP/000) ?
    or STM:100 to all systems ( SED:000 , SEQ:000 ) in my landscape ?
    Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System-> Add Import Authorization to Operator/Administrator
    i. Make sure that the operator and administrator users in client 000 of the target systems have the same name as their user in the Solution Manager  system.
    ii. Assign import authorization to the operator and administrator users in client 000 of the target systems (SAP_CHANGEMAN_OPERATOR and SAP_CHANGEMAN_ADMIN roles).
    Question 2. what is operator or administrator user
    is that my user ex. PJAIN ( the one who is configuring Charm ) or any other user ?
    Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System->Set Project Assignment of Requests as Mandatory
    TMWFLOW/CMSCONF --->Check the entries in the Proj. Assignment column
    System of Proj          Project Assigmnet
    SED :030                   optional
    if  i change this to "mandatory"
    Question 3 will this avoid users creating transport orders directly in dev system ( SED:030) ??
    as users are workin in dev system , and if i change this to madatory user wont b able to create change request in dev system ( SED:030 ) till the time configuration of  Charm gets over by me ,
    and if i stuck in some error during charm configuration , no user wil be able to create change request in SED:030 ??
    Please advice

  • Sales order creation for a project

    Dear all,
    I would like to know how to create quotation ,sales order, delivery and Billing for a total project. Let me explain the situation.. Customer has 4 different product.. they have 4 Plants to produce those materials.. They will sell each products individually and combination of others also. Their sales process is Customer will place an order for the total project which involves supply erection and Training. The erection and training may take 3 months to 1 year. The requirement is customer wants to create quotation and sales order creation in SAP. Also they want to map the erection and Training in SAP. They would like to capture the expenses involved during the erection and Training period. In this case excise duty, Sales Tax and service Tax all are involved in the same project.
    Can any one suggest some idea
    Thanks in advance
    Sriram

    Hi,
    It is understood that your client has 4 plants for 4 different materials. Your client sells materials and service (1.Installation of equipment and 2.Training the users). Your client wants to know the cost of the sold items (Materials and services). The billings are subjected to all applicable taxes.
    As you know, these requirements can be mapped in SAP by SD and PS modules.
    SD Module: Whatever the customer places the order (either partially or as total), you can create quotations. The materials are finished goods (FERT) and service materials (DIEN). The pricing procedure should consider all applicable duties and taxes.
    The business flow: Quotation >> Sales order >> Delivery of goods >> Billing (VF01) >> Excise Invoice >> Account receivable.
    Note: To link the sales order with PS module you have to maintain respective u2018WBS Elementu2019 in the Account assignment tab of the sales order. This is used for planned revenue in PS.
    Since you are supplying goods from all plants, maintain all plants to Sales organization and distribution channel combination in Assignment of Enterprise structure.
    PS Module:
    If the customer orders for an entire project including supply of materials, installation and training the users, create a project definition for that project in the project system. Assign a main WBS element under the project definition. Assign lower level WBS element according to your need. Under the WBS element network is assigned. Under the network activities are assigned. Under the activity there are activity elements. There are different types of activities; internal, external etc.
    You can assign different WBS element for services. Under this the relevant activities are assigned.
    You can budget for the project; you can assign supplementary budget if it is required. 
    When you release the project the Purchase requisitions are generated. The MM persons will create PO and procure the materials for the project.
    All the materials required are initiated from PS. Here every activity is routed through PS including service.  So, all the expenses are captured.
    By settlement rule, the cost is arrived at different levels.
    The configuration is to be done accordingly.
    Hope this give you an idea on the subject.
    Regards,
    K Bharathi

  • Charms Process in Implementation Project

    Hello Gurus,
    I am part of an implementation project for where we are implementing various functionalities of Solution manager.
    Here we are in the process of implementing CHARMS in the Implementation Phase.
    So I have created a project of type 'Implementation' and has already activated Charms.
    Here the task list is already created and active
    Following are the issues which i am facing while creating a change request.
    1: If I create a change request of type 'SDCR' and authorize the change request, a normal correction of type 'SDMI' gets created automatically. But system throws an error 'No Maintenance cycle is open for the current system'
    I believe for a project of type 'Implementation' ,maintenance cycle doesnt get created, instead an implementation cycle gets created.
    So Let me know if  i have missed out any configuration. or if possible can u suggest me if there is any workaround for this?
    Regards,
    Anubhav

    Hi Raquel,
    Thanks for the reply.
    I have only activated BC Set 'SOLMAN40_CHARM_BASICFUNC_001' prior to activating CHARMS.
    After Activation Charms A project cycle of type 'SDDV' also got created along with the task list.
    But when I try to create a change request of type 'SDCR', it is automatically creating Correction of type 'SDMI'
    Also I had selected the correct Subject option 'Development (Implementation)' in Transaction SDCR
    Am I suppose to activate any other BC set?
    But why is it giving me error related to Maintenance cycle?
    Regards,
    Anubhav

  • Results Analysis for Valuated Project stock

    Hi,
    To have transfer prices we have activated material ledger and multiple valuations.
    As material ledger only works with valuated stock, we have moved the Project structure (ETO) from non valuated to valuated.
    Our client requirement was to recognised revenue based on cost. With non valuated project stock, cost is upated as soon as we received the stock for the project and we were able to acheive the RA (revenue recognisition) as per the clients requirement.
    However after changing to valuated, during goods receipt stock is upated and not cost. So we asked the client to consume the purchased material if they have to recognise the revenue.
    Then the question came that if the SFG is received back from the assembly/production order, all of a sudden we will not have cost but revenue & stock. After looking some SAP notes on statistical cost elements, we have created the stock account as a statistical cost element (category 90) and implimented the following SAP notes which helped us to reverse the stock value and update it to P&L (by reading the balance in statistical cost element linked to the Project).
    a) Note 78420 : To activate Function Module EXIT_SAPLKKAG_005 (contains include ZXKAGU05).This Function module takes into account the actual & plan costs of the assigned Production orders & Networks
    b)Note 616869 : Provides source code to be copied to  include ZXKAGU05
    c)Note 616960 : Changes to include ZXKAGU05 to read statistical cost elements in RA
    d)Note 26002 : To activate Function Module EXIT_SAPLKKAG_001 (contains include ZXKAGU01).In this include we can make the necessary modifications to RA calculations. Through this include, stock will be reversed during RA.
    e)Note 785626 : Provides source code to be copied to include ZXKAGU01
    Hower if we have purchased parts which are not consumed, still the RA (FM EXIT_SAPLKKAG_001) reads the value in statistical cost element and posts a debit to RA P&L and reverses the stock. Therefore now i have cost but no revenue (as no consumption).
    As per last paragraph of sap note 785626, if we have purchased parts and we want to exclude them from stock reversal, we have to use a filter with customer enhancement 3 (SAP note 67423). It also says that the goods receipts and issues of purchased parts has to lead to a different valuation class and assigne a different stock accout. Now can any one give some guidance on how a project specific purchased parts (receipts and issues to prod order) can be linked to a seperated valuation class.
    We have same material which is sometimes purchased and sometime produced.
    Regards
    Raghu.

    Hi
    I can say something from theory but not much from sap config. perspective. You have not mentioned actual revenue since POC is calculated from
    R(a)/R(p).How you have considered 100% poc?
    From your data,it looks to me that you have met the target revenue from actual cost which is less than planned one.Inventory indicates that you can generate revenue in next accounting period (unlike WIP).I feel that unlike plant stock,RA is not perfomed on project stock Murli, can ammend my view if it is wrong.
    You can post this problem to Fi/Co.
    Regards
    Adwait

  • Data filtering not activated for ALE processing of Outbound Deliveries

    Dear all,
    we're currently upgrading from 4.6c to ERP 6.0 and are facing a serious problem with our IDoc interfaces:
    In 4.6c, data filtering for Message Type SHP_OBDLV_SAVE_REPLICA was activated and use to extract some segments from the IDoc sent to our logistics provider.
    In ERP 6.0 data filtering is not activated for SHP_OBDLV_SAVE_REPLICA and we do not know how to activate it. For some reason, we can still see the data filtering setting when we switch to "system view" in BD64 but we're not able to change it.
    Checking filter settings in the old system using transactions BD60, ... we do not see any clue how data filtering or filter objects have been defined for SHP_OBDLV_SAVE_REPLICA.or in it's context
    Help please - thank you very much in advance,
    Martin Pluntke

    Dear all,
    thank you for your help. I've just realized that the former project team made a modification to object LIKP, method SAVEREPLICA in transaction BDBG and set it to "Data filtering allowed".
    This setting was lost during upgrade.
    Last question: When redoing this modification (I hate to do this but that's the only way to keep the interface running) and save it I get an error/warning message during generation that the definition is inconsistent. I can continue the generation or cancel it. However, the switch is activated and my filter settings suddenly appear again in BD64 (they've been there all the time, but not displayed or active).
    Is there anything I've to keep in mind? Can I generate, should I ignore?
    Thank you all for your help,
    Martin
    Edited by: Martin Pluntke on Feb 8, 2008 4:37 PM

Maybe you are looking for