Routing update in capacity leveling CM21

Hi Collogues,
We have simple production type. Production order with production versions.
16 production lines (work centers) with different rates.  1 operation per routing.
I want to use in capacity leveling CM21 to dispatch planned/production orders on these 16 lines.
The problem is that when I dispatch a pln/prd order in CM21 on a work center nether routing nor production version gets updated.
Your suggestion are welcome.

Solution found.
Set for each production version "Production line".
Then go Mf50 switch to graphical planning table. It updates routing when I move planned order over work centers.

Similar Messages

  • BAPI's for capacity Leveling (CM21)

    Hello Friends,
    Can anybody let me know the list of BAPI's available for the CM21 Transaction(CAPACITY LEVELING in PP Module).
    Thanks
    Naresh

    Thanks Siddharth.
    i got it

  • Display the PO in the capacity leveling

    Hi,
    in the capacity leveling CM21 there is a table section.
    In the table section I get Production order and planned order.
    I just want to display the production order in this sections or in the oders pools.
    How can I customize the system.
    Thanks
    Dede

    Hi
    Use CM25 and the selection profile you can select order.
    Thanks
    S.Murali

  • Capacity Planning vs. Capacity Leveling

    My production facility is looking to divide up our shop floor by work centers.  There are about 20 individual work centers that are composed of 10 people each.  Each material we make is divided up into 3 operations which go through 3 separate work centers.  Each operation has a corresponding work center that it goes through.
    Right now we are unsure which program suits our needs better, Capacity Planning or Capacity Leveling.
    Our goal is to measure each individual work center (not the workers that make up the work center).  Each work center has a specific goal involving the number of materials they can produce, whether or not they reached that goal and by how many.
    In a nutshell, we want to be able to measure how long it took each work center to reach their individual goals by the materials they produce.
    This is all about measuring the individual work centers and how efficient they are.  Our goal is to be able to utilize this data within SAP.
    What is the difference between Capacity Planning and Capacity Leveling, and which would better suit our goals?
    Our production facility is not very complicated and we're looking for something simple and basic within SAP to accomplish these goals.
    All help is appreciated.  What would be your recommendations for this type of situation?

    HI
    Capacity evaluation
    In the capacity evaluation, available capacity and capacity requirements are determined and compared with each other in lists or graphics.
    Capacity leveling
    The objectives of capacity leveling are:
    Optimal capacity commitment
    Selection of appropriate resources
    In most applications, you can use two types of planning table (graphical and tabular versions) to display the capacity situation and to carry out capacity leveling.
    In some applications such as Repetitive Manufacturing (PP-REM) or Sales and Operations Planning (PP-SOP), there are application-specific planning tables for capacity leveling.
    T codes for Capacity Planning
    Work Center view - Capacity Evaluation
    CM01 - Load
    CM02 - Orders
    CM03 - Pool
    CM04 - Backlog
    CM05 - Overload
    Capacity Leveling
    CM21,CM22, CM27,CM28.
    Hope it will help u
    Regards
    Anupam Sharma

  • CM21 capacity leveling settings

    Hi,
    In CM21, is it possible to setup different colors for released  orders and created orders.
    Thanks in advance.

    Dear,
    Some settings in Customizing have to made to change the colors of operations or order depending on the status. Create a new object representation that must be entered in a new object representation selection via a modified decision table. Execute the query of the system status or the user status at order header level in the decision table using field AFKO-OBJNR. Field KBED-OBSTA can be used at operation level. The changes result in a new representation profile.
    Proceed as follows:
          1. Analyzing the used profile
                a) Go to the IMG structure for capacity requirements planning. Call your profile of the capacity planning table and note the following settings.
              o Choose 'Capacity leveling -> Capacity planning table -> Define profile for capacity planning table'.
              o Display your profile and take note of the following:
              o GraphObjectSele (Diagram section):
              o Repr.profile (Diagram section):
              o Group (Graphics profile):
              o Name (Graphics profile):
                  An overview of the used settings is displayed when you press the 'Check' pushbutton where you can execute the further analysis easily.
                b) Finding the graphic object type in question
                Double-click on the 'Graph.object.select.' area and take the graphic object type in question from the decision table:
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your graphical object type selection and choose 'Decision steps'.
              o Find out which graphical object type is affected by double-clicking on the relevant table line.
                c) Select the required graphical element type
                An overview of the available graphical element types is displayed when you do the following:
                In the overview, double-click on the area 'Group, Name' and there on the used graphical element group.
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphics profile'.
              o Mark the line with the corresponding group and name and choose 'Goto -> Details'.
              o Note the used graphical element group:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphical element'.
              o Position the cursor on the used graphical element group.
              o Here you will find the available graphic element types.
          2. Create a new graphical object representation
                a) Create a new representation profile in the used graphical object type selection based on the used representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GrapObjSele' and choose 'Representation profile - overview'.
              o Select your representation profile and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Stay in the overview of the representation profiles.
                b) Define a new object representation selection for the respective graphical object type based on the types used there.
              o Select the representation profile created by you and choose 'Representation profile'.
              o Note the object representation selection for the required graphical object type:
              o Now choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object'.
              o Select the required 'Gr.obj.'
              o Call 'Object representation' in the Navigation window.
              o Select the 'Object repr.' you have noted before and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
                c) Define a new object representation based on the object representation to be changed in the required graphical object type.
              o Select 'Object representation' in the Navigation window.
              o Select the 'Object repr.' to be changed and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Select your newly created 'Object repr.' and choose 'Graphical element type'.
              o Select 'New entries' and enter the respective graphic element type (see 1. c).
              o Delete the graphic element type to be replaced.
              o Save your entries.
                d) Insert a query for the respective graphic object type in the newly created object representation selection in the decision table so that the new object representation is displayed by the conditions specified through the system status or user status.
              o Select 'Object representation' in the Navigation window.
              o Select the new object representation selection and choose 'Decision steps' in the Navigation window.
              o Insert a line for the query of the status at a suitable position in the sequence 'Decision status, Sequence'. To execute this at order header level, you must specify a status comparison for structure AFKO, field OBJNR for which the new object representation can then be entered. Use field KBED-OBSTA if you want to evaluate the status at operation level.
              o Save your entries.
                e) Enter the new object representation selection in the new representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GraObjSele' and choose 'Representation profile - overview'.
              o Select the representation profile you have created and choose 'Representation profile'.
              o Replace the object representation selection by the newly created selection for the required graphical object type and save it.
                f) Replace the available representation profile by the newly created one in your profile for the capacity planning table.
    You can refer the OSS note 71014 for details.

  • CM01/CM21 - Capacity Leveling Customization

    Those who are still using R/3 for capacity leveling...
    1. Have you had complaints from your users that these R/3 transaction aren't user-friendly at all?
    2. Have they requested these to be customized?
    3. Have you customized these transactions? To what extent?
    The feel, look and config of these capacity transactions is very prehistoric (even before 4.0b)... nothing much has changed... then APO came in... the more leftout these transactions has become... users have resorted back to spreadsheets.. not good!
    So folks who've been stuck in R/3 land and cannot stand these standard transactions, what have you done??? I'm interested to know what you did, what technologies (i.e. web dynpro) you've used and how your users embraced it.

    Bryan,
    I agree with you Cap. Levlling is not frinedly in R/3 or ECC.
    However we use Capacity levelling for our collective order scheduling as it helps schedule parent & child orders as needed by planner.
    For this I use cutomised profile ZSAPPSG001 copy of SAP standard SAPSFCG001 - SFC: View work center/capacity (2 graf.).The agreed capacity overall profile is then called in your prod. schduling profile tcode : OPKP.
    You can customize user required Capacity levelling Overall profile in tcode : OPD0
    From there you can select any subprofile that meets user needs or further customize subprofiles as needed.
    Selection profile     SAPSFCS009 SFC: View Center  -> Capacity (2 graf.) ( tcode : OPD1)
    Control profile       SAP___C002 Gen: Planning table  ( tcode : OPDE)
    Time profile          SAPSFCZ002 SFC: graph. medium-term (3 months) ( tcode : OPD2)
    Evaluation profile    SAP___A001 Gen: Standard evaluation profile ( tcode : OPD3)
    Strategy prof.        SAP___T001 Finite scheduling forw./all functs.activ ( tcode : OPDB)
    Period profile        SAP___P002 Gen: Daily period split ( tcode : OPD4)
    Planning tab.profile  ZSAPPSL001 SFC: only main caps. (2 graf.) ( tcode : OPG0)
    List profile          SAPSFCI001 SFC: Production planning ( tcode : OPDH)
    As you can see I just customised a few changes in my Planning tab.profile  based on user requirement.
    I am sure this gives you good insight to research this further & give your users some customised screen.
    thanks,
    Ram

  • Use of Planning Table (MF50) in Capacity Levelling with Production Order

    Hello Experts
    I wish to know that is it possible to perform Capacity Levelling in planning table (tcode MF50) with respect to a Production Order ? It is known that MF50 is used in Repetitive manufacuring to do the capacity levelling with respect to Planned orders. But in our discrete manufacturing scenario we want to use planning table to the capacity levelling with respect toa Production order.
    Any clue or help pertaining to this will be highly appreciated.
    Thanks in advance
    Regards
    Jayanta

    Dear ,
    MF50 is does the cacapcity leveling based on mateail -run schedule order (planned order ) where as in discrete manufacturing , when you run the MRP ,  MRP system assume Infinite Capacity  and schedule the order as per your selection in MD02(2,1,3,3,2)  and then you convert those planned order to Production order .Here you checkied the Capacity in Production Order level .
    In stanadrd SAP  , it is not possible to use MF50 for discrete production order.
    In discrete order or process order ,  do the caapcity leveling , there are seperate planning table available based on Over all Capacity Profile and Schedule type .This can be done  in following way :
    1.CM31-Production Order Wise -Tabular
    2.CM23-PO wise -Graphical
    3.MC88: Ruf Cut Planning
    Work Centre Wise : CM21 -Graphical , CM22-Tabular Planning Table .
    Make sure the below set up before  you carry on the Capacity leveling :
    .Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In OPJK  maintained check capacity with SAPSFCG013 profile for your production order type
    In OPU3 , scheduleing parametre s: Generate Capacity , Scheduling Type , Automatic Log ,Start date in Past as per your req.
    In OPJU , chekc the contol tab of the scheduleing as per OPU3
    In OPKP- Production scheduling paranmeters assing the overall capacity profile -SAPSFCG013  with finte scheduling tick.
    Master Data :
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    Hope this will help you .
    Regards
    JH

  • WORK FLOW & PROCEDURE FOR FOR SNP CAPACITY LEVELLING HEURISTICS RUN

    Dear Sir / Madam,
    Currently, we are  taking  only SNP Heuristics Run  and the output viz. planned stock transfer requisitions are being passed to PPDS as such. But now we feel, SNP capacity leveling can play a vital role in getting more fine tuned results from PPDS. So, We wants to start using the SNP Capacity leveling run. We shall like to know the work flow / procedure for taking the SNP capacity level run i.e. what inputs should be properly reviewed before taking the SNP capacity level run and what shall  be its output..? Kindly let us know the procedure / work flow for taking the SNP Capacity Levelling Run.
    Your early reply in this regard shall be really appreciable.
    Thanks & Best Regards,
    Sanjeev Chugh
    25-Mar-10

    Hi Sanjeev,
    as in any other module, correct master will play a key role in getting effective results in capacity levelling. you will need to check the following master data while setting the system for capacity levelling :
    Consistency in BOM in R/3 and PPM/PDS
    Consistency in Routing in R/3 and PPM/PDS - the actual through put on the shop floor should be the same as that in the routing and in the PPM/PDS. unless this is in sync, no amount of levelling can return good results.
    Maintenance of shift - again as present in the shop floor.
    you can provide the dump of the above master data and ask the shop floor engineers to validate the data as it exists in the ssytem. you can do the consistency check between R/3 and APO yourself using queries. Once they have validated this master data and the the actual master data reflects in your system, i think, the job is more than 50 % complete.
    also you need to check the lot sizes, rounding profiles, and period factor, becasue all three combined play a major role in giving good or better results after levelling.
    you may also check at what level you want to run the levelling. whther the bottleneck is at the finished component level, or 2nd level, etc. you may check whther you have discrete manufacuring or REM and if you really want to levelling on REM order.
    then you need to analyse, what is the lengh of horizon you want to run the capacity leveling on. sometimes it makes no sense to run on the entire horizon because if capcities are already overlaoded, you will not achieve the desired results.
    hence depending upon the level of your understanding and comfort of the planner (who will be using this result), the horizon can be increased grdually.
    if you are starting to implemement capcity levelling, you can sumulate runs and show the results to the planner and check if the standard capacity heursitics satisfies their requirement. else you can go for custom requirement.
    you will also have to decide on the stratagies, priorities,etc based on the business requirement.
    i think the above should give some starting direction to implement capcaity levelling in your system.
    award points if you find this useful.
    Rgds, Sandeep
    Edited by: Sandeep Budhiraja on Mar 25, 2010 11:49 AM

  • Capacity Leveling of Work Center

    Hi all,
    I have a problem with Capacity of Work center (WC).
    I have a Internal Activity, and i assigned a WC for this Internal Activity. WC's capacity is 100H/day for 1 number of element.
    Work of this WC is 250H, duration 5 days, number of element 1. Default capacity of this WC is distributed by Distribution Key define in Activity. . And they are divided equally between factory days in 5 day. That is capacity requirement is 50H/Day
    So, i want to edit this WC's capacity following value:
    Day 1: 100H/day
    Day 2: 50H/day
    day 3: 0H/day
    day 4: 0H/day
    day 5: 100H/day
    How can i do it?? I try to use Dispatch Manually but i cant solve this problem.
    Please help me for this case.
    Thank all.
    NLQ

    Dear
    Capacity leveling depends on some of the basic set up of Capacity Requirement Planning .You need to have proper CRP set up frist .
    Couple of check points : -
    Did you work centre is relevent for finitie scheduling in CR02-Capacity Header and wht is the over laod percentage for work centre ?
    Did you have Capacity Requirement Related Set up like Over all profile , time profile , Startegy Profile -OPD0?
    Did your Capacity Check -OPJK -Order Control at order level are active for availibilty Check 1 and 2 and assinged Over all Profile ?
    Set up :
    1.Please assing a operation control key like PP01 where Details Capacity Check and scheduling is active .
    2.In CR02-Work centre -Capacity Header -You should have Follow check box marked
    1.Releven for Finitie Scheduleing
    2.Can be used for multiple Operation
    3.
    3.OPU3/OPU5 -Define Scheduling paramter -Mark Scheduling and Capcity Check for planned order or production Order
    4.In SPRO -Shop Floor Control-Define Production Scheduling Profile -You need to matian the relevent Parameters like
    1.Schedueling Automatically 2.Scheduling Log 3.Adjust Scheduling -Basic date , Depedent Requirement date 4.Scheduling Type -Backward etc .
    These are all basic level set up beside CRP overall profile and other profile like strategy /time etc which may in place as you are analysing in CM01.
    Please find below some of the useful CRP details : Refer this threads which are self explaintory :
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a5a3154adc11d189740000e8322d00/frameset.htm
    http://www.scribd.com/doc/17026521/SAP-ECC-60-PP-Capacity-Planning-httpsapdocsinfo
    capacity planning
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/PPCRPSFC/PPCRP_SFC.pdf
    Capacity Planning
    capacity requirements planning
    How to dispatch operation to do Capacity Leveling at Work Centre Level :
    1.Frist Check the  over load at work centre . Goto -CM07/CM05-give plant only -then hit the Stnadard view -You will find weekly or daily baiss load ( Requirement , Avaliable Capcity , Overlaod etc )
    2.Check the week in which days you are tring to dipatch -if you selet the week check box and double clik it will show u all the dataiul load .Basde on the available capacity in other week-days u need to dipatch in CM22/CM31  or CM25/CM21
    While dipatching in CM22/CM31-Select the Stragegy button on the top header -Mark Date entry when dispatching  so that when you select the operation of any production order or planned order for certain work centre , it will pop with window having information of Date , Work Centre , Time .Onec you did this you will receive Scheduling log with certain information .
    Hope this helps
    regards
    JH

  • Capacity Leveling error CM22

    Hi,
       I get a problem when I do capacity leveling in CM22..I can perform the leveling in CM21 successfully while I get error msg in CM22..I search this forum but no answer for this similar question..
    error msg:
       I try CM21 and it works..I didn't save the leveling result in CM21 and switch to CM22,but I get this error msg..
    Capacity not availableMessage no. C7056
    Diagnosis
    The system could not find any remaining available capacity within the planning period.
    things checked:
        I checked CM01 and I am sure there are enough capacity available ,the planning period in CM21 is also correct (2011/7/1 to 2012/3/31).I also check the strategy(finite schedule and planning direction checked)..

    Hi,
    Overall prof: SAPSFCG006           SFC: View work cntr/ind.cap.  (tabular)
           Select.profile:                     SAPSFCS006      SFC: View center  -> ind.cap. (tabular)
           Control profile:                    SAP___C001      Gen: Planning table (tabular form)
           Time prof:                          SAP___Z002      Gen: short-term (3 month)
           Evaluation prof.:                   SAP___A001      Gen: Standard evaluation profile
           Strategy prof.:                     SAP___T012      Gen: Finite sched.backw./alloc.& dispat.
           Capacity planning table (tab.form): SAPSFCR002      SFC: with indiv. capacities
               Layout ID                           SAPSFCLA04      SFC: Individual capacities (tabular)
               Ind. width
               FormulaRem.avail.capacity           2               Remaining av. cap. = Av. cap. - dispatch
               Dispatch time                       08:00:00
               Rqts to be displayed                3
    I use CMCH to check the overall profile and I don't get any error msg..But I still get error msg"no available capacity" when do leveling in CM22/CM25...Pls help...thanks..
    already fix it..it is due to the evaluation profile problem..
         still not fix..anyone can hep on it?thanks..
    Edited by: Monst Yang on Nov 29, 2011 9:05 PM
    Edited by: Monst Yang on Nov 30, 2011 8:00 PM

  • Capacity Leveling - CM22 - Question

    Colleagues,
    We are using CM22 for performing capacity leveling functions.
    1) In the standard system the Total capacity requirements (First column), are updated based on confirmation. We noticed that
    only confirmaton yield is posted, the capacity requirement is deducted. However, we would like to know if capacity requirements can be deducted, just by confirmin the operation hours alone.
    2) In the standard system, the Total capacity requirements incudes all the time buckets against an operation and sums it up as requirement. Therefore, if you have setup time, processing time in an operation both are added to the total capacity requirements and displayed.  We would like to consider only processing time and not include setup time in to the total capacity requrements field.
    If any of you have modified the total capacity requirement field on CM22, I would appreciate your thoughts and inputs on how to go about doing this.
    Thanks,
    PKV

    Hi, I didnt get your 1st question correctly. please elaborate.
    For point No-2,  From a business prespective if you dont want to capture setup time in ur capacity reqmt, then you should'nt be entering the same in the work center.  For some of the clients  we have used only process time so that we can plan actual capacity reqmt.  But in those case, the setup time was negligible when compared to process time.
    Regards

  • Capacity leveling problems

    I have some troubles with implementing capacity leveling. I cannot level with planned orders (cable solution), so it is only possible to plan production orders.
    The setup matrix is used (because setup times can be greatly reduced, depending on the succesor).
    For some operations, simular machines can be used. CM21 (work center view) is used. Version: R/3 release 4.6C.
    Now a couple of problems rise.
    Problem 1:
    Since there are simular machines, normally production versions are used for capacity leveling. However, we have to level with production orders, so production versions are not applicable.
    Making one workcenter with different individual capacities is also no solution, since SAP messes up with setup times then (i.e. two operations of different production orders have to leveled onto the work center. Normally, the setup is 20h, but if it is a right succesor, it has to be 0h. This is mentionned in the setup matrix. If we dispatch now with a specific strategy for setup time optimization, only one operation will have setup time and the other operation will be schedule from the start on of the other operation's setup... In reality, two setups has to be done, since there are two machines!).
    Alternative sequences is also no solution. While leveling, the alternative sequence will never be used by SAP, in my view.
    Problem 2:
    The strange logic of SAP: setup of the next work center can only be done if the production on the previous work center has finished. In reality, the setup of the next work center can overlap with the production of the previous workcenter.
    Besides these two problems, there are some more troubles with capacity planning in SAP. SAP messes up sometimes by putting the setup time before the wrong operation (sometimes, the first operation has no setup time and the second does. However, this should be the other way around.).
    If you plan an operation manually, SAP doesn't take into account the setup matrix.
    Does anyone has a solution?

    Hi  Walravens,
    What i have understood is, u have the avilability of multiple resouces to produce same material, if any capacity bottle neck, u level the different production order of same material from "one work center" to "another workcenter".
    At  cm21, select the mutiple workcenters (selection criteria) and dispatch the operation as need.
    For setup time overlap, how to system know ur producing two operations (from two different orders) with same setup.
    Even the operations from same production order, system consider the set up time of the second operations unless u define overlap function. . Am I understood your problem in correct way.
    So remove the set up time for second operation and dispatch. 
    Regards
    Pradeep

  • Capacity Leveling vs. Plant Maintenance

    What is the difference between Capacity Leveling Planning Tables (CM21, 22, 27,28,31,23) and Plant Maintenance Planning Tables (CM33, 34, 30, 24)? 
    In what type of scenario would I want to use either one?  What would the end result of utilizing these tables be?

    Hi
    Mark the control key for generating capacity requirement.
    Give the formula SAP008 in Work Center Capacity Tab.
    Use CM01 to check Capacity Planning
    Use CM22 for Capcity Levelling.
    Explore these options
    Regards
    KG

  • How to do capacity levelling

    Dear Frndz,
    Pls help me how to do capacity levelling.....
    Scenario:
    I have created two production orders for the same finish date as a result the work center is overloaded.Now I want to do capacity levelling.Tell me the step by step procedure to do capacity levelling, so that the capacity problem is solved.
    Regards,
    Srini.

    HI,
    Capacity leveling after order creation
    This process covers capacity leveling of requirements from the production process, monitoring the capacity after different periods, and how the system determines the new values for the current order after changes are made to the quantities, times, and dates.
    1) T Code CM21
    2) Enter the field Plant & work Center
    3) Choose Enter.
    The current orders whose operations result in capacity loads at the selected work center are displayed. By scrolling through the different charts in the planning table, you can analyze the information provided.
    4)For a better view, choose Settings ® Scale ® Monthly period split.
    5) To automatically dispatch one or several operations of an order, click the red rectangle in the order's diagram section to select the order and choose .
    The order disappears from the order pool and reserves a time segment in the work center section.
    6) To manually dispatch one or more operations of an order, select the order in the diagram section, drag it to the work center section with the mouse, and place it in a time period that you select.
    7) To deallocate an order, select it in the work center's diagram section and choose .
    The order is again displayed in the order pool.
    8) To analyze the changes made in scheduling, select an order in the order's diagram section and choose Order.
    9) Choose Item and write down the start and finish dates of the operation you selected.
    10) Choose Enter until the Planning Table: SAPSFCG001 Finite Scheduling Forw./All Functs.Active screen appears.
    11) Drag the order to a valid section in the work center's diagram section. Make sure that you move the order to a valid and defined start and finish date.
    13) Select the order in the work center's diagram section and choose Order.
    14) Choose Item and compare the new start and finish date.
    15) Choose Enter until the overview tree appears.
    Regards,
    srivas

  • Capacity Leveling - wrong conversion of base quantity

    Hello Everyone,
    we have the following issue /question with respect to capactiy leveling using PDS (APO 5.0):
    the base unit conversion  does not seem to be correct in the capacity leveling view:
    Our settings:
    In our routing we have defined a base qty of 10 PC, no break, no set up time, only 2min. machine no labour.
    Resource: Single mixed , 100% capacity consumption
    Material Output BOM =100 PC
    PDS activity conversion for 100 PC = 1200 seconds
    However: when entering 100 PC as planned requirement, the system calculates a capacity consumption of 33,33 hrs, with 10 PC 3,33, 1 PC 0,33 hrs. not the expected 20 minutes. Can anyone help clearing the fog? Any setting missing?
    Thanks a lot,
    Toms Team

    Hi Dibyendu,
    In both the material order unit is not maintained.
    Only the base unit of measure is maintained as EA and in additional data under units of measure the conversion  factor of 1EA = 2 KG is maintained for both materials

Maybe you are looking for

  • Video chat errors

    I see that there are numerous posts out there regarding the problems with trying to video chat. I too am experiencing the same problem. I have checked things from other posts and confirmed that I have them setup correctly (i.e. allow all incoming con

  • Script alignment problem

    hi to everyone plz help me in this issue how to get alignment correct. iam facing problem for amount figures if hte amount value is more it is affecting all the other fields of the out put. how to align the amount fields without affecting other field

  • How to use range for a field that is not in select options

    Dear All, I have a requirement to show Long Text of a G/L account , where G/L account is between a given range. But this field is not in select options. I have to show Long Text of this Account, if the field is in a given range. I have tried to use R

  • CN41N shows figures in CO Area currency

    Quick question here, - how to get object currency displayed in CN41N report?

  • SOAP::Lite error message

    Probably this is not a right forum since I have Perl / WSDL question - but want to give it a try !!! I have written small perl program to call webservice available on webservicemart.com Script... #!/usr/bin/perl #SoapTest.pl use strict; use warnings;