Dear Sir / Madam,
Currently, we are  taking  only SNP Heuristics Run  and the output viz. planned stock transfer requisitions are being passed to PPDS as such. But now we feel, SNP capacity leveling can play a vital role in getting more fine tuned results from PPDS. So, We wants to start using the SNP Capacity leveling run. We shall like to know the work flow / procedure for taking the SNP capacity level run i.e. what inputs should be properly reviewed before taking the SNP capacity level run and what shall  be its output..? Kindly let us know the procedure / work flow for taking the SNP Capacity Levelling Run.
Your early reply in this regard shall be really appreciable.
Thanks & Best Regards,
Sanjeev Chugh
25-Mar-10

Hi Sanjeev,
as in any other module, correct master will play a key role in getting effective results in capacity levelling. you will need to check the following master data while setting the system for capacity levelling :
Consistency in BOM in R/3 and PPM/PDS
Consistency in Routing in R/3 and PPM/PDS - the actual through put on the shop floor should be the same as that in the routing and in the PPM/PDS. unless this is in sync, no amount of levelling can return good results.
Maintenance of shift - again as present in the shop floor.
you can provide the dump of the above master data and ask the shop floor engineers to validate the data as it exists in the ssytem. you can do the consistency check between R/3 and APO yourself using queries. Once they have validated this master data and the the actual master data reflects in your system, i think, the job is more than 50 % complete.
also you need to check the lot sizes, rounding profiles, and period factor, becasue all three combined play a major role in giving good or better results after levelling.
you may also check at what level you want to run the levelling. whther the bottleneck is at the finished component level, or 2nd level, etc. you may check whther you have discrete manufacuring or REM and if you really want to levelling on REM order.
then you need to analyse, what is the lengh of horizon you want to run the capacity leveling on. sometimes it makes no sense to run on the entire horizon because if capcities are already overlaoded, you will not achieve the desired results.
hence depending upon the level of your understanding and comfort of the planner (who will be using this result), the horizon can be increased grdually.
if you are starting to implemement capcity levelling, you can sumulate runs and show the results to the planner and check if the standard capacity heursitics satisfies their requirement. else you can go for custom requirement.
you will also have to decide on the stratagies, priorities,etc based on the business requirement.
i think the above should give some starting direction to implement capcaity levelling in your system.
award points if you find this useful.
Rgds, Sandeep
Edited by: Sandeep Budhiraja on Mar 25, 2010 11:49 AM

Similar Messages

  • Work Flow & Procedure For Transportation Module Of SD

    Dear All,
    Currently, we have just got SD implemented. Now, we shall like to go for the Transportaion Module i.e. Order Booking, delivery and the PGI followed by Auto Invoicing. Now, we wants to go for Transportation Module  i.e. Shipment Creation, Shipment cost calculation , Service Order Creation etc. As we are quite new to this. So, we shall like to know the complete work flow & the procedure  for implementing the same. i.e. in what sequence the various transactions to be used for Master / Transaction.
    Please advise further.
    With Best Regards,
    Sanjeev Chugh

    Thanks for the reply. Definitely, i can share the details to the best of my knowledge about the transportation module.
    This module is basically meant for controlling purpose. Our main objective is to control the Transportaion Charges. Vendor Invoice must be cross verified from the sytem as well.
    Our Current Business Process : As per business process, we are having fixed rates per transporter for the type of vehicle and the source - destination combination. So, whenever, we are stock transferring the material from our mfg. plants to various depots, we are using various transporters (some one are specialised for south, some are spl. for east, so on and so forth). On the receipt of the material, receiver i.e. the destination branch , confirms the material receipt.. MIGO / MIRO etc. . We wants to capture the cost of the shipment as per the system and then on the receipt of the bill from transporter, the same must be cross verified.
    On going thru various documents from Web, I could gather the following details :
    1. After making deliveries, we have to make a shipment document. In our case, max. time it shall be an individual Shipment i.e. Tcode VT01N. Other type of shipment be Collective Shipment, which we use very less no. of times.
    2.  We have to prepare Shipment Cost document by using Tcode VI01
    3. We have to create a service Purchase Order By using ME21N.
    In our business scenario, we shall not be using legs concept as our shipments generally used to be from point to point basis.
    Sir, logically, i know our needs.. But getting stuck at a couple of points ... Like where to define various rates per transporter..That's why, i named the subject as the Work  Flow & Procedure for Tpt.Module.
    I shall like to request you to kindly advise further in this regard or kindly let me know if some study material is available from where i can comes to know about the exact work flow of the Transportation Module As Such.
    From Where I Can Get Help on Any Tcode Usage i.e How to use a Tcode and what be its basic functionality.
    With Best Regards,
    Sanjeev Chugh

  • Use of BADI for SNP capacity levelling

    I am using APO V5.1.
    I'm interested in using the Business Add in (BADI) for SNP capacity levelling.
    Can anyone tell me which BADI this is, and the possible functionality it can provide?
    Thanks for any information on this...

    To give you a couple of examples of what we use the BADi for:
    1) Based on a product characteristic, the levelling will only level certain products. E.g. you could set a characteristic to mark products for internal use versus export use and then level the internal requirements first.
    2) The levelling will only level planned production for highlighted orders in the data view.
    Hope that helps for ideas
    Regards
    Ian

  • Autorization and work flow in portal for ESS & MSS

    Hi All
    How to set Autorization and work flow in portal for ESS & MSS Business package
    Regards
    Daya

    Can you be more specific to the problem.
    Regards,
    --VP

  • APO SNP capacity levelling heuristic

    I am using APO V5 SNP.
    I have a question about SNP capacity levelling heuristic.
    As I understand it, the heuristic works on a resource by resource basis and will aim to capacity level across time buckets.
    But suppose I have a product which has two different sources of supply (PDS/PPM) using different resources X and Y.
    Suppose the capacity using resource X is overloaded for week n, but resource Y is not overloaded.
    Can the levelling heuristic be used to move capacity from resource X to resource Y for week n, or would this have to be done manually via changing the PDS/PPM?
    Thanks,
    Bob Austin, Atos Origin

    Bob,
    You can move the load from X to Y if Y is an alternative resource to X. This can be accomplished by going to the capacity levelling button and then in the options check the box for 'Consider Alternate Resources'. After that you can mention muliple alternate resources also to be considered.
    Hope this helps.
    Regards,
    Abhi

  • Functionality of APO SNP capacity levelling

    I am using APO V5.1 SNP capacity levelling.
    When capacity levelling runs on a given resource and tries to move planned orders, does it respect the relevant lot size parameters defined for a product?
    Thanks for any advice on this...

    Hi,
    In APO SNP , Capacity leveling takes into account lot size data that is defined in the master data(Product Master) with following restrictions:
    It takes into account   fixed lot sizes, maximum lot sizes, and minimum lot sizes.
    However, the system does NOT considet period lot sizes or lot sizes from PPMs/PDS.
    Further to the above, the capacity leveling method that you choose controls the way in which the system takes into account lot sizes.
    If we choose heuristic-based capacity leveling, the system uses the same rules as for the SNP heuristic when taking lot sizes into account;  and
    if we choose optimization-based capacity leveling, the system uses the same rules as for the SNP optimizer.
    Hope this gives you insight.
    Regards
    Datta

  • Work Flow in HR for on line Approval of Over time

    Dear SAP Experts,
    Client requirement is for OT approval through SAP by three seperate heads.
    Do i need to develop the work flow for this or can be taken care through some other means in standard SAP
    Please suggest possible methods
    Thanks and regards
    Punit Sharma

    Hi,
    If approval has to be taken from different people u can either use notifications from one user to another or develop a workflow for the same.
    Regards
    Raghu

  • SNP - Capacity Leveling question

    Hi All:
    I am trying to do Capacity leveling in one resource and for one material.
    After CIFing the material, resource, location and BOM (PDS), I entered some forecast for the specific material in DP and released it to SNP.
    Then I ran the product heuristics and when I looked at the planning book 9ASNP94 and Data View SNP94 I noticed that the capacity utilization where more than 100 % in some periods.
    Next I executed the 'Capacity leveling button'. and entered the following parameters and executed.
    Combined Scheduling
    100 % max util
    Product priority
    Ascending
    Heuristics Method
    All Relevant Resources
    In the Log checked all the three options
    The log comes out as follows:
    Green status on Resource and Parameters
    Yellow status and 'Resource xxxx not used in any PPM/PDS'
    Red status Resource utilization
    I checked the PDS for the resource xxxx and i found it to be there.
    When I go back to the Capacity view the leveling has not happened.
    What am I doing wrong?  Pl. help.
    Thanks
    Narayanan

    Hi Narayanan,
    I think there should be any issue. I hope You selected the data view snp94(2), and loaded your resource in the planning book.  then You executed the 'Capacity leveling button' in the planning Book, Right? Try without checking the 'consider alternative resource' check box, and dont give any priority in your capacity levelling profile.
    Thanks,
    Satyajit

  • Work flow object  type for purchase requisition   please do reply

    helllo anjireddy
    pls dont mind spare a lit bit extra time for my query....
    am giving u my requirement once again
       i have a custom table: the fields in it are storage location,issuing plant,approver user id..
    when a PR is created..the storage location(EBAN-lgort) and issuing plant(eban-werks) are to be read into the custom table where there is no data available for the approver user id...and a mail has to be sent to the approver ..when approved/ rejected a mail will be sent to the Requisitioner,approver and creator..
    as u said create a subtype of the Business object bus2105 and have to create a Customer Task in PFTC and assign this object and a Method  and define a triggering event.
    now wat i didnt understand is....when the fields location and plant r read frm the PR there will be no data in the approver user id field in the custom table,then how to get the approver' mail id...?
    pls do respond
    regards
    anik

    Hi
    You will get the UserID of the Approver from this
    then use the Tables <b>USR21 and ADR6</b> tables to get the mail ID
    See the sample:
    DATA :  lv_pernr LIKE adr6-persnumber,
             lv_adrnr LIKE adr6-addrnumber,
             lv_usrid LIKE pa0105-usrid,
             lv_mail  LIKE adr6-smtp_addr.
      CLEAR: lv_pernr, lv_usrid, lv_adrnr,
             lv_mail.
      lv_usrid = gv_ernam.
      SELECT SINGLE persnumber addrnumber FROM usr21
             INTO (lv_pernr,lv_adrnr)
             WHERE bname = lv_usrid.
      IF sy-subrc = 0.
        SELECT SINGLE smtp_addr INTO lv_mail FROM adr6
               WHERE addrnumber = lv_adrnr AND
                     persnumber = lv_pernr.
       endif.
    Reward points if useful
    Regards
    Anji

  • Work flow not created for the Shopping Cart

    Hi one of the customers created a shopping cart,in approval overview it is showing as no need of approvals,but the status of approval is 'awaiting approval', but workflow is not created for the Shopping cart. advised to re-order in change mode but still no use. please advise.

    Hi,
      what do you see in SLG1? Check the below t.codes
    SM58 - check for stuck remote function calls
    ST22 - check for system dumps
    SM13 - check for stuck update requests
    SM21 - check in the system log for anything unusual
    SWUD - run a consistency check on the workflow
    Saravanan

  • Work flow object  type for purchase requisition

    hello anji reddy
       u asked me to create a Customer Task in PFTC and assign this object and a Method  and define a triggering event etc for the workflow to get triggered,but in the triggering events there is no create event in it,so how and where should i create that event and also in the custom table which i have created there is a field approver user id ,where can i get this id frm?when the pr is created the fields storage location and issuing plant will be read and sent to the custom table where the related approver id should be chosen,,but the field will be blank so how to enter data into the approver user id field.....
    also in the business object(bus2105) is it that in the program only the create function module should be called and the rest of the fn modules which r there in the sample program which u have sent should be deleted?????????
    regards
    anik

    Hi
    It is <b>BUS2009</b>  for Pur Requisition
    Hi go to PFTC tcode and enter Workflow template and press F4, it displays all WF templates, then in that search and take the PR related one.
    Reward points if useful
    Regards
    Anji
    Message was edited by:
            Anji Reddy Vangala

  • WORK FLOW OBJECT FOR T CODE FI:- FB50 WHILE PARKING A DOCUMENT

    HI
    PLS SUGGEST ME WORK FLOW OBJECT NAME FOR TRANSACTION CODE FB50 WHILE PARKING THE DOCUMENT.
    THANKS AND REGARDS
    VINAY BHASKAR
    Moderator message: please do more research before asking, do not post in all upper case ("shouting").
    Edited by: Thomas Zloch on Jun 17, 2011 12:59 PM

    hi
    Go to FS00
    enter GL account no & Comp Code.
    Click Change button
    You might have to seek help of an FI consultant to do so.
    Also in KA01 create this G/L account as a cost element against your controlling area assigned to your Chart of Accounts, you can do so by clicking on Extra's tab in transaction KA01
    Regards

  • How To Activate Work flow Templates for Campaign Automation

    Hi friends,
    i created all settings for campaign Automation.when i click start process the system showing message like campaign has not started.i am not sure about weather work flows should activate for starting campaign automation.
    can u please let me know how to activate work flows and what is the path to activate work flow templates for campaign automation
    Thanks&regards
    kishor kumar

    Pls forward to me as well, facing the same problem unable to start Campaign Automation.

  • Work flow issue in Guided Procedures

    Hi,
    I have one issue in work flow implemented in Guide procedures with Webdynpro java.
    I have webdynpro application which developed and deployed in NW 7.0 SP3 version. The particular application request has suppose to be get approved by 5 users but after approving the 2 users, with out getting approved by other 3 remaining users it got approved the request completely. i need to trouble shoot this work flow issue. Can any body tell me how to troubleshoot this issue. why work flow not triggered for the last three users.
    Please let me know what are the steps for trouble shooting or monitoring the GP issues.
    Thanks
    vijay

    Hi Vijay,
    There are a few roles for  GP Administration. Once you assign these roles to your users, you can test , edit and trouble shoot Guided Porcedures, from Guided Porcedure Runtime Tab.
    First ask the portal admin to assign these roles to you and then you can check what is wrong with the corresponding GP.
    Hope it helps,
    Sattam.

  • Work Center(Capacity Level) Change Documents

    We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
    Thank you in advance.

    Hi Usman,
    I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
    When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
    To avoid it... i followed below steps
    1. Uncheck the capacity requirement indicator in all open orders
    2. when u try to delete, it will say "Capacity is still being used"
    3. Table KBED, use capacity ID and run, it will list out the pending orders
    4. When the table has no entries, delete the capacity category
    5. check all capacity indicator
    - Pithan