Sales order: Two schedule line items for single order item

Hi,
I have an issue with the schedule lines in the sales order. When we create a sales order  with today as the delivery date, it creates two schedule lines for the single order item. But if we give future date as the delivery date, then it creates one schedule line only. The confirmed quantity for the first line item (with today we the delivery date) is zero and second line item confirmed quantity (with delivery date as tomorrow) is actual order quantity. So as there is no confirmed quantity on todayu2019s date, it looks like it is creating new line item. But we do we have stock.
We donu2019t have availability check on and we use custom line item and schedule line categories.
Please give some hints on what might be the issue.
There was on post with this kind of issue, but it was closed without answer.
Thanks,
Srini

Hi Srinivas,
So as there is no confirmed quantity on todayu2019s date, it looks like it is creating new line item. But we do have stock.
As per my understanding although you have sufficient stock for the material system may be confirming the quantity in future date because of the forward scheduling. As you know system adds different times while evaluating the  confirmed delivery date. Check the route which system is using.

Similar Messages

  • My sales order is having two schedule lines

    Hi sap gurus,
    my sales order quantity is 36 pcs.
    the same sales order has two schedule lines in that the material availability date is 05/02/2010 for quantity 22 and for second is 15/02/2010 quantity is for remaining 14 quantities.
    so here delivery can be created for quantity 22 becasue the MAD is on 05/02/2010.  upto here no issues.
    here in my production server user is able to create only one delivery document for total 36 quantity which includes the 14 quantity also for which the MAD is at a far date that is 15/02/2010.
    (2).  i opened the delivery there two picking requests has been generated one on 04/02/2010 & for 07/02/2010.  how it is possible by the system.
    how is it possible for a material which is available in the future date that is 15/02/2010.
    can any help on this.
    regards,
    balaja

    Hi,
    Though the MAD is different, same delivery is possible for the two Schedule lines.
    But for the picking request creation for the future MAD (15/02/2009), please check your sales order. That is, go to VA02, and in to the schedule line level and then to the Shipping button and look for the various dates...
    Regards

  • Two different invoices created for  one order for two different lines

    Hi All,
    I have an order with four line items that was shipped on the same day, invoiced on the same day and all lines have the same delivery number yet two inovices were created for this order..one for the first three lines and one for the last line.
    Can anyone please explain what can cause this to happen?
    Thanks
    A/A

    Hi Asgar,
    If a single order has been split into two invoices, you should check the values of the mandatory columns. During Autoinvoice, the grouping is based on the madatory columns and also your grouping rules. If any of the mandatory column has a different value, it will split into different invoice.
    Please refer the following metalink note for further details
    Subject: How Autoinvoice Grouping Works
    Doc ID: 98772.1
    Hope that helps.
    Thanks,
    Anil

  • Amount spliting in 3 line items for single customer

    Hi All,
    Here i am facing one small issue  at the time of billing docment relesing  to finance.
    here i am getting 3 line items for single cumenter, custmoer debited in 3 line itmes.
    why i am geting 3 line items can any one help me in this issue.
    thanks
    kiran

    Hi,
    If you have new GL with document splitting active then if you have created billing for 3 items then system can split the customer line as well into 3 lines in GL view particularly if you have 3 items are getting credited to separate GL Accounts as sales revenue.
    In Classic GL view you will not see customer line getting split. Hoep it helps you.
    Regards,
    Sanjay

  • While Entering a Service Line Item for a Shippable Item under Order Lines.

    Hi all
    I have raised a Sales Order with Shippable Item and Non Shippable Item i.e Service Item for that Shippable Item under Sales Order Lines.
    When i click on Services Tab and enter the relevant details under Service Ref Order Number the system is defaulting the current Sales Order No. correctly but while selecting the Service Ref Line Number it errors out saying
    FRM-40212: Invalid value for field SERVICE_REF_LUNE_NUMBER.
    Please do help me on this.
    Regards
    Nakul.V

    Hi,
    You can easily list out sales order that have been assigned reason for rejection..simple extract of table VBAP-ABGRU = not blank.
    This report should list out the sales order number along with some more details, as required.
    Now the report should allow to choose the documents i.e. like giving checkboxes in the left most side and once the user chooses the sales documents he wants to get processed--> the program should call change Sales Order FM or BAPI. Execute this in background.
    Regards,
    Raghu.

  • How can I add a new line item for production order?

    HI all,
    How can I add a new line item for production order through BAPI/FM? Thanks in advance.

    Hi Mil,
      Unfortunetly SAP is not in front of me.
    But if possible go to BAPI transaction , check for any production order's bapi for CHANGE purpose. Where you will be able to add your new line.
    Reward if useful!

  • Schedule line category for cash sales

    Hi guru's
    here i have a small query wat is the schedule line category for cash sales
    regards
    srinivas

    Hi,
    The schedule line catagory for the Cash Sales is CN- No MRP. As the cash sales dont need MRP the materials has to be delivered and invoiced immediately.
    Hope this is clear
    Reward if helps.
    Manoj

  • Error "No schedule line due for delivery upto the selected date"

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

    Hi Experts,
    I am getting an error while creating outbound delivery for sales order.All items have same item cat and schedule line category,same customer.
    The sales order have three items with delivery date of 18.09.2008.the material stock is available for all three material and there is no planned issue for these material.
    In sales order schedule lines for all three items is confirmed on 18.09.2008. When I create a delivery on 04.09.2008(before the chedule line),it allows to create delivery for the two items but when I create delivery for material 3 on 04.09.2008(before the chedule line),it is giving error "No schedule line due for delivery upto the selected date" .on going to help it gives information that check whether the order item to be delivered contains confirmed schedule line.I checked the confirmed schedule line is on 18.09.2008 (though we have availbe stock on 04.09.2008).It allows to create a OBD either I change the delivery date in sales order to 04.09.2008 or create a delivery with delivery date 18.09.208.
    Kindly guide me how to resolve the issue,here I want to create delivery prior to the delivery/Schedule line date in Sles order.for 2 items it works but for third it is giving error.
    Is it something to do with Material group 5 in material master sales view for the 1 and 2nd mtrl it is 14 days for for the third it is 7 days?
    Sarvesh
    Edited by: Sarvesh Vashist on Sep 5, 2008 5:31 AM

  • Two Schedule Lines after MATP check

    All,
    We are doing MATP check in Sales Order. After the MATP check, the Sales Order is confirming with two Schedule Lines, the first line is confirming with 0 qty and the second line which is created after two days and is confirming with actual Sales Order required Qty. This is happening for all the materials and at any requested date you put in Sales Order.
    We further analysed that during the MATP check the Bulk component availability is actually getting delayed but we verified the Stock is fully available for the Bulk as per the requirement date. Master data are setup as per the MATP requirements.
    Also we checked, and do not see any issue because of Pick,pack, loading times or delivery & Transportation scheduling config in R/3.
    Please provide your suggestions.
    Thanks,
    Aashish

    Hi Aashish,
    You may check
    Factory calendar set into Customer Master (Ship to party) for the Unloading Point at 'General data' tab.
    Regards,
    Mrinal

  • No schedule lines due for delivery up to the selected date

    Dear Experts,
    My order has no block. i tried with 3 months in selection date in VL01N.
    My schedule line in order has 0 confirmed quantity,
    Kindly confirm if error in VL01n No schedule lines due for delivery up to the selected date because of 0 confirmed qty
    Thanks
    Siva

    Hi,
    I think you should use the " Back order process". Using backorder processing, you can list sales documents relevant for requirements for particular materials and confirm them manually. You can assign available-to-promise (ATP) stock to
    Outstanding order quantities. In addition, you can withdraw already confirmed quantities and reassign them to different items. The stock may be reserved for other sales order. You can reassign the stocks to your sales order material.
    To do this, go to Co06 (Back order processing) , enter the Material number, Plant and the checking rule.
    Select any sales order and choose --> Edit --> Change confirmation. Make sure the confirmed quantity is "0".
    Then select the unconfirmed sales order, then choose --> Edit --> Change confirmation. Now you can enter the "Delivery quantity manually ".
    Now you can create the delivery document.
    Hope this can help you .
    Regards
    M. Lakshmi Narasimhan

  • BAPI Error: No schedule lines due for delivery up to the selected date

    Hi,
    I have created a program to create delivery orders with reference to sales orders using BAPI - BAPI_OUTB_DELIVERY_CREATE_SLS.
    After execution I get the error: No schedule lines due for delivery up to the selected date
    Please help.
    Thanks in advance!!!
    Regards,
    Sriram

    hi,
    this is to inform you that,
    please check the schedule line date in the sales order because the date is not matching here for the BAPI to upload.
    here,  for example the schedule line is 4 days after and you are running BAPI today. that will mismatch no.
    the same thing is happening in uploading case also.
    so please check the date.
    because in teh sales order if teh schedule line date is today it will accept the uploading with out throwing any errors.
    regards,
    balajia

  • Schedule line blocked for delivery

    Hi Friends,
    Can you please tell what does Schedule line blocked for delivery ( LIFSP )  means?can you please explain the business process involved in this?
    Regards.
    Dinesh

    At schedule line level, the following are some important prerequisites must be fulfilled, else the same would be set as blocked:
    1. The schedule line must be due for shipping on the specified selection date.
    2. The schedule line is due for shipping as the material availability date or the transportation scheduling date is reached.
    3. The schedule line is not blocked for delivery.
    4. The delivery quantity must be greater than one.
    5. The items in the order must be fully processed.
    6. The product status of the material must permit delivery.
    7. No credit check are pending.
    Regards,
    Gauravjit
    Reward Points if solution is helpful.

  • Schedule line getting confirmed when Ordered Quanity is greater than stock.

    Hi Sap Gurus,
    We have an issue in one of the sales scenario.
    In one of the sales orders the ordered quanity is purposely maintained greater than the stock at respective storage location(batch managed).
    In this case the schedule line should not get confirmed and it should not allow delivery document creation.
    But in the sales order the schedule lines are geeting confirmed and even the delivery document is getting created with picking request completion.
    Could you please help to understand :
    1.  why the schedule lines are getting confirmed when ordered quantity > Inventory?
    2. How do I stop delivery document creaton in this scenario?
    Looking for a quick response.
    Thanks in advance,
    Bhaskar

    Hello Bhaskar,
    Is Availability Check in your system considering Replenishment Lead time, if yes, then this is possible.
    Check this IMG Link:
    IMG - Sales and Distribution - Basic Functions - Availability Check and Transfer of Requirements - Availability Check with ATP Logic or Against Planning - Carry Out Control For Availability Check
    Here check the RLT settings.
    Also check settings under In/Outward Movements, where things like include Purchase Order can lead to confirmation of stock in Sales Order, despite physical inventory being present.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Different tax codes in the MIRO for single service item

    Dear all,
    Customer wants to enter 2 different tax codes in the MIRO for single service item. How it can be achieved?

    >
    Milosavljevic Sreten wrote:
    > Just loudly thinking... what can be reason that one service for same invoice is taxable with two different tax codes? 
    >
    It is cross-counties transportation. Part of route outside company country is non-taxable, inside part is taxable. Amounts are proportional to distance and hence become known only at time of invoice receipt.
    Users do not want to create 2 separate invoices. They would like to have ability to enter 2 lines in MIRO. But I need your help to understand, how it can be done? Service receipt is done by single line (because actual taxable / non-taxable amount is unknown at that time). So, is it possible to enter non-taxable amount in MIRO in some additional line?

  • Two schedule lines despite sufficient stock

    Hi Gurus,
    My order form shows two schedule lines even after maintaing sufficient quantities in the respective plant location.....another strange happening which I comprehended was if at all I create order with reference to quotation then order form confirms and me the qty....but if I create a seperate order then the qtys are not confirmed....what wud be the reason?..........
    Also to understand the importance of checking rules like individual requirement and daily requirement I tried changing checking rule from individual to daily....but I cud not see any changes...where do I see the changes?.......
    Looking for ur valuable feedbacks on this.................thanks in advance.......................

    Hi,
    The reason for your first query that you get 2 schedule lines even though you have stocks could be due to the fact that delivery and transportation scheduling would be on and the system is adding the pick/pack/load/transit time also. So, if the requested date is for today and you have stocks also, system would still create a 2nd sch. line since it is adding the above mentioned times.
    for your 2nd doubt, do you get the same schedule line category in both the cases?

Maybe you are looking for

  • Mouse goes dead when printer powered up

    I have a Beige, but recently was given an early G3 iMac, 233mhz processor, 288mb ram. I successfully installed OS 9.2.2 (starting with an OS 9.1 iMac disk..........the iMac had 8.6 on it) and updated the firmware; removed the hard drive, hooked it up

  • No place to Double Click visible on pdf file-after opening a password-protected pdf

    No place to Double Click visible on pdf file-after opening a password-protected pdf

  • Paste special...

    I am an Excel user for many years. As I mentioned that I just started using Numbers today. One question is about Paste special in Excel "Paste ...". From there I can paste a text in csv format back to worksheet from a wizard, which helps me to walk t

  • Adding % sign

    SELECT CASE WHEN (BI_DR_HR_SO.SOTotal/BI_DR_HR_CQ.CQTotal)>0 THEN to_char(ROUND(((BI_DR_HR_SO.SOTotal/BI_DR_HR_CQ.CQTotal)*100),2))||'%' ELSE 0 END AS HR FROM BI_DR_HR_CQ, BI_DR_HR_SO I get the error message ORA-00932: inconsistent datatypes: expecte

  • How to check if two or more controls/i​ndicators have the same name/label in LabView?

    LabView does not show any rror if I name two controls with exactly the same name. It can be confusing. I am using LabView 6.1.