Same material with diff. Production scheduler profiles
Hi,
I am working on PP-PI, where the same material is being manufactured using separate order types.
To be more specific, one order type for the regular manufacturing & another with Re-work order type. The requirement is such that the Order type dependent parameters & production scheduler profile are different in both the cases. Since my master has the prod. scheduler for regular manufacturing on the material master, even if i select the Re-work order type the system is considering the Settings of the regular manufacturing order.
I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
master due to various reasons. At the same time system should consider the settings for Re-work order only when the specific order type is manually selected during order creation.
Appropriate solution would be of great help, thanks in advance
Hi,
Try using user exit. change the production scheduler profile during order save based on the order type.
check with your technical team.
hope this helps.
regards
CSN
Similar Messages
-
Unit Conversion issue for same material with Diff KPI
Hi,
i have a report with multiple key figures which form a structure.
Unit conversion for this report and all the key figures are defined at report level.
Below are the settings in place
Source currency: Data record from target
Target Currency: From variable ( Input variable in BeX report)
Conversion factor: Dyanamic Determination of conversion factor
Using Reference Infobject if available otherwise use T006
Reference Infobject: 0Material
Issue: For 1 Key figure conversion to TO is happening, however for other Key figure conversion is not happening for the same material.
Note: Conversion to TO is defined in BEX settings for Info object 0material and stored in DSO UOM0MATE.
Why for same material some key figures convert to target unit correctly and not the others?
See the attached screenshot. Sales Quantity is convertin to "TO" while Volume third party shows figue in"ERR" for same material.
Thanks
NayabHi,
Following reasons cause to your issue,
1. Unit Conversion is not maintained for that particular material in source system Material itself, so that conversion data data may not updated in DSO (UOM0MATE).
2. For particular transnational data record key figure value don't have any base unit or units measures, that case also you may get that error.
Request check the transnational data in your InfoProvider and 0Material Master data and DSO data (UOM0MATE) . Correct the data based on that.
Check the Master data test in RSRV for 0Material, if any SID generations was missed or not.
I hope this can be help to find the cause of error , based on that you can resolve problem.
Thanks & Regards,
Leela Krishna. -
Dear Experts,
Can i have multiple scheduling profile ?
Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
Please help me to solve the issue.
AmitHi,
I am unable to figure out from your query what you exactly need.
But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
So hope the above clarifies, if it does not, then please explain with an example, it would be better.
Regards,
Vivek -
When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
How to check whether production scheduling profile is maintained for relevant order type 10.
To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
Also, pls explain about “Order Type 10” and how it is linked with material and order execution.
Looking for a detailed explanation with screen shots , since i am new to SAP.
Thanks With Regards,
Dinesh Kumar V.Hello Dinesh,
Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
Production order have Order category as 10 Process Order 40 in standard SAP you can check this in OPJH.
Best Regards,
R.Brahmankar -
Production Schedule Profile & shop floor paper printing.....
Hi there ,
If we set the Execute Printing checkbox in the T-code <b>CORY</b>for a production scehedule profile....... then when we will release the order along with the other shop floor paper do the Transfer Order will also get printed if the material is warehouse managed.........
Please enlighten me .....
Thanks & Regards
KaushikHi there ,
Thanks for your reply...... I am aware of the fact that the shop floor paper will be printed once the order is relased & the relevant config is done in the Production schedule Profile.........
But in case of the material which are warehouse managed the Transfer requirement will be created & the further the Transfer Order........... I wan tto know that these will also Print the Transfer Order doucment for the warehouse managed material .......
Thanks & Regards
Kaushik -
Production scheduling profile for production order type 10 does not exist
Kindly suggest me how to resolve this error
Production scheduling profile for production order type 10 does not existHi Archana,
Go to material master-work scheduling view and check what is the production scheduling profile maintained for the same materisl -plant combination.
then go to OPKP and check if production scheduliong profile is maintained for relevent order type 10 in custmizing. If not maintain one and it should resolve the error. -
Same Material with different itemcatagory groups
We have 3rd party manufacturers that make product for company and sometimes they send the finished product back to company and other times they will drop ship it to one of our customers.
this scenario we need to have the same material with different itemcatagory groups
i tried to create same material with different storage locations, but it's possible but the thing is when i change the item catagory group for the material , the same is applicable for 2nd same material, my requirement is i need 2 different itemcatagory for the same material, hope u understand my requirement
i will be expecting your possible replys.
Thanks & Regards
Venkat.DhanemkulaHi Venkat..
Please explain it more clear manner..
With whatever i have understand, i think you scenerio is manual 3rd party order processing.
In that case the material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing.
Keep only one material and specify the item category group NORM in the material master.
If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
hope it helps you.
Regards
Harry -
Production scheduler & profile configuration
Dear SAPper,
When i create production order, the production scheduler is automatically flled (ex.101) and then
the production scheduler profiles is automaticalled filled too.
I don;t maintain production scheduler & production scheduler profile in work scheduling in material master?
where did system pic thatt value??
Best regards,
Freddy HaHi,
For your order type,
Please check if in OPL8 "Assignment" area - "substitute scheduler" field is defined.
This scheduler is picked up as default if not defined in material master.
If a PSP is attached to this defualt scheduler in OPJ9, then that will also be picked up in the order.
Hope this helps.
Regards,
Ashok -
Difference mpr controller and production scheduling profile (exact)
hi gurus
wht is difference between mrp contoller and production scheduling profile. and which will come first at the time of planning.
thanks in adavance
avinash.pegarlawarHi,
MRP controller
MRP Controller is the person responsible for a group of materials in MRP in a plant or company.
Material that takes part in material requirements planning must be assigned to an MRP controller.
Production scheduler
Scheduler responsible for a material in production activity control.
Example
The production scheduler determines how capacity requirements are calculated for a material during a scheduling run.
MRP Controller comes into Planning first which you need to assign in MRP-1 View in material master while production scheduler you need to assign iin Work Scheduling View in Material Master.
Hope this helps clearing your doutb.
Revert if still any query.
Regards,
Tejas -
Printing setting in Production Scheduling Profile
Hello Guys,
In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
I used this setting.
But I could not print the production again.
I want to re-print the production order.
How do I enable re-printing the production order?
Thanks
George KingHi George,
the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
Did you get any error? Are you able to print when you push the print button manually?
Settings in OPK8 are correct ?
Regards,
Sabine -
HOW TO CREATE PRODUCTION SCHEDULING PROFILE
PLEASE
TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
EXPLAIN IN STEPS
THANKSHi,
Check the below link and the screen shot:
http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
Hope it will help you.
Regards,
Alok Tiwari -
Same material with Different qualities
Dear Experts,
Please give me the solution for mentioned issue ....
I have to maintain the same material which has different qualities (grades) and according to these qualities, the material rate is different. i have near about 50 different qualities for the same material and 50 different rates.
My every vendor is supplying this material for 50 different qualities and rates. So in this case to maintain the individual material prices is big challenge.
If i will maintain Info records, i have to maintain 200000 info record. and also there is possibility of price change for every three months.
So please give me any other alternative solution for the problem.Hi Vijay,
Variant Configuration may work in your case. I collected some links, please go thru the links:
http://help.sap.com/saphelp_47x200/helpdata/en/92/58d455417011d189ec0000e81ddfac/plain.htm
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
http://sap-img.com/sap-sd/steps-for-sd-variant-configuration.htm
http://www.slideshare.net/arun_bala1/variant-configuration-overview
http://www.sap-topjobs.com/VARCONFG%5B1%5D.pdf
Purchasing:-
1. MATERIAL MASTER
Create Material with material type as HALB Transaction code MM01
Enter Material code as ZMAL.
Select the following views Basic data1, Basic data2, Purchasing, MRP1, Storage1, Storage2, Accounting1, Accounting2, Costing1, Costing2.
Basic Data1 Select General Item Category Group as 0002
Basic Data2 Activate the field Material Configurable
Remaining fields data is as applicable.
2. VENDOR MASTER
Create Vendor Master Transaction code XK01
Enter Vendor code as ZVEN
3. Classification Characteristics
Create Characteristics Transaction code CT04
Characteristics created as
i) ZMALCOLOURRED after entering the description click on the tab Addnl data & then fill up the data in Table name = MMCOM & Field name = VKOND then save the characteristic.
ii) ZMALCOLOURBLUE enter the description & save the data, do not enter any data on Addnl data tab strip.
Save the data
4. Classification
Create Class as ZMALCLASS Transaction code CL01
Class as ZMALCLASS, Class Type as 300
Assign the above two characteristics ZMALCOLOURRED & ZMALCOLOURBLUE to class ZMALCLASS.
Save the data
5. Configuration Profile
Create Configuration Profile Transaction code CU41
Enter the material code as ZMAL,
on the next screen enter Priority 10, Profile Name ZMALPROFILE, Class 300. Select the line & click on the push button Class Assignment, assign the class ZMALCLASS come back to main screen
Select the profile line item & click on the Profile Detail
then click on the push button dependency assignment
on the screen input dependency as ZMALDEPENDANCY &
then click on the push button Dependency editor
input the syntax as
$self.ZMALCOLOURRED = 'RED' IF ZMALCOLOURBLUE = 'BLUE'
save data
6. Pricing Procedure ( SPRO )
Pricing condition types like VA00 - Variants/Quantity & VA01 Variants % is included in the pricing procedure with following settings
Sr. No. DATA VA00 CONDITION VA01 CONDITION
Control Data 1
Condition Class A A
Calculate Type C A
Condition Category O O
Changes can be made
Manual Entries C C
Item Condition Active Active
Delete Active Active
Amount / Percent Active Active
Scales
Scale Basis C C
Control Data 2
Variant Condition Active Active
Access Sequence Variants Variants
These conditions will appear in the pricing when variant configuration is made active in vendor Info Record.
7. Vendor Info Record
Create Vendor Info record Transaction code XK01.
Input Fields like Vendor, Material, Purchasing Organisation and Plant.
Click on the push button Variant Configuration In the pop-up window input the variant condition.
Select the line & click on push button choose the pop-up window will display the two condition VA00 & VA01, select the relevant condition, click on choose then save the data.
Input all other relevant data for creation of vendor info record
8. Purchase Order
Create Purchase Order Transaction Code ME21N.
Input all relevant like Vendor, Material, PO quantity, price etc.
Select the Material Data tab strip in Item & click on the push button configuration the characteristic of variant configuration will appear input the required value,
Go to the condition tab you will find variant configuration condition has appeared in pricing condition.
Save the purchase order.
Reg,
Ashok -
MF60 scenario - same material with different orders
Hello,
I am using MF60 to transfer the stock from raw material location to Production location. I transfers the goods based on each production order.
Now the scenario is: I have two tins of paint each weight 20 kg.
My current order needs 8 kg of paint and it would take 3 days to finish the order(on Machine A). It means rest of the 12kg would be available after 3days.
Now I am creating 2nd order(on Machine B) of smaller qty and that order requires 2 kg of the same paint. I have to use the 2nd tin of paint. Now when I try to use MF60, system does not propose me qty (as 12 kg paint is already available in Production location but canu2019t be used as it is on machine A).
So please suggest me, how I can transfer the material to production location using MF60. I donot want to use the MB1B.
kind regards,
JPSHello Mangalraj.S,
I have checked with workcenter also (removing the selection date) and set the 'all requirements' in global setting.
But it does not showed the particular components (against the order in question) but does showing those other which needs higer quanties
Can you please explain more in detail regarding your requirement?-- The requirement is that If I have two tins of paint (20kg each), if first order require needs 8kg (but rest of the 12kg won't be available physically), Now in the 2nd order which needs 5kg. System does not propose the requirement in MF60 (I believe because of there is 12 kg already available in prod location on the system)
Also please execute the pull list by giving the work center as the input and do not specify any date in the selection horizon for
requirements.Include the check for include all requirements under global settings.---- I did opt the same settings but it is not propsing 2nd order requirements
In the second tab production/process orders,just give the input as the work center and check for the same.---- In the 2nd tab I did try with workcenter but..... (I am not a PP expert, this is the first time I am working on PP, So I have created the routing without workcenter and assings the workcenter in prod order only)
Regards,
JPS -
Create inbound delivery for same material with multiple batches
Hi Experts,
An ASN( advanced shipping notification) contains multiple batch numbers for same material or line item.An IDOC has different segments with batch numbers but in SAP while creating Inbound delivery(VL31N) only batch number ( segment) get posted automatically in SAP other batches are need to post manuaaly.
I am using IDoc type : Delivery03 ,Message type: DESADV
How to resolve this problem?
Thanks,
AnilHi Anil,
Welcome to SCN for your first post. Did you check with your functional people about this.
Regards,
Madhu. -
Same Material with Different G/L Account
Hi Everybody,
I have a material X is for HALB .I want use X is for Stock Material and as well as Special Procurement Q i.e Project stock.Those stock should be posted to different G/L account.Is it possible can anyone put me on this.
BR
govindHi,
1.
Generally, split valuation is to valuate the same material differently based on various criteria (external/internal procurement, country of origin, etc)
http://www.sap-img.com/mm025.htm
http://www.sap123.com/showthread.php?t=29
http://help.sap.com/saphelp_47x200/helpdata/en/a5/63314d43a211d189410000e829fbbd/frameset.htm
2.
However, (independently form the topic of split valuation), you can maintain separate valuation class for project stock. Check Accounting1 view of material master and you will find a separate field for this purpose (MBEW-QKLAS, 'Proj. stk. val. class')
Regards,
Csaba
Maybe you are looking for
-
How to find out the Non Partitioned Tables used 2Gb on oracle
Hi team how to find out the Non Partitioned Tables used > 2Gb on oracle where not is sys & system regards
-
Remove Company Code with all the Employees in it from r/3?
Hi i have a bit unusual requirement. i want to know how can i Remove a Company Code with all its assigned Employees completely from a system(r/3) ? can this be possible at all? if yes then please also mentions what can be the side effects of this act
-
Problem when compiling example from TechEd 2008
Hi, I' am using sap sneak preview 7.01 and I'm trying to compile the ZMHO_EX3_* webdynpro example. I get the error : "syntax error : long text". When I check the syntax I have allways the same error : Field ")" is unknown... each time the source cod
-
Hi, I've been using LabVIEW for about 7 months now, and am still a bit confused about the save options. It seems that whenever I modify a sub-VI for my app, the previous sub-VI I created ends up with the same settings that I changed in the newly mod
-
X220 will boot up when on the dock but when off the dock : error loading operating system
When the laptop is on the dock it will boot up to xp, however, when off the dock the following error appears: ERROR LOADING OPERATING SYSTEM Checked the bios tried in COMPAT AND AHCI modestill the same, changed the boot up selection, still the same