Same PO for 2 Plants

Hi Experts,
In sap we can make one PO for several plants, suppose, there are 3 lines in the PO and we can put different - different plant in the line item, if the item codes are extended in those plant, we don't want this facility. We want that one PO should me made for One Plant, if we want to make pO for another plant we should use new po.
Can we restict the user to create one PO for one plant.
Regards
GR

Dear friend
For each and indusaval plant define separate purchase organizations, by this you can restrict the user
regards
Pramod

Similar Messages

  • How to control "Procurement parameter" for plant stock.

    Hi everyone
    I have changed Subject and question as below;
    Our customer wants to create P.R manually before MRP running for some of reason.
    After create Project/WBS/Network/Activity and assign component to Activity,  when assign
    component to activity, set "Procurement parameter""Requisition + reservation for WBS elemen",
    then P.R is automatically created. For project stock it seems OK. However when I try to do
    same thing for plant stock, I can choose only "Reservation for network". How to control this part?
    Experts, please give me your advice.
    Regards,
    Satoru
    Edited by: Tempra Samurai on Jan 23, 2010 12:37 AM

    Hi,
    Create a Procurement Key in OPS8 and under Priorities give Priority 1 to Plant stock and 2 to Project Stock.
    So attach a material to Activity in CJ20N a reservation will be created without AcctAssgcat Q ,Special Stock Q.
    Here in this case you can directly issue goods to project also if unrestricted stock is availabe ,here the system will consider only 281 Now.
    After you run MRP ,system will create PRs on the basis of Requirement and availabity but without the reference of WBSE because you are creating PR for Plant stock.
    Hope it is clear.
    Muzamil

  • PO for Plants belonging to different Country under same Company Code

    Hi,
    We have created a Company      1000 (Country u2013 India)
    We have created two Plants 1001 (Location - Delhi, India), 1002 (Location - United Kingdom).
    We have created a pricing Procedure      ZDOMES & ZIMPOR for Domestic & Imports Procurement.
    We have created a Tax Code V0, Country IN.
    We have tested the Procurement Cycle for Plant 1001 (Location - Delhi, India) and it is working fine.
    For Plant 1002 (Location - United Kingdom) what extra configuration do I need to do? Can we use the same pricing Procedure, Tax Code?
    Please advice.
    Regards,

    Thanks for the reply.
    Here in our scenario, we have created only one Company Code and one of our Branch is in UK.
    we need to create only One Company Code & Branches (Plants) in Delhi & UK
    Please suggest .
    Regards,

  • Access Sequence for Plant/Tax code Combination  for JTAX

    Dear All
    i want to create a new access sequence for "Plant/Tax code" Combination.
    Please let me know the process for the same
    Regards
    Amey

    Hi,
    Goto- M/05.
    Create the condition table by selecting the fields Plant & Tax code.
    Assign this condition table in the Access sequence JTAX as per ur requirement.
    Create condition records (FV11) by choosing the requirec access sequence.
    Regards,
    Satpal

  • Missing Part list for Plant to Plant Purchase order

    Hi,
          I need the following requirement in CO24,
          In CO24 its shows the missing parts for Sales order, similarly we want the missing parts list for Plant to Plant Purchase order in the same report. Also the report,
    1.It  should not consider the Planned order for a sales order.
    2.It should not consider the planned order which can be convert into purchase requisition.
    3.The procurement type should be "E" or "X".
    Kindly guide me is there any standard layout changes in available or any development we have to do.
    Thanks
    Muthamil Murugan.G

    Hi Purushothaman,
    If you have the following settings in OPJK:
    Plant                 XXXX
    Order Type       XXXX
    Availability Check    2
    [X]Status Check
    [X]Check material availability when saving order (may not need)
    Checking Rule        PP PP checking rule
    Component Check Type    ATP check
    Release material     2  Release permitted despite missing parts
    Then in COHV you try to mass release the order with the following parameter:
    List: Order Header
    Selection: Your selection criteria
    Mass processing:
    Function: Release
    Max. No.of Processes 99
    Save Log: Always
    Release control order: Collective Order Release
    Then after the order is released, you can find the missing part list of that order in CO03 menu path:
    Goto->Missing Parts->Missing parts list
    Hope it helps.
    Regards,
    Rachel

  • Can i maintain a same number for both the customer and vendor

    Hi all,
    i have a scenario, as a vendor is supplying some assembly  components to the client. the client is assembling the components. and sending the same to the vendor
    since the same person is acting as a vendor and a customer i want a common number for both the vendor and customer in their master data's.
    Thanks
    KV
    Edited by: krishna vamshi on Nov 27, 2010 12:20 PM

    It's not mandatory to use the same ID for vendor and customer if they are the same entity, you can use different IDs w/o any problem.
    It might be difficult, if you are using internal number assignment. It may occur that the ID is already occupied by a vendor or customer.
    You can link your customer to your vendor both in XK01/XK02 (LFA1-KUNNR; control tab) and XD01/XD02 (KNA1-LIFNR; "Control Data" tab). One assignment is enough.
    In this case you can always see, which customer belongs to which vendor.
    Sometimes plant vendors, customers are defined via external number assignment, to have the same ID as the plant, but this should be decided in advance...(separate account group is used generally, with separate number range)

  • Need to Create a Check for Plant in WBS & Plant in Network

    Dear Guru's,
    While creating Project (CJ01) my users are creating in a Plant, and while creating network for the same project/WBS, they are using different Plant Code.
    Since my Profit center is related to the plant in CJ01,
    and because of wrong Plant in network, all my PR/ PO is going in a different Profit center, which is creating a huge problem while auditing.
    I need to Create a Check for Plant in WBS & Plant in Network...!!
    Kindly suggest me the ways to do it and how to do it...

    Hi Deepa,
    The Check you are trying to create between Plant defined at Project def and network level that should be same can be achieved through validation at the network level by using a user exit at network level.
                    While creating the network you can change the plant value not equal to the value at proj def/network profile may be one of the reason is since the network type is defined for more than one plant (OPUV).
                    While creating validations at network level we do not have the option of setting the prerequisite/check  using WBS or Proj def fields (i.e. PROJ-, PRPS- fields)    so we need to create a user exit at the network level.
    I am not sure but logically u can have a user exit for both prerequisite and check steps of the validation.
    You need to create the user exit in program ZGGBR000.
    Please take help from your Abaper for the same.
    OPSI-Network header-Validation- Step - Prerequisite u2013 Check u2013 Message.
    Prerequisite
    If Proj Profile = u2018XXXu2019 and Network Profile = u2018XXu2019 (or as per your logic if need be use a exit)
    CHECK.
    PROJ-WERKS = CAUFVD-WERKS   (This logic needs to be defined in user exit and set the same user exit at the check.)
    Once you define the user exit in ZGGBR000, it will be available in the tab u2018exitsu2019 at the Prerequisite and Check levels.
    The name of the form pool (e.g., ZGGBR000) that contains your user exit must be stored in table T80D.
    It is important that you make declare the code generation program for your user exit; how many and what type of parameters you are using for the user exit. You do this by entering your newly defined user exits in the form routine GET_EXIT_TITLES. Found in program ZGGBR000.
    Check with your Abaper to check on all the aboveu2026
    Message:
    Plant at Network level should be same as at Project def level.
    Hope it helps you,All the best..
    Regards
    Vinayak.

  • FI -Follow on Doc-Plant field not updated for Plant to Plant Tfr

    Hi All,
    For plant to plant stock transfer made with movement type 641- the receiving plant and  supplying plant fields are not getting populated in the debit and credit line items respectively in  the accounting document.
    In FI the same G/L Account is getting debited and credited.So there is no meaning or information one is getting from FI. We have to go to MM and see the rec'ing and supplying plants.
    Can anybody tell whether any specific customisation to be done for updating the plant fields in FI Accounting document.
    Thanks in advance.
    Regards
    Deepak

    Hi
    Please maintain plant entries and make an entry default in the extended attribute tab - location radio button in the org structure, for the respective user and recreate the SC.
    R/Reddy.

  • Define shipping data for plants / multiple sales areas should be assigned f

    Dear All ,
    Appreciate of you helped me in this:
    I am trying to configure the intercompany STO process, when I reached the step of u201CDefine shipping data for plants u201C I found that the issuing plant is already assigned  to sales Area ( 2000 , 60 , 10 ) which represent local sales , but I need to assign the sales area ( 2001 , 60 , 10 ) which represent foreign sales.
    Both sales areas should be used because we are doing STOs with a local company here in jordan and another one in Algeria , so Is there any way to have both sales areas assigned for the same issuing plant?
    Thanks ,
    Malik

    Hi Malik,
    I am afraid this is impossible in SAP standard. For this purpose you have the BAdI ME_PROCESS_PO_CUST. The method PROCESS_ITEM of this BAdI gets one single parameter, IM_ITEM, which is the pointer to the PO item object. This object has a lot of useful methods, among them:
    - GET_SHIPPING_DATA gives you the Shipping tab of the PO item derived by SAP, among them the ship-to number
    - SET_SHIPPING_DATA allows you to amend the data on the Shipping tab
    Let your ABAPer implement the BAdI and program its method PROCESS_ITEM.
    BR
    Raf

  • Multiple Selection for Plants

    Gurus,
    While using the Multiple Selection option in MMBE (The Arrow  tab). I could not save the value of the plants I have entered.  Requirement is that the plants needs to be added or removed as and when required./ ie plant need not ot be hard coded in the batch program which calls this screen. I tried using the Multiple Selection option where I created a list of plants in txt file and then imported the same. After I exit the transcation the plant disappers. Next time I have to manually enter the plants again.
    Please let me know how to use this functionality.
    Paddy

    Paddy,
    In standard SAP, MMBE does support the creation of variants.  If you are unable to perform this activity, then it means you have an authorization issue.  You need to consult with your authorization team to have the proper objects added to your profile.
    Here are the steps required to create/run MMBE with a variant:
    1.  MMBE
    2. Enter the plant data.  Your technique of importing via text file is acceptable.  Also, manual entry can be used.
    3. Enter any other settings that you wish to have selected during the batch run
    4.  Hit 'Save' icon (floppy disk).
    5. Name the variant.  Enter a short description of the variant.  Ensure that the checkbox "save field without values" is unchecked for plant.
    6. Hit 'Save' icon again. Clik though the confirmation.
    Now, to use your newly created variant:
    7.  MMBE
    8.  Select Goto>Variants>Get.
    9.  Select your variant created in steps 1-6.
    The fields should now be populated according to your original entry.
    You can create a simple single step batch job by running the program in Background
    10.  MMBE
    11.  Select your variant as in steps 7-9
    12. Select Program > Execute in Background
    13. Select output parameters (printer, etc)
    14. Select start parameters (immediate; Date/time, After job, etc.)
    15. Select if you wish to have the job run periodically.  If so, enter the periodicity  under 'Period Values'.
    16. Hit the 'Save' icon at the bottom.
    Or, you can use SM36 to create a job, which can also include multiple steps.  The ABAP program is RMMMBEST and the variant is the one you created.
    Rgds,
    DB49

  • STO: Define Shipping Data for Plant- problem

    Hi Gurus,
    I am configuring Stock Transport Order. now my problem is,I have to do Stock transfer from one depot to Two plants which are of two different Sales Org. thru SD delivery, two step procedure.
    Path: Materials management> Purchasing>Purchase Order>Setup Stock transport Order> Define Shipping Data for Plant.
    Now the problem is here is i am able to assign only 1 Sales org for the corresponding depot. But we sell goods from both the plants via depot, the same way i want to send back the return goods from Depot to corresponding plants through STO. Please suggest
    Thanks & Regards
    Praveen.

    Any Inputs guys

  • Same dates for GA and GR in ATP

    Hi All,
    This is my very first post. I have a situation where for an Inbound delivery. I should have 2 days difference in Goods arrival and goods receipt in plant. For some reason system is showing the same dates for Goods arrival and goods Receipt. Can someone help me what all tolook for?
    Many thanks
    YS

    ATO Items/ Models have significant complex requirements and behavior when ATP check is called. While this is handled appropriately in ATP from OM interface, direct ATP Inquiry either from APS responsibility or similar form in OM--> Scheduling menu option.
    I'll highly suggest not to use either of these ATP Inquiry forms for anything related to CTO (ATO, PTO etc) and only use OM UI for such availability checks. This is by design unless Oracle makes significant changes to how these forms are built, please note there is no configurator support from these 2 forms for similar reasons.
    Thanks
    Navneet Goel

  • CATS for plant maintenance

    Hi Guys,
    I need your advice:-
    We are on ECC 6 environment, the time system is running on 3rd party and payroll is on r/3, now the management decided to Implement CATS for plant maintenance (Activity based cost). So let me know is there is a feasibility to do so. If so, Please advice, your help will be greatly appreciated.
    Thanks,
    Babu

    What type of time evaluation do you do ? PM
    CATS are very much feasible with PS and activity types and you can transfer costs against activities, orders, networking elements and WBS elements. --Understandable
    You said Time is captured by third party, which sub system is this? Legacy
    CATS doesn't have any relation with 3rd party, ---Understandable. My? Can we make two process same time. Legacy and CATS ( My concern is about IT007 and Work schedule)
    CATS users are different from swipe card users: Understandable
    it depends on your design and requirement to comment on the feasibility at your end.
    but on a general scale , CATS is feasible in transferring activity based cost and post it into FI and CO: Understandable
    Requirement: 
    Need to implement CATS, to get work order, Time, and Employee name etc.
    My question is where in SAP I can store the data enter through CATS, If I use IT0007, I may redundant the data at HR side which is using 3rd party data to run payroll, or using 2001, 2002 and 2005.
    So,  How can I use CATS Independently. Please advice. Thanks

  • Message LP327 WM Not active for plant

    Dear All,
    We have just upgraded our SAP system from 4.7 to ECC6.0, While doing a repetitive manufacturing backflush a warning has appeared (LP327 WM Not active for plant), the statement in the warning is correct, the plant is not active for WM, I was wondering if this particular warning could switched off.
    Kind Regards
    Mark Summerbell

    Hi Mark,
    The message is triggering from std SAP program RLLT0R00 and is defaulted to Error message.We cannot change that to warning message in that program.Pls try to search suitable OSS notes for the  same.It looks like Extent WM is active for your plant so the message is issued.
    Pls see below attached details of Extent WM
    Reg
    Benny
    Extent Warehouse Management
    Key that controls the use or the degree of activation of Warehouse Management for a storage location. The key controls whether bin stock is to be managed in the MM-WM component.
    The field can have the following settings:
    blank = normal management of stock in bins. The full range of functions provided by the MM-WM component is available.
    1  = Lean WM for inbound or outbound deliveries. The delivery or pick is executed using transfer orders (from MM-WM). These transfer orders, however, do NOT update bin stock in Warehouse Management.
    2  = For this storage location, you can use normal SD picking in combination with doors and staging areas. In this context, no Warehouse Management functions are activated.
    3 = Lean WM for outbound deliveries. Picking occurs using transfer orders (from LE-WM). However, these transfer orders do NOT update bin stock in Warehouse Management.
    4 = Lean WM for inbound deliveries. Putaway occurs using transfer orders (from LE-WM). These transfer orders do NOT, however, update bin stock in Warehouse Management

  • Creat Shipping point configuration for plant

    Hi
    I want create shipping point for plant XYZ.
    I need to create shipping point, so that I can maintain country and Transportation zone for the same.
    Request you please tell me where i can configure in IMG?
    What is the step by step process for setting shippong point for anty plant ?
    Vicky

    Hi Vicky,
    Shipping Point Configuration:
    1) SPRO->Enterprise Structure->Definition->Logistics Execution->Define, copy, delete, check shipping point...  for Defining the Shipping Point
    2)SPRO->Enterprise Structure->Assignment->Logistics Execution->Assign shipping point to plant... for linking Shipping Point with Plant.
    3)SPRO->Logistics Execution ->Shipping->Basic Shipping Functions->Shipping Point and Goods Receiving Point Determination->
                 ->Define Shipping Conditions
                 ->Define Loading Groups
                 -> Assign Shipping Points ........ here you enter the combination of Shipping Condition, Loading Group, Plant for  determing the Shipping Point which can be one default and many manual.
    Regards,
    Karthik

  • Maintain Shipping data for plants

    Dear all,
    We have Two plants which are of two different Sales Org. thru SD delivery, two step procedure.
    Path: Materials management> Purchasing>Purchase Order>Setup Stock transport Order>
    Define Shipping Data for Plant.
    Now the problem is here is i am able to assign only 1 Sales area for the corresponding depot. But
    we sell goods from both the plants via depot, the same way i want to send back the return goods
    from Depot to corresponding plants through STO. Please suggest
    Shipping point determination is maintaned properly but still getting problem..
    With Regards,
    San Rao.

    Hi,
    i  am unable to assign  two Sales org for the corresponding depot. it is having only one option.
    how can i assign second sales org.
    With regards,
    San Rao.

Maybe you are looking for

  • Confused about Mapviewer and SQL in OBIEE 11g.

    I read in another post that you cant use mapviewer unless you have an oracle database. Here is my confusion. The mapviewer product comes with OBIEE 11g, Correct? If I use Google Maps, and load the map information into an SQL data base, why wouldnt I

  • Deleting songs while using the icloud and ios 6 system

    I just updated to the ios6 system and have been using the icloud. Since downloading the ios 6 system I can't delete songs off of my ipod. Suggestions?

  • Drives Going to Sleep

    I've been to the Energy Saver. I have turned off "Put the hard disk (s) to sleep when possible." I have it set to sleep in 3 hours. Yet continuously, the external Firewire drives go to sleep--sometimes even during the long Auto Save (rant previously

  • SAP PM object dependency diagram

    Hi All,          We are working on an SAP PM data migration project. Could anyone help me with the load dependency diagram for SAP PM objects. At least a list of SAP PM objects will be of help. Thanks, Gopi

  • CS5 confusion about saving and previews

    I'm adjusting to the recent upgrade to CS5 but have reached a hiccup. I'm on a Mac Pro (2010) with OS 10.6.4. Previously, when I've saved a file (whether it was a jpg, tiff, eps, png., psd...), a preview was created. If I double-clicked on it to open