Scheduling Issue at subassembly level

Hi Experts,
In REM scenario we are having two levels of BOM e.g. Finished Good X and subassembly Y both are produced in house with REM on different production lines. The total time taken to produce one finish good is 2hrs which includes 1 hour for producing Y and one hour for producing X, while running MRP with lead time scheduling system creates RSQ for the finished good X say on 13.04.2010 and at the same time subassembly RSQ is created on 12.04.2010.
Whereas practically system should create RSQ for Subassembly on the same day and the finish time of subassemblyu2019s RSQ should be equal to start time of finished goods RSQ.
Is there any specific setting required for this?
Regards
CS

Dear
Please check the OPU5 and selected the selection ID 02 for rate routing for detailed and rate based scheduling.
Scheduling type Backward and Adjust Scheduling to basic date.
Planned orders are created from MRP. When I check the planned order deatails, in the Det.Scheduling tab it shows scheduling type  and in the Production rates tab it shows backward scheduling.
Also check the schedule margine key for both the materail it should be zero.
Please refer this link,
http://help.sap.com/saphelp_erp60_sp/helpdata/EN/f4/7d299844af11d182b40000e829fbfe/content.htm
Regards,
R.Brahmankar

Similar Messages

  • How to make a mass change for incoterms of a scheduling agreement at item level.

    Hi SAP Guru,
    There are many wrongly assigned incoterms in the scheduling agreement at item level by a user exit which was implemented recently in production. May i know if there is any way that we can revert those changes back to the original incoterms via mass change? I've tried to search over the internet and it seems like there is no posting about this issue before. Please help urgently. Thanks in advance.
    Regards,
    Shawn

    You can use the following sample to develop your usecase.
    Here, we would show menu items only for the nodes at level 3.
    You can also download the entire sample based on POJO at
    http://adfsampleapplications.googlecode.com/svn/trunk/TreeSampleApplication.zip
    The code is self explanatory.
    Let know, if you have any specific questions.
    <af:form id="f1">
    <af:treeTable value="#{bindings.continents.treeModel}" var="node"
    selectionListener="#{bindings.continents.treeModel.makeCurrent}"
    rowSelection="single" id="tt1" columnStretching="last">
    <f:facet name="nodeStamp">
    <af:column id="c1">
    <af:outputText value="#{node}" id="ot2"/>
    </af:column>
    </f:facet>
    <f:facet name="pathStamp">
    <af:outputText value="#{node}" id="ot1"/>
    </f:facet>
    *<f:facet name="contextMenu">*
    *<af:popup id="p1" contentDelivery="lazyUncached">*
    *<af:setPropertyListener from="#{bindings.continents.treeModel.depth}"*
    *to="#{pageFlowScope.CurrentDepth}"*
    *type="popupFetch"/>*
    *<af:menu text="menu 1" id="m2">*
    *<af:commandMenuItem text="View Districts" id="cmi1"*
    *visible="#{pageFlowScope.CurrentDepth == 2 ? true : false}"/>*
    *<af:commandMenuItem text="View Attractions" id="cmi2"*
    *visible="#{pageFlowScope.CurrentDepth == 2 ? true : false}"/>*
    *</af:menu>*
    *</af:popup>*
    *</f:facet>*
    </af:treeTable>
    </af:form>
    Thanks,
    Navaneeth

  • I cannot enter new Schedule lines in item level

    hi.,
    while creating sales order, i want to  split the Schedule lines in item level for running MRP. i cannot enter new Schedule lines in item level. at present the system is not allowing in sales order
    Regards.,
    Lakshmanan.S

    Hi,
    Will you let us know what is the error message system is giving ?
    Regards,
    Amrish Purohit

  • Difference between sales order schedule line and item level data

    Hi All,
    Could you please let me know what is the difference between sales order schedule line and item level data?
    Thanks,
    Ramya

    Hi Ramya,
    Sales order schedule line contains del date, order qty, rounded qty, confirmed qty, delivery qty, schedule line category, purchase requisition etc.,  ie It contains the full details of sales order data with respect to the scheduled line of delivery.  The total quantity of a sales order item can be subdivided into schedule lines that contain the various subsets with the corresponding delivering dates.
    Sales order Item level data contains details of the item in the sales order like material code, net price, net value, UoM, PO details, reason for rejection if any, material group,billing date, plant etc., ie this
    contains the full details of item irrespective of scheduled line.
    Regards,
    R. Senthil Mareeswaran.

  • Issue inMaintenace scheduling issue in Two plants with similar data set up

    Hi PM Gurus
    Scenario: A) We Have two maintenance Plants which have got Factory calendar assignment as per Table Data. We need to change Non Working days of factory Calenders (D1 and T2) for work centres working and do Maintenace scheduling
    Issue    A) Plant PL0B  has got factory Calender T2 set up at work centre (WCT2) .We get Maintenace schedule Calls as per Calender set up ie No Maintenace Call (Planned call and Call date) on  (Non Working Days). Here we change public holidays to working days and this throw schedule calls accordingly (thatu2019s Maintence Calls on working days only).
    B)     We have similar requirement to change public holidays for Calender D1 which is assigned to Work centre WCD1, then we must get maintenance calls for working days. But we find that for Plant PL0A, Maintenace Calls are generating even on non working days. Only difference between Plant PL0A and PL0B is for Work centre set up as per screen shots for Capacity data.
    C)     We have changed work centre data of WCD1 as per WCT2 ,but still PL0A is giving maintenance Calls on Non Working days (Not Controlled by Calender data of Work Centre )
    D)     Info: Scheduling indicator in Maintenace plans of both plants is TIME
    Plant      Factory Calender (plant      Factory Calender
    (Work Centre)     Non Working Days                                                      Work Centre (PL0A)
    PL0A       U1     D1     3-Public holidays                                                WCD1
    PL0B     T1       T2     Sat ,Sun and 10 Public holidays                                WCT2
    Thanks
    Upinder

    Greetings Upinder,
    You should set the Scheduling indicator to "Time - factory calendar" and select a Factory Calendar if you want the Maintenance plan to be scheduled according to one of the calendars you set up.
    The work centre capacity scheduling doesn't come into place here, yet - it'll allow for rescheduling once the orders are called.

  • URGENT HELP PLS :  Issue with Multi Level Master Detail block

    This is an issue someone else had posted in this forum few years back but there was no solution mentioned, I have run into this same issue , The problem is as explained below.
    Any help on this is appreciated.
    Scenario:
    There are 3 Blocks in the form : A (Master Block)
    : B (Detail of A )
    : C (Detail of B )
    There is master detail relation created between A and B and B and C. So initially when we query for a record in Master A, it shows all records properly in B and C.
    Now if i navigate to the first record of B , and then second record of B , records corresponding to that record shows up properly in C block.
    Till now everything works fine.
    Issue 1:
    But in case after querying initially on Master Block A,If I go directly to the second record of B block, it clears the whole B block and C block.
    Issue 2:
    Same thing happens if I am on C block ( corresponding to second record of B block) and then navigate to first record in B block , it again clears the whole B block and C block.
    Please Help !!
    Thanks !

    Thanks Xem for Your reply , I tried those settings but it did not help..here is the original link that to the thread that talks about the same problem ,
    Issue with Multi Level Master Detail block
    The last update to this was the following :
    "I figured out that this is happening because Block Status is set to 'Changed' and this is causing it to clear out the blocks.
    But cant figure out why the status is setting to 'Changed' "
    Any Help from the form Gurus on this form in this matter is truely appreicated !!
    Thanks,
    Zid.

  • Scheduling  issue

    Hi Experts ,
    I am experience one issue as explained below. your expert advice would help a lot.
    We have a bom with one finished product and a semifinished product. I have created a planned order for finished productin in repetitive planning board mf50 and when i convert into processs order, the order start times are according to shift sequence start times (i.e 6.00 a.m).
    Now when I have run MPS single item and multi level planned order is created for semifinished product. When I convert this planned order for semifinished product into process order the order start times are always at midnight (00:00), whereas even in case of semifinished product also same shift sequence is considered in workcenter. The operation times for both finished and semifinished product are less than 1 day for the order quantity.
    I have configured in scheduling parameters for planned and process orders for scheduling as "Adjust basic dates of depedent requirements to order start dates), forward scheduling (OPU5 & OPUZ). This is same setting i have maintained for repetitive planning scheduling parameters also.
    If semifinished product is also directly planned in mf50 and the planned order thus created is converted to process order then it starts at shift sequene time i.e 06.00 as defined.
    Why does the semifinished product doesn't start at the shift start time? How can I make that semifinished product to also start at shift start time when planned orders is converted to process order.
    Regards
    Sandeep

    Hi,
    Have you checked the work centers for semifinished material please recheck the work center capacity view and capacity header.
    Kindly check the capacity which u maintained and its group for shift sequence.
    If there is no group of sequece in capacity header then update it and schedule the order it will show u the details of start dates as per the schedule.
    Regards,
    Nilesh

  • PM Order Scheduling - issue

    Hi experts
    I'm having issues in the scheduling of PM work orders.
    I'm using unplanned WO. They are created from the notifications. Upon indication of operations ( with time for each operation) and components, i set the work order as planning complete (user status). At this point, the system status is created and material availability not check.
    When i hit "schedule button" on the WO, i get the message:
    Scheduling log does not contain any entries
    Message no. C7119
    My WO type is configured with the following:
    : Ajust basic dates, adjust dep. reqmts to operation date
    * Scheduking type: Forwards
    * Automatic Scheduling
    The control key has the following sets
    * Scheuling
    * Det. Cap. Req.
    * Print
    * Print time tic.
    * Confirmation required
    * Print confirmation
    My work center has the following:
    * Work Center category: 0005 (Plant Maintenance)
    * Capacity category: 002 (person)
    CAPACITIES
    Operating time: 6h
    * Relevante for finite scheduling
    * can be used for several operations
    * long term planning
    On the other hand, when i analyze CM07 and CM25 i always get the following message
    There are no capacity requirements for the current selection and
    settings
    Message no. CY144
    I have created 2 profiles to analyze WC loads/Work order leveling - 7 day and 30 day
    Even when I use tcodes like CM02, i get the message that no work orders are selected.
    So I'm either missing some config or some step.
    Can you please provide some clarity on this?
    Thanks in advance
    Joana

    Hi
    I'm still having doubts.
    So, just for my understanding, what should you get from "hitting" schedule button in the WO?
    Let me elaborate on my questions (mostly the second one)
    I create the the WO. based on the basic dates defined, and the work center capacities, and operations durations, the system will define in the operation detail the dates.
    when i n going through CM07 and CM25 i should be able to get the full picture, right? work centers capacities, what is compromised, in which WO?
    I get nothing like that. So it seems that althoug i indicate a WC in the WO (it is set for finite scheduling), there is no place where i can get the full picture.
    my assumption is that with this info in CM25 i would be able to adjust the scheduling made "automaticaly" by the system (based on my config), to better adjust the work to be done.
    Can you provide some clarity on the steps, cause i'm missing something for sure.
    Many thanks
    Joana

  • Issue with Capacity Levelling-CM25

    Hi Everyone,
    We use CM25 for capacity levelling.
    Issue:
    Total Capacity req. = 186.8 Hr
    Available Capacity on 01.01.2012 on the resource = 380.2 Hr
    Now when I try to dispatch the capacity req. for a planned order manually on 01.01.2012, system distributes the capacity-
    Distributed   Period
            5.0    31.12.2011
          23.8    01.01.2012
          23.8    02.01.2012
          23.8    03.01.2012
          23.8    04.01.2012
          23.8    05.01.2012
          23.8    06.01.2012
          23.8    07.01.2012
          15.6    08.01.2012
        186.8
    But we want to dispatch capacity say on one particular day or split it onto two different days i.e. 90 Hrs on 01.01.2012 & 90 Hrs on 02.01.2012. Is it possible? If yes, how?
    Additional Information-
    Capacity Defination in resource-
    No. of indiv. cap.   16
    Operating time       23.76
    Capacity             380.16
    Relevant to finite scheduling
    Thanks,
    Parashar.

    Hi Amol,
    Thanks for your input.
    As I have said I already have Capacity more than what is required.
    Capacity Available per day: 380.2 Hr
    Total Capacity Requirement: 186.8 Hr
    I am trying to know that whether what issue has been raised is possible to solve in Capacity Levelling & How.
    We are not maintaining shifts in SAP at present.
    Thanks,
    Parashar.

  • Work schedule display in capacity leveling cm25

    Hello,
    In our company we have created a work schedule (tcode OP4A) and have associated to a work center (tcode IR02).
    However, capacity leveling (tcode CM25) doesn't display the work schedule associated to our workers in the graphical planning table.
    Do you have any idea how to solve this problem?
    Thank you very much,
    Óscar

    It could be issue with your over all profile..
    Use - Over all profile SAPPM_G001  
    Overall prof: SAPPM_G001           PM: Ind.cap/tab/day/avail.lab./norm.schd
           Select.profile:                     SAPPM_S001      PM: Tab/work center/lab/
           Control profile:                    SAPPM_C004      PM: Capacity planning table individual
           Time prof:                          SAPPM_Z0T1      PM: Tab. short-term (1 month)
           Evaluation prof.:                   SAPPM_A001      PM: Plant maintenance
           Strategy prof.:                     SAPPM_T002      Lead time sched. backwards
           Capacity planning table (tab.form): SAPPM_R001      PM: Plant maintenance/Individual caps.
    Note: Don't modify the Standard profile .

  • Webi Report scheduling issue

    Dear Experts,
    I have webi reports which are running fine when i refresh the query from query panel. When i am scheduling the report it is failing.
    My webi reports are connected to the Bex Queries using OLAP Connections which is working fine for other reports.
    I am getting the following error message
    "Can not connect to the source olap com.sap.conn.jco.JCoException: (103) JCO_ERROR_LOGON_FAILURE: Access key access is no longer possible"
    Because of this BW Credentials are getting locked and user cannot able to access the BW System.
    Kindly help us getting this issue solved.
    Thanks in advance.
    THanks & Regards,
    Archit Sarwal

    Hi Archit,
    Try this...
    Logon to Central Management Console (CMC) with an Administrator user.
    Click on OLAP Connections.
    Right click on the connection and click User Security.
    Assign Full Control to the User on the connection.

  • Scheduling issue with Analysis for Excel

    Hi,
    I am trying to schedule a workbook in Analysis for  Excel from CMC. The schedule always fails when I uncheck the APPLY DEFAULT FORMATS in the components tab of the Display Analysis. The schedule works fine if this box is checked. Has anyone come across this issue?
    Analysis Excel Version: 1.4.5.2837
    Thanks,
    Kal

    Hi Tammy,
    Sorry for getting back to you so late. We are right now BIP-add on SP5 for Analysis Office. We are planning to have BIP-add on SP6 next week. Dont know if this will solve my issue but something to try.
    Thanks,
    Kal

  • [BO 4.0] Webi scheduling issue

    Hi,
    We are using Business Objects 4.0. i have a webi report that uses SAP BW as source. We are using DF to create universes for these webi report. In DF Admin tool, we have manually mapped the RFC connection to programID field. While scheduling this webi report, scheduling fails with the following reason,
    Database error: [Data Federator Driver] [Server] [Connector 'RC_SalesAw'] Connection failure: com.sap.conn.jco.JCoException: (103) RFC_ERROR_LOGON_FAILURE: Password logon no longer possible - too many failed attempts on 172.16.8.135 sysnr 01. (IES 10901)
    Note that we are providing the corrrect user name / password for these users.
    Please provide your inputs on this issue.
    Thanks,
    Ravi

    Hi,
    despite your assurances,  it clearly indicates that the logon string provided for the relational BW connection is not authenticating correctly..
    Whilst your BO logon may be correct, i would encourage you to check all the credentials used elsewhere in this connectivity
    Does this same universe refresh correctly when running webi in ad-hoc mode?  i.e. not scheduling?
    If Yes - i'd recommend you log a Support message.
    Regards,
    H

  • Stock issue at delivery level

    I have a fert having stockable product, MM post 100 tons to storage location.
    i have 10 sales order and among them i have created 5 outbond delivery of total qty 40tons.
    at schedule line level i have remove the availability check so now its check the availability at outbond delivery level.
    now i am creating an outbond delivery with ref to order system prompt me with the warning that only 10 tons of material are available. ????
    i have run the mmbe report which shows the 100 tons qty and "schedule for delivery" of 40 tons.
    no pgi done of any single delivery so far.
    Looking for the gurus experience in this regard as problem is very critical by nature.
    Regards,

    Hi Piyush,
    Please follow the following path :
    SPRO | Sales and Distribution | Availability check & Transfer of Requirements | Availability Check | Carry Out Control for Availability Check <--
    In the screen select the Availability check and Checking Rule and then Explore it.
    There are several options available here, like what kind of stocjk the system should take into account while doing availability check. Here you can select / deselect (X or Y etc) for Sales Order Stock to give you more clear picture for the stock and force the system to take the desired sales order stocks into calculation.
    Hope you will get the very clear picture of the scenario configuration settings.
    revert Back If it helps you.
    Regards,
    Manoj K

  • Duplicate Planing at subassembly Level

    Hi Gurus,  
    I need your help.
    Scenario:
    Final Product is of 2 types
           -  Make to Stock (FERT)
           -  Make to Order - Configurable (KMAT)
    One main assembly for both the products is same.
    Let us say basic assembly "A" (Plng Strategy 10) is used for
            - MTS Fert "X" (Strategy 11) and
            - MTO KMAT "Y" (Strategy 20)
    During beginning of month,
             - we know the MTS fert demand and
             - for MTO KMAT , the orders are not on hand but the overall Qty
                             (i.e. at assembly u201CAu201D level) in known.
    Hence for MRP we feed the PIR for MTS Fert (X) and
                                                 PIR for  main assembly (A) to plan for expected MTO.
    Issue:
    After MRP, system plans for X an A.
    Hence total demand of A is
    -     Dependant requirement coming from X and
    -     PIR for A (in anticipation of Sales Order for Y)
    When Sales Order comes for Y, it generates requirement for A.
    This way the requirement for A (which was fed as PIR) gets duplicated.
    Requirement:
    Whenever Sales order for Y gets planned, it should consume the PIR of A
    However, the PIR of MTS FERT (X) should not consume the PIR of A.
    Thanks & Regards
    Nitin

    Try the following:
    Introduce a phantom material B between MTO KMAT "Y" & assembly A . Give strategy 59 (Planning at Phantom Assembly Level) to phantom assembly B. i.e.
    Assign B to the BOM of Y & assign A to the BOM of B. (Let the BOM of MTS material X be as it is i.e. assembly A assigned to the BOM of X)
    Following are the prerequisites of strategy 59 for phantom assembly B
    - Strategy group 59 on the MRP screen.
    - Set the indicator for assembly planning, the Mixed MRP indicator, to 1 on the MRP screen.
    - Consumption parameters (Consumption mode, Bwd consumption, Fwd consumption on the MRP screen)to allow for consumption of planned independent requirements.
    - Set the Special procurement field on the MRP screen to 50 (phantom assembly)
    - If you are using this strategy in a make-to-stock environment, you must set the Individual/coll. indicator is set to 2 on the MRP screen.
    You also must set the Backflush field to 1 (2 may also be possible) on the MRP screen of the material masters for the components of the phantom assembly.
    Backflushing is essential because the components are planned with only one planned independent requirement which can only be planned correctly if all reservations are reduced at the same time. This is only possible when the goods issue for the components is posted at a later stage as in backflushing. In addition, all components of the phantom structure have to be linked to the same operation. BOMs must be maintained for the finished products and for the phantom assembly.
    In this way PIR of A will not be consumed by MTS material X, since the assembly A is being procured by PIR of phantom material B. However it will be comsumed by MTO material Y since phantom material B is in the BOM of Y.
    Try this & see if your requirements are fulfilled.
    Revert if any problem or clarifications

Maybe you are looking for

  • Table for FBL1N report

    Hi All, in FBL1N we have vendor open item for which we have table BSIK. Now in FBL1N, we have open to see all posting for a vendor based on posting date. i need table which can all all posting in a vendor account. Please advise Regards Deepak

  • OWB Release 10.2.0.1.0 instalation on  Oracle Release 9.2.0.1.0

    Hi All, When i try to create OWB repository with Repository assistant i get the following error : ORA-22905 cannot access rows from a non nested table iteam ORA-06512 at line 17. My environment details are as given below. O/S : Windows 2000 Oracle: R

  • Managing files in CQ components folder...

    Hi, I am a newbee in CQ development. I start to develope many components in "components" folder. Now, the folder has too many files inside and I realized that I need to sort related components and put them in a folder. If I create a folder under the 

  • Bridge Skips Images on Import

    Bridge has started skipping images on import.  I find fewer files than were on the CF disk.  First time I saw this I had set Bridge to delete on import.  Next time, I had to search for missing sequence numbers and reimport.  Out of about 450 images,

  • How come Flex Builder does not complain when semi-colons are omitted for AS3 statements?

    Hi, I was wondering why my flexbuilder3 plugin for eclipse does not complain when and if I leave off a semi-colon at the end of an AS3 statement.  Has anybody else experience this in their flex environments? What can I do to fix this; as this is very