SDV03V02 : Need to de-allocate (unconfirm) a scheduled quantity.

Hello,
I need to de-allocate (unconfirm) a scheduled quantity.
Is there a user-exit, BAPI or function module that I can use to do this?
The allocated quantity needs to be reset, so that the quantities can be allocated again according to the checking rule for product allocation. Program SDV03V02 will be used for this..
This is probably not clear anymore, I am also totally confused. An example has been added at the bottom to show what I need to achieve.
Regards,
Edwin.
Example:
SCENARIO 1: Rejected item quantity not available to earlier order:
Assume product ABC is on a monthly allocation plan at a channel level
Available units = 100 units
Allocation plan = 50 units for Channel1, 50 units for Channel2
Assume all orders in this scenario are for one channel
1. Order 1 is entered
Qty of 40 confirmed from ATP check, confirmed from allocation check
RESULT: allocation of 40 units is consumed, available allocation = 10 units
2. Order 2 is entered
Qty of 20 confirmed from ATP check, confirmed for 10 units from allocation check
Remaining 10 units unconfirmed
RESULT: allocation of 10 is consumed, available Allocation = 0 units
Unconfirmed order quantity = 10 units
3. Order 1is rejected
line item for Qty 40 is rejected
RESULT: available allocation = 40 units
4. Order 3 is entered
Qty of 40 confirmed from ATP check, confirmed from allocation check
Allocation of 40 is consumed
RESULT: allocation of 40 is consumed, available allocation = 0
5. Rescheduling is run for this product (order creation date determines priority in the queue)
EXPECTED RESULT:
Order 2 has highest priority and would be committed for 20 units, leaving 30 units for Order 3
Order 3 Commit quantity 30, unconfirmed quantity 10
Order 1 Line item was rejected, (no committed quantity)
RESULT:
Order 2 - Commit quantity 10, unconfirmed = 10 (as available allocation 0)
Order 3 - Commit quantity 40
Order 1 - Line item was rejected

Solved.
The reason why it did not update, was because someone else was using transaction MC95 or MC94...
It works.
See thread: [Solution|How to delete confirmed schedule lines, without executing the ATP check?;
Edited by: Edwin Vleeshouwers on May 20, 2009 9:57 AM

Similar Messages

  • Need a user exit to modify the quantity schedules in a sales contract

    Hi,
      I am using ECC 6.0 with IS OIL. Need a user-exit to update the quantity schedule(table OIA05) in the sales contract VA42.
    I have a new field called timestamp in the table OIA05 which needs to be updated with the timestamp value.
    I tried the user exit MV45AFZZ in USEREXIT_SAVE_DOCUMENT_PREPARE and USEREXIT_SAVE_DOCUMENT to update the values. But the new values are not being reflected. Can you please help me in this regard.
    Thanks,
    Best regards,
    Ajith

    that will allow me to append an initial line with <accit> pointing to the line. Therefore I just have to modify <accit> and the new line will then have my changes?
    Yep, that is exactly it.    So after the APPEND statement, simply fill the fields of the <accit>.
    append initial line to im_document-item ASSIGNING <accit>.
    <accit>-field1 = 'Blah'.
    <accit>-field2 = 'Blah'.
    Regards,
    Rich Heilman

  • Message no 06067 "Scheduled quantity & &" greater than target quantity

    Hi,
              I change the status of the message no 06067"Scheduled quantity & & greater than target quantity & &" from W to E. Than In Se38, the schedule quantity cannot be maintained greater than target quantity.
    But in MRP Run, the message number does not work.
    How to restrict higher qty then target qty created through MRP.
    Thanks in Advance.
    Ashish Panchal

    Hi Ashish,
    The Note 83343 should answer your question.
    83343 MD01: No check of target qty in sched. agreemnt
    As described:
    "The planning run should run automatically and without interruption by some events.
    The system makes a decision either in favor of the quota arrangement or in favor
    of the source list. The system reads the scheduling agreement once in the update process.
    To have a check on the target quantity would require another read of the document which
    was determined to affect the system performance."
    A maximum quantity can be considered by means of the quota arrangement. A modification exists which will allow for a check of the maximum quantity in the quota arrangement. The note contains more details on this.
    Regards,
    Purnima.

  • Need dynamic File name in the Schedule link for FTP Destination

    Hello,
    We are using Oracle BI Publisher Enterprise formerly XML Publisher
    I am trying to drop a .csv file into an FTP location using the Schedule link for a report I have created. I need to run this program everyday. Is there a way I can have it drop a file with the date stamp? Currently when you hit Schedule and select FTP destination I need to specify the path of the file and I am not sure if it can accept dynamic parameters?
    Can it?
    I want to be able to specify "SomethingDate{sysdate}".csv
    Cheers
    Vijay

    Hi Vijay
    Im pretty sure it can not do that at the moment, not thru the scheduler UI.
    What you could do thou, is set the report up as a bursting report - you're not going to split the report but the bursting engine can be fooled. With that method you can specify the file name to be used via sql
    Regards
    tim

  • Need help on event based report scheduling on webi 3.2

    Hi All,
    I need to add/remove trigger events on scheduled report instances.
    I have around 100 scheduled report instances and want to add a event trigger.
    I do not want to reschedule all the instances one by one with new event trigger.
    Is there any way that i can add event trigger to all the instances at once ?
    Thanks,
    Alorika

    Hi
    Can you please tel me hoe to view these report properties in R3.
    If I go to schedule, It allows to set a new schedule but I want to view the existing settings.
    Please guide.
    Thanks ,

  • Need urgent help in Real Time scheduling algorithm implementation

    I am new to Java Real Time programming. I have faced a problem which is stated below:
    Declare tasks
    for
    if it is schedulable then run the task
    otherwise it is not schedulable
    for
    check priority with respect to deadline.
    select highest priority task
    for
    start higest priority task
    if the task is preemtable
    then switch lowest priority task to highest priority task and stop the lowest priority task
    after completion higest priority task, lowest priority task complete the rest of the work.
    this is actually a pseudocode for real time dynamic scheduling ( rate monotonic scheduling). can anyone please help me develop the code?

    PrinceOfLight wrote:
    I am new to Java Real Time programming.
    this is actually a pseudocode for real time dynamic scheduling Define "real-time" in your context. Most people who use the term don't use it correctly. If you truly mean "real-time," then you'll need real-time Java running on a real-time OS.
    can anyone please help me develop the code?What specific problems are you having? If you have no clue where to start, this site is not a good resource.

  • Need list of recurring jobs in scheduler

    Hello,
    I need a list of all the reports scheduled. And the recurring jobs specific. I need also al the parameters one needs to fill in the form when scheduling a report (like: every thurstday, next runtime, to emailadress, etc etc).
    BO had the tool instance viewer (?) but info I get is not complete and it's not in excel
    can anyone help?
    thanks, Lia

    hi prewin,
    1.opereting system monitor(ST06).it is necessary fot 24 hours.
    2.Database check monitor(DB16)
    3.Local transaction Statistics(STAT)
    4.current active users monitoring(AL08) & (SM04)
    5.workload Analysis(ST03):this was main for caluclating all jobs
    6.Database operation Monitor(DB24)
    :I Hope it is usefull to you.
    regards,
    reddy

  • Need a REAL phone number to schedule repairs

    I spent an hour on the phone yesterday, trying to REQUEST that someone come look at my multifunction machine (we're a HUGE international business, just like HP).
    After being transferred to at least 5 different departments because the person at HP:
    1) from the model number, couldn't figure out what kind of machine I have.....???????
    2)  couldn't understand my serial number....they kept telling me it was not a valid serial number, even though I was reading it off the machine configuration page that I printed from the printer's administration menu....???  After repeating the serial number twice, I was passed immediately from a phone operator to a manager.
    2)  they didn't know the appropriate department to transfer my call to.....???
    FINALLY someone was (with random 10-minute hold intervals) able to enter a ticket into the system and issue me a case number.  That took AN H-O-U-R.  Then I had to wait till THE NEXT DAY for someone else to call and tell me that someone would be at my office within a 2-hour interval to repair the machine.
    When he walked in the office, he was aware of only ONE of the issues I'd called HP about...even though I repeated BOTH issues to the ~4-5 people I talked to while they transferred me from department to department.  (A constantly-jamming tray and a loose network port......on a 5-month old machine that's used by ~30 people.)  Unfortunately, it wasn't my regular repair guy (yeah, this isn't the first repair we've needed), otherwise I would have talked to HIM about my frustrations.
    I need a REAL phone number where I can call this repair-scheduling-center DIRECTLY.  WHEN the next problem with my machine(s) happens, I do NOT want to have to spend another hour on the phone, trying to schedule repairs.
    Can someone provide me with this direct line?
    Thanks in advance.
    There was no appropriate board to post this on, so I apologize for posting it on the wrong one.

    I just noticed that the repairman has been on the phone for 30 mins about our repairs.....most of it has been on hold.

  • Need to find a calendar to schedule multiple assignments with multiple tasks set on specific days for multiple people

    There may be no such animal as what I am searching for, but I thought I'd give it a try.
    What I need to do is find a calendar app that allows me to have individual calendars for staff members that I can place a several-days-long assignment and have those people access remotely on an iPad or iPhone (autosync).
    I also want to be able to have tasks set on specific days within that assignment that have alerts/reminders for each stage of the assignment.
    Being able to custom colour each individual assignment (not just the person's own calndar) is also necessary, as these asignments overlap and need to be easily distinguishable at a glance. Each assignment needs to be its own entity and not affect any furture or previous entries, even if I choose the same colour.
    It needs to be in a month by month view and be able to be something each person can subscribe to and sync up with for changes on a daily basis. It does nothave to be a calendar like in the screen shot below, it could be a linear calendar that has days across the top and assignments down the left side.....
    Here is a screen shot of a rudimentary excel spreadsheet I have been using. It is awkward and becoming unmanageable as the number of assigments increases and more staff are being added on. And I must send a new spreadsheet out every time I make a change or add an assignment, which is several times a week.
    I suspect I may be asking for the world, but if anyone knows a direction I can go in to start a search, I'd be grateful. I haven't had success of my own so far and need to find something soon.
    iCal doesn't work for me due to the fact I can only colour code the calendar itself and not the event, plus not being able to have multiple tasks within one event. And the qty of assignments I'd have would see most getting lost, eliminating my abilty to see every staff member's assignmanet at the same time.
    Thank you in advance if you have a suggestion and if not, thanks for looking at my dilemma! 

    check with T-code TPM44
    zashok

  • Student needing some questions answered about Manufacturing Scheduling software

    Greetings;
    I am a undergraduate senior at Arizona State University majoring in Supply Chain Management. I am currently doing a project about Oracle's Manufacturing Scheduling option and have a few general questions for those of you that have used the software and/or involved with its implementation. Your help is greatly appreciated. If you are uncomfortable releasing your company's name that is fine. If you do not want to post the answers here, I can also be emailed at rmkraus"SAYNOTOSPAMBOTS"@asu.edu. Thank you!!
    The questions I have are:
    What is your experience with the manufacturing scheduling software?
    What is/was your role with the software?(ie buyer, consultant, user, technical support, etc)
    How do you feel about the software's ease of use?
    What training did you recieve or did your company offer?
    How much did implementing the software approxiamately cost?
    What do you feel are the advantages of the software?
    What do you feel are the disadvantages of the software?
    Did your company have any problems during the implementation?
    Has your company experienced cost savings due to the software?
    Have you or your company used any competing software in the past?
    Any other insight that you would like to share?
    Thank you, I greatly appreciate your help.

    Im not sure on 5
    I know it's unusual, but if your project budget is
    good you may have more than one constructor. At least
    that's what I thoughtach.. you poor fellow, you are confused now aren't you.
    i bet taht in the fifth question they are talking about 'constructor methods', not procrammers who are constructing the code (or 'contractors')
    if your budget allws then you may even have three or 87 contractors, but that's not the case here.
    i hope that clarifies things a bit.
    and PS! i don't like when people intentionally give bad solutions to others.

  • Need the IP address of a scheduled job

    I'm calling the API of one of my vendors via an HTTP Get scheduled job on Azure.  My vendor is going to start blocking any request to their API from an Azure IP address.  However, they can whitelist specific IP addresses, but I don't see an IP
    address associated with my scheduled job.  How can I obtain the IP address for the job?
    Thanks,
    Mike

    Azure scheduler reserved IP adress is not supported at this time.
    You can assign reserved IP to VMs and services, but not to scheduler.
    Also assigning reserved IP must be done when creating service, it can't be changed later.
    Mustafa Toroman

  • Need SAP Crystal Report formula for Blance Quantity

    Hi,
         i really need a formula for SAP Crytal report my requirement is
        i have group 2 Groups  one on sale order and another one on Invoice
       Example:
            ================================================================
              Order No:100001 
             Order Quantity:1000
          =================================================================
          Detail Area invoice group
          INV#        INVQty   CreditNoQty        Balance
         10002       100               0                       900
         10003        500             100                    500   
           i need formula for balance quantity . the balance quantity subtract from order quantity and plus with credit note quantity.

    Try this:
    1) Modify the code above to:
    Whileprintingrecords;
    Numbervar x := x +1;
    If x = 1 then
    Numbervar t := ({Order qty} - Invqty) + {Credit};
    Else
    t := ({Order qty} - t) + {credit}
    2) Create a reset formula and place this on the group header 1:
    Whileprintingrecords;
    Numbervar x := 0;
    Numbervar t := 0;
    -Abhilash

  • Need Enhancement which is triggered after material quantity creation

    Hi guys,
    Iam in need of enhancements or exits which would be triggered after creating quantity for my material. Kindly enlighten me on this issue . I need a place to right a code which will be triggered when i create a material quantity .
    Regards,
    Sivaganesh

    Hi Siva,
    I hope you are talking about transfer posting with movement type 561 to get quantity of material in. If yes then you can go for BADI MB_DOCUMENT_BADI after put wait for few second and then get the document number generated.
    Please correct my understanding if it is wrong.

  • Schedule quantity allocation based on latest delivery date.

    Hi Friends,
    Could any help me taht hoe can handle the below situation.
    We have gone live recently, we having difficulty on the Available to Promise (ATP) functionality of sales orders. The current process has a sales order with multiple scheduled delivery lines for dates upto 13 weeks in the future. However, they will only manufacture the parts demanded in the sales order a few days before shipping. Therefore, at sales order entry, the parts are never available.
    Now user as changed the customization settings that turn-off ATP for KB order types.
    While I have turned off ATP for KB orders, SAP is still u201Callocatingu201D the available inventory to sales order schedule lines on a FIFO basis as the order is keyed with no apparent consideration to scheduled ship date. All the on-hand inventory appears to be u201Callocatedu201D the first sales order that is keyed. Then when we try to create a delivery for the second sales order entered that wants to ship today, it indicates that you do not have enough to ship.
    Now what are the setting we have to do to reallocate the available quantity for the oders which they wanted to ship today.
    Please give the suggestion to handle this.
    Thanks & Regards,
    Jayalakshmi
    Edited by: Jayalakshmi Yamanapalli on Nov 10, 2009 6:32 AM

    Hi,
    Thanks for all of your response.
    Actually the issue with MTO products. when creating sales order for MTO products, the stock will be posted against sales order stock only irrespective of the schedule dates.
    Now my client requirment is for new order which is creating today, he wants ship the phisical existing quantity (which is already allotted to specific sales orders) against this new order.
    As per my knowledge it is not possible. My view is we can do transfer posting using 413 movement type as special stock indicator as E. I don't know whether it is a suggestable solution or not.
    Could you please let me know for  both MTS and MTO products also can we do this through CO06 backorder processing.
    Thanks & Regards,
    Jayalakshmi

  • Need FM to bring BOM explosion and quantity

    Hi,
    I'm using FM CS_BOM_EXPL_MAT_V2 to bring BOM explosion, but this function doesn't return the correct quantity like VA01 when I enter the main material and its order quantity.
    Does someone know any other function to explode BOM material and return each quantity, depending the main material order quantity entered?
    My codes are:
        CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
          EXPORTING
            capid                 = 'SD01'
            datuv                 = sy-datum
            emeng                 = w_qtd
            mtnrv                 = material-matnr
            werks                 = material-werks
          TABLES
            stb                   = gt_stb
          EXCEPTIONS
            alt_not_found         = 1
            call_invalid          = 2
            material_not_found    = 3
            missing_authorization = 4
            no_bom_found          = 5
            no_plant_data         = 6
            no_suitable_bom_found = 7
            conversion_error      = 8
            OTHERS                = 9.
    Thank you.
    Chang

    Hi a®s,
    The only difference in putting MEHRS ='X'. is the function returns multilevel of part list. The function still doesn't return the quantity based on main material order quantity like VA01 (salesorder create) does.
    Thank you anyway.
    Chang

Maybe you are looking for