Select a location that is assigned to the plant chosen

When trying to create a shopping cart I get the following errors:
Select a location that is assigned to the plant chosen
Back-end data could not be read
SRM 7, support pack 9 extended classic.
I have replicated plants from R3 Back End and everything looks fine in BBP_LOCMAP table and talbe looks same in QA and DEV.
We only get this error in our QA system, DEV system is ok.
The shopping cart is picking up the company code and location from the org chart correctly.
I see postings in the forum for this error but no clear solutions or causes provided.
Thanks,
Matt

Thanks everybody we have solved the issue.
I missed a checkbox in config designating SRM as the local system.  This is in define system landscape node.
We found issue by
Put a break point in function module BBP_PD_MSG_ADD. Once you hit one of your messages, check the call stack to see the calling function/method who triggered the error message.

Similar Messages

  • Selected communication channel IDoc_AAE_In is assigned to the wrong adapter type IDoc_AAE Supported adapter types: HTTP, SOAP, XI, WS.

    Hi Team,
    I have a problem.
    I have a scenario using the the Sender Adapter. HTTP_AAE
    When I am trying to use the function "Display WSDL" I am receiving the following.
    Error:
    Selected communication channel HTTP_AAE_In_SAPII is assigned to the wrong adapter type HTTP_AAE Supported adapter types: HTTP, SOAP, XI, WS.
    Somebody knows this problem?
    Thanks

    Hi,
    am also getting same error.
    think that feature is not supported.
    have look on Configuring the Java HTTP Adapter on the Sender Channel - Advanced Adapter Engine - SAP Library for sending a message.
    reg,avinash M

  • How can I change (or select) what is being being used when I share, as the file cover. When I Share lets say "Master File" i want to select a frame that is used as the file cover. So when its on my desktop I see this image as the file icon.

    How can I change (or select) what is being being used when I share, as the file cover. When I Share lets say "Master File" i want to select a frame that is used as the file cover. So when its on my desktop I see this image as the file icon.

    I don't think Finder does this (I've tried).
    iTunes does though. Where you can set artwork or the "poster frame"...
    This may not be what you want but if it helps, I know 2 ways  do this is
    Open the video in QuicktimePlayer7 | View | Set Poster Frame (even then, you might need to save it as .mov (ie in a 'mov container').
    Drag the file into iTunes and set the artwork (as in http://www.dummies.com/how-to/content/adding-album-cover-art-or-images-in-itunes .html)
    From there, iTunes will use that frame as the "poster frame" ie the photo/frame that shows when you browse your videos. Which is what you want, but limited to iTunes.
    When I do either of these above, the frame I set does not show when exploring files in "Finder" (or in the other Explorer tool I use called "Pathfinder").
    So it maybe, that exactly what you want, is not possible.

  • MRP to be run for those materials that is assigned to the MRP controller

    Dear Gurus,
    Pl. let me know how MRP can be run for materials assigned to the MRP controller only.
    Regards
    Veronica

    Hi
    You can run MRP for MRP controller using User Exit Key available in TCOde MD01.
    You have to define the user exit keys and make use of the same. ( in SPRO you can do that )
    Regards

  • In SAP sales order, Is that possible to change the plant manually?

    Hi experts
    When we create sales order, for material , it will choose the shipping plant . Some materials
    has different level, like Material A is 0 Level, Material B is under A . So B will use same plant as A.
    We hope to manually change the plant for B, but the field of plant is grey.
    Is that possbile if we could enhanbe this field and could manually change plant ?
    Thanks
    ALice

    Hi all
    Thanks, Ya ,we have setup sales bom and extend the matieral plant . for sub-item
    Currently, our problem is we need 0 level mateiral A plant as X , and Sub-item mateiral plant as Y , we hope to manually change the sub-item plant , but that field is grey , so we can't do it. We can change the high level mateiral plant, but for our request, the we only want to change the low level item plant, high level plant still need be X, no need change to Y.
      The one way we found is to reject this line, and craete a new item and also input the level number.
    but it's not convenient
    So we hope to know for such plant field, Now in our sap, it's grey, we can't change it. Does sap need confige and allow this field un-grey, then we can manually directly change sub-item plant?
    Thanks
    Alice
    Edited by: alice zhang on Apr 30, 2008 5:37 AM

  • How to retrive value of a Button that is assigned in the Button Dynamically

    Hi All,
    I am searching the user from LDAP on the basis of the first name ( eg. abc ) Entered of the user to be searched and on the click of the Search Button I have displayed the First_Name, Last_Name, & other Info also, & One Button Having the value as the "uid" for all the users having the First Name as ( abc ) in the Form inside a Table using a loop for loop. Now if there are 10 user having the First_name as abc then there are 10 Buttons which has been displayed Now I want that If I click on the Button corresponding to the 3rd User then his all the details which was displayed on the previous page will be passed in the different editable text fields.
    The major problen which I am facing in this is that as I am generating all these buttons dynamically & all the buttons have same name but all the buttons have the diffrent values, I am able the generate Different names to all the buttons dynamicall & pass their reference dynamically to the Workflow in a transiction condition dynamically.

    if you want some default value in LOV. you go to edit list of value wizard-> UI hint->include no selection Item checkbox -checked.use labeled item first of list- and beside that put the label. but when you try to get value, it will show null.but you can manipulate in ur java , if it default value

  • IMovie appears to be picking a random frame from a project that it assigns as the Thumbnail/Poster for the final video that is shared via iMovie Theater.  How does it choose this frame, and is there a way to change this?  I cannot find this anywhere.

    This question was posted back in 2013, and I'll having it today. Anyone know what the deal is with the system selecting a theater image with NO way to change it--better yet--has anyone figured out a way to change it? Not a clue, do you know wherethe theater files are located on a MAC?

    I can't answer your first question.
    The default location for the imovie Theater.theater  package is in your user / Movies folder.

  • How do I move a page to a new location that is offscreen to the left or right on the planning screen

    When I'm in the planning screen mode, even though I have the thumbnails set on their smallest size, my website is so large that the  branches of the hierarchal layout of webpages and their various subpages stretch out to the left and right far distances off the screen. When I try to move one of the little rectangular webpage icons in the hierarchal layout in Plan Screen mode, I can't move it off screen to the left or right to change its position in my website's horizontal menu.  In other words, even at the smallest setting for the icon webpage thumbnails, there's so many icons that they go off page and I can't move a webpage icon to a position that is currently off-screen to the left or right in the menu layout.
    Any ideas how to do that?  Is there a non-graphical way to do it? Thanks!!!

    Your best bet is to reduce the thumbnail size to the smallest, then turn off thumbnails (to speed redraw), then drag in multiple steps, scrolling the Plan view each time. In the upcoming release of Muse (June 17th) you will be able to collapse vertical stacks of pages, which will means your Plan view won't be as wide. If you collapse each stack, you will only see the top level pages, and you won't have to scroll as many times. Or maybe they will all fit. What you really need is autoscroll in Plan view, which we don't currently have.
    Paul Sorrick
    Muse Engineering

  • Error: Select a Location for the chosen compnay code

    Hello Guru's,
    We have an issue . Shopping caart at the time of approval (Business approval) we get the error message :" Select a Location for the chosen company code".
    We checked in PPOMA_BBP  for the approver (in extended attributes the relevant plant was not assigned. Hence had assigned the plant to the user attributes. But unable to approve. Still get the same error message.
    Also had checked the attributes of all the approvers of the shopping cart . They all are assigned to the relevant plant.
    Below are the questions i have :
    1) Is it possible to debug the shoipping cart which is in awaiting approval status.
    2) We checekd in SE91for the error message  and found the message but not able to see where it is used and no additional details.
    IS there any way to check this error andd fix
    Best Regards,
    Shree

    Hi Shree,
    Does this happen to all the locations?
    Have you ensured that the Plant chosen in the shopping cart belongs to the Company Code in the Shopping cart and that the Company Code is assigned to the user and the approver in PPOSA_BBP?
    Regards,
    Yateesh

  • Is there any way to find out what the Ext Id is that is assigned to CRM records

    Whilst there is a lot of confusion as to when and where you use this field and what is the unique record key for some, I have understood that however what I am wanting to find is excatly what is the external ID that was assigned to the CRM record when it was first imported. I can't find any report or other means for getting this info and without it I can't re-import record updates.
    A method for resolving the issues with CRM updates would simply be if the CRM module provided the following
    An export facility as in the Web Apps and Products to simply export the full record with all fields in the same order as required for import
    The ability to attach to that export a slected extended CRM layout
    That he export record also included as the first field the BC CRM ID (this is the one thing we know to be unique no matter what)
    With the above and changes to the import to reference the CRM ID (for existing records) we would indeed be able to apply email address updates to existing records via batch import.
    This seems to be a rather obviuous and simple solution unless I am overlooking something. At present the CRM export / import functions are a serious weakness for large database updates and not having the ability to also import bulk deletes is a major drawback on our ability to maintain and manage the CRM integrity. As it stands, if you have been hit by spammers and have hundreds or thousands of delinquent entries in yoru CRM then you have no choice but to leave them in place and if you used a form that by default subscribes them to your mail list - I gave up on that.
    My last comment relates to the data pass that is done as part of the import - is it not possible to report on all records that will fail to be imported instead of one at a time?  If you want to reduce the load on teh system having a single pass to list all errors and list this so you can read it before the error message fades before your eyes would not be an unreasoonable request. I loath facing imports for this very reason.
    Please BC - when are you going to get around to correcting this major shortcoming in a critical aspect of the solutions we deliver.
    Greg

    Condolences. You can't retrieve the existing password, but you can reset it. See the section on "Resetting the original administrator account password" in this support article:
    http://support.apple.com/kb/HT1274
    Regards.

  • Service order creation based on counter reading assigned to the Ibase.

    Hi All,
    I've created a service contract (ZXXX) with the item category (ZIT1) of service plan.
    In the item category (ZIT1) definition i've copied the standard item cat. of service plan (SPLA) and assigned the standard date profile SERVPLAN to the item category.
    Requirement - Service order has to be created automatically if the counter reading assigned to the Ibase is greater than counter reading that is maintained in the service plan template that is assigned to the service plan product(Item) in the service contract transaction.
    Master Data -
    Service Interval Template - Created service plan template for counter based interval and maintained the interval as 100HR.
    Assigned the template to service plan product(item) which is assigned in the service contract.
    Created a counter ID and assigned the counter to the Ibase.
    In the item date profile SERVPLAN , I've assigned the date rule (Planned time based on the counter reading) to 'Release date' date type.
    In the item action profile ., Action is defined as it should create a service order (ZSER) with the template defined in the item if the (Release date =< today's date) as start condition.
    I've maintained the complete master data.
    Now Release date should be picked based on the counter reading of the Ibase assigned to the service plan item in the service contract.
    If Ibase counter reading > counter reading maintained in the interval the release date = todays date.
    If Ibase counter reading < counter reading maintained in the interval the release date = future date.
    which is not happening now in my case. service order is getting created even the counter reading of Ibase is less than the interval.
    Please let me know if further more changes to be done to map the scenario.
    Thanks
    Syam

    Hello,
    I found the following:
    If you fill someting in the fields REFOBJ_IBASE, this value is being converted into a GUID internally
    This happens in function CRM_BSP_OIC_1O_SEARCH_FROM_RF
    So you have to make sure that the search field REFOBJ_IBASE points towards the field CRMD_SRV_REFOBJ~GUID_OBJECT ( via table CRMC_REPDY )
    And even then I have the impression it only works when you only fill the Ibase in the order. When you fill the component there is a different GUID.
    In my case I found out it is even more complex, so I will need to create my own search field (extend search structure )
    Regards,
    Erwin

  • Many Purchasing Organisation assigned to 1 Plant?

    Hi all
    This is going to be an easy question for all the expert here.
    While I did some reference for Purchasing Organisation and Plant assignment, I realise that PLANT and P.Org has this M:N relationship.
    I interpretate M:N as
    (a) 1 PLANT to many P.Org or
    (b) 1 P.Org to many PLANT
    Questions
    1. Does my Intepreation of M:N as above correct?
    2. I do not think  PLANT and P.Org has this M:N means Many to Many relationship as we cannot do so in SPRO. Please comment.
    3. I have been seeing this 1 P.Org to many PLANT in the reference book but there is no actual business examples given to explain and also, I cannot find any such possible assignment in Enterprise Structure -> Assignment -> Materials Management -< Assign P.Org to Plant. Please advise the actual business example of this case and the SPRO path for this.
    Thanks.
    Edited by: Daimos on Sep 26, 2011 8:31 AM
    Edited by: Daimos on Sep 26, 2011 8:32 AM

    Hi Krishna
    Thanks for clearing it up. Centralised P. Org is at the Company Level instead of the Company Code Level:
    [http://help.sap.com/saphelp_470/helpdata/en/75/ee0a9555c811d189900000e8322d00/Image191.gif]
    Here is the summary:
    1. Centralised P. Org = 1 single P. Org responsible for the purchasing of several CoCd. It can be seen in Cross-CoCd-P.Org
        scenario. No assignment between CoCd and P.Org is required but the value of CoCd will be prompted for input during the 
        procurement activity.
    2. Cross Plant P.Org (terms used in SAP Certification) is also known as Company-specific P.Org.
    Questions:
    1. I found out in the SAP Certification Material for the scenario of Plant Specific P. Org assignment with 2 Plants under 2 P. Org respectively, we are asked to "Assign just one plant of the company code to this purchasing organization under Assignment u2192 Materials Management u2192 Assign purchasing organization to plant."
    Can't we assign all the plants used (under 1 Company Code) to the individual pairing P.Org 1 by 1? Is this SAP standard config feature to ease consultant?
    Edited by: Daimos on Sep 26, 2011 11:08 AM
    Edited by: Daimos on Sep 26, 2011 11:10 AM

  • Im getting the message "The selected SAN location is already in use." This happens when I start up final cut pro 10. Anyone else have this problem before?

    Hi everyone. I just today got the message "The selected SAN location is already in use." Has anyone recieved this message before? If so, how can I fix this?
    Thanks!

    Welll I don't see fast how to edit my reply. (the projects and events on external drives show up, but there is a error when FCP-X started up with the message that the "home folder user" is in use
    and can not be used by SAN becase of the same name????)
    First I did use Preference Manager 3.2 to trash the preference but that did not solve my problem.
    Then I repaired permissions. I did not solve the problem.
    Waht solve dthe problem is next.
    I started my MacBook Pro is safe mode (shift power on) Then I repaired permissions.
    Then I copied the Final Cut Events en Projects folders from my home folder Movies to a external dive (in a folder so that with start up it did not show up in. (And trashed the project and event folder in my movies folder)
    I restarted the Mac Removed again the Preference.
    Then I restarted FCP-X and it started up without a problem.
    Then I copied the content of my old folders to the new folders in my movies home folder. (not just the folders Final Cut Events/Projects)
    Now it is working correctly.

  • Select a location to which a plant has been assigned

    Hi all.
    We Work in SRM 5.0 Extended Scenario, ECC 6.0.
    When I try to make a PO from a SC system sends me the following error: Select a location to which a plant has been assigned.
    I made corrections in the organizational unit, assign default to the plant as buyers in extended attributes, but the problem persists.
    Any help will be good.

    Hi Raul,
    Check whether in the Extended Attributes of P.Org / P.Group where the user is assigned has Locations maintained or not.
    Also check for any check in the Deactivate check box.
    Check in BBP_LOCMAP table using SE16 txn. whether all the plants concerned were replicated from the correct logical system or not.
    Otherwise once again replicate the plants using BBP_LOCATIONS_GET_SELECTED report.
    Check for the consistency of Business partner using BBP_BP_OM_INTEGRATE txn by inputting the business partner number of plant.
    Please let us know after checking and modifying the above mentioned points for further help.
    Hope this will help you in resolving the issue.
    Award points for helpful answers.
    Rgds,
    Teja

  • An error has occurred because a control with id '%spPlaceHolderMain%' could not be located or a different control is assigned to the same ID after postback.

    Hello All, When i try to do a filter on an entity and click filter button, i see the below error message being popped up. Can someone provide a solution to this ?
    "An error has occurred because a control with id '%spPlaceHolderMain%' could not be located or a different control is assigned to the same ID after postback. If the ID is not assigned, explicitly set the ID property of controls that raise postback events
    to avoid this error."
    Please let me know the process to set the ID explicitly.

    Can you try resetting the IIS?

Maybe you are looking for