Select datasource version in NW2004s?

Hi folks,
I am currently going to transfer data from an BW3.5 system to a NW2004s SP7 system. The original source of data is an infocube in the 3.5 system. In the new system I would like to create 3x version objects (datasource-infosource-infopackage-updaterule) for this dataflow.
We have done 'generate export datasource' in the BW3.5 system
The BW3.5 system has been created as a source system in NW2004s system.
When replicating datasources, the infocube shows as a datasource in version NW2004s.
When creating an infosource and assigning a datasource to the transfer structure I can only select the 3x version datasources.
-> Is it possible to change version of my data source so it can be selected in to the infosource (transfer structure)?
Best Regards
Martin

Andreas,
I myself had worked on these and had bad experience even with SAPs response on it ,I was on ramp up of these project.
First time in BI while i replicated ALL datasources i had option 3.x or NEW ,I landed up with the NEW datasources but then due to SAP restriction of not having its business content cubes compatible with NEW datasources(barring few which are not even used and of not prime importance), I mean we cannot use Business content cube(with readily available business logic) with new datasources as the transfer rules and .... get deleted which I DIDNT want.
So i asked the BASIS if they had the option as i dont have the authorization and they said they had the option ,they created and the next time i didnt get any option 3.x or new all the datasources were replicated as 3.X datasources by default.
Steps done prior-
1)Deleted the source system from BI
2)Created source system
3)on Replication still asked for 2 options
1)Deleted the source system from BI
2)Created source system
3)Deleted ALL the datasources available in RSA6.
4)Installed/Activated all the datasources from RSA5 again to get them in RSA6.
5)BASIS had done setting(they say they created 3.x datasources in R/3)
6)Replicated datasource in BI
No option or selection pop -up for 3.x or new asked ,it replicated defaulting to 3.x datasources.
Hope it Helps

Similar Messages

  • Creating Selection Screen version in Logical Database

    Hi,
    I want to design my own Selection screen while creating a report with Logical Database. My requirement is not to show the Standard Selection screen of LDB.
    Can it be achieved by creating Selection Screen Version in SE36 and using that version in Attribute of the Report?
    If yes, then how can it be created?

    You can change the Selection Include to include your selection screen version.
    Go to SE36
    Select "Selections"
    Change
    Create a new version like:
    SELECTION-SCREEN BEGIN OF VERSION 904 TEXT-904.
      SELECTION-SCREEN EXCLUDE PARAMETERS: KD_STIDA.
      SELECTION-SCREEN EXCLUDE SELECT-OPTIONS: KD_GJAHR, KD_BUDAT, KD_AUGDT,
                                               KD_ZUONR, KD_UMSKZ.
    SELECTION-SCREEN END   OF VERSION 904.
    Regards,
    Naimesh Patel

  • Selection screen versions in LdB

    The following questions are related to SAP delivered LdBs that are not for HR.
    a) Do you know where the selection screen versions for a delivered LdB are stored?
    b) Can additional selection versions be created /delivered selection screen versions modified? Or the authorization for doing the changes is generally not provided.
    Thank you much,
    Fred.
    Edited by: Fred Myer on Jan 30, 2008 11:16 PM
    Guys, any help?

    Hi,
    Try declaring some global variable in the data delclaration event, and pass the values these variable at selection screen, and use them wherever required.
    Regards,
    Santhosh.

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Why can I not select SD versions of SD programs I purchased?

    Why can I not select SD versions of SD TV programs I purchased? When I go to my program to download it. I click the SD button, that is what I paid for. It will not move over to the SD version to allow me to download it even though I have received notification that I have a new program waiting.

    I found my own solution. While in the Itunes store I did a search for the program by name of the current season. It brought up a list of the current season and it showed that I had an undownloaded episode of the program. I hit the download ad it completed the SD download.

  • MRP with selected production version

    Dear PP experts,
    I have two production version
    Prod. Version      From lot        To lot size        Base Qty.
       1001                      1                   100                100 Kg.
       1002                      101             9999999          400 Kg.
    The batch size mentioned in the material masters are Mimimum lot size 100 Kg. and Maximum lot size as 400 Kg.
    I have entered PIR in MD61 for the material for 350 Kg. Since I need planned orders selectively of 100 Kg. in MD61 I have maintained in schedule lines tab production version as 1001.
    After running MD41 system creates planned orders with the production version, but the batch size is not as per the production version.
    Pl. let me know what needs to be done.
    Regards,
    Prashant

    Hi Watson,
    I can see some conflicts in your Master Data settings.
    First of all you have set your Lot size ranges in Material Master Data from 100 to 400 Kg.
    And your Production Versions (1001) set lot size range is 1 to 100 Kg.Which may creates conflicts.
    Now your require qty is 350 kg.So as per your lot size restriction set in Material Master will force system to create one planning proposal of 350kg.I can guess you get one plan order of 350kg but due to selection made in (MD61) selected prod. version is 1001 instead of 1002.Which is again wrong
    Now to make the things correct you can have below options,
    1) change Lot size restriction to 1 to 100 in Material Master.So you wil get 3 Plan orders of 100 Kg and 1 of 50 kg.
    or
    2) Instead of changing Lot size in Material Master, use quota arrangement (MEQ1).For this you have to first activate Quota arrangement in MRP 2 view of Material Master.Then go to MEQ1 and create quota for the specified period.Here you can restrict lot size at production version level.
    Regards,
    Dhaval

  • How do I select one version from multiple stacks and export?

    I have a color copy and B&W copy of 800 images. I want to export the B&W versions only. How do I select just the B&W versions in the stack at one time without having to click on 800 images?

    If you check the filenames, you'll see that the versions have a version name tagged on the end, like "Version 2" when I did a quick monochrome mix of one of my own. Make a smart album with the search term set for text being "Version 2" and you should end up with all the b&w versions. That is, assuming you made them all in the same way and they're all Version 2 versions. Since the initial version would not have the term "Version" attached, you could make the search term "Version" and it would fill with all the 2nd and 3rd et al. versions.
    Just a thought. Give it a try.
    Mark

  • Selecting production version in MRP run

    Hi dudes,
    our client is having reuirement is he will select the production version irrespective of lot size, but he select the production version at the time of manual creation of process order where it depends on resource(work center used in recipe of particular production version, BOM will be 1 alternative only.
    now while running MRP how to make system to allow manual selection of production version at the time of converting planned order to processs order.
    respond asap plz...
    Daniel.

    Hi ,
    During MRP, system will select the production version based on Validity date & Lot size.
    If a material contains two production versions with same validity date & Lot size qty , system will select the First valid PV by default (unless it is locked) & will copy to planned order.
    When u convert the planned order to production order,default PV will be copied automatically from planned order. Here u cannot select PV manually.
    Settings:
    Create valid production version with lot size and Valid routing , BOM at MRP view of Planning material.
    Assign the selection method = 2 or 3 at MRP view of Planning Material
    Regards,
    Anand.

  • Selecting InDesign version in VB script

    I am having some difficulty with selecting the proper version of InDesign in my VB scripts.
    Usually I use the connection string: CreateObject("InDesign.Application"), which will launch in whatever version is installed.
    Now, one of my customers has installed version 6 along side with version 5.5, which means that I have to supply either: CreateObject("InDesign.Application.CS5.5") or CreateObject("InDesign.Application.CS6"), in order to get it to run on the proper version.
    What I don't understand is why the script doesn't start within the version of InDesign that it is activated from. If I use the connection string: CreateObject("InDesign.Application"), and I start it from within InDesign version 6 (from the script menu), why does it launch version 5.5 and try to run the script there? Why does it not run inside the InDesign application that launched it?
    It quickly becomes a mess to have to modify scripts whenever people install new versions of InDesign, so is there any way to ensure that a VB script is always run within the InDesign application that launched it, regardless of what other versions people might have installed?

    you can use WMI to have a peak at all the ID processes.
    here I have both CS4 and CS5 running, hopefully only one version should be running at a time, and we can use the ExecutablePath property to get the version (CS4 for instance) from it.
    Dim WMI, Col, Ob, S2
    Err.Clear
    On Error Resume Next
    Set WMI = GetObject("WinMgmts:")
        If (Err.number <> 0) Then
           MsgBox "Error creating WMI object. Error: " & Err.Number & " - " & Err.Description
           WScript.quit
        End If  
    '-------------- processes ------------------------------------
    Set Col = WMI.ExecQuery( _
        "SELECT * FROM Win32_Process" & _
        " WHERE Name = 'indesign.exe'",,48)
      S2 = S2 & " Process Info:" & vbCrLf & vbCrLf
      For Each Ob in Col
        S2 = S2 & "Caption: " & Ob.Caption & vbCrLf
        S2 = S2 & "ExecutablePath: " & Ob.ExecutablePath & vbCrLf
        S2 = S2 & "ProcessID: " & Ob.ProcessID & vbCrLf & "__________________________" & vbCrLf & vbCrLf
      Next
                msgbox S2
    Set Col = Nothing
    Set WMI = Nothing
    MsgBox "Done."

  • Selecting prod.version before MRP run

    hi all;
    can any body know about-how  the production version selecting before MRP run?
    for example: I have a material.it has 2 production version. when I run the MRP, MRP reads first production version(prd vers-1). but I want to select other production version(prd vers-2). how can I make this selection?
    Regards,
    Sema

    Hi,
    If you want to select the perticular alternative BOM define it in production version.
    Theree is option by which the PV is manually assiged
    Goto MD62
    Execute the report
    Goto Schedule line tab page
    Fallow the menu path
    Setting Production version
    Enter the Production version required
    Save
    So system will select the perticular alternative BOm which maintain in that production version.
    Regards,
    R.Brahmankar

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • 0PM_OM_OPA_2 Datasource VERSION Field extraction issue

    Hi ,
    I am facing an issue with Standard data source 0PM_OM_OPA_2. It is converting the value of VERSION Field to 0 always even though the source records ( identified in RSA3) are having the values like 0, V1, V2 etc..
    Testing is done in RSA3 and identified the above problem.
    Plz give some inputs on this issue if there is any workaround or solution.
    Thanks in advance.

    Hi,
    I'm facing the same issue on a different datasource for PS. Have you found the reason behind this?
    Regards,
    Sameer

  • Cannot select Product Version. Its greyed out ???

    Hi All,
           I have configured maitenance ooptimizer in sol man 4.0. but when i tried clicking the "Maintenance Optimizer" button under the "Change Management" -> "Support Package Stacks", I see every selection greyed out. I am not able to select any option (i.e Product Version, Priority, Short Text, and even the Back and Continue buttons are also greyed out).
        I have "SAP_MAINT_OPT_ADMIN" role under which the authorization objects CRM_ORD_PR and D_SOL_VSBL exist.
        I feel still there's some sort of authorization missing but not sure whats that.
       Can someone please reply to help me with this...
      Thanks
      Sourav

    Can I get some suggestions to the above question please.....

  • What happened to trial versions of NW2004S?

    The trial site indicates no NW2004S versions are currently available.
    Any ideas?

    Closing the question. Just have to wait.

  • WLS 6.0:  javax.naming.NamingNotFoundException when selecting DataSource in server JNDI tree in Admin Console

    Summary of problem: Get a javax.naming.NamingNotFoundException when selecting the DataSource (see the configuration below) in server JNDI tree in Admin Console
    TheConnection Pool and a corresponding DataSource are configured as follows:
    <JDBCDataSource
    JNDIName="jdbc.PNStoreDB"
    Name="PNStoreDB"
    PoolName="PNStorePool"
    Targets="serverA"
    />
    <JDBCConnectionPool
    CapacityIncrement="2"
    DriverName="weblogic.jdbc.oci.Driver"
    InitialCapacity="2"
    LoginDelaySeconds="1"
    MaxCapacity="10"
    Name="PNStorePool"
    Properties="user=rms;password=rms;server=ora81"
    RefreshMinutes="10"
    Targets="serverA"
    TestTableName="dual"
    URL="jdbc:weblogic:oracle"
    />
    Can't figure out why this is happening. The following is output to the Admin Server command prompt:
    <May 18, 2001 10:20:02 AM EDT> <Error> <HTTP> <[WebAppServletContext(6233000,console)] exception raised on '/console/panel
    javax.naming.NameNotFoundException: Unable to resolve jdbc. Resolved: '' Unresolved:'jdbc' ; remaining name ''
    <<no stack trace available>>
    I tried using a different JNDI name for the DataSource (e.g. just PNStoreDB) with no success.
    The weird thing is that it messes up other resources bound in the JNDI tree. For e.g. I have some EJB's bound under ejb/XXXX that I can click on and view in the Admin Console (JNDI tree) before I add the pool and DataSource. After I add them though, I see the same NameNotFoundException for these as well.
    Thanks in advance for your help.
    [att1.html]

    Are you sure that the connection pool and datasource deployed
    successfully? (Check the logs for an error.)
    Also, I suspect that you want a TxDataSource instead of a
    JDBCDataSource.
    -- Rob
    Weblogic NewsGroups wrote:
    Summary of problem: Get a javax.naming.NamingNotFoundException when
    selecting the DataSource (see the configuration below) in server JNDI
    tree in Admin Console
    TheConnection Pool and a corresponding DataSource are configured as
    follows:
    <JDBCDataSource
    JNDIName="jdbc.PNStoreDB"
    Name="PNStoreDB"
    PoolName="PNStorePool"
    Targets="serverA"
    />
    <JDBCConnectionPool
    CapacityIncrement="2"
    DriverName="weblogic.jdbc.oci.Driver"
    InitialCapacity="2"
    LoginDelaySeconds="1"
    MaxCapacity="10"
    Name="PNStorePool"
    Properties="user=rms;password=rms;server=ora81"
    RefreshMinutes="10"
    Targets="serverA"
    TestTableName="dual"
    URL="jdbc:weblogic:oracle"
    />
    Can't figure out why this is happening. The following is output to
    the Admin Server command prompt:
    <May 18, 2001 10:20:02 AM EDT> <Error> <HTTP>
    <[WebAppServletContext(6233000,console)] exception raised on
    '/console/panel
    javax.naming.NameNotFoundException: Unable to resolve jdbc. Resolved:
    '' Unresolved:'jdbc' ; remaining name ''
    <<no stack trace available>>
    I tried using a different JNDI name for the DataSource (e.g. just
    PNStoreDB) with no success.
    The weird thing is that it messes up other resources bound in the JNDI
    tree. For e.g. I have some EJB's bound under ejb/XXXX that I can
    click on and view in the Admin Console (JNDI tree) before I add the
    pool and DataSource. After I add them though, I see the same
    NameNotFoundException for these as well.
    Thanks in advance for your help.--
    Coming Soon: Building J2EE Applications & BEA WebLogic Server
    by Michael Girdley, Rob Woollen, and Sandra Emerson
    http://learnweblogic.com

Maybe you are looking for

  • Read-Only text area

    Hi, I'm using a text area to display a longer read-only text. It should display only 5 lines and, if the text is longer, it should be scrollable. Works fine as long as I set the attribute Editable to true. But if I set it to No (because it should be

  • Rental Contract with Periodic Billing Plan

    Hello, I need to have a rental contract created, But the payment is one shot. For example, if the customer rents a cylinder for a contract period of 1 year, he pays the contract payment for 1 year in one single shot. So, i need to have the periodic b

  • MBAM 2.5 integration broke my Primary Site Server - Managment Point http status code 404, not found

    I uninstalled MBAM 2.0 and installed MBAM 2.5. During 2.5 installation there was this one section to enter "Web service application pool domain account", where I entered domain admin account. I don´t know if that has any effect on this problem. Thoug

  • Post mapping for Reject records!!

    hi I would like to capture all the rejected records when I am loading the fact table. I know I can get this information from WB_RT_ERRORS and WB_RT_ERROR_SOURCES. But, what I would like to do is to have Post mapping process which and the action set t

  • Packaging a PAR as Part of a EAR

    Hello I have found documentation regarding Packaging a PAR as Part of a EAR on http://help.sap.com/saphelp_erp2004/helpdata/en/76/27044017355c0ce10000000a1550b0/content.htm Though I managed to do it manually (i.e. meddling with the application-j2ee-e