MRP with selected production version

Dear PP experts,
I have two production version
Prod. Version      From lot        To lot size        Base Qty.
   1001                      1                   100                100 Kg.
   1002                      101             9999999          400 Kg.
The batch size mentioned in the material masters are Mimimum lot size 100 Kg. and Maximum lot size as 400 Kg.
I have entered PIR in MD61 for the material for 350 Kg. Since I need planned orders selectively of 100 Kg. in MD61 I have maintained in schedule lines tab production version as 1001.
After running MD41 system creates planned orders with the production version, but the batch size is not as per the production version.
Pl. let me know what needs to be done.
Regards,
Prashant

Hi Watson,
I can see some conflicts in your Master Data settings.
First of all you have set your Lot size ranges in Material Master Data from 100 to 400 Kg.
And your Production Versions (1001) set lot size range is 1 to 100 Kg.Which may creates conflicts.
Now your require qty is 350 kg.So as per your lot size restriction set in Material Master will force system to create one planning proposal of 350kg.I can guess you get one plan order of 350kg but due to selection made in (MD61) selected prod. version is 1001 instead of 1002.Which is again wrong
Now to make the things correct you can have below options,
1) change Lot size restriction to 1 to 100 in Material Master.So you wil get 3 Plan orders of 100 Kg and 1 of 50 kg.
or
2) Instead of changing Lot size in Material Master, use quota arrangement (MEQ1).For this you have to first activate Quota arrangement in MRP 2 view of Material Master.Then go to MEQ1 and create quota for the specified period.Here you can restrict lot size at production version level.
Regards,
Dhaval

Similar Messages

  • Creating Production Order with wrong production version

    Hello Expert,
    please provide me answer and solution to resolve our problem regarding creation of production order (CO01 and CO41), because SAP provide and propose production version which have alternative BOM which is status 02 (inactive) already it is not picking the production version which has active alternative bom for our finished material. it is allowing the production to be created even the bom was inactive.
    please help us to this it still bugging our system
    tenx

    Hi Ryan,
    Production version will be selected based on the field Selection Method field in Material Matser MRP 4 view.
    1  Selection by explosion date
    2  Selection by production version
    3  Selection only by production version
    If the selected field value is 1 , then system selects the version based on the validity dates i.e whichever production version is active on that day that will be considered in MRP.
    If the selected field value is 2 by production version. Then system will select the First Prodution version mentioned in the Material Master MRP 4 View (production version Tab).
    If the selected field value is 3 always only by production version. Then system will select the First Prodution version mentioned in the Material Master MRP 4 View (production version Tab).
    So to address you query I suggest you to delete the production version PV1 with BOM 01 and Make production version PV2 will be available and active in seen as the first production version in teh screen.
    Then for your inof purpose you want have the PV1 then re-create it as second version in the Version tab screen.
    Regards
    radhak mk

  • Selecting production version in MRP run

    Hi dudes,
    our client is having reuirement is he will select the production version irrespective of lot size, but he select the production version at the time of manual creation of process order where it depends on resource(work center used in recipe of particular production version, BOM will be 1 alternative only.
    now while running MRP how to make system to allow manual selection of production version at the time of converting planned order to processs order.
    respond asap plz...
    Daniel.

    Hi ,
    During MRP, system will select the production version based on Validity date & Lot size.
    If a material contains two production versions with same validity date & Lot size qty , system will select the First valid PV by default (unless it is locked) & will copy to planned order.
    When u convert the planned order to production order,default PV will be copied automatically from planned order. Here u cannot select PV manually.
    Settings:
    Create valid production version with lot size and Valid routing , BOM at MRP view of Planning material.
    Assign the selection method = 2 or 3 at MRP view of Planning Material
    Regards,
    Anand.

  • MRP Scheduling with a material with multiple production versions scrap rate

    Greetings all.
    I have a problem with MRP scheduling.  How do you account for different loss rates or scrap rates on a material because of multiple versions of a material that are in production.  For example, we have an item.  There are two differen ways to make that item and both have different loss rates or scrap rates.  How do we account for this.  And whatt happens when you have these with multiple routings.  Thanks.

    Dear,
    It can be handled in 3 ways.
    1st way - Create 2 versions to represent 2 ways of production. Create a 3rd version name it as total and make it as a first version so that MRP will take this version for scheduling. In total version give the most correct scrap qty and timming in routing. Hence when you run MRP system will consider the total version, then change the varsion in planned order as per your requirement.
    Second way - Create 2 version and if you are using Demand planning, in MD61 against the qty represent the version number so that when youn run MRP, the planned order will carry the version.
    3rd way - Create 2 Production version and create a quota arrangement and assihgn these two Production version as Quota items and give the % share. Hence when youn run MRP system will share the demand qty into two different version as per Quiota arrangement(setting in MRP2 is necessary fir planning).
    Please come back which one you are looking for so that we can give furthur information

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • Cannot select Product Version. Its greyed out ???

    Hi All,
           I have configured maitenance ooptimizer in sol man 4.0. but when i tried clicking the "Maintenance Optimizer" button under the "Change Management" -> "Support Package Stacks", I see every selection greyed out. I am not able to select any option (i.e Product Version, Priority, Short Text, and even the Back and Continue buttons are also greyed out).
        I have "SAP_MAINT_OPT_ADMIN" role under which the authorization objects CRM_ORD_PR and D_SOL_VSBL exist.
        I feel still there's some sort of authorization missing but not sure whats that.
       Can someone please reply to help me with this...
      Thanks
      Sourav

    Can I get some suggestions to the above question please.....

  • Building an Installer with the product version major at 0

    Hi Everyone,
    I'm currently working on a prototype and I should build an installer for the prototype validation.
    The matter is that the prototype version start at 0, and I can't find a way to set in the product version major field at 0.
    Setting the major field at 0 is possible while building an executable, but not for an installer.
    My LabVIEW version is 12.0
    Thanks...

    Marc-junior wrote:
    It seems to me that it is the wanted behaviour application builder here. From the help page, you can read the following "You must increment the version number if you want to create upgrade versions of the installer that are capable of overwriting previous installers."
    That does not explain anything. We should be able to make the first ever version 0.0.0, that can later be upgraded to e.g. 0.0.1.
    According to microsoft:
    The format of the string is as follows:
    major.minor.build
    The first field is the major version and has a maximum value of 255. The second field is the minor version and has a maximum value of 255. The third field is called the build version or the update version and has a maximum value of 65,535.
    So, the max is 255.255.65535. There is no minimum given, so 0 should probably be allowed. I suspect that the input field in the build specification has an incorrect range setting.
    LabVIEW Champion . Do more with less code and in less time .

  • Can any one help me  with SAP product version information,

    1) NW04. Which has two subsequent versions:
    SAP Netweaver 2004
    SAP Netweaver 2004S (Alias SAP Netweaver 7.0), for which one enhancement
    pack exists:
    - EHP1
    2) NW05. Which has one version:
    SAP Netweaver 2005 (Contains ECC 6.0 / ERP 6.0), for which four
    enhancement packs exists:
    - EHP1
    - EHP2
    - EHP3
    - EHP4 (Available from 21.11.2008). EHP4 seems to exist in two flavors,
    "Easy adaptation", and "Continues Innovation"
    3) NW06 (Alias SAP Netweaver 7.1, currently in rampup phase)
    4) SAP Netweaver 7.2 (Available in 2009)
    First question:
    The Netweaver Developer Studio (NWDS) seems to exist in two versions:
    - NWDS 7.0
    - NWDS 7.1 (As part of the Composit Environment / CE) Which SAP
    Netweaver release(s) support the above NWDS versions?
    Second question:
    Has anything changed in the graphical capabilities (such as the
    availability of GUI controls, office integration, etc) between both NWDS
    versions? If so, what are the major changes?
    Third question:
    The CE environment contains development tools for SOA development.
    Is it possible to use NWDS from the CE environment, without requirering
    end-users to install the CE environment on their system?
    Fourth question:
    Are there any differences in the graphical capabilities between NWDS
    Java and WebDynpro for Java.
    If so, which?
    Are there any differences in the integration capabitlities (i.e. ABAP
    dictionary info, help texts, search helps, messaging, etc) between
    WebDynpro for Java and WebDynpro for ABAP?
    If so, which?

    Have you got any answer for these questions
    Nikhil

  • MRP - Production Version

    If there are 2 prod. ver. (BOM alt. is diff. in both prod. ver.) for a product. Selection of prod. ver. is manual.
    How MRP will plan RM? In MRP , selection of BOM is by Sel ID. only (Sel. ID - Sel. priority - BOM usage)

    Hi Sandeep,
    There is no manual selection of prod versions for planned orders in MRP run. MRP always select prod version/BOM based on the selection criteria in MRp4 view. If you have 2 prod versions with selection criteria 2 "selection by prod version" then the first valid prod version will be selected otherwise you will get error "BOM has not selected" from MRP. Otherwise during manual creation of planned order you can assign prod verisons.
    Without prduction versions creating planned orders for RM is not possible so selection of BOMs from any other mode is vain. I mean RS type of planned orders. You will always get stock planned orders from MRP which are not qualified for RM scenario.
    if you have any question then please inform with rewarding suitable points.
    Regards
    TAJUDDIN

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • How to add production Version  field in COOIS to selection options?

    Dear Experts,
    Need your suggestion for below issue raised by client.
    1) As per client, he was running COOIS with the selection option of a production version. But currently he is  not able to see this selection while executing a COOIS t-code.-----> Kindly guide me on its possibilities & necesary checks.
    2) If I want to correct it & want to add Production Version field in COOIS report what steps I should take?
    Need all your valuable guidence to resolve above issue.
    Thanks & Regards,
    Mehul

    Hello Vivek,
    Really thanks for your mail. Please see below comments-
    1) I checked the transaction COOIS & also told user to select Production Version after executing the report by giving Plant code & dates. But user asking for this field before execution.
    As per your suggestion I checked in Header level of first screen but its not showing me also.
    2)  I am using ECC6.0 version
    3) One finding from my side- This is I am checking only selecting Production Orders. But when I am selecting only Planned order then Production version can be seen in first screen under Repetitive Mfg. section.
    so kindly tell me why this not showing when Production order selected?
    Thanks in Advance for your help.
    Regards,
    Mehul

  • Selecting prod.version before MRP run

    hi all;
    can any body know about-how  the production version selecting before MRP run?
    for example: I have a material.it has 2 production version. when I run the MRP, MRP reads first production version(prd vers-1). but I want to select other production version(prd vers-2). how can I make this selection?
    Regards,
    Sema

    Hi,
    If you want to select the perticular alternative BOM define it in production version.
    Theree is option by which the PV is manually assiged
    Goto MD62
    Execute the report
    Goto Schedule line tab page
    Fallow the menu path
    Setting Production version
    Enter the Production version required
    Save
    So system will select the perticular alternative BOm which maintain in that production version.
    Regards,
    R.Brahmankar

  • Demand Management with Production Versions

    Dear all,
    Is it possible to link the requirements in Demand Management with a production version which I've listed in the MRP 4 view?

    Hi,
    Yes it is possible. In MD61 when you place independent demands, switch to the schedule line view & specify which Production Version you want the demand to consider.
    Hope the above clarifies.
    Regards,
    Vivek

Maybe you are looking for

  • My external hard drive doesn't show anymore

    Hello Everyone, I hope you can help me. Today I wanted to put new data on my WD hard drive, I have it for almost a year and always worked fine (it's just USB, no power necessary). But my External HD was almost full so I deleted the "time machine" bac

  • Manager's problem with appraisal

    Hi there Our MSS users are able to see their subordinates' appraisal documents, but not their own. I am using evaluation path O-O-S-P for object O with RH_GET_MANAGER_ASSIGNMENT. But now according to SU53, the system is asking for object P, with DISP

  • CD Drive screwing up

    Hi, So I got a new CD (Thrice, yay!), and I went to listen to it. Popped it into my computer (MBP, Tiger, 2.16ghz, bought June 2007). I got one song into the CD, and it suddenly stopped. I figured that Itunes messed up. But then it wouldn't start aga

  • Any updated to iOS 7.1 with a 5s; how did it go?

    Hi all, I have been waiting and watching to see if there have been any issues with updating to iOS 7.1 with an iPhone 5s. In the past, I have gotten burned with updating my iPad to a newer iOS namely poorer battery life, etc. Our iPhones are only two

  • File synchronisation between several devices

    Good afternoon I have a MacBook Pro and currently use FreeFileSync to backup/synchronise files between my Mac and an external hard drive and a NAS drive. Whilst this works OK I was wondering if there was anything out there that may be a little slicke