Service Level in the Material Master

Hi -
Can the service level field in the material master MRP view be used to drive additional demand independant of safety stock?  Meaning, is there any way I can enter a service level and have it increase demand even if I am not using it to calculate safety stock?
Thanks

I do not think this is possible. Service level is usually used for safety stock planning.

Similar Messages

  • OCM for Revesion level in the Material Master and for the BOM

    Hello,
    I use My SAP 6.
    I have implemented OCM. It's used for 2 things:
    - The first is for revision level in the Material Master.
    - the second is for the BOM.
    Today, the customizing is good, it's work.
    My need is to have the same change number for those 2 evolutions:  for the material master evolution and for the BOM evolution.
    It's possible, and how?
    Thanks for your answers.
    Bérenger

    I do not think this is possible. Service level is usually used for safety stock planning.

  • Product  Hierarchy Levels in the material Master.

    Plz let me know the Levels to which product hierarchy can be maintained for a Finished good in its Material Master.
    What I know it is 9 and is limited to 18 characters.
    The T- code for it is v/76, and is maintained thru it, but while I am trying to maintain 4th level it is automatically taking 3rd Level. please point out the mistake which i must be doing.

    Hi
    As per standard SAP allowed up to 3 steps only
    Here i am furnishing small example
    1 step allowed 5 digits - 00001-  Electronics
    2  Step allowed 5 digits-  00001 - Home Appliances  
    3 step allowed 8 digits- 00000001- Steam iron
    The above hierarchy can be assigned in material master as 000010000100000001

  • How to determine the real (effective) Service Level ov a material?

    Hello Experts,
    I have Service Levels of for example 92% or 98% for a material set up in the material master data ( MARC-LGRAD ). This shall mean in reality, that I can deliver in 92% or 98% of the cases the needed goods in the right quantity. Only in 8% or 2% of the cases I can not do that. Maybe I have nothing of that material in stock to deliver or I only have not enough of it.
    The Service Level is one of the aspects affecting the reorder point and safety stock.
    No I want determine for my materials what the "real" Service Level is based on maybe the deliveries?
    Is there a standard report of SAP to check this? If not: does anyone has some hints for me how to code it myself?
    Best Regards
    Manfred

    Hi Manfred,
    This information is a bit tricky, becuase you don't always have it in the business process.
    One of easy sources, is if you plan for sales, then you can see both what was ordered versus what was actually delivered.
    But if you plan for internal consumption, lets say somebody goes to the store, and if the material is not there nothing is recorded in the system to testify for that.
    Regards,
    Mario

  • Adding a Z field in the material master at the plant level

    Hi,
    I want to add a new text field in the material master.
    The data maintained inthis field should be easliy retrievable using  some STD SAP Report or using Abap query ( SQ01/SQ02)
    Please advise how do i do it.
    Regards,

    Hi,
    I want to add a new text field in the material master.
    The data maintained inthis field should be easliy retrievable using  some STD SAP Report or using Abap query ( SQ01/SQ02)
    Please advise how do i do it.
    Regards,

  • Screen Level Security for the Material Master

    We need to create security for the material master by screen views. The Purchasing group needs to be able to change the Purchasing and MRP screens but none of the other screens. How would we accomplish this with SAP security?
    Thanks!

    Janet,
    It is hard for us to know how your authorization profiles or roles are constructed.  You really should consult your local authorization expert.
    The Authorization object you are looking for is M_MATE_STA.  It is probably contained in at least one of your Roles or Profiles that are currently assigned to your MM maintenance people. At a minimum, it should exist in standard SAP profile M_MATE_ALL in your system.  You can review all of these types of authorization info in the User Information System (transaction SUIM).
    You would have to create roles or profiles that narrowly define the "User department" fields for M_MATE_STA object.  You would also have to search for existing roles/profiles that contain "*" in this field, and determine if these entries are still appropriate in your new authorization business process you want to begin.
    Below is the SAP help about this authorization object
    M_MATE_STA
    Definition
    Maintenance status authorization for material master records
    The data contained in a material master record is divided into user departments or views (Purchasing, MRP, and so on). The maintenance status is a single-character key for the relevant user department or view.
    This object determines which user departments or views a user is authorized to process; that is, which data he or she may process from this view.
                                                                                    Note                                                                      
    To use material master functions, a user needs the authorization for at least one user department.
    Defined Fields
    Fields               Possible values      Meaning
    ACTVT                01                   User may create data.
                         02                   User may change data.
                         03                   User may display data.
                         06                   User may flag data for deletion.                       
                         08                   User may display change documents. 
    STATM                                     Here, you specify the maintenance status for which the user is authorized.         
    The maintenance statuses possible are as follows:
    User department                Maintenance status
    Work scheduling                   A
    Accounting                        B
    Classification                    C
    MRP                               D
    Purchasing                        E
    Production resources/tools        F
    Costing                           G
    Basic data                        K
    Storage                           L
    Forecasting                       P
    Quality management                Q
    Warehouse management              S
    Sales                             V
    Plant stocks                      X
    Storage location stocks           Z
    Notes
    This authorization object also determines:
    o   Whether a user may flag a material master record for deletion. In this case, 06 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may change the material type. In this case, 02 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may process an MRP profile or forecast profile. In this case, the following values must be entered in field ACTVT:
    -   01 to create
    -   02 to change or delete
    -   03 to display
    The maintenance status must be D for the MRP profile or P for the forecast profile.
    o   Whether a user may create an overview of all extendable materials. In this case, 01 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may call up the materials list. In this case, 03 must be entered in field ACTVT; the maintenance status is irrelevant here.
    o   Whether a user may create or change production versions from task lists. In this case, 02 must be entered in field ACTVT, and A in field STATM.
    Rgds,
    DB49

  • Open field for cost center on the material master

    We have a unique requirement in a facility we intend to implement plant maintenance in to track a cost center to a material by including the cost center on the material master somewhere.  Cost center is not a field on any of the material tabs we use for maintenance materials, but the requirement is just that it is tracked in a field, even if it's just an open field like a "user defined field" or another field not used often.  We realize there are disadvantages such as the field not being checked against active cost centers, but we are looking at options short of adding cost center as a field manually to a tab (which I believe would require ABAP assistance).  I don't think there are any other fields/tabs we are currently not utilizing but I could be wrong... The best option we can think of is adding it in a material characteristic so it shows on the classifications tab, but I thought I would see if anyone has any other ideas.
    Thanks

    Not sure what is the need of cost center on material master when you want to implement Plant maintenance module. Do you have any specific requirement for this?
    Ideally cost center will be derived from either functional location/ equipment (equivalent of material master) on to PM work order or notification.
    Can you elaborate the requirement?
    After all if you wish to go with cost center, then I suggest it should be at plant level as PM requires plant level distribution. You can add up a custom field and give the reference of cost center data element with help of developer.

  • Plant specific fields in the material master for product move

    Hi, SAP gurus,
    My scenario is we are moving a existing product in US plant to Brazil plant. What are the fields in the material master that are specific to a plant that will change. For ex MRP controller will change from plant to plant. Like that can anybody please provide me a list of fields that i need to be looking at?
    Thank you
    Anusha

    Hi Anusha,
    First of all, list down all your materials those you want to extend to new plant.
    a) Secondly, pay attention to those fields you will find "filled" in those materials at plant level.
    b) MARC comes handy for you to analyse which fields are at plant level.
    Intersection of fields with values between a and b are the ones you need to work out.
    Good luck,
    Regards

  • For a PR, check the material master

    Hi,
    I have a basic question.
    I have a requirement to check the material master to determine the existence of the material master after a PR is created. Can we create a PR without a material.
    What are the methods of creating PR apart from manual creation
    Thanks.

    > Hi,
    >
    > I have a basic question.
    > I have a requirement to check the material master to
    > determine the existence of the material master after
    > a PR is created. Can we create a PR without a
    > material.
    > What are the methods of creating PR apart from manual
    > creation
    >
    > Thanks.
    Hi,
    Here u can Extend the material master after creating PR,and u can create PR with Out Material master,but this is possible only with Consumable materials and services.
    Thanks & Regards
    suresh

  • MRP TYPE for  Periodic planning in the material master.

    Dear gurus,
    i need planned the materials in the periodic modality, are there the type MRP in the material master for create the planned file ( table MDVM) one once a month or in the specific period chose ?
    Example :
    I need that the material master don't create a file planned ( MD20- TABLE MDVM) for a change of the requirement situation new , but i would like that the flag in the table ( MDVM) or file of the planning MRP created when the today date is in the period specific.
    31.3.2011  (or period 1.4.2011- 10-4-2011)Date for the create a file MRP and after when run MRP planned the material, for others scenary the system must not planned the material.
    Are there the MRP type for my problem? Or the customizing setting?
    Thanks a lot
    Dani

    Dani,
    Not sure if MRP type or customizing can help here. And even if we are able to achieve this requirement it will be applicable at plant level.
    However, try exploring option of periodic lot size (weekly, monthly, etc). This will work according to period you've set and should give you the results you are looking for.
    Regards,
    Himanshu

  • " Item Category Group" in the material master?

    Hi,
    I'm going to use inbound delivery for purchase order, so I'm going to do it as follows:
    1) Create a new "item category group Y001"
    2) Create a new "item category Y001  (copy from ELN then change the movement type to 101, and set it relevant to putaway)",
    3) Replace the item category group in the material master with Y001
    4) Determine the item category via transaction 0184 as the following ways:
         "Delivery Type"  EL    + 
         "Item Category Group From Material Master" Y001    +
         "Item Usage"  V     +
         'Item Category Of The Higher-Level  Item"  
         ==>  "Determine New Delivery Item Category" Y001
    My question is, If I change the item category group in the material master, is there any effect to SD part?
    Thanks.

    hi
    General item category group
    Materials grouping that helps the system to determine item categories during sales document processing.
    *If a group is configured specific to distribution channel, it has priority if the corresponding activity is distribution channel-dependent
    Item category group from material master
    A grouping of materials that the system uses to determine item categories during the processing of sales documents.
    the difference between the two lies in the specificity to the distribution channel
    Regards
    Raja

  • "Req. Inv. Level" in the Item Master Data - Inventory Data

    Dear All,
    Would like to ask what is the function of the "Req. Inv. Level" in the Item Master Data -> Inventory Data ??
    What is the different with Min. Inventory?
    And what is the different with Item Master Data -> Planning Data -> Minimum Order Qty ??
    Thank you very much!!!

    Dear All,
    Thank you for your reply.
    i found something strange for the MRP, it is as the following:
    at 06.11.2009, i have created 1 SO : SO123
    qty: 150
    due date: 10.11.2009
    for the Minimum Order Qty in Planning Data: 200
    Lead time: 2 days
    when i run MRP, it can show at 10.11.2009, qty 200 is needed to be purchase (it match the Minimum Order Qty in Planning Data:200)
    But when i set the lead time to be 10 days), it only show at 10.11.2009, qty 150 is needed (in red font).
    Question: seems if the date for the material to arrive (06.11.2009+10 days = 16.11.2009, which is excess the due date of the SO 10.11.2009) is over the due date (10.11.2009) then the MRP will just show qty150 instead of showing qty 200 (the Minimum Order Qty) ? so after that when create the PO by using Order Recommendation Report, it qty in the PO is 150 only, but not 200.
    is it how the MRP in B1 works?
    thank you very much!!

  • Organization Level screen on Material Master

    Hi experts,
    I am trying to use User Exit or BADI which runs Organization Level screen on Material Master.
    However, I don't know which one I should use...
    Could someone help me to tell me the User Exit or BADI that I'm searching for?
    Sally
    Edited by: Sally10 on Jan 21, 2011 8:21 AM

    This problem is caused by the program design.
    In the R/3 System the low-level code is only ever increased and never reduced when the product structure is changed.
    The low-level code is not reduced for reasons of performance and is thus greater than absolutely necessary. The larger low-level code does not disrupt the MRP however, that is, the material can be planned correctly.
    please read OSS  Note 494236 - Low-level code not reduced
    for more  detailed info

  • Product hierarchy in the material master record

    Hi,
    I am handig Data migration project.
    This is related to Product Hirerarchy.
    I one business Product Hirerarchy have been configured. But in another buisiness, Product Hirerarchy has not been configured.
    There are some common materials using by both business processes.
    For coomon mateials  if I am maintaining Product Hirerarchy value in the material master record, is there any impact on business which is not being used Product Hirerarchy. Whether it will stop / impact on business processes.
    Can you explain plz
    Thanks in advance
    Regards

    Hi karthink,
    Thanks for your inputs.
    we are meging two servers. In that in one server, product highrechy have been configuredand in another server not configured.
    There are some materials with the numbers calling as a common parts exists in both servers.
    ex: plat 0001 in one server 1         &          plant 0002 in server2
    Common part is : m1
    plant 0001  not using product hierarchy and plant 0002 not using product hierarchy,.
    After golive, all the common parts are being used by both plants and same basic data 1 view.
    If we are maintaing product hierarchy in the basic data 1 view, it will flow into sales view as well.
    Then what about impact on the plant 0001 business since it is not using product hierarchy.
    In the configuration, is there any settings to activate / deactive product hierarchy at sales area level.
    Is there any impact on MM / FICO side.
    Please explain.
    THANKS IN ADVANCE.
    Regards
    KRK

  • Reference a document in the material master

    I'm wondering if anyone can suggest a way that we can do the following....
    We basically want to have a field/location in the Material Master that will reference a document stored somewhere on a network server and in turn, display and print on the PO (the document name prints, not the contents). Any suggestions of where to start?
    So in the MM for Material # 123456
    MyField = "MyInspectionDoc.pdf" (MyInspectionDoc.pdx resides on \\mynetworkserver\MyInspectionDoc.pdf)
    Or
    Is there a way to have an attachment in the MM that will automatically be pulled into the PO when the PO is created (with the material item as a line item in the PO of course)

    I think you are mixing DMS (document management) with GOS (generic object services)
    GOS content is created as shown in your screen shots.
    You cannot even see from any transaction which materials have a GOS attachment. The GOS attachment can only be accessed from the object (material master) where it was created.
    DMS is a central component in SAP and embedded to the material master like it is done with classification too.
    You can create the documents in CV01N transaction and link to the material or directly from material master. you can use CV04N to search for documents
    In the material master you will find the link to the document in alternative data tab where you have as well your alternative units.
    This screen looks like this one:
    Those material master attachments/documents do not print automatically in a PO, for this you have to do some ABAP development

Maybe you are looking for

  • Downloading to ipod

    Ive had some trouble downloading to the iPod. In iTunes everything seems to go well, but when I look at the iPod(go into songs or anything), nothing is there. I check the memory and I have used about 10gb, but none of it shows up. I checked by going

  • XStep conditional formatting. Can it be determined at run time ?

    Does anyone know of a way to put conditional formatting into an XStep generated table output. For example, this is what we are trying to do: - At some point after an order is generated and released, materials are issued to it. - We have created a fun

  • Automatic Payment problem

    Hi, i've this problem with  Sap B1 2005A SP1  patch 45  Automatic payment: i want to print by PLD pax 6 of 9: if i see system information, in automatic payment row  i see that Total is associated to variable 66 and balance expiring to variable 67. Ho

  • PerformancePoint Designer is not loading when clicking on "Add new item" from PerformancePoint Content List

    Hello, I am using Internet Explorer 9 to create a new item by launching Performance Point Dashboard Designer from browser.  When i click on "Add new item", an Iframe will open showing dashboard design redirect which keep loading for couple of minutes

  • Scroll Bar Not Visible