Service subcontracting

hi grus,
i want to know can i run subcontracting scenario for service? if yes how? in that case wether we hav to creat service master or we can make master record using material type dien? pls help also explain in that  case how to make gr by service entry sheet or by migo

Hi ,
Difficult to understand your question but you try to know when DIEN can be used and Service master, and then only you can design your business process.
Material master records with material type DIEN is used for when you offer "SERVICE" to your customer.( The steps are (VA01,VF01,VF04,F-28), If u used HR module( you can used with sales order with t.codes are: CAT2,CATS_APPR_LITE,CAT7,PR05,PRRW,PRFI)
Service master records(ESM) is used when you procure "SERVICE" from your vendor.( Steps are: ME21N with Item Cat. "D" with Acc. ***. Cat. "K" or "C", ML81N,MIRO & F-53).
Service can be received, once vendor completed his service as Service Entry Sheet in T.code: ML81.Please note that Service entry sheet is the equivalent of a goods receipt from a materials point of view.
Regards,
Biju K

Similar Messages

  • Output for PO document type

    I have created 4 document types in PO
    Domestic, Import, Service, Subcontracting,
    I have to add extra one document type and i want the print out of this document type should be different from remaining 4
    only for this 5th document type i need to have different output..
    Is it possible in SAP

    Hi,
    You should have different document types for all process( Domestic, Import, Service, Subcontracting and 5th one) and can have one output type for all document type ( where you have one  SmartForm)  OR you can have different output types( five SmartForm ) for each document type.Just talk to ABAPer for inclusion of all PO output formats with all condition types.
    Regards,
    Biju K

  • Subcontractin by process order: ME2O

    Hello everybody,
    I’m implementing subcontracting by process order.
    I feel very unsuitable with the transaction ME2O that we use to post GI to the vendor.
    The problem is that we need insert the code of every components that we send.
    As an alternative, we can insert just the vendor, but in this case we get a lot of material in output.
    The problem is overall that, if we send material managed to batch, we need insert the batch number.
    All this is very bad because add a lot of steps to the operator job.
    Is there the way to get in ME2O with the process order number or simplify any step?
    Best regards,

    Dear,
    There are two ways of subcontracting in SAP...opration subcontarcting and material sub contract
    <b>Operation sub contract in process order</b> -  Tick the sub-contracting box in Routing. This will not create Subcontracting PR during MRP run. This will create PR during Production order release or that particular operation is released.
    - In the above case, after the first operation if you are sending it to contractor then there will be any entry in Inventory management as it is not material subcontracting it is only SERVICE subcontracting i.e. this particular operation is subcontracted. This procedure is followed when contactor is working with in your company premises.
    <b>Material sub contract</b> - The procedure you are talking about the <b>material subcontract...</b>the procedure is as below
    Let us say you have a final product C.
    C needs B
    B need s A
    A needs raw material X and Y
    In the above case
    C and B is having routing
    In A material master MRP2 view....enter special procurement key as subcontacting(in STD sap the key is 30), procurement key = F
    A has a BOM having items X and Y.No routing for A
    When youn run MRP
    System will create Pl order for C and B, SUBCONTACTING PR to A and PR to x and Y
    After you procure X and Y, You can convert PR of A to PO.
    Then you will send the material i.e. issue the material to subcontractor through 541 and special stock O.
    This stock you case see in MMBE with special stock O.
    Once you receive the material A, when you do GR, the materials are issued to A and A will be inventarised with mov type 101.
    The cost of serve and the cost of raw material is booked to cost center entered in subcontracting PO.
    The cost of this will be settled to production order later.
    I hope it is clear.

  • Forms in SAP MM implementation

    Hello Gurus,
    Can someone throw some light on the various forms which need to be printed or faxed for internal use or for vendor use, in a typical SAP MM Implementation.
    Thanks,
    Sachin

    HI,
    These are the forms which are needed in MM implementations.
    Again it entirely depents on the clients requirement.
    1. RFQ
    2. PO (All kinds of PO's like services, subcontracting, assets Consumables etc)
    3. GR
    4. GI
    5. Service Entry Sheets
    6. Shedulling Agreements
    7. Shedule Lines mainted for Sheduling Agreements
    8. Contracts
    Thanks & Regards,
    Kiran

  • Work Order - Cost Settlement (Urgent)

    Hi All,
    I would like to know where i can check the costs, after doing MB31 or CO11. I suspect the way the work order flow has been setup in incorrect, as the work order is supposed to generate a purchase requisition, which is to be converted to a PO. But at the moment i just see a number in the requisition column of operations page of the work order. But no p-req's are seen in MD04 output.
    I checked in MB51, i find a 101 movement for the sub-assembly work order, but the cost column is 0. Await inputs.
    Vivek

    Dear Vivek
    1. Tick the sub-contracting box in Routing (to ensure the system generates sub-con purch reqn during MRP run & then i convert it to sub-con PO) ---> <b>This will not create Subcontracting PR during MRP run. This will create PR during Production order release or that particular operation is released.</b>
    2. In the above case, after the let us first operation if you are sending it to contractor then there will be any entry in Inventory management as it is not material subcontracting it is only SERVICE subcontracting i.e. this particular operation is subcontracted. This procedure is followed when contactor is working with in your company premises.
    3. The procedure you are talking about in you serial no 1 to 4 is the <b>material subcontract...</b>the procedure is as below
    Let us say you have a final product C.
    C needs B
    B need s A
    A needs raw material X and Y
    In the above case
    C and B is having routing
    In A material master MRP2 view....enter special procurement key as subcontacting(in STD sap the key is 30), procurement key = F
    A has a BOM having items X and Y.No routing for A
    When youn run MRP
    System will create Pl order for C and B, SUBCONTACTING PR to A and PR to x and Y
    After you procure X and Y, You can convert PR of A to PO.
    Then you will send the material i.e. issue the material to subcontractor through 541 and special stock O.
    This stock you case see in MMBE with special stock O.
    Once you receive the material A, when you do GR, the materials are issued to A and A will be inventarised with mov type 101.
    The cost of serve and the cost of raw material is booked to cost center entered in subcontracting PO.
    The cost of this will be settled to production order later.
    I hope it is clear.

  • BT/Yahoo Email unfit for purpose.

    INFORMATION:
    I have been with BT Infinity for over a year.
    The customer service team, on the few occasion I have had to contact them, are excellent.
    Download speed is constantly in excess to 65Mbps.
    The only issue I have is that the email service subcontracted out to Yahoo (A company I normally avoid like the plauge) by BT is abysimal.
    It can take 20 to 30 attempts to get emails to download.
    Constant "Please enter a valid password" from my client, when I know the password is valid, as I only changed it yesterday, and wrote it down to ensure the problem was not me.
    Then proof it is the right password, as 24 hours worth of emails arrive on the 31st attempt.

    That's one of the glitches that, amongst other things, prompted BT to ditch Yahoo! (a process which has stalled). The glitch usually puts itself right eventually, and simply logging in to webmail and straight out again sometimes puts it right.
    You can click the white star next to this message if you think it was helpful.

  • Subcontracting: Picking Relevancy of service Line Item in Inbound Delivery

    Hi experts
    I have a challenge. There is a Subcontracting PO having 2 line items, 1st one is Trading product which is the physical finished product & 2nd line item is service line item( service material type). So Can we create a Inbound Delivery wrt PO having Service Line item to do receipt?
    I tried creating Inbound but failed, error is : material ( service line item) is not extended to Warehouse. But my requirement is: it shouldnu2019t be extended to WM views so that it only appears in Inbound delivery as line item & it should not be relevant for Picking.
    Any idea how can we do this?
    Rgds
    Ram

    Hi
    No delivery is possible for item catageory D or material type ( DIEN)
    Edited by: Sanjay  Shah on Sep 20, 2010 3:50 PM

  • Goods Receipt and Subcontract/Service confirmation

    Dear SAP Guru,
    I have one scenario to map.
    Some waste will be generated because of nature of FG production and processing of this waste will be carried out within factory premises by sub-contractor. As material issued will be waste, no weighing of material issue is done. But after sub-contractor process it, it is supplied back as SFG which has some value and hence weighing is done.
    Now my question is how to mapp it:
    1) Standard Sub-contracting scenario: Its not possible as weight of material supplied to sub-contractor is not known as its not feasible considering that its waste material. Or can we have sub-contracting without any material issue to vendor but only GR for SFG?
    2) Service Contract: Service order can be created and against that service entry sheet can be used for service provided by sub-contractor on the basis of weight of SFG received from sub-contractor. And SFG material can be received as by-product against FG order by seperate transaction.
    3) An extra operation can be defined in recipe of FG as external processing but then what details should be sub-contracting or service (which info record standard/sub-contracting) and how the whole cycle would be?
    Please give your comments on each option.
    Thanks and regards,

    Hi
    1. What is quantity of the waste material you get as by product? Do not you wan it to be handled as scrap? What is the %age of scrap you have defined in the BOM for the material? You wll have some data regarding this. Or else how do you arrive at decission that after subcontract processes the waste you are paying him, Is it umpsum basis or material quantity basis. The best way is to have a Subcontract PO, but for that even though you do not weigh the watse quanity you must be having so historical data for the waste quantity generated and the conversion of the sane to other SFG , definitely you can arrive that on a pro_rata basis. Have a Code for the waste mateial. Release Subcontract PO for SFG which is what you get back, and issue the components( waste) to subcontractor.
    Please remember your PO intially will be for Provisional quantity if you are unable to reach a fixed quantity. Amend the PO before GR as per the actual quanity for which you wish to pay the vendor.
    For the waste quanity stock updation you use 262(w/o refe to Prd order) after the FG is confirmed.
    Material price updation happens cirrectly in this process.
    2. You can pay the vendor as you wish by by this process but what about the price updation for the ordered material SFG. When you can receive by product in separate Txn againt FG then why can not you follow the proces no. 1?
    3. I would not liketo suggest 3 rd option as that becomes much comlicated for a simple operation.
    Best Regards

  • Subcontracting with external service / non-stock material

    Hi,
    I have a scenarion in subcontracting when i provided the components / raw materials to the in-house workshop (workshop treated as an internal vendor) and further more our workshop required some external services / non-stok material from third party... now how i will incured this service / non-stock material cost on finished product.
    (PP moudule is not implemented on project)
    Regards,
    Ali

    Hi,
    Please refer the following links ..it may help you...
    Subcontracting service to a FERT material.
    http://books.google.co.in/books?id=LDyarcerUu0C&pg=PA571&lpg=PA571&dq=Subcontractingwithexternalservice/non-stockmaterialinsap+mm&source=bl&ots=vj5kUO9dto&sig=vrlCpSZ0-V0BseN96Qw9rTVhsQ0&hl=en&ei=cJKRTs5_0MmsB6rrgIsB&sa=X&oi=book_result&ct=result&resnum=10&ved=0CG4Q6AEwCQ#v=onepage&q&f=false
    Regards,
    Udaya

  • Subcontract Service PO Help

    Dear all,
    I have doubts in creating subcontract service PO. Here is my scenario. I have a project going on which i hire subcontractors to perform the planned activities. Thus, i created on Service Purchase Order in ME21N and listed the activities performed.
    1) I need to make an advance payment of 10%. How do i make an entry in SES to allow accounts make the advance payment?
    2) Sometimes, there will be partial payments. And after the project is completed, there may be late penalty for example 5%. But after doing SES for the partial payments, i am not able to modify the PO pricing conditions since it has already done SES. How do i go about this problem?
    Appreciate if anyone could help.
    Thanks

    Hi,
    you can save invoices before GR documents when you set up your system according to the information from knowledge base article 1496165.
    Regarding subcontracting in service PO item,  please refer to note note 634395, question 1.
    Regards,
    Edit

  • Subcontracting or service Po

    Hi,
    We are sending machines to a vendor for repair. Most of the times we are providing the spares- say as an example gear to the vendor. Sometimes vendor can also use this gear from his own if it is not available with us. In addition if required some other spare in the machine need to be changed, he can use his own spare.
    He sends us the bills for his services and of spares if he has used any.
    This scenario will fit in which process- Subcontracting or service Po?
    If it is service PO than how can we issue the material to the vendor and how the accounting entries will look like?
    Regards
    Neeru

    Hi Neeru,
    In your case better is to send a subcontracting PO for the Finished component you required from the subcontractor.
    and you can maintain the same value in subcontracting Info record irrespective of the material he use .
    Now if he uses gears from his own which is defined in your BOM but you havent provided but vendor fited from his own
    in this scenario raise a PO to that vendor for that component and provide the drop shipment info in the delivery tab
    as subcontractor this will replenish the material at that vendor end. And now when you are doing ME20 you will have already material at vendor end if you have raised this PO before or if after raising subcontract PO you can provide it and it will be
    in the stocks of Vendor and now at MIGO you can collectivelly do the 543 movement of this components.
    This will stream line your process into two steps without faults else you will awlays have a mess ann will hard to account for.
    still you can look into another options but I encountered the same situation and we adopted this method which is working well.
    Cheers,
    Biren Agnihotri

  • How to book subcontract service AP invoice ?

    Dear all,
    For a subcontracting service bill we need to book ap invoice for sub contracting charges 13320 and
    we need to less esi charges 865.80(6.5% of sub con charges) and lunch expenses for 300,
    Sub con charges  -  13320
    ESI charges        -    (-865.80)
    Lunch expenses  -    (-300.00)
    Total                        12151.20
    Problem is we need to deduct TDS for sub contracting charges 13320,but system is deducting
    TDS for 12151.20.
    How to do this in AP invoice ? or any other solution.
    Thanks
    Edited by: Jeyakanthan A on May 6, 2009 11:27 AM

    Hi Jeyakanthan,
    I think you can post A/P invoice for full amount and then pass a separate Journal entry for Food and ESI charges, where in you can debit the sub contracter for the respective charges.
    BR
    Samir Gandhi

  • Subcontracting scrap, component consumption and service cost booked to vendor

    Hi,
    Our client is issuing 100 pieces of component "A" to subcontracting vendor to manufacture finished product "B". In MIGO, we are receiving finished product B and consumption is booked for 100 pieces of component A . Invoice is paid to the subcontracting vendor for the service cost. 
    Later, we realized finished product did not met the quality standards and decided to scrap out the finished product B. This is scrapped and stocked out using std. SAP using 551 mov type.  But the client want to charge scrap cost of finished product B, service cost (Job work cost) and the consumed components (A) of 100 pieces to subcontracting vendor. How to map this challenging scenario in Std. SAP.
    Regards,
    Sat

    No need to create subcontracting PO.
    Just create a standard PO, use material as FG (Material B as per your scenario)
    Enter the vendor (whom you want to charge for it)
    Let me explain the scenario:
    1. You have created a subcontracting PO for vendor X, FG material B and component A.
    Subcontracting service charge = Rs. 10.
    Price for Material B = Rs. 50
    Price for material A = 30.
    2. You have done GR.
    Now the FG material B is in your stock. (Here, you have done 551 movement type). Right ?
    Now just do not do 551 movement type. Leave the stock as it is.
    3. Then create a standard PO for material B and vendor X, give the price = (10+50+30) 90 and tick the return option in PO line item.
    4. Then do goods receipt. Movement type 161 will be automatic posted in system and stock will be consumed from your storage location.
    Then accounting entry will be
    Stock account Credit
    GR/IR account Debit.
    5. Then you can do credit memo to vendor from MIRO with the reference of this PO. Then the accounting entry will be
    GR/IR account Credit
    Vendor Account Debit.

  • Subcontracting - combining services and components

    Hi,
    I've also posted this thread in the EAM forum but as this is a general topic - subcontracting - it is also posted here:
    Is it possible to send components on a PM03 (external services) operation for subcontracting?
    To be more clear: we've defined the following starting scenario's:
    1) send an item for an analysis - positiontype L / PM02 operation
    2) send an item for a modification directly - position type L / PM02 operation
    Ad1:
    The subcontractor might report back that the item sent needs to be overhauled or should be modified. In any way, a certain service (modification) should be carried out. This service is predefined in the system in a service master record. We currently process this service as a PM03 operation in the PM order and stipulates a service preq and PO. So send the item on PM02, add another line - PM03 - to handle to service. We do a GR on the PM02 operation and do a service entry sheet receipt for the service performed.
    Ad2)
    The item will be modified and shipped back. Only PM02 is applicable and only a GR will be performed.
    The service / modification will be handled as a PM03 operation as the item is already at the subcontractor. Would it also be possible to only use a PM03 and add send the item on this PM03 operation as well? I.e. somehow combine position type S and L?
    Or would material type Service (DIEN) be suitable for this?
    Thanks for the suggestions.

    how about some sample code... from you, I mean, but here's what I would do:
    public class MyPanel extends JPane {
       public void paintComponent(Graphics g) {
          super.paintComponent(g);
          // add custom painting code here
    }And just add components to the panel with the add method. I'm not sure what you are doing, but I see no reason that won't work.
    However there could easily be issues with alignment of components vs what's drawn on the panel. Furthermore, many components, like textfields are not going to be transparent and the bounds of the component may not be quite what you think, thus causing overlap issues.

  • Subcontracting services to repair the customer material

    Hello,
    I need your help to the following scenario:
    1. Company 1: I receive from our customer a material (the material belongs to him) to repair. Then I need to post it and the material needs to appear in the stock as material of the third partner in our company. The Nota Fiscal has the CFOP 5949, no taxes.
    2. Company 1: Then, I pick  up this material and send out to our supplier to make the repair. Nota Fiscal CFOP 5940, no taxes.
    3. Company 2: As I'm also the supplier in another plant, I receive this material, make the repair and send it back to the customer, in the step 2. Nota Fiscal CFOP 5949, no taxes.
    3.1. How to bill the aggregated costs? Because I needed to put new components and labour to make the repair.
    4. Company 1: I receive the material repaired from the company 2.
    5. Company 1: I send it back to the original customer and bill the service.
    Overview:
    Customer -> Company 1 -> Company 2 -
    > Company 1 -
    > Customer
              material A  /     material A    /         material A + service X     /         material A + service X + Y
    So, have you seeing this scenario before? How to do it in SAP? Which transactions? Process?
    It is not industrialization process, due the fiscal incentives...
    Thanks a lot by your help.
    Selma
    Edited by: Selma Moraes on Sep 28, 2011 8:33 PM
    Edited by: Selma Moraes on Sep 28, 2011 8:37 PM

    Hi,
    There are two scenarios in your case. ONE is subcontracting and service procurement. First thing is you will receive material and get it repaired by another vendor send it to customer. In this you do GR for the material and raise subcontracting PO and send to the vendor. Receive the material after repair and send it to customer. You can do settings that the vendor itself can send the material directly to customer when the SC vedor box selected in PO.
    Reseiving materiall and get it repaired and send back to customer can be treated as service procurement scenario.  You can pay the tax for the service provided by you. For that you need to do some settings in Tax procedure. Thanking you.

Maybe you are looking for

  • Go to destination button

    I'm trying to create a navigation system at the bottom of my pages so that when a reader is on one section of my issue, he/she can click on one of these buttons and be taken to the other sections. Currently I'm using the "go to destination" option wi

  • How much RAM can my MACPro really handle? 16GB or 32GB

    I am using a MACPro Quad Core (2x Dual Core) Xeon 2.66GHz and the specs show this machine maxing out at 16GB RAM (8x 2GB).  However, a memory web site shows 4GB DDR2/667/FB memory as being compatable with this MAC; selling 32GB kits (8x 4GB).  Is thi

  • Where can I get an older version of iphoto for mac osx 10.4.11 on a PPC G4 processor

    I have an old Imac G4 and wish to upgrade it to it's maximum, it is running mac OSX 10.4.11 tiger and currently has iphoto 2. I have the installers for iphoto 4.0.3 and 6.0.6, but I cannot activate either of them because I only have iphoto 2.

  • Upgrading the from 10.2.8 to 10.4.6 (tiger)

    Hi there: I had singal proccossor server with os server 10.2.8 and recently upgraded it to 10.4.6 (tiger) and got the following problem. This is a file server (all the users save gets thier profile, and data by logging into thier computer) using neti

  • Numbers formulae issues

    Greetings all, I'm relatively new to programming in Numbers (or excel for that matter), so was wondering if someone could give me a hand with the syntax for the following problem. I am a pilot and I'm trying to create my own logbook to record my flyi