Settlement of Production Order to specific GL Code

Dear All,
During the production process we get the output of some materils as powder. If we carry the further production of the same  we are able to get some raw materils
for example: - if the byproduct  is 2kgs. we will get the raw materials of 1.5kgs. We want to post the difference amount of 0.5 kgs to either production loss / cost of goods sold / melting loss etc gl code.
kindly suggest the procedure of handling in CO module and we would like to settle the production order to specific gl code
Regards
Anilkumar

You will have to define settlement rule first. The settlement rule configuration should allow posting to GL account. You will also have to define variance calculation. First do the variance calculation and then perform settlement. From this link check variance and settlement topics.
http://help.sap.com/saphelp_47x200/helpdata/en/90/ba81d2446711d189420000e829fbbd/frameset.htm
Regards
Ram

Similar Messages

  • 'Message no. F5 480'  - Settlement of production order.

    Hi Friends,
    I am getting a message 'Message no. F5 480' *'For document type SA, an entry is required in field* Doc.head.text' when trying to settle a production order through transaction KO88.
    Can you help me in this.
    Regards
    Sameer

    Dear,
    I'm not sure but try this Go to OBA7, double click doc type SA and then remove the tick mark reference and document header text.
    And
    Use T.Code OKOA ans in the screen select Settlemet profile and select the settlement profile assigned to settlement rule and click display button. In the next screen in Other Parameters tab u can change the document types also.
    Regards,
    R.Brahmankar

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Accounting entry - WIP, Variance Calculation & Settlement of Production Orders

    Hi All,
    Please explain the process of WIP calculation, variance and settlement of production orders. At each stage will there be an accounting entry generated?
    1. WIP calculation: All production orders for which the status is REL at the month end will be included in WIP calculation. How the amount of WIP is derived and what will be the accounting entry.
    2. Variance calculation: Production order needs to have the status TECHO in order to do the variance settlement. Will there be an accounting action and how the amount will be calculated?
    3. Settlement of Production Orders: Dr. WIP A/c (Balance Sheet a/c)
                                                        Cr. Volume Variance WIP a/c (P&L Account)
        Is this the correct accounting entry? If yes, please advice how the WIP a/c is showing balance on settlement of production order, how it will get nullified? If no, please advise on the correct process?
    Regards

    Dear Andy
    In product cost by order scenario the WIP or Variance calculation is dependent on order status. If the Order has a status of REL or PDLV, the system will calculate WIP and if the order status is DLV or TECO the system will calculate variance on this order. At the time of calculation of WIP or Variance no accounting entry i generated but when you settle the order at that time FI documents are passed in the books.
    Ans1-  In product cost by order WIP or variance is calculated based on the actual cost debited to the order and value of GR made to the order. System does calculation by the formula GR value-(GI value+Activity value+ Overheads)
    Ans2-  As I said at the time of calculation no FI entries are passed but at the time of settlement FI entries are generated. The method of calculation is the same as described in Ans1.
    Ans3- Entry at WIP settlement WIP (P&L) a/c Dr and WIP Offsetting(B/S a/c) Cr.
              Entry at variance settlement : Variance a/c dr/cr and COGM cr/dr.
              and if there is already a WIP posted for this order then at settlement WIP entry is reversed provided we have calculated WIP again the the month of settlement of variance
    Note for Anand: Dear Anand we need to calculate WIP again in the period when the order status  is changed to DLV or TECO otherwise system will not pass reversal entry of WIP. Kindly test it in your IDES and let me know if you find something on the contrary.
    Regards
    Rajneesh Saxena

  • WIP is not calculated even after settlement of Production Order.

    Hi Friends,
    The system is not calculating WIP even after settlement of Production Order.
    Please suggest possible solutions.
    Thanks in advance.
    Regards
    Rahul Jain

    Hi Rahul ,
    SAP has two distinct steps..
    1. WIP steps calculates the WIP if the order is not fully delivered ..
    2. Settlement steps posts the WIP calculated to the GL accounts..
    Please check wether the process order under consideration statisfy to be a partially delivered order ..
    Regards
    Sarada

  • Settle the production order

    hi,
    what are steps to settle the production order( order settlement)
    thanks & regards,
    elanchi

    Hi,
    Follow below steps for order settlement. Before order settlement confirmation must be done i.e order should have CNF status.
    - After Final Confirmation of Order make GR for for order using Tcode : MIGO / MB31 for manual or at confirmation with auto goods reciept. so Production Order Status will be delivered -DLV.
    -Then complete the order technically in CO02 - Functions ( Menu)--- Restrict Processing -
    Technically Complete. TECO for multiple Orders in mass basis with COHV.
    -Next Calculate Overheads using Tcode KGI2 (Individual Processing) or CO43 (Collective Processing)
    -Then Calculate WIP using Tcode KKAX (Individual Processing) or
    KKAO(Collective Processing).
    -After that Calculate Variance by Tcode KKS2(Individual Processing) or KKS1 (Collective Processing)
    -Finally do the settlement of Order with Tcode KO88 (Individual Processing) or CO88 (Collective Processing).
    After settlement order balance will be zero & then you can do the closing of order.
    in CO02 - Functions ( Menu)--- Restrict Processing -
    Close. Close for multiple Orders in mass basis with COHV.
    Hope this will help you.

  • Settlement of Production Orders

    Dear Sirs
    How can we see if the Production Order has been settled or not?
    Regards
    Samir

    Dear Samir
    You can use KKBC_HOE . If the order balance is zero, than it means that order has been settled. You can also try T Code KKS1.
    Thanks & Best Regards
    Sanil K Bhandari

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • Error - Settlement for Production order Co88

    Hello,
    Before Dec 2009 the FG material xxxxx has been goods movement post without maintained split valuation. Then Dec2009 the material xxxxx has been extended to split valuated.
    While process of production order settlement against said material through CO88, we are facing one error Valuation Type not set for material xxxx.
    What could be the reason that system is showing the error.
    Best Regards,
    Avijit

    Hi,
    If no valuation category has been assigned to a material (MBEW-BWTTY is
    blank), and you wish to assign multiple valuation categories (split    
    valuation) to this material, then the material must not have linked    
    documents and the stock must be zero for both the current and previous 
    periods.
    The reason of this restriction is that objects that are open and              
    refer to valuation data without split valuation can result in                 
    inconsistencies if the valuation category is changed.                         
    So If you want to subsequently change the valuation control for a material       
    to split valuation, you should previously check the following:                                                                               
    - No stock is available for the material                                      
    - All production orders must be closed                                        
    - No purchase order can still be opened                                                                               
    These checkings will avoid inconsistencies or undesired side-effects.    
    Consequentely you can not change a valuation category of a material    
    if there are purchase order item lines (even if the purchase order is  
    completed) or if a stock balance exists for that material.             
    For more information concerning limitations associated with changing the
    valuation category, you can see note 30656.  (Although this note is  
    used primarily regarding a change to the Unit of Measurement, the      
    functionality is very similar).                                        
    Please also check note 155874, which outlines what must be performed   
    in order to change the valuation category.                             
    Best regards,
    MLM

  • Production order on two company code

    I have two company code A110, plant p110 and A111, plant P111.
    My requirement: I want planned order in P110, production order in P111, goods receipt in P110, goods issue to plant P111.
    I setup material code 200201 for both plant, in plant A110, I use special production, receiving plant A111. besides this, what should be configured to meet with my requirement, thanks

    SivKumr,
    First, a technical question.  You mention A110 and A111 as company codes in the first statement, then you mention them as plants in the second statement.  Can you elaborate?
    Actually I don't know what you want from us, you haven't mentioned yet what your problem is.  Exactly what do you want to happen that currently does not happen?.   
    In your original statement you have described your desired solution, which I must say is...ah....odd.  How about also enlightening us with a statement of your business requirements?    I personally am at a loss to conceive of any business reasons why a company would wish to implement such a solution.
    You might also want to refer to SAP help, to see what special planning processes are available.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/41/32b8371a2c9912e10000009b38f889/frameset.htm
    Best regards,
    DB49

  • How to settle the production order variance to 3 GL account

    dear all
    i met a problem in the project ,the customer need see the production order variance category detail for (material,routine,overhead variance) in FI report ,so it need to settle the variance to at least 3 GL account
    i don't know how to configure it ,i try to use result analyse like wip ,but go failed
    do you have some suggestion
    thank you

    Hi ,
    Through Standard SAP .. the same it not possible . Standard SAP will post the differences to one GL account ..The variance amount is not segregated..
    The way out is to use report KKO0  .( Product Costing Drill Down Reports  )  in CO . There are many reports available .. and you can compute the difference in CO Reports and manually make an entry in FI by manually reversing the original variance account and posting it to cost component wise variance accounts ..
    To use the KKO0 report.. please perform the following tasks :-
    1. Assign cost component structure in transaction OKN0 ( Date Extraction/Product Drill Down) tab.
    2.  Product Group Type = Material group..
    3. Run KKRV after period end every month to collect the data for drill down reporting..
    Please revert back for any further clarifications
    Regards
    Sarada
    Sarada

  • Settlement rule production orders

    Hi All,
    I want any report through on can see the settlement rule maintained for production orders.?
    Regards,
    MHP

    Hi All,
    If anybody can share the standard SAP report for this please?
    Regards,
    MHP

  • How do we do production orders for same item code in different sizes

    Hi,
    We have Items which we buy as a single sheet of material and our customers can ask for us to cut the complete sheet into different sizes before despatching it. i.e
    Item Code Sheet1: Sheet size 100mm x 100mm
    Customer asks for sheet to be cut into 10 off 10mm x 10mm sheets, which we presently put on the sales order as a line note
    We then generate a production order for this item and indicate on the production order printout the line note
    We've recently had a customer who has asked for Item 1 in two different sizes on the same sales order ie
    Order Line 1 Sheet1 Qty:1 Line note: cut into 10mm x 10mm sheets
    Order Line 2 Sheet1 Qty:1 Line note: cut into 50mm x 50mm sheets
    When generating the Production order SAP combines the items into
    Product No: Sheet1
    Planned Qty: 2
    Where as we want it to create 2 production orders 1 of each different sizes items.
    I know I can create BOMs for those two sizes, but customers can ask for the sheets to be cut to whatever size they want. Is the best method to create BOMs on the fly for each different sizing option or are there alternative methods that are easier to manage ?
    Thanks
    Carl

    Hi Carl Rutter,
    You have to creat 2 special production order for this item. when issue the component make sure you issue the stock as per the cosumption becaue one have 10mmx10mm and the another item have 50x50 in this case you issue component by square inch wise. for example 10*10 = 100 squre inch.
    50*50 = 2500 square inch so the cost will be approtionate. you can Use multiple uom method to obtain this, other wise you have covert into stock then you issue the component. If you want traxk size wise ,you can use batch option for Finishe goods.
    Regards
    Sridharan

  • Settlement of Production Order

    Dear Gurus,
    I settled the the co-product through co8b it was settled, but when i go to settlement through ko88 it shows in coloum no change 5. it is not showing in the coloum settlement exectued. but in co03 that order has balance.
    can u pls. guide me who to go ahead
    this is very urgent because of month end process
    thanks & regards,
    Gopi.

    Hi
    Normally when you configure co-product, you have to define source structure, where you have to define what % you want to allocate to co-products for each category of cost (range of cost elements) incurred in the production order.
    According to what you are describing, you have missed to include the cost elements of that cost in column no 5.
    Assign points in a way to say thanks.
    Regards,
    Suraj

  • Settlement of Production order to multiple objects with settlement type PER

    Hi  All ,
    We have a production order in which settlement  profile says that , settlement to material is mandatory and settlement to cost center optional with u201C to be settled in full u201C
    Default object type is MAT . In indicators portion we have 100% validation , % settlement , Equivalance numbers , amount  settlement , variances to costing based COPA  -all are selected .
    In PP distribution rule , we have PP2  as default distribution rule   for the order type which means automatic generation of  settlement rule for  MTR 100% PER .
    In settlement rule of the production order , We have Settlement to material PER 50 % & Settlement to Cost center 50% PER . Automatically generated settlement rule has been modified  as above  as per the requirement .
    Although total % as per above is 100% ( Sum total of settlement to Material & Cost center ) , we are getting the error as
    Settlement type PER: Total percentage in distribution rules <> 100%
    Message no. KD562
    Diagnosis
    The distribution rule percentage total is 80,00 for settelement type PER.
    ·     Settlement type FUL:
    The total of the distribution rule percentages must always be 100%.
    Example:
    1. Receiver cost center  4711   20%
    2. Receiver cost center  4712   80%
                               Total 100%
    ·     Settlement type PER
    You can use the settlement profile to stipulate whether the periodic settlement settles 100% of the costs, or whether less is allowed.
    We can not change the  settings of settlement profile for 100% validation &  to be  settled in full  for business constrains .
    Any idea , for the reason of the error , since the sum total % for settlement is 100% and possible solution ?
    Thanks is advance for help
    Regards ,
    Arnob

    Hi,
    As per SAP help only the following fixed characteristics can be used for target fields.
    Customer number (CO-PA KNDNR)
    Product number (CO-PA ARTNR)
    Business area (CO-PA GSBER)
    Profit center (CO-PA PRCTR)
    Sales organization (CO-PA VKORG)
    Distribution channel (CO-PA VTWEG)
    Division (CO-PA SPART)
    Plant (CO-PA WERKS)
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    Even when i created a table look up with AUFK, in the target field i am not able to see COPA-KAUFN in the drop down.
    Regards
    Raghu

Maybe you are looking for

  • How do I save a ringtone on my 680 that I Bluetoothed to it?

    I Bluetoothed a ringtone from a friend's phone, but it saved it in P-tunes and I can't figure out how to make it available as a ringtone on my 680.  Can someone tell me how to do this?  Thanks in advance for your help! Post relates to: Treo 680 (AT&T

  • Need help with creating B*Tree XMLIndex on a structured object-relational xmltype column

    The following is my schema: CREATE TABLE TST_AUDIT_TBL    NOTE                  VARCHAR2(25 CHAR)     null,    CHANGE_HISTORY        XMLTYPE               not null,    CHANGE_HISTORY_EXT    XMLTYPE               null XMLTYPE COLUMN CHANGE_HISTORY STO

  • Registering Extended warranty for my IdeaCentre K450

    Hello all,  At a loss here to be honest, I purchased an IdeaCentre K450 Desktop and along with it for piece of mind payed for the 2 year accidental damage warranty, called - 2YR Mail-in/CCR + Accidental Damage Protection. The computer arrived perfect

  • Captions w/Transparent Background Don't Show when Published

    HELP! I've put together two captivates that on some slides contain text on which I chose transparent background. They are not showing up at all! I'm working in v3. Has anyone else come across this?

  • Gmail does not work through Air Port / Time Capsule

    I have narrowed down my problem with sending and receiving email to the Time Capsule base station. If I select the crappy Linksys router/wifi access point that is closest to my cable modem I am able to send and receive mail to both Gmail and my own h