SFC partial qty split after logging NC through PAPI

Hi experts,
I am trying to split SFC with partial quantity after logging NC using PAPI. Through POD I have done the same using
ALLOW_PARTIAL-- YES,AUTO_SPLIT-- ALWAYS activity rules, when i try to achieve it through PAPI NCProductionServiceWS, I facing the following issues,
when I use createNC method , I am able to log NC but sfc qty is not splitting and ther is no new SFC with split qty.
when I use disposition method , there is a field called 'ncs' which is mandatory, not sure what to pass here.
so, my requirement is simple..when operator logs NC with some defect count, that much qty should be split from SFC and create new SFC.
Please suggest me that I am using right method and PAPI or not.
Thanks , Eswar

Hi!
I've tried your scenario. In my system, "Log NC" button in NC Selection plugin gets activated each time when NC Data Entry plugin is closed and I select a row in Available NC Codes column of NC Selection plugin.
If NC Data Entry plugin is open, the button is grayed out always.
Regards,
Sergiy

Similar Messages

  • During Inprocess Inspection partial qty confirmation

    Hi Experts,
    There is a requirement in Inprocess Inspection (for 03) find here the detail.
    Ex: Routing Operations
          010       Machining
          020       Milling
          030       Inspection
          040       Turning
          050       Inspection
          060       End Cut
    Challenges :
    1) Without confirmation of operation 020 system should not allow for result recording.
    2) If partial qty accepted system should allow on those qty for further operation 040 confirmation.
    3) How many operations inspected, accepted qty operation wise, can we get through std
    Kindly suggest
    Thanks
    Shiva Patil

    Go here:
    SPRO > Production> Shop floor control> confirmation> define confirmation parameters
    Maintain
    1)Operation sequence u2013 error when order sequence is not adhered to
    2) Over delivery u2013 Error when over delivery tolerance is exceeded
    3) Results Rec. (QM)- Error message if no Insp results exist
    So what these setting helps is that
    1)All operation has to be confirmed operation wise means 0010 has to be confirmed for confirming 0020 operation. SO production guys can only confirm 0040 operations only after 0030 operations is confirmed by quality personal.
    2)Over delivery is not allowed means of in 0030 operation if only 50 quantity is confirmed in 0040 operation only 50 can be confirmed. Production people cannot confirm more than 50 quantities
    3) Also PP personal cannot confirm operation 0030 through C011N till the result recording of that operation is done through QA32.
    Hope this helps to start.
    Thanks!!!

  • Outsource partial qty of the oepration at production order

    Hi, there,
    I am currently working on a mechanical industry project. The customer may outsource partial  quantity of an operation due to capacity limit. That means one operation will be splitted into in-house production and external processing. I try to keep this process in the same production order due to production management concern. However, since oepration qty can't be changed, user will post a final confirmation to original operation to close the in-house production operation. And user will insert an external processing operation right after the original operation. My original idea is to convert the partial qty of PR generated by production order into purhcase order and then close the rest of PR. But I found out it's impossible to do anything on PR Qty except of blocking it. Does anyone ever
    have experience on this kind of requirement? Any input is welcome.Thanks in advance.
    Regards,
    Nancy

    Hi,
    1. For your order type PP01in opl8 tcode  in the controlling tab page set the cost collector indicator and default rule as Periodic settlement PP2.
    2.create info record for vendor.
    3.create product collector.(KKF6N)
    4. create production order and release .
    5.Goto operation  overview.select the operation for which you are going to outsource.
    6.choose function and split order and enter the outsource qty.
    7. Enter the order type and execute.
    8. Now your production order will be two .
    9.  Now choose the second order and goto operation oveview and select the operation and change the control key as PP02 and enter the purchasing details in the External operation view and release the operation and save.
    10.Now in the same tab PR will be created and convert it to PO and the external processing of operation begins and process
    is as usual.
    Regards,
    nandha

  • I am having trouble viewing iStore. It appears as if its a Flash issue, as several minutes after logging in to iStore I get a non-flash page of iStore in my iTunes window. I have re-installed everything and tried opening all ports in router....any ideas?

    I am having trouble viewing iStore. It appears as if its a Flash issue, as several minutes after logging in to iStore I get a non-flash page of iStore in my iTunes window. I have re-installed everything and tried opening all ports in router, and used msconfig to bring up each service individually to see if there is an effect.Flash and iTunes have been re-installed  ...any ideas?

    I agree. I don't rely on iCloud as a backup, that is what I have my portable hard drive for. Its 500 GB so I can hold my entire iTunes library several times over on it. I have all my movies on my hard drive, but somehow "The Mist" got deleted off of my hard drive, so I figured "Well, the option to redownload an already purchased movie is available through iCloud, I'll just do that!"
    And permissions and download availability have nothing to do with it, the movie's still there, it still allows me to redownload it. The only problem is when I click download, I get that message.
    And nobody else uses my computer, but I do have multiple accounts authorized on it. Even still though, I am attepmpting to download it through the account I purchased it under. :/

  • Partial qty MIRO and GR for import PO

    Hi,
      For import PO first we are creating PO for vendor and we enter only qty and 0%  tax for import PO  after getting material as per schedule qty we are creating new PO for the recieved qty only and we are adding all the custom condition as delivery cost in second PO then we process further like MIRO  and GR ,  but to avoid this we are trying to make only one PO on import vendor and adding all the custom codnition in that PO in development server and we process the MIRO, J1IEX, and GR process for partial qty for one material and for one material we have taken ful qty. first time it works OK  ,  now when second time we want to do MIRO , J1IEX and GR againt same PO we are facing probelm like In MIRO when we enter PO number it is showing some amount in Balance amount filed which is generally 0 ,  in MIRO it is also showing the some material for which no open qty and also for partial qty if we enter qty more than open po qty system is not giveing any error,
    Can you some stpes and tips  what configurationwe need,  actual requirement is we want that we will create import PO o etime by adding all the custom condition as delivery cost and ref. to that material we want to do MIRO, J1IEX and GR  for partial qty.
    regards,
      zafar

    Hi,
      I have two points,
    While after  recieving import material first we do the miro for custom condition in this we enter the custom vendor code in the invoicing party, and below next to PO number field we generally select option no. 3 i.e Goods / service item + planned delivery cost with this all conditions come in the miro but our requirement is only those codnition should come in which invocing party is which we have enter in the header fied of MIRO ,
      so insted of 3 option Goods / service item + planned delivery cost ,  if we select option 2 Planned delivery cost our problem get solve so i want to know what is the effect if insted of 3 option we select option 2.
    regards,
      zafar

  • HT1918 When I try to download a free app after log in the iTunes gets cut off with a msg update security question where do I do this?? I can't download anything

    When I try to download a free app after log in the iTunes gets cut off with a msg update security question where do I do this?? I can't download anything

    If you have a credit card on file on top of your gift card then it is asking you to confirm the security code for the card, which for a Visa or MasterCard is 3 digits located on the back, or AMEX has 4 digits on the front.  This happens just to ensure that you are the account holder, and would happen from time to time whether it was a free or paid app, even if you have a credit through your gift card.  This doesn't mean that your credit card will be charged.

  • How to perform Data Collection on single SFC with QTY = 1 with material lot size 1?

    Dear experts,
    We are working with SFC qty>1 on a relaxed routing. At a given operation we want to collect the data on single quantity; i.e. SFC qty on that operation, where the collection will happen, will be 1.The corresponding material lot size is for ex 10. The operator must be able to collect data on SFC with qty=1 multiple times until the quantities will be consumed. He must be also able to collect other values on the remaining quantities on the same operation with the same DC group or other DC groups. How many times the data must be collected is dependent on the shop order build quantity. The data may be collected several time but not more than the build qty. In other words some specific data will be collected on a qty of a product while others will be collected against remaining quantity. The data collection must be also done in a serialized manner.
    Here's what we have set up so far:
    1) 3 DC groups, each DC group has 3 data fields.
    2) Each data field has the following restrictions:  Required Data Entries = 0 and Optional Data Entries = 1
    3) All DC groups are attached on the same combination of operation\material\routing
    4) we are using relaxed routing
    Process description:
    The operator must be able to collect any data field on single product. For that he will enter the operation where the data collect are attached, he will enter the SFC with qty=1 then he will run the data collection after selecting the appropriate DC Group and entering the needed information. The operator will complete the SFC with qty=1.
    The operator will pick the next product, select the same SFC and enter qty 1 and collect other value against this product.
    Problem is:
    Once the first collection is done on a given SFC with entered qty=1, the system is not allowing the operator to do further collects on the same SFC with qty=1 or any other quantity. He cannot select any DC group from the DC group list. We tried also with the table selection menu on the DC Group list but nothing can be selected.
    So we tried to play around with the DC group definitions as follows:
    A) we set Required Data Entries = 0 and Optional Data Entries = 10. Still the operator was not able to select any DC group after collecting data the first time. We tried to reopen the pod and list again. But we get the same blocking behavior.
    B) we set Required Data Entries = 10 and Optional Data Entries = 1. The operator was able to select the DC group after collecting data the first time. BUT operator must enter the data fields 10 times on one SFC quantity, which is not what we want. Besides again he cannot collect other information on remaining quantities on the same operation.
    C) There's an option to serialize the SFC before reaching the operation where the collection is happening, then merging ofter complete. Automation is needed here; hence customization. We are highly avoiding customization now, since we expect the data collect to work well on single quantities even when the main SFC has qty>1
    Questions:
    1) Are we missing any kind of further configuration\setup?
    2) Or the current system design does not allow collecting data on single quantities of an SFC which main quantity is greater than 1?
    3) Looking at this link Approaches to Collection of Data - SAP Manufacturing Execution (SAP ME) - SAP Library, there's nothing mentioned about same SFC number with multiple quantities!!!
    We are using SAP ME 15.0.3.0.
    Thanks in advance for your help
    Ali

    Ali
    to collect data for the same SFC multiple times, your system rule "Allow Multiple Data Collection" needs to be set to true for the site.
    Stuart

  • Qual Insp:Perform partial qty REJECT in QA12 for Material GR inspection lot

    Dear All,
    Please advice me for a scenarion.
    I perform MIGO-GR - MType 103 for 5 qty, material moves to GR Blkd Stk.
    Then perform MIGO-RelBlkSTk - MType 105 for 5 qty, the material moves from GRBlkStk to QualtInspStk.
    The perform QA32 for the insp lot , and ACCEPT the 5 qty to UnrestStk.
    This acceptence movement calculates the Vendor Evaluation Quality criteria also.
    I can also REJECT the above inspection lot by QA12 : Change Usage Decision, this rejects the full 5 qty, and this also has impact in vendor evaluation quality criteria rating. Then Return to the Vendor the 5 qty.
    My query is:
    Now if i want to return PARTIAL qty to the vendor ALONG WITH VENDOR RATING RETURN CALCULATION.
    I am unable to enter partial qty in the QA12, in the 'Inspection Lot tab' in the 'To Be Posted' column.
    The whole column is non-editable, is it standard by default as non-editable?
    Am i performing the right steps for my requirement?
    Thanks in advance,
    Joy Ghosh

    Hi
    In QA12, after entering appropriate Usage decision, click on "defective quantity" tab at header, and there enter the quantity.
    Umakanth R

  • Problem logging in through GUI - lack of ttys... need help

    hi all....
    I had logged in to my Arch linux install, and was trying to make X work in my gentoo install by chrooting to it.
    I had followed this guide, but I made an error when editing this command to suit my need.
    slackbox # echo "c7:1235:respawn:/usr/bin/chroot /mnt/chroot "\
               "/sbin/agetty 38400 tty8" >>/etc/inittab
    I did not create a mnt/chroot as advised in the guide, as I already had gentoo installed and had a mnt/gentoo dir.
    So I edited the command to put /usr/bin/gentoo and /mnt/gentoo. But I never could get gentoo to start X from the chrooted envt and I gave up on it.
    Now - I am not able to log in through Entrance (log in manager of E17.) but I can start X from console. There are  error messages at the end of boot that fly past too fast for me to be able to read them. But they go something like
    cannot stat /usr/bin/gentoo (about 7 lines of the same) and then some message about respawning... I am not able to get to the actual error messages through the logs as well.
    So it looks like I need a way to reverse whatever that command did, and as a noob who got his foot stuck in his mouth by goofing around too much, I would appreciate some help.

    Thanks for the reply u_no_hu. I looked in /etc/inittab, and sure enought the line was there at the end of the file.
    I deleted it, like you suggested. And did an init q.
    However it did not help, and the problem still persists.
    here is my inittab, as it stands now, after deleting the line.
    # /etc/inittab
    #  Runlevels:
    #    0    Halt
    #    1(S)       Single-user
    #    2    Not used
    #    3    Multi-user
    #    4    Not used
    #    5    X11
    #    6    Reboot
    ## Only one of the following two lines can be uncommented!
    # Boot to console
    id:3:initdefault:
    # Boot to X11
    #id:5:initdefault:
    rc::sysinit:/etc/rc.sysinit
    rs:S1:wait:/etc/rc.single
    rm:2345:wait:/etc/rc.multi
    rh:06:wait:/etc/rc.shutdown
    su:S:wait:/sbin/sulogin -p
    # -8 options fixes umlauts problem on login
    c1:2345:respawn:/sbin/agetty -8 38400 vc/1 linux
    c2:2345:respawn:/sbin/agetty -8 38400 vc/2 linux
    c3:2345:respawn:/sbin/agetty -8 38400 vc/3 linux
    c4:2345:respawn:/sbin/agetty -8 38400 vc/4 linux
    c5:2345:respawn:/sbin/agetty -8 38400 vc/5 linux
    c6:2345:respawn:/sbin/agetty -8 38400 vc/6 linux
    ca::ctrlaltdel:/sbin/shutdown -t3 -r now
    # Example lines for starting a login manager
    x:5:respawn:/usr/bin/xdm -nodaemon
    #x:5:respawn:/usr/sbin/gdm -nodaemon
    #x:5:respawn:/usr/bin/kdm -nodaemon
    #x:5:respawn:/usr/bin/slim >& /dev/null
    #End of File
    Last edited by jaydoc (2009-03-15 15:58:08)

  • Service PO, partial qty not able to reverse in service entry sheet

    Hi,
    I am facing problem in service Purchase. In standard there is no option to reverse partial qty after creating a service entry sheet. We can reverse the entire quantity only.
    I have a scenario as below
    PO qty - 10
    Service entery sheet - 10
    MIRO - 9
    Payment is already done to the Vendor.
    we canu2019t reverse the MIRO entry. Here differential amount for 1 Qty will reflect in GR-IR Account.
    Can anyone pls suggest any other way where we can reverse the entry for differential qty. Or in such scenarios what could be done.
    Regards,
    Radha

    Hi Radha,
    Please find the below link on GR/IR GR/IR Clearing Account Maintenance.
    http://help.sap.com/saphelp_47x200/helpdata/en/30/1060387db94003e10000009b38f8cf/frameset.htm
    Hope this will help is resolving your issue.
    Regards
    Sindo

  • Order related billing for Partial Qty item in sales order

    Hi SD Gurus,
    In case of delivery-related billing we can create a bill for partial qty or item by creating delivery(against order) for partial qty/item. Is it possible to create order-related bill for the partial qty or item ?
    Any suggestion on the subject is appreciated.
    Thanks in advance,
    Velmurugan

    HI Velmurugan,
    This can be solved through by doing an order related billing,
    First check weather copy control setting is there for order to billing.
    In item category check for billing relevance. Make it has order related billing.
    Now do order related billing for partial quantity.
    Regards,
    Nagesh

  • Allow log on through Remote Desktop Services Group Policy for Domain Controllers

    Hello,
    We want to allow our Helpdesk Operators to be able to connect to Domain Controllers with the Remote Desktop Services. This is by default not allowed but according to many sites, it should be able to configure by using a Group Policy.
    We made a new Group Policy with the setting 'Allow log on through Remote Desktop Services' and 'Allow log on locally' (as an extra for testing) and applied Security Filtering to only use it for a specific Security Group. Our test user is a member of this
    security group and should be able to access the Domain Controllers now. However this isn't working.
    The error message we receive upon trying to connect:
    The connection was denied because the user account is not authorized for remote login.
    For troubleshooting, we also applied the Security Group for that setting in the Default Domain Controllers Policy but that doesn't seem to work either. We want to avoid customization on our Default Domain Controllers Policy but this was just a test case
    for solving our problem.
    What should we do to solve our problem?
    I hope to hear from you soon.
    Thanks in advance.

    Hi, I just found out what the problem was. This site helped me alot:
    http://blogs.technet.com/b/askperf/archive/2011/09/09/allow-logon-through-terminal-services-group-policy-and-remote-desktop-users-group.aspx
    In my case, I had the group added to the Allow Logon Through Remote Desktop Services but was not added to the Builtin\Remote Desktop Users group. After knowing this I made some changes to our situation and are now using the builtin\Remote Desktop Users group
    rather than a new self made Security Group. I also added the Remote Desktop Users to the Allow Logon Through Remote Desktop Service in the Default Domain Controllers Policy as this is not done by default. By default only the Domain Administrators are able
    to logon through remote desktop services.
    You do not need the 'Log on Locally' permission within the Group Policies.
    In short:
    Add the desired users/groups to the 'Builtin\Remote Desktop Users' security group.
    Add the 'Builtin\Remote Desktop Users' security group to the 'Allow Logon Through Remote Desktop Services' within the 'Default Domain Controllers Policy'.
    Thank you anyway for the fast reply.
    Have a nice day!

  • Hold Data after logging off

    How do I Hold Data after logging off and back on again.
    The data that I hold works fine when originally set in the user profile but once the user logs off and back on again the data resets
    any quick fix's that anybody knows about?
    This data will be entered on a service order if this makes any difference,
    Thanks
    Liam

    Hi liam,
    while logging off u r system , the system will ask  like if u want save unsaved data or not,
    that time u go through with YES.
    i feel that is only option to save unsaved data .
    Bestregards ,
    bhaskar

  • Some apps revert to english when logged-in through qingy

    Hi,
    I have all the programs I normally use configured in spanish. Yesterday I started testing some login managers to replace kdm, which is the one I've been using so far. I found qingy and after some checks I think I will continue using it. But if I use it instead of kdm, some apps (firefox, claws-mail, oppenoffice, thunar...) start in english. It seems that only the gtk apps have this strange bahaviour, because konqueror or amsn still appear in spanish.
    This happens only if I use the openbox menu, if I start an xterm terminal and launch the apps from the command line, they appear in spanish.
    Also, I don't know if this is the cause of the problem, I have one defunct X process:
    ps -A
    PID TTY TIME CMD
    1 ? 00:00:00 init
    2 ? 00:00:00 kthreadd
    3 ? 00:00:00 migration/0
    4 ? 00:00:00 ksoftirqd/0
    5 ? 00:00:00 watchdog/0
    6 ? 00:00:00 events/0
    7 ? 00:00:00 khelper
    8 ? 00:00:00 kblockd/0
    9 ? 00:00:00 kacpid
    10 ? 00:00:00 kacpi_notify
    11 ? 00:00:00 kseriod
    12 ? 00:00:00 pdflush
    13 ? 00:00:00 pdflush
    14 ? 00:00:00 kswapd0
    15 ? 00:00:00 aio/0
    894 ? 00:00:00 kjournald
    957 ? 00:00:00 udevd
    1064 ? 00:00:00 ipw2200/0
    1073 ? 00:00:00 kmmcd
    1587 ? 00:00:00 ksuspend_usbd
    1591 ? 00:00:00 khubd
    1923 ? 00:00:00 pccardd
    1944 ? 00:00:00 kpsmoused
    2823 ? 00:00:00 kjournald
    3764 ? 00:00:00 syslog-ng
    3775 ? 00:00:00 crond
    3792 ? 00:00:00 acpid
    3856 ? 00:00:00 wpa_supplicant
    3865 ? 00:00:00 smartd
    3885 ? 00:00:00 dbus-daemon
    3895 ? 00:00:00 hald
    3896 ? 00:00:00 hald-runner
    3923 ? 00:00:00 hald-addon-inpu
    3932 ? 00:00:00 hald-addon-cpuf
    3933 ? 00:00:00 hald-addon-acpi
    3938 ? 00:00:00 hald-addon-stor
    3943 ? 00:00:00 hddtemp
    3953 ? 00:00:00 ntpd
    3955 ? 00:00:00 ntpd
    3956 ? 00:00:00 qingy
    3961 tty2 00:00:00 qingy
    3962 tty3 00:00:00 qingy
    3963 tty4 00:00:00 qingy
    3964 tty5 00:00:00 qingy
    3965 tty6 00:00:00 agetty
    4156 ? 00:00:00 xinit
    4158 tty1 00:01:18 X
    4213 tty1 00:00:00 X <defunct>
    4216 ? 00:00:00 sh
    4217 ? 00:00:01 openbox
    4226 ? 00:00:09 conky
    4230 ? 00:00:00 skim
    4232 ? 00:00:00 xterm
    4233 pts/0 00:00:00 bash
    4264 ? 00:00:00 dbus-launch
    4265 ? 00:00:00 dbus-daemon
    4275 ? 00:00:00 kdeinit
    4278 ? 00:00:00 dcopserver
    4280 ? 00:00:00 klauncher
    4282 ? 00:00:00 kded
    4286 ? 00:00:00 scim-helper-man
    4290 ? 00:00:00 scim-launcher
    4292 ? 00:00:00 scim-launcher
    4300 ? 00:00:00 kio_file
    4305 ? 00:00:00 firefox
    4309 ? 00:00:00 run-mozilla.sh
    4314 ? 00:00:46 firefox-bin
    4318 ? 00:00:00 gconfd-2
    4338 ? 00:00:00 thunar
    4391 ? 00:00:01 claws-mail
    4400 pts/0 00:00:00 ps
    And finally, skim doesn't work when logged-in through qingy, I can´t launch it anymore with Ctrl+space, even is the process is running.
    I'd like to keep qingy, but if I can't solve this little mess I will go back to kdm.

    If you are not physically in the US, you can't access the US App Store.

  • Preventing the User from going back to the main page after logging out.

    Hi all,
    In my project I want to prevent the User from going back to the Main page, by clicking the back button of the browser, after the user has loggged out.I had invalidated the session so the user will not be able to do any operations, but he can vew the infos. I want to redirect to the login page if the user tries to go back using the back button after he has logged out.
    I tried the same in this forum after loging out. Surprisingly it is the same. I can browse through all the operations i did even after logging out from here.
    Is it not possible to do that in Servlets?Could somebody help?
    Thanks,
    Zach.

    Hi,
    You can use a servlet filter to do this , as it can interceptany request to your application you can decide to allow user access or not to any page/servlet.
    public class Test implements Filter{
         public void destroy() {
         public void doFilter(ServletRequest arg0, ServletResponse arg1, FilterChain arg2) throws IOException,
                   ServletException {
              System.out.println("filter");
              HttpServletRequest request = (HttpServletRequest) arg0;
              if(!request.getRequestURI().contains("index")){ // set condition that will be checked to verify if the user is logged in
                   System.out.println("redirecting ... ");
                   RequestDispatcher d = arg0.getRequestDispatcher("/index.jsp");
                   d.forward(arg0, arg1);
              arg2.doFilter(arg0, arg1);
         public void init(FilterConfig arg0) throws ServletException {
    }in you web.xml add :
    <filter>
              <filter-name>test</filter-name>
              <filter-class>test.Test</filter-class>
         </filter>
         <filter-mapping>
              <filter-name>test</filter-name>
              <url-pattern>/*</url-pattern>
         </filter-mapping>

Maybe you are looking for

  • How do I change multiple list items at once in a SharePoint list with ribbon button

    Hi I have a sharepoint list and a ribbon button that open a dialog box with buttons to set color on a row The problem is that i can only selecet one item at once to set the color.  How can i do so it could set all or a couple items att once to the co

  • Acrobat 9 Mac Print dialog freezes

    I haven't been able to print from Acrobat 9 Pro for Mac for about many months. I can open the Print dialog box and change settings, but as soon as I click the Print button, Acrobat freezes and I have to force quit. (More accurately, the Print dialog

  • Bind parse errors

    Oracle 11.2.0.1. Background: doing "multi-threading" using DBMS_PARALLEL_EXECUTE, which uses the bind variables +:start_id+ and +:end_id+ when executing a "thread". The Problem: Oracle chokes on parsing a bind variable used in a FOR loop. Example: //

  • How can I tell what version of SharePoint Designer 2010 I have?

    I know there have been at least 2 service packs for SharePoint Designer. I know what version I have - 14.0.7128.5000 How can I tell whether the service packs have been applied or not? Thank you.

  • Modify a group of contacts or quick change address

    Hi, Would anyone know a good program or tip on how I can modify a group of peoples work address or home address instead of individually change one at a time. Also, If I have a contact with key address details and phone numbers and another contact has