Shift scheduling in SNP Run

We are trying to use APO for Shop Floor Planning.
I want to know, can SAP - APO (Optimizer Run) give shiftwise planning instead of day bucket ? i.e. instead of daily requirement, 3 shifts requirement saperately ?
Thanks in advance.
Rajan

Hi Rajan,
SNP is bucketed planning and the most granular bucket is a DAY.
So in SNP you cannot do shiftwise planning. You need to use PPDS for shiftwise planning.
Thanks,
Somnath

Similar Messages

  • Scheduling Lines from SNP Run

    Hi,
    R3 by MRP Run system automatically cretes Scheduling Lines (Procurement)
    Same thing is possibles in APO also after SNP run?
    Sorry, I dont know about APO.
    But my client is having APO and R3.
    Thanks
    Prasad

    Dear Prasad
                         SNP run also generates Schedule lines required the followin is mapped
    1. PIR is Ciffed to APO
    2. Scheduling Agreement is Ciffed to APO.
    IN Case of Sub contracting Schedule lines
    1. PIR should carry the production version
    2. Sub contracting PPM should be ciffed to APO
    3. Scheduling agreement should be ciffed to APO
    -Regards
    Virender S Thakur

  • Scheduling in MRP Run MD02

    dear all,
    i still confuse for using scheduling in MRP run MD02,
    what is the use of using both scheduling type "1" and type "2"?
    because if i run the MRP using scheduling type 2,  after i generate the planned order, then i can see the capacity planning evaluation,
    but not if i run scheduling type 1
    if i run the scheduling type 1, how can i analyze the capacity planning?
    until now, i always run the scheduling type 2, because i think it is more useful to run scheduling type 2,
    so what is the plus and the minus using scheduling type 1 or type 2?
    best regards,
    MARUFAT

    Hi,
    In simple words:
    The main difference between scheduling type 1 (Basic date scheduling) & Scheduling type 2 (Lead time scheduling & Capacity requirements) is from which records MRP reads the values.
    Basic dates is more like a rough scheduling where the values are read from the material master & the exact operation times are not considered or capacity requirements generated.
    Lead time scheduling is more precise meaning for each in-house produced material it reads the routing & checks the time maintained for each operation, it then calculates the exact times for each operation based on the working days, shift timings, breaks & also generates capacity requirements.
    Now what is the criteria to select... it depends on the business requirement. But the data maintenance for Scheduling type 2 is higher as compared to Scheduling type 1.
    What is the benefit for going for Scheduling type 2.... well it gives you a clear picture on your production planning process & how much capacity is required, whether you have the requisite capacity etc etc.
    Basic date scheduling is preferred when you do not want such fine control on your production planning process.
    For more info refer to SAP help, it should make it more clear.
    Regards,
    Vivek

  • Best Practises for doing Master Scheduling using SNP

    Hello Gurus ,
                         Can you please suggest the best practises for doing Master Scheduling using SNP . Which engine to use , what would that mean etc
    Regards,
    Nick

    APC Back-UPS XS 1300.  $169.99 at Best Buy.
    Our power outages here are usually only a few seconds; this should give my server about 20 or 25 minutes run-time.
    I'm setting up the PowerChute software now to shut down the computer when 5 minutes of power is left.  The load with the monitor sleeping is 171 watts.
    This has surge protection and other nice features as well.
    -Noel

  • 24/7/365 shift schedule assignment in Outlook 2010

    I would like to show a shift schedule (day, afternoon, midnight turn) in outlook. I have the schedule in Word tables and would like to find a way to import that instead of entering all the data from scratch. The employees work a 7 day shift that rotates.
    7 straight days on both mid and afternoon shifts. Days off occur on day turn. Any ideas?

    There doesn't seem to be a buildin feature to import the shift from Word tables.
    There should be a way to import from Excel though:
    https://www.youtube.com/watch?v=_DrODDy_cXg

  • Scheduling Broadcaster to run on specific times

    Hi all,
    I'm trying to create a job that will send a report via broadcaster on every working day (Sun - Thu)
    I've created a job with transaction sm36 as described on the help and scheduled it to run on daily basis.
    Restricted by colander to run only on working days.
    I can see the job on sm37.
    My problem is that when I try to schedule a job via the portal,
    I don't see my new scheduled option.
    Any ideas?
    Do I need to restart the portal? BW?
    Thanks
    Shlomi

    PPBM: Premiere Pro Bench Mark http://www.ppbm4.com
    $ 1300 for a notebook for editing is not much, in fact it is cheap. Have a look here: http://forums.adobe.com/thread/438156?tstart=120
    As always, you get what you pay for. Often you hear: "If you pay peanuts, you get monkeys. If you pay money to monkeys, you get rich monkeys."

  • How do i set the scheduler schedule property to run at 6am & 9pm daily?

    How do i set the scheduler's schedule property to run at 6am & 9pm daily?
    Do I have to use a PeriodicSchedule ?
    Edited by: DivyaR on May 19, 2013 11:10 PM

    Use the Calendar schedule. set the schedule property as following in your scheduler
    schedule=calendar * * * * 6,21 0
    The value of 6,21 specifies that its going to run once at 6AM and other time at 9PM everyday.
    Thanks

  • Jobs Scheduled But Never Run or EM jobs remain in 'running' status

    Hi All,
    Please I need help on this: I have job scheduled through Oracle Enterprise Manager (OEM) but each time our Windows server is shutdown for patches update the job I scheduled failed and in the status column it shows that the job is still running ( Note: I do know how to stop/delete this job) BUT I will like to know if there's anything I need to do so that each time our server is shutdown the scheduled job will not fail to run.
    Thanks
    Wale

    Jobs Scheduled But Never Run or EM jobs remain in 'running' status what is the output of user_jobs and user_jobs_running views when this happens? especially last_date, last_sec, failures, broken columns.

  • Background job RDDIMPDP is not scheduled. Please run report RDDNEWPP.

    Dear Guru's,
                     I am having a problem during transportation. i am not able to transport to quality system.And the tp system logs shows following error messages:-
    WARNING: System GNQ. Warning.        20071105123442 :
    ERROR:       Background job RDDIMPDP is not scheduled. Please run report RDDNEWPP.
    ERROR:       I'm waiting 100 sec (Count: 1).
    WARNING:       (This warning is harmless if no further warnings follow.)
    Please help.
    Regards
    Akif

    Re: Importing trans request failed
    Re: Transports Erroring
    Re: What is RDDIMPDP .....
    have a look it may help you
    Message was edited by:
            Vinod Udapudi
    Message was edited by:
            Vinod Udapudi

  • Can anyone show me how to create a scheduled app to run

    hi
    i have a application that needs to be run at certain time daily. i was wondering if anyone here can show me how to do that? thanks

    thanks, i have never used either to run java app. however i had used window's schedule task to run other window programs before. is there any sample to use both to run java prgram? thanks

  • Scheduled Tasks wont run

    I had recently upgarded to CF8 from CF7.
    After the upgrade non of my Scheduled Tasks are running.
    Even when i trigger the tasks manually from CFAdmin I get the response "This scheduled task was completed successfully."
    But nothing really runs. My application is using Integrated Windows Authentication and the schedulled tasks were running fine with CF7.
    Now when i switch off the Windows authentication, the scheduled tasks are working fine.
    Could you please tell me why my Scheduled Tasks are not running when i turn on Windows authenticaton, where as it was working perfectly with CF7.

    ColdFusion schedule tasks CAN NOT run under windows integrated authentication.  ColdFusion is not a windows product, it does not pass the NTML headers with requests.  You have to turn off windows integrated authentication for any resource you would like to run as a schedule task.  Helpfully, you can set that permssion to individual files and|or folders so you do not need to turn it off for the entire site.
    I don't know why this would change after an upgrade, unless you built a new CF8 server with a newly built IIS as well.

  • Scheduled Backups Stopped Running

    I have two Hyper-V 2012 Servers on which I have scheduled a number of backup jobs using the SCHTASKS command. The backups have been running fine since I created the tasks on 2/26/2014 until last night. On one of the servers the backup was supposed to run
    at 6:00pm last night and on the other one it should have run at 7:00pm. On both of them the backup task was apparently not triggered, when I view the event logs for the task manager there is no entry there at all for those times.
    On the server where the backup was supposed to run at 6:00 last night I brought up the task manager and see this for the job.
    Name: WeeklyBackupMonday
    Status: Ready
    Triggers: at 6:00 pm every Monday of every week starting 2/26/2014
    Next Run Time: 3/17/2014 at 6:00pm
    Last Run Time: 3/3/2014 at 6:00pm
    Result: The last job finished successfully.
    Clearly the job that was supposed to run on the 10th did not run, the same thing is happening on both servers. The other server has a backup job that is supposed to run on Sunday and it also did not run. The history shows that prior to Sunday the jobs were
    running normally.
    I find it very strange that both servers started exhibiting the same issue simultaneously and am having a difficult time knowing how to troubleshoot the issue as I can not find anything in the logs regarding why it may have failed. Can any one point me in
    the right direction for troubleshooting this issue?
    Thanks in advance.

    Hi,
    Please post the SCHTASKS command to help us troubleshoot the issue. In the meantime, please refer to the thread below to see if the issue is related to Task Scheduler Service Quotas:
    Scheduled Backup not Running
    http://social.technet.microsoft.com/Forums/en-US/ea368220-a058-421b-bbf0-a02c9fa86a92/scheduled-backup-not-running?forum=windowsbackup
    Regards,
    Mandy
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • Regarding shift schedule

    Hi all experts.
    I hv a querry regarding the shift schedule.. i hv various shift schedule.like shift A- 6am-2pm, shift B- 2pm-10pm, shift C - 10pm-6am, shift D- 8am-5pm etc.. now i want a new shift schedule for e.g. shift E- shift Ashift B, *shift F- shift A shift C*.. can this be possible? if yes, kindly guide me how it will be done.
    Thanx n Regards,
    S.Kumar

    Yes it is possible. You can add these additional shifts in the DWS and assign it to the existing personnel subarea groupings fpr Work schedule and DWS or may be the different grouping as per the requirement.
    Then create PWS using the new shifts in the table V_T551A, assign public holiday calendar and generate work schedule rules in the table V_T508A.
    Can u be a bit more clear on your requirement so that the personnel subarea groupings can be decided?

  • Deployment with "Refer to last SNP run" deploy

    Hi guys
    I'm running the deployment over /SAPAPO/SDP94 in the planning map. Demand is there, stock is there (and production, no STOs or other orders). ATD issue/receipt is standard.
    When I run the deployment with procedure "Refer to last SNP run", nothing happens - nothing is deployed.
    When I run the deployment with procedure "Real-time", everything stays unchanged (because I did the SNP heuristic seperately before), but now the system is at least deploying accordant to my expectations.
    Because I want to run the SNP heuristic and the deployment normally on different days, "Real-time" is no option for the productive system.
    What could be a reason for that?
    Thanks in advance for your help.
    Regards

    Hello Samir
    Thank you for the answer.
    All the points are fulfilled but the Deployment "Refer to the last SNP run" is not creating any confirmed distribution demands.
    I did 2 trials:
    1. SNP Heuristik (Network / Multilevel) -> deployment with procedure "Refer to the last SNP run" -> no deployment (no basis for TLB)
    2. Directly deployment, but with procedure "Real-time" ->  confirmed distribution demands -> deployed quantity for TLB available.
    Actually standard should be point one, because SNP and Deployment running on 2 different days.
    I suppose because the product can be deployed to different locations (actually just one has demand), but even when I lock the transportation Lanes to the other locations, isn't the deployment proposing anything.
    Thanks for your help
    Regards
    Johannes

  • Task Scheduler Won't Run Task With Idle Condition

    When I schedule a task to run Disk Cleanup with a one minute idle condition the task does does not run successfully and provides the following run result.
    The Task Scheduler service has asked the task to run. (0x41325)
    If I manually run the task or remove the idle condition the task runs and completes successfully.
    Why won't the task start with an idle condition?

    Hi,
    I noticed that you set the idle time shorter than the waiting for idle time. In my opinion, we should set the idle time longer than the waiting for idle time if we schedule a task running during the idle contidion. As the documents described, the Task Scheduler service will verify that the computer is in an idle state every 15 minutes. If a task is set to start only if the computer is idle for 30 minutes, and the task waits for the computer to be idle for 10 minutes, then the task will launch in 5 minutes only if the computer has been idle for 25 minutes prior to the time the trigger was activated. The task will not start if the computer enters an idle state 5 minutes after the trigger is activated. For more information, please refer to Task Idle Conditions.
    Best Regards
    Dale

Maybe you are looking for