Simulation of first order system

i want realize a simulation of first order system (K/(1+to*s)). i need to realize a sample system.
thank you for your help.

Hello,
You can find an example of a first order system at the following link:
http://sine.ni.com/apps/we/niepd_web_display.display_epd4?p_guid=C4B9DDC93090460CE034080020E74861&p_node=DZ52010&p_source=External
Best regards
Alexandre D
NIF

Similar Messages

  • Function transfert of a first order system (without any toolkit)

    Hello,
    I'm using a quite old LabVIEW version (6.0.1)
    I'd like to simulate a system and its control.
    Unfortunately I haven't enough money to buy a toolkit for this.
    I'd like to do it without any toolkit
    The function tranfert of my system is
    H(s) = OUT(s) / IN(s) = K/(1+tau*s)
    So I can write OUT*(1+tau*s) = K*IN
    and so OUT = K*IN - tau*s*OUT
    Inverse Laplace transform is
    out(t) = K*in(t) - tau * d out(t) / dt
    so the schematic should be
         K--|
              x----------(K*in)
    in------|            |
                           +
                             -------------------------out
         tau---         -                  |
                 | -------(tau*s*O)   |
                x                            |
                |-----<---d/dt-----<--
    Input comes from a slider
    and output goes to a scope
    Is it possible to do it with LabVIEW ?
    I have the following problems :
     - I don't see how to calculate the derivative function of OUT
     - I can't compile because LabVIEW seems not to like cycle in my diagram
    Regards

    Thanks for your .vi
    But there is some problems...
    First I don't understand how it works (sorry I'm a beginner)
    I don't understand for example what is the difference between T and tau
    (I have never use the "i" and the "+1" icon)
    On your scope, I see that the initial condition is 0...
    but the graph start at 0,5...
    I don't understand why it is not possible to do a cycle in a shematic...
    Regards
    Attachments:
    diag.jpg ‏42 KB
    front.jpg ‏33 KB

  • First order control system for proportion​al valves

    I am working on a proportional valve control program. We have four gas lines and it is desired to send four different gases through a combustion chamber sequentially. The close time for each valve is determined by the pressure measurement inside the combustion chamber. For instance, firstly, we let the nitrogen gas flows to the chamber, and the pressure inside the of it reaches 5 bars, we closed the nitrogen valve, and open the argon gas valve, and hold it opened until the pressure is reached at 15 bars inside the chamber and so on.
    I was thinking on utilizing PID for control of these valves, however, one author from my institute said that you can not do this with a PID program, you can do that with a  first order control system. Because in the system,  it is not allowable to gases exceed their set points (set pressure values). PID controls the system with osilations around set point and after it provides the set value, but in this case, we are not allowed to exceed the set point (we may reach the set point slowly and asymptotically, but never exceed it).
    I have not background on controlling hence I need your help. Could I do that with Labview? Is there a first order system control module in Control & Simulation Toolkit? And also where can I find examples, tutorials, etc. -if there are- about first order system controlling? Thanks in advance.
    Egemen

    what you are trying to do can be done with PID, but you would need to tune it to avoid overshot. But, most importantly, the use of the closed-loop PID will guarantee that your system will follow the setpoint, which can be a ramp going from the 0 to 100 % of the valve. The ramp on setpoint is a typical control technique to avoid overshoot of the system.
    Now, if you look in the PID palette under Control and Simulation, you will see the function called "Lead-Lag". This function is a 'first order' system and you can define a pole and a zero for your system. If your objective is just make the change smooth, you can make the Lead-Lag to work as a "Lag" (make the lead zero) and apply to your system. here is an example:
    C:\Program Files (x86)\National Instruments\LabVIEW 2014\examples\control\PID\Simulation - Lead-Lag.vi
    If you need something more complicated than Lead-Lag, than I would you advice to use the LabVIEW Control Design and Simulation Module. There you can really develop more advanced controllers, like higher order filters or Model Predictive Control. But this also requires you to have a better knowledge of control theory...
    Barp - Control and Simulation Group - LabVIEW R&D - National Instruments

  • First order RC circuit

    "I just started working with LABVIEW 6.1,I am working on simulating the first order RC circuit where I need to show the input voltage(Square or sine) and output voltage across the capacitor on the same plot in the front panel.I am unable to figure out how to update the waveform at the output, I am using the Basic function generator.vi at the input and I tried to split the waveform of the input using generate waveform components and tried to update Y(data Values of the waveform),but doesn't work.Is there any other way I can generate the output wave form using the formulas I have for the out put voltage across the capacitor..Please help.
    thanx
    vishnu

    Greetings, Vishnu;
    As you may have discovered, Labview doesn't have the same modeling capability as, for example, Pspice. However , you can model just about any RC circuit using the filters toolbox, (order 1 butterworth) in your example.
    If you want to show the filter response in the frequency domain, you will need to sweep the function generator, and then plot the output as a function of frequency. (You can use the WAVEFORM Max to read the values, and then plot it on a graph.
    There is no direct equivalent in Labview for either a resistor or a capacitor, but the exponential math functions, can, of course show your RC time constant quite nicely.
    Eric
    Eric P. Nichols
    P.O. Box 56235
    North Pole, AK 99705

  • While creating Process Order system has to validate the Batch field

    Hi All,
    While creating the Process Order system has to validate the Batch field which comes under Goods Receipt tab. Please let me know is there any standard user-exit is there for this requirement.
    Regards
    Naveen

    Dear Swapnil,
    Thanks for the reply,
    At the time of creation of process order I am entering the External Batch no as per the logic i.e. first two letters as 08 (for year), next two letter as section 51 (for solid mfg section, which i am planning to maintained in the Z table) and last three letters as 001 (for serial no in this section). so batch no is 0851001.
    Now i want to validate these all letters as per the above logic i.e first two letter should be cross check with current year, and next two letter with Z table for section and last three letters for sr no with previous batch, which is already created for this section.
    Now can you please help me to find out the function exit or screen exit to validate the above requirement at the time of creation of process order i.e. COR1, under the Goods receipt tab. 
    Thanks in advanced
    Naveen

  • My first built system for Premiere CS5. Need advice to approve hardware list.

    Hi All:
    After some research and reading some of the posts I have cane up with the hardware list I (think) I will need to built my first editing system for Premiere, Photoshop and AE CS5. I have came out so far with an estimate of around US$1500.00, without considering yet the hard drives. I do not if top wait a little bit until prices drop or just do it. I am not sure yet if I will start with an SSD for the OS and what type yet. I will figure it out later and ask your kind advice.
    As I post my list I will note what options it would be recommended for a good system. I just have a basic acknowledge of computers and excuse me if I make any insane comments. I hace seen some videos and read some other users experiences and I am very confident I can built my very first system.
    I am planning to start ordering some of the parts as soon as possible (like the case, BDR) and tdo the rest in the next days.
    Thanks in advance!
    COOLER MASTER HAF 932 Advanced Blue Edition RC-932-KKN3-GP Black Steel ATX Full Tower Computer Case with USB 3.0, Black Interior and Four Blue LED Fans-1x 230mm front fan, 1x 230mm top fan, 1x 230mm side fan, and 1x 140mm rear fan   $139.00 after rebates
    Do I need additional fans?
    ASUS P8Z68 DELUXE/GEN3 LGA 1155 Intel Z68 SATA 6Gb/s USB 3.0 ATX Intel Motherboard with UEFI BIOS   $269.99
    Which one should I choose? Is it worth paying an extra $50.00 for the 2700k?
    Intel Core i7-2700K Sandy Bridge 3.5GHz (3.9GHz Turbo) LGA 1155 95W Quad-Core Desktop Processor Intel HD Graphics 3000 BX80623i72700K   $369.99
    Intel Core i7-2600K Sandy Bridge 3.4GHz (3.8GHz Turbo Boost) LGA 1155 95W Quad-Core Desktop Processor Intel HD Graphics 3000 BX80623I72600K    $319.99
    Should I consider this?
    COOLER MASTER Hyper 212 Plus RR-B10-212P-G1 "Heatpipe Direct Contact" Long Life Sleeve 120mm CPU Cooler Compatible Intel Core i5 & Intel Core i7   $29.99
    Should I consider this?
    Arctic Silver 5 Thermal Compound    $12.98
    Is 16Gb good enoughRam? Is G.SKILL a reliable brand? I have seen others choosing Crucial brands and going 3x4Gb (total of 12Gb). Any thoughts?
    G.SKILL Ripjaws X Series 16GB (4 x 4GB) 240-Pin DDR3 SDRAM DDR3 2133 (PC3 17000) Desktop Memory Model F3-17000CL11Q-16GBXL   $139.99
    Which one? Is it worth to pay an extra $60.00 for the GTX570 2560mb?
    EVGA 012-P3-1571-KR GeForce GTX 570 HD w/Display-Port (Fermi) 1280MB 320-bit GDDR5 PCI Express 2.0 x16 HDCP Ready SLI Support Video Card   $339.99
    EVGA 025-P3-1579-AR GeForce GTX 570 (Fermi) HD 2560MB 320-bit GDDR5 PCI Express 2.0 x16 HDCP Ready SLI Support Video Card    $399.99
    Which one oh these Cooler Master?
    COOLER MASTER Silent Pro Gold Series RS800-80GAD3-US 800W Power Supply  $139.99 after rebates
    COOLER MASTER Silent Pro Hybrid RS-850-SPHA-D3 850W Power Supply  $199.99
    I am already using one of these and I am happy with it. I am planning to have 2 installed in the system.
    LITE-ON Black 12X BD-R 2X BD-RE 16X DVD+R 12X DVD-RAM 8X BD-ROM 8MB Cache SATA 12X Blu-ray Burner with Blu-ray 3D feature IHBS112-29 - OEM    $99.99

    Here are some links I've saved that talk about Win7 setup
    Registry Cleaners http://windowssecrets.com/newsletter/putting-registry-system-cleanup-apps-to-the-test/
    Be sure you have the default hard drive indexing OFF for all drives and folders!!!
    http://www.pcworld.com/businesscenter/article/220753/windows_7_godmode_tips_tricks_tweaks. html
    Temp/Cookie Cleaner http://www.mixesoft.com/
    http://forums.adobe.com/thread/789809
    Win7 Toolbar http://WindowsSecrets.com/comp/110210
    More Win7 Tips http://windowssecrets.com/comp/110127
    Utilities http://windowssecrets.com/comp/110106 (Startup Solutions)
    Win7 Help http://social.technet.microsoft.com/Forums/en-US/category/w7itpro/
    Win7 Configuration Article http://windowssecrets.com:80/comp/100218
    Win7 Monitor http://windowssecrets.com:80/comp/100304
    Win7 Optimizing http://www.blackviper.com/Windows_7/servicecfg.htm
    Win7 Virtual XP http://www.microsoft.com/windows/virtual-pc/
    More on Virtual XP http://blogs.zdnet.com/microsoft/?p=5607&tag=col1;post-5607
    Win7 Adobe Notes http://kb2.adobe.com/cps/508/cpsid_50853.html#tech
    Win7 Adobe Update Server Problem http://forums.adobe.com/thread/586346
    An Adobe Win7 FAQ http://forums.adobe.com/thread/511916
    More Win7 Tips/FAQ http://forums.adobe.com/thread/513640
    Processes http://technet.microsoft.com/en-us/sysinternals/bb896653.aspx
    Compatibility http://www.microsoft.com/windows/compatibility/windows-7/en-us/Default.aspx
    Win7 God Mode http://forums.adobe.com/thread/595255
    CS5 Install Error http://forums.adobe.com/thread/629281
    CS5 Help Problem http://kb2.adobe.com/cps/842/cpsid_84215.html
    Win7 and Firewire http://forums.adobe.com/thread/521842
    http://lifehacker.com/5634978/top-10-things-to-do-with-a-new-windows-7-system
    http://www.downloadsquad.com/2009/05/29/7-free-windows-7-tweaking-utilities/
    Win7 64bit Crashing and "a" fix http://forums.adobe.com/thread/580435
    http://prodesigntools.com/if-any-problems-downloading-or-installing-cs5.html
    Harm's Tools http://forums.adobe.com/thread/504907
    Also http://www.tune-up.com/products/tuneup-utilities/
    Also http://personal.inet.fi/business/toniarts/ecleane.htm
    Optimizing Hard Drive http://www.video2brain.com/en/videos-5353.htm
    Win7 Reinstall http://windowssecrets.com/newsletter/win7s-no-reformat-nondestructive-reinstall/
    Anti-Malware Tools http://windowssecrets.com/newsletter/the-advanced-system-recover-toolkit/
    Free Optimizer http://www.iobit.com/advancedsystemcareper.html
    Repair AVI http://forums.adobe.com/thread/888268
    Tune Vista & Win7 64bit http://forums.adobe.com/thread/436139

  • While creating the Transfer Order system is not picking Sale order stock?

    Hi All,
    In the B2B  process the system is not picking the stock from from sale order stock while creating the transfer order? Please suggest.
    Summary : Here we are creating the PR in the sale order and STO is created using the same PR to procure the materials from the WM plant to sale order plant. Since here intialy we are moving the stock to our sale order in WM plant and then picking the same. But while creating the Transfer order system is not picking the sale order stock in WM plant.
    Regards.

    C S Javali
    Check in schedule line in transaction flow whether Transfer Req /assembly is checked or not
    Regards
    Pradeep

  • Servlet or jsp for online ordering system?

    i'm new to servlet and jsp. i'm going to develop and online ordering which is still thinking to use servlet or jsp. If i want to develop a web-based ordering system with nice interface and most data will be retrieve from database, should i go for jsp? If choose servlet, will servlet able to do what jsp able to do?
    thanks

    If you're going to use JSP, only use it to produce HTML output. For complex logic like database access, use servlets. I suggest you have a look at this tutorial:
    http://java.sun.com/j2ee/tutorial/1_3-fcs/doc/Servlets.html

  • Reg Update Order System Status

    Hi,
    My requirement is, while doing TECO (technical complete) of maintenance order I want to check for open reservation/requisition in maintenance order. and if we found any any open reservation/requisition then order status TECO will not update. maintenance order will remain in present status. any other update done in this order before TECO will save.
    Please suggest how I can acheive this.
    I tried to use uesr exit IWO0009 and BADI WORKORDER_UPDATE but not abe to update order system status in this point.
    Please suggest me any EXIT or BADI or Solution for this requirement.
    Regards,
    Atul

    Hi Atul,
    Following codes can be help u for Open PR before TECO.
    *&  Include           ZXWO1U03
    EXIT_SAPLCOIH_004
    DATA: BEGIN OF IT_EBAN OCCURS 0,
            BANFN LIKE EBAN-BANFN,
            BNFPO LIKE EBAN-BNFPO,
            EBELN LIKE EBAN-EBELN,
            LOEKZ LIKE EBAN-LOEKZ,
          END OF IT_EBAN.
    DATA: IT_AFKO LIKE AFKO.
    DATA: BEGIN OF IT_AFVC OCCURS 0,
             BANFN LIKE AFVC-BANFN,
          END OF IT_AFVC.
    DATA: X_AUFPL LIKE AFKO-AUFPL,
          X_BANFN LIKE AFVC-BANFN,
          STR TYPE STRING.
    SELECT SINGLE AUFPL
       FROM AFKO
         INTO X_AUFPL
           WHERE AUFNR = CAUFVD_IMP-AUFNR.
    IF SY-SUBRC = 0.
      SELECT SINGLE BANFN
         FROM AFVC
           INTO X_BANFN
             WHERE AUFPL = X_AUFPL
               AND STEUS = 'PM03'." Extenal Service Control Key"
      SELECT BANFN BNFPO EBELN LOEKZ
         FROM EBAN
           INTO TABLE IT_EBAN
             WHERE BANFN = X_BANFN.
    ENDIF.
    LOOP AT IT_EBAN.
      IF IT_EBAN-EBELN = '' AND IT_EBAN-LOEKZ = ''.
        CONCATENATE 'PR' IT_EBAN-BANFN 'is not converted to PO.TECO is disallowed' INTO STR SEPARATED BY SPACE.
        MESSAGE STR TYPE 'E'.
      ENDIF.
    ENDLOOP.

  • Transporting PI/XI object deletions beyond the first target system?

    Hello,
    we're running PI7.0 at the site I'm working at, and our PI transports are controlled via CMS.
    I'm experiencing a problem in transporting Deletions of integration directory objects.
    From Development to the first target Test system, the Deletions are moved through fine. This 'D' --> 'T 'transport forms the first track.
    The second track moves the same transports from 'Q' (after being assembled and approved out of 'T') to 'I' and then to 'M' systems.
    However, beyond the 'T' system, the Deletion objects seem to disappear off the transport!
    Other items on the same transport (eg. object creations or changes), still get transported fine.
    The outcome is that we seem to only be able to delete objects via transport in the first target system, not any follow-on systems.
    Does anyone know what could be causing the problem?
    many thanks
    DaveR

    Hi Marco,
    For Java development, you will still use NWDI until the assembly step. The result will be a software component archive, which can then be moved over to CTS+.
    For XI development, it is possible to use CTS+ instead of of CMS at the transport technology.
    You also might want to take a look into the following document, which highlights the combination of CTS+ and NWDI:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/a0d96022-9df5-2910-90b8-8e0580e0987e
    Interesting quote:
    "Usage type DI is by no means invalidated by this [CTS+] scenario: The NWDI is the recommended environment for JAVA-based development."
    Best regards,
    Dennis

  • Why are BT's ordering systems soooo bad??

    After a truely horrendous home move experience that could easily have cost me my job through lack of internet access, I am finally inching towards having infinity installed in my new house.
    My phone line was activated late on Tuesday 28th August, with broadband appearing earlier in that day (only 3 weeks later than originally agreed, but that is a whole other story that nearly reduces me to tears when I think about it). BT had to wait until Total Broadband was working before they could place an order on their system for an Infinity upgrade. Because of the mess around my home move, BT Retail had agreed to pay the extra to Wholesale to fast-track my inifinty engineer appointment, so it would be in a matter of days not weeks from now.
    So, Total Broadband became active on the day they said it would - 28th August.
    I called them (no call back though I had been promised one for the day after activation) on the 29th to make sure Infinity would be ordered immediately, and fast-tracked. Was told that on their ordering system Total Broadband hadn't registered as being activated, but that it would hit their systems "today" (the 29th). They couldn't place an order for Infinity until Broadband had registered with them... I was assured that the order would be placed in the morning (on the 30th) and I would be called before noon with confirmation.
    Today - the 30th. No call by noon. I call them at 12.45pm. No order for Infinity had been placed, but the operator would place the order immediately. However, no date could be given yet for the engineer appointment as that order would have to hit the engineer's systems before a fast-track appointment could be made. That would happen tomorrow (the 30th)!
    Even then, I was offered a callback tomorrow but that could come any time between 8am and 8pm! I declined and have said I will call them tomorrow at 9am to find out the date of my engineer appointment.
    Why does it take 24 hours for one system to pass information to another system with BT, even if it is within different subsidiary companies???
    Why can a provisonal engineer appointment not be booked under special circumstances when it is clear an order will be placed?
    This has been a thoroughly unpleasant experience from the moment I found out that my home move order had been moved back 3 weeks, and I had to find that out for myself, I wasn't told that by BT.  It has caused me to lose my temper with operators who are trying their best but the systems they have to work with are woefuilly inadequate at handling the tasks they were designed to do.
    Oh, and the compaint I made weeks ago has been roundly ignored, and when I chased it up, I was told they don't deal with complaints until after the issue has been resolved! Conveniently this allows time for the complainant's ire to cool and details to have been forgotten.
    I detest how BT have made me feel and act over the last month. I just hope they try to bill me for the period when I've had no phone or email service....

    It's typical, not only of BT but of pretty well all companies and public services that rely heavily on automation. The technology is by and large fast and efficient. On the other hand, when things don't follow the predetermined path, there is too often nobody left with the authority and nous to get things back on track. That would be expensive and play havoc with the financial model.
    Look at the recent catastrophes at RBS and HMRC for example.   
    You can click the white star next to this message if you think it was helpful.

  • While saving maintenance order system throughing error

    Hi,
    we have assigned wbs element in Add data tab , But while saving that order system throughin error as"Assigning PM Order to WBS Element L-DI-0001-3-1 is not Allowed"
    regards
    Ganesh

    Hi
    Can you post the exact message with number
    regards
    thyagarajan

  • User enter sales order, system display " Lock table overflow",

    Hi Experts,
    We are facing a problem, user enter sales order, system display " Lock table overflow",  and using T-code VL02N, system display "You   cannot block the transaction at the moment.
    Please help.
    Thanks,
    Sujit S.

    Dear Sujit,
    [Lock Table Overflow|Re: Lock table overflow]
    Also, Just check with your Basis-Admin in T. Code: TU02 - profile parameter maintenance
    Best Regards,
    Amit

  • Variant configuration - Configuration Simulation for Planned Order

    Hi,
    I am using the configuration simulation to check the configuration results for BOM and Routing. However, I am unable to get the simulation of the Planned Order. What are the requirements to get simulation of the Planned Order in configuration simulation? I have set the configuration parameters - Process to Plnd/Prod Order and BOM explosion to multi-level. The BOM for my KMAT material also have semifinish goods which requires MRP. I am confused how come no components was selected during the simulation of Planned Order.
    I would really appreciate if anyone has any input on why this happened.
    Thank you very much.
    Cheers,
    Sue

    Dear,
    Please check the following
    Material type =Kmat
    Super BOm and depedency is maintained for BOM item selection
    Super routing with dependency is maintained
    you have maintained - conf profile with following setting
    process- pl/prod order
    bom exlposion - multi level
    BOm explosion - PP01
    explosion level - <b></b>NO<b></b> check box tick for only conf meterial
    Profile is released.
    now try in cu50, confi result=BOM radio box
    please come back if you still have problem

  • Sales order system status

    Hi All,
    we want to change the sales order system satus, then we found we can only do it in item level.since in one sales order we may have many items, if we change the system status by manually one item by one item, it cost time, I wonder in SAP 6.0 if we can do batch change sales order system status? If have, please tell me how to do it?
    Regards,
    Jagan

    Hi Raj,
    Thank you for the reply.The problem here is there are 100 line items in a sales order and user wants to change the item status (in the status tab in item level data) from A3-A4 ( example here is A0-SO created,A1-SO changed,A2-SO released,A3-PO created,A4-Delivery created,A5-SO closed) for all line items.In this Sales order 10 line items have not got the Goods receipt.But all other items have got.So he dont want to go to each and every line item to check and update the status of the GR,since it is time consuming process.So he is looking for the possibility in the header level like when he update the status in Heder level,it has to change the status in item level or if any item is not relevent for status change from A3-A4 (means the item present status is not in A3) it should throw a message.
    Regards,
    Jagan

Maybe you are looking for