Hi Gurus,
What would be the config required for rqmt strategy /anything else for consuming forecast in APO whenever a delivery is made in R3? Is there anything reqd on R3 side as well?
I tried few rqmt strategies with net segment and category group of BR(delivery) consumption with conf qty but did not work.
Thanks.
-Vinay

Hi Vinay,
Please try the copy of Requirement strategy 20 in APO.
You have to create a new category group by copying K01 and remove the category BM from the new category group. Assign this category group to your new requirement strategy.
Then assign this requirement strategy to your Product/Location
While releasing the forecast, please maintain the new requirement strategy in the release program, so that forecast will be released with this strategy.
Then while you create sales order, it will not consume the forecast.
When you create the delivery for SO, it will consume the forecast.
In order to make the forecast reduce, after you post Goods Issue for the delivery, you have to maintain the active integration model for 'Requirement Reduction' for the Product/location.
Regards,
Manimaran M.

Similar Messages

  • APO Standard Forecast Consumption Condition in /SAPAPO/DM_BADI_CSP

    Hi
    I need to change the standard forecast consumption logic to meet the business requirement which is as follows.
    Forecast should be consumed based on the fiscal month window.
    Note: Standard SAP /APO functionality do not support forecast consumption based on the fiscal month window instead system uses consumption period [in calender days] in backward/forward direction and system do not restrict the forecast consumption window based on the fiscal month.
    Please provide inputs if you have faced such situation. I have got a BAdI  '/SAPAPO/DM_BADI_CSP' that most closely resembles to serve the purpose but then I don't know much about it. Any sample implementation will also be helpful.
    Thanks and Regards
    Zafar

    Hi,
    For Issue#1
    I have ran this utility multiple times, but its not correcting. Probably i need to raise OSS message to sort it out.
    For Issue#2
    I think i have confused you, i have two scenarios first where i have sales order/delivery coming from external system. I am not worried about them as i will not be doing PGI for such order.
    Second scenario which i am having is very standard scenario. I have forecast in APO and creating sales order/ delivery in ECC. When they come to APO they consume forecast. Till this point every thing is fine. As soon as i do PGI of delivery, then that quantity should move to withdrawal from allocated, but in my case its not going to withdrawal but getting removed from allocated. This is resulting in increase of forecast quantity. I am tring to resolve this issue and seeking your help.
    Thanks
    Akhilesh
    +91-9764341911

  • Forecast Consumption in SNP for shipped qty's

    Hello experts,
    I got a question for forecast consumption in SNP and whether forecast stays "consumed" or not after a customer orders gets shipped (Post Goods Issue).
    My example is: I have a weekly bucket forecast qty of 100 in DP and release this to SNP. Now in SNP planning book I have 30 units of open Customer Demand against it ... means I have 70 in Forecast line (30 units got consumed correctly). Once I create a shipment for the open Customer Order of 30 units in R3 the situations remains the same .. but if I post the Goods Issue now on the delivery document the Customer Demand disappears (which is correct) but my Forecast line increases again from 70 to 100. I thought forecast consumption in APO would "remember" the already shipped quantities ? I know that you can reorganize open forecast but want I'm looking for is the standard R3 behaviour of keeping already shipped qty's as consumed. Can anybody help here or explain ?
    Regards
    Thomas
    Using SCM5.0

    Hi Datta,
    I checked the note  - there is only point 9 in the list saying:
    "9. During goods issue for the delivery in R/3, the forecast is always reduced to the date requested by the customer. In addition, overdeliveries are ignored."
    Unfortunately this doesn't explain how it works or needs to be done to have FCST consumption happen in APO_SNP based on shipped qty's. In my case FCST consumption works okay up to the point of posting the goods issue on a delivery document. I wonder if there something I need to activate somewhere to have this working since I can't see any "with drawn qty" in APO.
    Any other hints ?
    Regards
    Thomas

  • IMP:Forecast Consumption/Netting by incoming Sales orders in SNP

    Dear All,
    I need your help to understand the logic of Forecast netting by Sales orders in SNP. I can see the details in /SAPAPO/RRP3 but getting puzzled for soem SKUs. We don't have any PP/DS and GATP implemented.
    Below are the details and question based on that:
    I am releasing my forecast monthly and Sales orders as usual are coming from ECC and netting happens. Then next month again i have my forecast release then will the existing Sales orders will consume my this month's forecast (we are following backward/ foreward consumption type with 35 days back and 1 day forward, so as per the time period, SO can consume Forecast). I am a bit confused because pegging relationship is created between the demand and supply element and so new forecast shouldn't be consumed by the existing Sales orders. Am i correct here?
    Secondly, could somebody explain the difference between the 'Overview and detail' tab under the Forecast tab in /SAPAPO/RRP3. Sometimes i see some data under the 'Withdrawal Qty' column in Detail view of Forecast tab. Could somebody explain when it is populated.
    Regards
    Bishwajit

    Hi,
    I think your first question is regarding the pegging relationships used for forecasting.  Even when you release a new forecast, the system remembers the forecast relationship.  So, pegging occurs but in the sense that it pegs to forecast - in general - not to one specific forecast order in the system.  If you desire to "reset" these relationships, then you need to run the program for reorganization of independent requirements (/SAPAPO/MD74).
    Your second question relates to the existence of a withdrawal quantity and differences between the overview and details in /SAPAPO/RRP3.  The withdrawal quantity represents the amount of forecast that has been "reduced" from the forecast (corresponding to actual shipments that have been PGI'd against deliveries).   Forecast consumption occurs when SO's and Deliveries are created and saved and reduction occurs when they are PGI'd.  Withdrawal quantity corresponds to the reduction...
    Hope this helps!
    Chris

  • Forecast Consumption in SNP for Make-to-Order products

    We are working on using APO-SNP for Make-to-order products (PlngStrategyGroup = "81" in R/3). We want to achieve normal forecast consumptino on FinishedGoodLevel and generate PlndOrders which shall derive component demand for purchasing (such PlndOrers wont be released to production - they should only function as demand driven on component level)
    What we have done so far: Forecast in APO-DP on Finished good level exists and has been released to SNP. The product gets "ciffed" from R/3 into APO material master with planning strategy group "20" (which is basically "make-to-stock") --> we were hoping this would allow us to use "normal" forecast consumption but nothing happens (FCST is not being consumpted by open Sales orders). Within the product view of such products APO is still "realizing" that this is a make-to-order product.
    Any other ideas / thoughts what could be done to achieve "normal" forecast consumption on FGI level for make-to-order products in APO-SNP ?
    Tks !

    I checked in /n/SAPAPO/RRP3 (Product View), unfortunately only FC exists there
    Seems that the open Sales Orders from R/3 are being created within another segment (the "element" Tab of RRP3 shows 2 segments:
    1) "Make-to-stock" (which contains the FC)
    2) "Make-to-order" (which contains the Sales Orders)
    That might explain the issue I see (FC and SOs are in different planning segment --> no consumption). Reading about planning segments in the help sounds like I need to find a way to bring Sales Orders for Make-to-Order products into the Make-to-stock segment  ... jus a thought .. any idea how to do this ? Does that mean I need to modify the CIF for Sales Order transfer for Make-to-order products ?
    Tks
    Thomas

  • Demand (not consumption) based Forecasting

    Hi SDNers,
    In 4.7 standard SAP without APO, we have consumption based forecasting.  We need forecasting to be DEmand based so it forcasts based on sales orders, both open and closed.
    How is this possible to setup please?
    Your help is greatly appreciated.

    Hi DB49,
    Yes you are correct: I am talking about the key figures from which your forecast is derived. We do "not" want to use the past issues (consumption) as a key figure, and "do" need to use demand/requirements (Sales orders, both open and closed) as a key figure.
    Apologies for my not clearly defining the issue earlier.  I was alwalys told SAP standard forecasting used only consumption to derive the forecast - really hope this is not true as we must now use actual sales orders to derive the forecast numbers.  Unfortuntly, I do not know how to accomplish this change.
    We do not use S&OP: currently run Forecast (RMPROG00) then Copy Forecast (RM60FORC) monthly, which passes to Independant requirements, which is then planned by MPS and finally MRP.  We run MPS and MRP on different days by plant.
    Most of our materials are MRP Types M0, M1, PD, using MRP Group 0040, with many different Lot size groupings. For the most part, we do not use Strategy Groups.
    We forecast at the parent and component levels, mostly at the parent level.
    Hope this helps - please let me know if you need any more info or if I did not clearly state our processes.
    Thanks again for your help!! Really appreciate your time and knowledge sharing.
    Paul

  • Scheduling agreement with Consumption based planning

    Dear Experts,
    I Have a Scenario,
    I need to Bulit a Laptop which is a Finished Material, and the Components like Hardisk, Processor, Ram, Casing, Monitor are my Rawmaterials. By using these rawmaterials we are building the parent material.
    My Client requirement is 1) Plan and schedule the requirement
    2) Replenish the stock based on consumption based planning.
    My query is
    1) How should i proceed for mm based procurement ?
    2) Does i need to create scheduling agreement for rawmaterials and and maintain schedule lines ?
    3) For which materials i need to run the MRP ? weather its parent material or Component material ?
    4) What are the sequence of process need to be carried out ?
    Required ur valuable inputs on this.
    Best Regards
    SAP LEARNER
    Edited by: JAVEED AHAMED on Feb 12, 2010 8:34 AM

    Hi
    Consumption based planning and Scheduling agreement are two different functions.
    Consumption-based planning is based on past consumption values and uses the forecast or other statistical procedures to determine future requirements. The procedures in consumption-based planning do not refer to the master production schedule. That is, the net requirements calculation is not triggered either by planned independent requirements or dependent requirement. Instead, it is triggered when stock levels fall below a predefined reorder point or by forecast requirements calculated using past consumption values.
    A form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.
    With release documentation (in the standard system, document type LPA)
    The schedule lines in the system have internal character. This means that you can change them in any way you wish. The schedule lines stored in the system are not transmitted to the vendor until you explicitly create a scheduling agreement release (which may take one of two forms: a forecast delivery schedule or a JIT delivery schedule).
    The release documentation allows you to display the releases transmitted to a vendor over a certain period in order to establish exactly when you transmitted which information to the vendor.
    Without release documentation (in the standard system, document type LP)
    The schedule lines immediately have official character, i.e. they are immediately transmitted to the vendor the moment you save them (transmission time-spot 4 for messages). There is no release documentation in this case.
    It cannot be explained in few lines. You need to study the below link.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm

  • User exits/BAdIs for Forecast consumption by sales order

    Hello Experts,
    My question here is: When Sales Order either new or change comes from ECC to APO, what are key fields considered for Forecast Consumption? Is requirements strategy is considered from location product master or Sales Order brings own data from ECC into it's own structure? I have read from SAP help or documentation that Sales Order coming from ECC does not use requirement strategy from Product Master. Rather it get its own fields like planning strategy/group / requirement class from ECC. It uses location product master only to get consumption parameters like forward/back word consumption days. So I am thinking to use some user exits or BAdIs to enhance the incoming sales orders to consume separate forecast categories in APO.
    My requirement is:
    For the same one product we want sales orders (can have two different order types or identify by a custom field) to consume two different order categories (ie. FA & FC) by enhancing incoming sales orders. So we have regular 1)Forecast key figure which is 'FA' category and 2)Forecast Additional key figure which is FC category. When we release two separate forecasts from DP we release into these two key figures and categories. Now we want incomping sales orders to consume these two categories separately when our sales orders are having two different order types (i.e OR and ZR).
    I want to kow what way we can acomplish this? Are there any user exits or BAdIs for this purpose?
    I looked arount BAdI /SAPAPO/DM_BADI_CSP and I am not quite sure it's going to help. Are there any others?
    I appreciate if anybody explain me the process?
    Thanks in advance!
    Raj

    Standard Logic --- Whatever plant is visible in the Sales Order, the sales order will appear under that Product Location in SNP
    There is no standard way of making the sales order visible in another location.
    Depending on your requirement(Ex: Forecast Consumption, planning etc),using APO-BW we can simulate the requirements in the other plant which can be a nightly run and not immediate.
    Now coming to your question, if the delivering plant is A, how does ECC Delivery document know when the sales order has plant B that the delivering plant is A.
    Can you be more specific.
    THanks
    Kumar

  • What kind of consumption based planing

    Hi,
    we have some materials those we only need for 3 month. After 3 months we change the materials.
    We often purchase the material each 2 days and the delivery time is also short 1 till 2 days.
    I don't know exactly which kind of consumption based planing we can use.( manual reorder point planing, automatic RPP or Forecast-based planning).
    we would like to automatise the process but the problem is with the assortment change after 3 months we will not have a consumption material a the begining with the new material.
    what can you advise me. (do it manual or automatic and which kind of method)
    Thanks

    hi,
    in your scenario changes are frequent and material is changed. i suggest to use manual reorder planning.
    regards
    points if helpful

  • Forecast consumption situation not shown in Forecast tab-RRP3 View

    Hi,
    I have released Forecast(FA) from DP to SNP.I am able to see the forecasts in Product view Elements tab.But I am not able to see any Forecast consumption details and overview in Forecast tab of Product view.It is showing if i create forecast manually in RRP3 view itself.How to bring the forecast data in forecast tab of RRP3 view.
    Thanks&Regards
    Venkadesh

    Hi Venkadesh,
    This is a known issue and can be solved by SAP  Note 743646 - Incorrect consumption situation in product view.
    Using a report, you can adjust the consumption situation in the element view so that it is the same as the consumption situation in the forecasting view.  To do this, call transaction SE38 and create the report Z_CSP_DELTA_FCST with the title "Check of the consumption situation"; Type: Executable program; Status: Test program; Application: Materials Management.  Delete the first line "REPORT..." from the new report  then use the cut and paste functions to add the program to the correction instructions.
    Try this out and let me kow if this solves your purpose.
    Many thanks,
    Amit Sen

  • Consumption based planning

    Hi,
    I need to configure the CBP based on Past consuption data of 3 months and also it should give me future forecast values for 3 months. also I want to use safety stock and Reorder level.
    Which MRP type should be used and what are configuration setting required for the same.
    Also pl.guide me on What will happen if there is sedden rise in the requirement is any month?
    Thx

    Hi,
    MRP supports and helps the MRP controller in the task areas. These tasks include
    determining type, quantity and time of the requirement, and scheduling corresponding
    procurement elements. The automatic planning run for MRP determines shortage situations and generates the corresponding procurement elements. Possible
    procurement elements of MRP are planned orders, purchase requisitions and
    scheduling agreement schedule lines. The planned order and purchase requisition are
    internal planning elements that can be changed, rescheduled or deleted at almost
    any time.
    In in-house production, the system creates planned orders for planning production
    quantities. When planning has finished, the system converts the planned orders into
    production orders. The system then converts the dependent requirements in the
    planned order into reservations in the production order.
    In external procurement, the system either creates a planned order or a purchase
    requisition for direct planning of external procurement quantities. Whether purchase
    requisitions are created for direct planning, or planned orders are created first, you
    can use the creation indicator for purchase requisitions/MRP groups in the material
    master record on the initial screen of the planning run. When planning has finished,
    the planned order must be converted to a purchase requisition, which is subsequently
    converted to a purchase order. The advantage of creating a planned order first is
    the additional procurement proposal check that is executed by the MRP controllers.
    Purchasing can only order the material when the MRP controller has checked the
    planned order and converted it into a purchase requisition. Otherwise, the procurement proposal is immediately available for Purchasing.
    Planning Levels of Consumption-Based Planning
    Requirements planning takes place at plant level. In other words, the entire stock that
    exists in the plant is considered in planning. However, the stocks of individual storage
    locations can be excluded from MRP or planned independently. These stocks are then
    not included in MRP at plant level. You can also execute requirements planning
    for individual MRP areas. You can define the MRP areas yourself. This means
    that several storage locations can be grouped together for one MRP area and that
    requirements planning can be executed separately from the plant for these MRP areas.
    MRP areas enable a differentiation of material requirements planning within a plant.
    (MRP areas include the function of storage locations that are planned separately for
    materials requirements.)
    Planning Levels for Materials Planning is either
    1. The Plant with Storage locations planned separately.
    2. MRP areas
    Basically, MRP areas are optional. You can plan all material requirements without referring to MRP areas.
    There are three different types of MRP areas:
    1. Plant MRP areas (obligatory) that are automatically created by activating
    planning with MRP areas. Their numbers match the number of the plant. If no
    more MRP areas are defined, the plant MRP area covers the entire plant.
    2. Storage location MRP areas that are defined by the storage locations assigned
    to them.
    3. Subcontractor MRP areas that provide planning of the requirement of the
    material provided for a subcontractor and are defined by the assignment of
    this subcontractor.
    Prerequisites for Consumption-Based Planning
    The following prerequisites must have been fulfilled in order to carry out requirements
    planning for a plant:
    Requirements planning for the corresponding plant must be activated in
    Customizing for Materials Management under Consumption-Based Planning u2192
    Planning u2192 Activate Material Requirements Planning.
    T-code - OMDU
    The plant parameters for the corresponding plant must be activated in
    Customizing for Materials Management under Consumption-Based Planning u2192
    Plant Parametersu2192 Carry Out Overall Maintenance of Plant Parameters.
    T-code - OMI8
    In the material master record, you have to maintain the MRP data of the materials
    that are subject to automatic planning.
    I hope this may help u !

  • Consumption Based MRP

    Hi,
    We are running consumption based MRP using MRP Type as VB. We run consumption based MRP daily. In this, when ever there is change in stock level due to consumption, the system reschedules the old schedules also. We don't want to disturb the old schedules generated by MRP as we confirm the vendors as a Firm Schedule.
    Can you please guide me on how i can run consumption based MRP daily and not tamper old schedules.
    Regards
    Shankar

    Hi Shankar,
    SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/1a/8b4bbecdd74536acd4e970faaf6e2d/frameset.htm
    SAP recommends working with scheduling agreements with release documentation.
    Use a document type for scheduling agreements with release documentation. In the standard system, document type LPA is supplied for this purpose. (In the standard system, the Release docu. indicator is selected for document type LPA in Customizing for Purchasing under Scheduling Agreement à Define Document Types.)
    It is sensible to carry out the planning run daily and generate releases (delivery schedules) automatically once a week, for example. You can set up the system in such a way that releases are generated for changed scheduling agreement items (materials) only.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/3b/66596bda7b11d1b6330000e8a738dc/frameset.htm
    Scheduling agreement releases provide information to vendors regarding the quantities of a material that are to be delivered and the desired delivery dates. A scheduling agreement release enables you to record the current status of the lines of a delivery schedule stored in the system for a scheduling agreement item and then transmit this status to the vendor.
    Are you using release SA release?
    It seems this is the solution for your problem
    Regards,
    Csaba
    Edited by: Csaba Szommer on Mar 1, 2010 1:47 PM
    Edited by: Csaba Szommer on Mar 1, 2010 1:48 PM

  • What setup is require to run a consumption-based planning

    Dear all,
    I know there is a two way to run Consumption-Based Planning in standard SAP:
    1 - Forecast-based Planning, and
    2 - Re-order point Planning.
    My question is what is the configuration setup and material master value maintenance require for the above two procedures?
    Thanks
    Tuffy

    In Material Master
    MRP 1 view choose the
    MRP type
    VB - Manual reorder point or
    VM - automatic reorder point
    Reorder point
    Regards

  • Cross-location forecast consumption

    Hi experts,
    Is there any possibility to influence the forecast consumption logic in order to have a cross-location forecast consumption?
    Let me explain the requirement with an example:
    PROD 1 - LOC A -> FCST = 10
    PROD 1 - LOC B -> FCST = 20
    The situation is...if a new requirement for the first combination (PROD 1 - LOC A) of 15 is entered in the system we will consume the entire forecast in LOC A.
    APO WAY:
    PROD 1 - LOC A -> CONSUMED FCST = 10 --> REMAINING FORECAST = 0
    PROD 1 - LOC B -> COMSUMED FCST = 0  --> REMAINING FORECAST = 20
    In that case we would like to consume all forecast for LOC A (10) but also consume the remaining requirement quantity for LOC B (5).
    DESIRED WAY:
    PROD 1 - LOC A -> CONSUMED FCST = 10 --> REMAINING FORECAST = 0
    PROD 1 - LOC B -> COMSUMED FCST = 5  --> REMAINING FORECAST = 15
    We have been looking for user exits in order to influence withdrawal quantities stored in /SAPAPO/DP_SCHED table...is that correct procedure?
    We are looking at BAdI "/SAPAPO/SDP_RELDATA" in order to influence the release, and change the the forecast quantities based on the withdrawal quantities, but this would force as to release forecast on daily basis.
    Finally, we know that GATP functionality could be used, but it is moving sales orders in case that allocation is not possible, and we are not allowed to move sales orders across locations.
    Any idea? Is that possible?
    Thanks in advance,
    Raul

    Thanks for your quick answer, do you think it is possible to use /SAPAPO/SDP_RELDATA in order to influence forecast distribution and "simulate" a cross-location consumption?
    Example:
    PROD 1 - LOC A -> FCST = 10
    PROD 1 - LOC B -> FCST = 20
    Sales Order in A for 15. After Sales Order creation my situation is:
    PROD 1 - LOC A -> CONSUMED FCST = 10 --> REMAINING FORECAST = 0  (RELEASED = 10)
    PROD 1 - LOC B -> COMSUMED FCST = 0 --> REMAINING FORECAST = 20 (RELASED = 20)
    If I use /SAPAPO/SDP_RELDATA in order to check consumed quantities and redistribute forecast from B to A it would be possible to have:
    PROD 1 - LOC A -> CONSUMED FCST = 15 --> REMAINING FORECAST = 0 (RELEASED = 15)
    PROD 1 - LOC B -> COMSUMED FCST = 0 --> REMAINING FORECAST = 15 (RELEASED = 15)
    Has someone experience on that BAdI? Is there any other possible solutions?
    Thanks in advance,
    Raul

  • ASCP engine does forecast spreading or forecast consumption first?

    We are using Demantra for forecasting in Monthly bucket.Say for March 2011, forecast is 2300 qty.
    And we have a sales orders 1 for 200 qty on 1st March 2011.
    Planning Bucket is daily for 6 months with 5 days working. So for march we have 23 working days.
    I think ASCP will first convert Forecasting bucket to Planning bucket, which means each working day will have forecast of 100 qty. ( Forecast Spreading)
    Then Sales order of 200 qty will be consume by forecast on March-1,2011 ( Forecast Consumption)
    If I check Consume forecast by Bucket then on 1st March, I will have 100 qty sales order and 100 qty forecast.
    If I uncheck the above option in plan then based on consumption days it will work.
    Our requirement, is first forecast consumption should happen before forecast spreading? How can we achieve this.
    So really, Sales order on 1st March for 200 qty should be consumed against 2300 qty for March month, and then 2100 should be spread to 23 working days, Is it possible?

    Hi Sandeep,
    Thanks for pointing me to the section.
    One solution can be the forecasting and planning bucket to be same, periodic. In this the forecast consumption will happen correctly, no issue and within the bucket. But the issue will be the ASCP will recommend planned orders on the last day of the period, which won't work. We want the planning & supply in daily bucket.
    If we have forecasting bucket monthly and planning bucket daliy than every day when we run the plan we have to update the forward and backward days so that consumption can happen exactly the same month.
    So I am currect with the understanding that forecast spreading happen first and then consumption.
    Thanks
    Dheeraj

Maybe you are looking for

  • MTO Discrete Manufacturing with multiple plants and sub-contracting

    Dear PP Gurus,                        I am facing a problem, pl. help me out. My Scenario is as follows: I am having 4 plants with Make-To-Order Discrete Manufacturing scenarieo . Suppose to manufacture a particular Product , there are 10 operations.

  • How to search contacts in the new version?

    What the heck Skype?! I have hundreds of contacts. Before I could simply go to my contacts and SEARCH! Now? Scroll forever? Also sometimes I have like "FULL NAME MOBILE / HOME", thats not displaying since it is too long... As I could search before I

  • Using Pro XI and formscentral

    My form which previously collected data using Tracker is now using FormsCentral since I downloaded the trial for Pro XI. The only thing is that the check box fields are not passing their data value to Formscentral just the true or  false value. Is th

  • Nomad jukebox zen replacement screen???

    hi folks i am in extreme need of help and advice. I recently bought a 60 gb nomad jukebox zen second hand from ebay. As it was second hand I have no warranty. After around a week I somehow cracked the screen? There is now no display whatsoever. I can

  • After upgrading to OS X, can't email pictures from iPhoto.

    I cannot email photos selected in iPhoto.  I click the email icon, as I have always done, on the bottom of the iPhoto page.  Email opens, I type in my message but, when I hit send, nothing happens.  Not only that but I can't delete the stuck e-mail e