Split Valuation Process

Hello SAP,
Can anyone explain the Split valuation Process step by step, what are the settings has to be done in backend and how can we apply it to the material?
How it will effect the material process?

Hi Mohan,
The SAP R/3 System allows you to valuate stocks of a material either together or separately, that is, according to different valuation criteria. Split valuation is necessary if, for example:
1. Stock from in-house production has a different valuation price than externally procured stock.
2. Stock obtained from one manufacturer is valuated at a different price than stock obtained from another manufacturer.
3. Different batch stocks of a material have different valuation prices.
4. Value damaged and repair part differently from a new part.
To used split valuation, you have to activate it using 'OMW0'.
To change split material valuation once it has been set, you must
1. first post out all stocks (for example, to a cost center or with movement type 562)
2. then change the control parameters
3. if necessary, change the automatic account determination
4. finally post the stocks back in again
In split valuation, you can distinguish between partial stocks of a material according to certain criteria and valuate them separately.
The material stock is divided according to valuation category and valuation type.
The valuation category determines how the partial stocks are divided, that is, according to which criteria.
The valuation type describes the characteristics of the individual stocks.
With the function "Setting" you can determine:
which valuation categories exist in your company (global categories)
which valuation types exist in your company (global types)
which valuation types belong to which valuation category
which valuation categories exist in a valuation area (local categories)
Your entries are only relevant if you set split valuation as active in the function "Global settings".
In the standard SAP R/3 System, the following valuation categories are default settings :
B procurement type
with the valuation types:
"EIGEN" for in-house production
"FREMD" for external procurement
H Origin
X automatic valuation (only for batch)
To select split valuation ('OMWC'), proceed as follows:
1. Determine the valuation categories and valuation types that are allowed for all valuation areas:
global valuation categories via menu "Goto --> Global Categories"
global valuation types via menu "Goto --> Global Types"
2. Allocate the valuation types to the valuation categories.
a) Select "Goto --> Global Categories".
b) Position the cursor on a valuation category and select
"Goto --> Global Categories --> Assignments --> 'Types->Category'".
c) Activate the valuation types you want.
3. Determine the local valuation categories for each valuation area.
a) Select "Goto --> Local definitions".
b) Position the cursor on a valuation area and select
"Goto --> Local Definitions --> Allocate Categoires->Org.units (button Cats->(OU)".
You obtain a list of the global valuation categories.
c) Activate the categories to be used in this valuation area.
The system creates the local valuation types based on the allocations under point 2.
Only now can you create a master record with split valuation.
Specifying Split Valuation by creating Material Subject to Split Valuation
1. Create a material master record, selecting the Accounting View 1.
2. Enter your data as required on the Accounting data screen, specifying a valuation category.
(If you can't find the valuation category field, it might be hidden, use OMSR to define the Field Groups.
Look for the field MBEW-BWTTY for Valuation category).
3. Be sure that the price control indicator is V for moving average price and enter a moving average price.
4. In the case of split valuation, you can create only one valuation header record with price control V because the
individual stock values are cumulated, and this total value is written to the valuation header record. This is where the
individual stocks of a material are managed cumulatively. To do this, fill in the Valuation category field on the accounting
screen when you create the material master record and leave the Valuation type field blank.
5. Save your data and the system creates the valuation header record.
6. The initial screen appears.
7. Extend the material by creating new material master records from the Accounting view 1. For the first material, specify a
valuation type in the Organizational Levels dialog box and enter the respective accounting data on the data screen.
Proceed likewise for the other materials, distinguishing between them by valuation type. To do this, call up the material in
creation mode again. Due to the fact that a valuation header record exists, the system requires you to enter a valuation
type for the valuation category.
8. Repeat step seven for every valuation type planned.
Hope this helps!
Preethi.
Edited by: preethi R on Nov 26, 2008 9:39 AM

Similar Messages

  • Split Valuation : Different procurement type and different origin

    Hi ,
    I have the following scenario :
    The company has a plant in Dibrugarh and another in Plant Raipur .
    It deals with product called SIG .
    SIG is manufactured at Dibrugarh but sent to Raipur. So we have different valuation for the same material at two different plants . Now the second scenario is this product SIG is also procured from the domestic market as well as imported . This externally procured SIG either from domestic market or from foreign country is also sold to the customer. So what would be the valuation of this SIG . How many valuation types should it have . And what are the mandatory settings at two plants .
    Regards
    Nandini

    Hi,
    Split Valuation process is useful when the materials have to be maintained with more than one value based on certain criteria like
    The following are some reasons for which Split valuation is used
    Different origins of the material
    Different grades of quality for the material
    Different statuses for the material
    Differentiation between in-house production and external procurement
    Differentiation between different deliveries
    In your case;
    Split Valuation process is useful when the materials have to be maintained with more than one value based on certain criteria like
    Imported materials and local material based on the origin of purchase so that the valuation of the final product manufactured can be valuated accordingly
    For Activating Split valuation certain settings have to be done in customization and in the Material Master record.
    Activate split Valuation for the Valuation area (In SAP standard system the split valuation is set as active by default)
    MENU: -   IMG  Materials Management  Valuation and Account assignment  Split Valuation Activate Split valuation
    Define Valuation Category and Valuation type for the material in the customization
    MENU: -   IMG  Materials Management  Valuation and Account assignment  Split Valuation Configure Split Valuation
    Note : Valuation category specifies which criterion should be used as the basis for differentiating between the various partial stocks ( origin, quality, production etc)
    *The valuation type specifies an individual characteristic of a partial stock ( Origin u2013 imported/local , Quality u2013 (high/low) Etc)*

  • Process order based on split valuation

    Hi Experts,
                      I have a scenario where the same HALB material in the plant can be of 3 different grades.
                      Accordingly, if I do a split valuation based on the 3 grades, how can I ensure that while creating a process order on the HALB, depending on the grade (and hence the valuation type) the system picks up the recipe from an available collection of 3 different recipes (for the 3 types)?
    Regards
    Sm.

    Hi
    Just go to CT04 and creat three characterstics with grade 1,2 & 3 or as u wish. You can give single value to identify the grade say 1,2,3
    go to CL02 and creat class using material class as class type .
    Assign these three characteristics to this class
    go to mm01 and type the halb and extend the classifcation view
    specify the class that is created.
    go to bom and in the HALB  line item delete it. and create new line item using  k as item category and save the bom
    now when you creat configuration profile using cu40 and make sure you can use it in production
    after this try creating a production order the system will prompt for characteristics use your grade and proceed for production
    Krishna

  • Alternate solution for Refurbishment Process without split valuation

    Hi Experts,
    We are implementing SAP PM module. We want any alternate method for Refurbishment process ( Internally processed inside the plant) without activating the split valuation . Is it possible ? If possible, please suggest the process .
    Thanks in Advance.
    VT

    No suggestion received, I am closing this.
    regards
    VT

  • 541 & 543 Mvt for Sub Contract Process with Split Valuation

    Hi all,
    We have activated SPLIT VALUATION for sub contracting in ECC 6.0
    We have clasified into 3  Valuation Catergories as New,Repaired & Faulty.
    The logic & naming convention of the materials are
    New Material : C1
    Repaired : C2
    Faulty : C3
    The details are as.....a faulty material can be converted into Repaired by the external  Vendors,for which we raise a PO and do MB1B with 541 mvt type with ref to this PO.
    The Acing Entries are
    PK      GL Code        Material     Value
    99         117000         C3            10
    89         117000         C2            100
    93         600530                           90
    While in process the GR w.r.t the above mentioned PO ,we are getting 6 accounting entries (which is delivered by Stand SAP) they are as
    PK      GL Code       Descrip     Value
    89         117000        Stock        100
    96         117400        GR/IR         150
    91         600530        Sub Cont    100
    86         600863        Sub Service 150
    99         117000        Stock          100
    81         600530        Sub Cont     100
    Can any please explain me how the system calculates the above Accounting Entry.
    We are confused why the system calculates ( entries) for the 91,81,86 Posting Key.
    I have uderstood that PK 89 for goods inward, 96 is for GR/IR clr, 99 is for reversal of 541 mvt type.
    Other 3 entries i have the confusion ........
    Can anyone please guide me and explain in detail how ,why andfrom where the system is calculating the entries.
    Hope that you will help me in this regards
    Take Care
    God Bless
    Regards
    Praveen.
    Edited by: Praveen Singh on Sep 16, 2008 8:07 PM

    Go to OMWB and click on simulation and here enter you mateirla number, plant and Mtype 101
    Then click on account assignment
    you will see all the entries
    Posting Lines Text              VlGCd AGC  VCl   PK Acct D      PK Acct Cr   
    Gain/loss from revaluation      -e-   -e-  -e-   83 440700      93 440700    
    Inventory posting               -e-   -e-  TRA1  89 130000      99 130000    
    Incidental costs of external a  -e-   -e-  -e-   86 460820      96 460820    
    External activity               -e-   -e-  TRA1  86 460960      96 460960    
    Change in stock account         -e-   -e-  TRA1  81 460820      91 460820    
    Purchase offsetting account     -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Purchase account                -e-   -e-  -e-   40 --Missing-  50 --Missing-
    Materials management exch.rate  -e-   -e-  -e-   40 440600      50 440600    
    Cost (price) differences        -e-        TRA1  83 440000      93 440005    
    GR/IR clearing account          -e-   -e-  TRA1  86 210005      96 210005    
    Inventory posting               -e-   -e-  TRA1  89 130000

  • Estimation process while split valuation is active

    Hello friends
    Is there other configuration required when materials valuated using split valuation .. ?
    while estimating the cost of finish product , other  components like semi-finish materials , and raw  materials are valuated at split valuation . how system will know which price it has to pick .
    Examlpe :- one semi finish material valuated at 3 levels  01, 02, 03 .
    in material master without valuation type price control is V      233.00      procurement type X
    IN valuation type 01 price control  V                                               250.00
    but in valuation type 02 price control is S                                     150.00
    and in valuation type 03 price control is S                                    180.00
    now while estimating  cost for finish product , which price system will consider .
    i think i have to use valuation price with user exit - setting available in okk4 valuation variant
    Thanks in advanvance .
    sachin s. joshi
    Edited by: sachin on Mar 30, 2010 3:44 PM

    HI,
    the main question (from your first posting) is: "how system will know which price it has to pick . "
    As BOM does not contain the information which split-valuated segment of a material should be considered during plan cost estimation (only the material is known, but not the batch) its up to you to define the rules for which valuation-segemnt price has to be picked.
    Best regards, Christian

  • Split valuation for non-valuated materials

    Hi dudes,
    We are implementing SAP for our Subcontractor.
    our SC  receive all components from our company ( on free ) but sometimes they purchase the same material themselves for other uses. so we decided to use split valuation to separate valuated and non-valuated materials.
    I did configuration and created 2 valuation type ( valuated - nonvaluated )
    when I create Purchase order it askes for valuation type but even when I use non-valuation type in PO it asks for price!!!!
    do any of you have used split valuation for this target?
    have the same problem?
    what should I do actually??

    Hi,
    Is someone in the subcontracting plant going to do a process order on the materials you send them? Or are you only going to track the finished inventory once it reaches your plant?
    In the first case:
    1) Create a STO to the SC plant. This stock will have to be priced.
    2) Inventory reaches SC plant. They perform production process.
    3) finished inventory is sent using another STO.
    2nd Case:
    1) Create a SC vendor using the SC plant as a vendor.
    2) Create a SC PO to this vendor using this vendor and transfer goods to him. In this case, goods are transferred for 'free' as they really belong to you and not to the SC
    3) Once the production process is over and the finished product is sent back to you, do a GR. The raw material sent to the SC will be consumed.

  • Batch Management with Split Valuation

    Hi
    We have a scenario in which we have split valuation for a material and it is also batch managed. In the business process there is regrading step where the material from one valuation type (A) needs to be transferred to a different valuation type (say B). Before regrading each of these grades have different batch nos.
    I tried to do a transfer posting (mvmt type - 309) and put the material (from Val type A to B). It asks for batches for both A and B.
    We can give batch of A (the from material), but we want a new batch to be created for the "to" material.
    How does one go about that?
    Deepak

    Deepak
    I think that you will find that the batch managemenmt is either internal or external at either plant or material level and so if you are changing the valuation in the same plant I do not think that the system will allocate a batch number for you and that you will have to tell the system what the batch is.
    I hope that this helps

  • Vendor Consignment for Split Valuated Materials

    Dear All,
    We have a scenario where in our material is split valuated,we have 2 valuation type import and Domestic, both the valuation type is being supplied by a single distributor, the price of the import valuation type is different from the price of domestic valuation type.
    We are trying to configure consiginment process for split valuted material.While maintianing consignment info record, we are not able to maintian separate info record for import and domestic valuation type (since material /vendor/plant/purchase organization are same).Hence while doing goods issue using 201 K, the system is taking the price from the info record.Is there any solution available, to post the  goods issue for import valuation type at a different price and domestic valuation type at different price.
    Thanks,
    Vairavan.

    How system will pick the info record price for movement type 201 K ?
    As of my knowledge, system will create accounting entry as per the material price (MM03 - Accounting 1 view for the valuation type)
    It may create problem for 411 K movement type, but not for movement type 201 K.
    If you need to pick different price as per valuation type, then you can do this via condition table.
    Have a look into the discussion Info record Price on the basis of Valuation type

  • Error when doing two step transfer between Plants with split valuation

    Hi expert,
    I´ve activated split valuation for Material X , it has three Valuation types ( NEW, REPAIR and DAMAGE ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    Hi,
    What do you mean with "inconcistent to my storage type definition?", is that mean i can process two step transfer without using PO/delivery process or one-step movement? coz according to business requirement, we must use two step transfer considering to the distance between plants is so far and we want to make it the simple way so that PO/Delivery process isn't better solution. I think, this is an standard procedure all company over the world can use but just the reason of split valuation the system can't execute the transaction.
    Is there any config i miss to? is there any user exit i can use for this requirement? please help me..
    thanks,
    AJ

  • Split valuation for material

    Dear all,
    I'm facing issue when trying to assign "Valuation category" to Material in Material master Accounting view.
    Purpose of doing this is to achieve split valuation. But system is blocking me to do that due to PO created for the material before.
    Refer below that steps happen for the scenario:
    1. Material 123 created without split valuation.
    2. Create PO 999 for the material 123, follow by full GR of qty 10 and eventually "delivery completed" marked for the material.
    3. Using MIGO movement 261 to perform GI qty 10 for production usage.
    4. Now Production order has been finished, and wish to bring back the qty 10 to Non-valuated stock.
    5. Goto MM02 change Material 123 to assign "Valuation category" in Accounting view. Error returned by system " Purchase order 999 item 00010 already exist".
    For the case, do you know how to get rid of the error in order for me to assign "Valuation category" after PO has been created for the Material?
    Please comment.

    Hi,
    Have you activated Split valuation ???? Before using valuation category.
    the process you followed is correct. Now the stock is 0.
    You need to configure Split Valuation :
    1.To use split valuation, you have to activate it using TCode 'OMW0'.
    2.To select split valuation ('OMWC'), proceed as follows: 
    2.1. Determine the valuation categories and valuation types that are allowed for all valuation areas: 
    - global valuation categories via menu "Goto --> Global Categories" 
    - global valuation types via menu "Goto --> Global Types" 
    2.2. Allocate the valuation types to the valuation categories. 
    a) Select "Goto --> Global Categories". 
    b) Position the cursor on a valuation category and select 
    "Goto --> Global Categories --> Assignments --> 'Types->Category'". 
    c) Activate the valuation types you want. 
    2.3. Determine the local valuation categories for each valuation area. 
    a) Select "Goto --> Local definitions". 
    b) Position the cursor on a valuation area and select 
    "Goto --> Local Definitions --> Allocate Categoires->Org.units (button Cats->(OU)". 
    You obtain a list of the global valuation categories. 
    c) Activate the categories to be used in this valuation area. 
    The system creates the local valuation types based on the allocations under point 2.2.
    Now you assign the Valuation Category in Material MAster Accouinting View.
    Hope this is useful for you.
    Regards,
    Smitha

  • Split valuation conflict

    Folks,
    2 questions related to split valuation:
    1) We've valuation level at company code and split valuation active. We have set  valuation type A as a default in tcode OMWC. In the stock determination rule, we've set that valuation type A and B can be assigned to a delivery. Now, the default valuation type A will prevent B from doing GR as the default in the PO is set to A. There is no possibility to make different settings in OMWC for external PO's and internal PO's. How can we arrange that a valuation type different from the default can be processed during GR. How can we handle multiple valuation types in 1 PO automatically (so not splitting the different types into different PO-items)?
    2) When entering a specific batch with a different valuation type then the default A, system gives a hard error. Is it possible to have the valuation type of the batch overrule the default?

    Do you have the material master accounting view s created for A and B valuation type?
    What is the exact message  and its message number?

  • Batch and Split valuation

    Hi Friends,
                                      I need bach anagement for all our raw materials and some materials need split valuation ( imported, domestic) based on orizin. When I assign both, valuation type only selectable . But I want the batch control for FIFO. can anybody suggest, how to maintain both options?
    Regards,

    1. split valuation
    Valuation type
    http://www.sap123.com/showthread.php?t=29
    2.batch
    2-a - active batch mgmt in mat master
    2-b- do batch config steps.
    3.  FIFO.
    If Batch Management is active for the materials then use following process;
    First create characteristic in CT04 for Batch Creation Date, under "Addnl data", enter Table Name MCH1 or MCHA (As per Batch Class 022 or 023) and Field ERSDA and save it.
    Assign this characteristics in CL02 in your Batch Class.
    CU70 - Create a Sort Rule and specify the Characteristic of Batch Creation Date and activate "Ascending" indicator.
    Now assign the Sort Rule in MBC1 and keep Selection criteria as "O" for the Strategy type.
    Now do batch determination in MIGO.

  • Error Split Valuation

    Hai...
    When i processing PGI ....i get an error
    saying  that ..........Material - 12450871  9030 not subject to split valuation
    12450871 is Material
    9030 is Plant
    regards
    pathys

    Hello Parthasarathy,
    might be that, you have maintained the valuation category in the accounting view 1 of the material master record.
    If you dont need the split valuation, remove that valuation category.
    I hope this solves your problem.
    Regards

  • Material 2000590 3101 not subject to split valuation

    Dear All,
                   We are trying to transfer Material from our One plant to another Plant with help STO ( Stock Transfer Method ) .
    at the time purcahse order creation we are not facing  any issue . after that we are creating Delivery Order from Transaction VL10B.
    But At the time VL02n transaction at the time of PGI we are getting problem / Error regarding
    "Material 2000590 3101 not subject to split valuation "
    so that we are not able to complete our PGI .
    Second at the time of batch Picking for This PGI process . in  Valuation Type column we are getting  " EXTERNAL P "  Valuation
    Type . after on PGI  (Post Goods Issue ) Click we are getting this error .
    Please Help us how we can resolve this issue .
    With Best Regards
    Jaideep Dave

    Hi,
    Please check whather the material is subjected to split valuation in the supply and receiving plant.
    please check the valuation type taken in the PO for this material.
    please try to deliver the material which is unique in its split valuation features in both the plants.
    check the stock batches  in the supplying plant are with which valaution type.
    reply back with more details.