Staging for production

Hi All,
i would like to know the difference between automatiac staging and manual staging for production operation. What config steps are different in both scenarios?
i would like to know what settings are required in control cycle and also the usage of 100 storage type(standard).
pls throw some light on this scenario
Thanks

Hi,
From my point of view, whatever automatically or manually staging for production, the following customizing you have to do in SAP system. In SAP system call it as Replenishment Control:
Replenishment Control Customizing
Process Flow
The internal stock transfer process is at the core of all the different types of replenishment control covered in this lesson. Generally, partial stocks are moved from one storage type to another within a warehouse number. As of SAP R/3 4.6C, you can use replenishment control to supply both fixed storage bins and bins in storage types with random storage. The following programs are available in
the SAP ECC standard system:
1. Report RLLNACH1 for fixed bin replenishment based on bin stock only
2. Report RLLNACH2 for fixed bin replenishment based on bin stock and the current requirements in outbound deliveries
3. Report RLLNACH4 for replenishment in storage types with random storage
To use these programs, you first have to add some storage type specific fields in the second Warehouse Management view of the material masters of all of the affected materials. For delivery-related control, you have to enter a replenishment quantity. For replenishment control based on the bin stock alone, you have to enter a minimum and a maximum quantity (for fixed bin materials, the maximum quantity is often already specified for the quantity-based capacity check and this quantity can be used by replenishment control as well).
As well as maintaining the master data, it is also useful to create at least one new Warehouse  anagement movement type for use in replenishment control. In the standard system there is already a warehouse management movement type, 320, created for replenishment. You can use movement type 319 (replenishment for production) as a template and change some of the details. In the copy, remove
interim storage type 100, the indicator for dynamic storage bin creation, the requirement type, and the GR data in quant indicator. Assign this new movement type to the storage type that needs replenishing in the Define Stock Transfers and Replenishment Control table. This table is in Customizing under Logistics Execution u2192 Warehouse Management u2192 Activities u2192 Transfers u2192 Define Stock Transfers and Replenishment Control.
If you want to make sure that the reserve storage type is always found as the picking storage type for replenishment stock transfers, you can use the Reference storage type search indicator. You assign this indicator, which creates links between Warehouse Management movement types and storage types, to your new replenishment movement type. Unlike many other indicators, you do not have to
define the indicator in a table in advance, you simply enter a numerical value between one and three digits in the Ref.Stor.Type Search field in master record of the the movement type of your choice. You then enter this value in a new entry in the storage type search table (in the Reference Storage Type Search field), with the reserve storage type in first position in the search sequence. If a stock transfer transfer order is created, controlled by your new replenishment type, the system determines this exact table entry on the basis of the indicator and removes the required quantity from the reserve storage type.
Generally, a storage type indicator for stock removal is set for the material that is picked and used for the replenishment. The indicator is set to the fixed bin storage type in the first Warehouse Management view. You can enter an indicator for the reserve storage type in the Stock placement field. The Reference
storage type search indicator separates a “normal” stock removal process from a replenishment stock transfer during the search for a storage type for stock removal.
Good day
Tao

Similar Messages

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Production order status for wm staging for production

    Hi Friends,
    What should be the status of production order for wm staging of raw for production.
    In production order status Confirmed & delivered will I be able to do staging for the production order.
    Thanks,
    Kiran

    Hi
    Material staging should be allowed following the Release of the Production Order.
    Then, as an example, you could have your first operation in the order (OP10) to Consume Materials. This will then backflush the materials in the PSA (Production Supply Area) that the staged materials were taken to. Ensure that the materials are set for Backflushing in the material master in MRP2.
    If the OP10 is confirmed before materials have been staged then they will not appear in the LP12 staging report.
    It's all about timing
    Regards
    Darren

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • Material Staging for Production

    Hi,
    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    Regards
    Shrinivas

    When WM is implemented, is it really necessary to use Production supply area and Control Cycle? or only Interim storage area 100 is sufficient? We are not using any KANBAN features,,
    1.
    If you use WM/PP interface, you use interim storage type 100 for material staging. In this case production supply area is a must.
    In this scenario you move the pick parts to the interim storage type (100) by processing the TR that is created at the time of PrdOrd release (e.g.).
    Please notice that no IM movement is posted at that time. When you get the parts in interim storage type you post IM-mvt 261 and consume the components (so, first WM movements and after that comes IM movmement). Storage type 100 behaves like an interim storage type.
    2.
    If you don't use WM/PP interface you use interim storage type 914. First you post IM-mvt 261 and after that processing the TR (that is created as a consequence of IM booking) you will get the TO and move the parts from normal storage type to 914.
    So, in this case WM movements come after IM movement.
    Regards,
    Csaba

  • Material staging for production orders- NO TR

    Dear Experts,
    I have created a Planned Order for which Component materials are to be supllied.
    I am not able to see the Transfer request for the same.
    Kindly help.
    Please also let me know if there are any configurations for this?
    regards,
    Shetty

    Any suggestions pls?

  • Material Staging for Pick part from MF60

    Hi,
    I would like to do material staging for a Pick part from MF60.
    During staging I get the error as
    WM material staging for production order reservation not possible
    Message no. RMPU311
    Kindly can you tell me how is it possible to perform tthis action using MF60.
    Using LP10 I am able to perform this staging for pick part. But Business requires to perform if from MF60.
    Thank You

    HI,
    It is possible to do staging for pick parts using MF60.
    I am setting up this for a plant, and the existing plants are able to do staging with MF60 for Pick Parts.
    Do you know the configuration that are required for doing staging using Pull List..

  • WM staging for Prod Order

    Hi,
    Gurus,
    Can any1 explain me how to do WM staging for Production order?
    From , Co02 menu, I selected WM staging fro Menu List. After that I gave quantity for BOm matrerial. is it the correct way?

    Denish,
    You would need WM relevant components in production order inorder to get this activated. It will work if WM is active for the component materials.
    Hope this helps give you an insight.
    Thanks,
    Ram

  • Control cycle for production staging SAP WM

    We currently have control cycle for kanban purchase orders. Do I need to create new control cycle production staging. Actually I will be using fixed bin for production consumption. Kindly confirm whether existing control cycle of purchase order can be used.

    Material Staging Indicator for Production Supply
    The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.
    As with the location coordinates (warehouse number, storage type, and storage bin), the system files this indicator in the control cycle.
    The following staging types are supported:
    "1": Pick parts
    These materials are picked according to the required quantity specified in the production order.
    "2": Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    "3": Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "4": Manual staging
    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. In goods receipt posting, postings are made to the production storage bins from the control cycles.
    "0": Not relevant to WM-PP
    These materials are not relevant to WM staging. They cannot be requested using the WM system.

  • Expired stock being picked for production order staging.

    Hi all,
    While picklists are being generated for production order staging, materials that are past their expiry date are being selected and allowed to be picked and confirmed. Is there a way that such expired materials can be excluded from picking?
    Many thanks in advance.
    Kevin.

    Hi,
    As mentione dby Philippe, You can make use of batch search strategy to avoid picking of expired batches be it for production or Customer delivery.
    You can use LS51 transaction to setup batch search strategy WM01 (at Warehouse level) or WM02 (Warehouse / movement type). Hope you maintain classification data for your materials (023 batch class) where you maintain expiry duration and productioninformation etc.  In LS51, select the appropriate batch class and maintain batch parameters as released and  sort the strategy by Shelf life expiration date.
    Storage type startegy search (T334T) has to be maintained accordingly.
    If this helps you kindly reward your points.
    thanks and regards
    Varadharajan

  • How do we have a distinct DB for production & staging?

    Hi all;
    We can push our cloud service up as staging or production. When we do, each needs to hit a different Sql Azure database. Otherwise our staging system will be mucking with the accounts of our users in the production system.
    How can we do this?
    thanks - dave
    What we did for the last 6 months -
    Made the world's coolest reporting & docgen system even more amazing

    hi dave,
    For your scenario, you may need create two SQL Azure data base for staging and production environment. You can use different Configurations file for different environment. I recommend you could refer to this similar issue (http://stackoverflow.com/questions/4328462/staging-or-production-instance/4330628#4330628).
    Regards,
    Will
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Deployment of upgraded site from staging to production - error when trying to access "Content and Structure"

    Hi,
    We recently upgraded a site from SP 2010 to SP 2013. For moving to production, I copied over the content database to production and used the following command to to make the content database accessible in production:
    Mount-SPContentDatabase -Name 'WSS_Content_SSBC' -WebApplication 'https://biprod.bljc.com'
    I then change the host name of the site from staging to production host name using
    $site = Get-SPSite  https://stagingsite.companyname.com
    $site.Rename("https://prodsite.companyname.com")
    The site loads and I can see my content. But when I try to use the "Content And structure" link under "Site Settings" --> "Site administration"
    I receive the following errror:
    Sorry, something went wrong An unexpected error has occurred.
    Technical Details
    Troubleshoot issues with Microsoft SharePoint Foundation.
    Correlation ID: 3fbfcd9c-7185-10a2-6d19-8570d7f15319
    Date and Time: 11/19/2014 3:38:31 PM
    IN THE ULS LOG, THIS IS ONE OF THE ERRORS:
    Application error when access /_layouts/15/sitemanager.aspx, Error=Object reference not set to an instance of an object. 
     at Microsoft.SharePoint.Publishing.Internal.WebControls.ObjectSerializer.DeleteAllowed(Boolean checkPermissions)   
     at Microsoft.SharePoint.Publishing.Internal.WebControls.SmtButtonField.FormatDataValue(Object dataTextValue, Boolean encode)   
     at System.Web.UI.WebControls.BoundField.OnDataBindField(Object sender, EventArgs e)   
     at System.Web.UI.Control.DataBind(Boolean raiseOnDataBinding)   
     at System.Web.UI.Control.DataBindChildren()   
     at System.Web.UI.Control.DataBind(Boolean raiseOnDataBinding)   
     at System.Web.UI.WebControls.GridView.CreateRow(Int32 rowIndex, Int32 dataSourceIndex, DataControlRowType rowType, DataControlRowState rowState, Boolean dataBind, Object dataItem, DataControlField[] fields, TableRowCollection rows, PagedDataSource pagedDataSource)   
     at System.Web.UI.WebControls.GridView.CreateChildControls(IEnumerable dataSource, Boolean dataBinding)   
     at Microsoft.SharePoint.WebControls.SPGridView.CreateChildControls(IEnumerable dataSource, Boolean dataBinding)   
     at System.Web.UI.WebControls.CompositeDataBoundControl.PerformDataBinding(IEnumerable data)   
     at System.Web.UI.WebControls.GridView.PerformDataBinding(IEnumerable data)   
     at System.Web.UI.WebControls.DataBoundControl.OnDataSourceViewSelectCallback(IEnumerable data)   
     at System.Web.UI.WebControls.DataBoundControl.PerformSelect()   
     at System.Web.UI.WebControls.BaseDataBoundControl.EnsureDataBound()   
     at System.Web.UI.WebControls.GridView.OnPreRender(EventArgs e)   
     at System.Web.UI.Control.PreRenderRecursiveInternal()   
     at System.Web.UI.Control.PreRenderRecursiveInternal()   
     at System.Web.UI.Control.PreRenderRecursiveInternal()   
     at System.Web.UI.Control.PreRenderRecursiveInternal()   
     at System.Web.UI.Control.PreRenderRecursiveInternal()   
     at System.Web.UI.Page.ProcessRequestMain(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint)
    BTW, don't know if this applies but production is load balanced and staging is not.
    Thansk,
    Sherazad
    Sherazad

    Hi Sherazad,
    As the Content and Structure is enabled by the SharePoint Publishing feature, I recommend to deactivate and re-activate the publishing feature with the command below to see if the issue still occurs:
    Disable-SPFeature –identity Publishing -URL <sitecollection url>
    Enable-SPFeature -Identity Publishing -url <sitecollection url> -Force
    Thanks,
    Victoria
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Victoria Xia
    TechNet Community Support

  • Changes are not reflected in Staging or Production Database - BCC

    Hi,
    I changed an asset from product catalog and able to see successful deployment in BCC. But, I am not able to see the changes in Staging or Production database.
    I see only changes in Versioned Database.
    Did the following things to see if thee is any error but there is no error during this operations.
    1) Enabled all the logs for DeploymentManager, DeploymentServer.
    2) Ran the CatalogMaintenanceService.
    Please help me in resolving this issue.
    Thanks,
    DKAP

    Adding to Desai, check for the repository mapping in agents, i.e in your production agent, you need to map the repositories to production repositories. For example ProductCatalog should be mapped to ProductCatalogproduction, similarly in Staging agent as well.
    Cheers
    R

  • Deploying  jsp into testing/staging/developement/production environment

    Hi,
    I have a jsp, say header.jsp. It has,say 2links. All these links have different URL's based on the environment this jsp is deployed.
    Snippet of JSP deployed for Test enviroment:
    test_env=hostname:portnumber
    contextroot=webappln
            <TD><A href="https://test_env/webappln/querystring">products</A></TD>
            <TD><A href="https://test_env/webappln/querystring">services</A></TD>
            prod_env=hostname:portnumber
    contextroot=webappln
    Snippet of JSP deployed for Production enviroment:
            <TD><A href="https://prod_env/webappln/querystring">products</A></TD>
            <TD><A href="https://prod_env/webappln/querystring">services</A></TD>
            Problem: For system testing, we need to deploy the code in test/staging and developement servers before it goes into production. Right now i have only one JSP. If i follow my lame procedure, i have to create 3 JSP's for each environement and deploy it in three diff env.Is there a better way?. How to eliminate the duplicate and redundant code in jsp. If the URL's change, need to change at 3 places.Its a big maintenece mess too.
    Insted of making three different jsp's for each environment, i want to use single jsp and dynamically figure out the enviroment and generate the urls appropriately. That way we need to maintain only one JSP. No matter where its deployed(test/stage/dev) the URL's are dynamically generated.
    Snippet of JSP which dynamically generate web resource URL's based on the Env
            //Determine the environment type
            //Generate URL's with proper hostname, port # and context root and set place holder       
           <TD><A href="https://{place holder}/querystring">products</A></TD>
           <TD><A href="https://{place holder}/querystring">services</A></TD>
            Any pointers of how to implement the above case. Any help greatly appreciated.
    Thanks,
    DHM

    Check the action part of the html form tag. On problem I see is in the dev environment you had file.jsp under /jsp but in the production you have it under /dir. This could just be a typo.

Maybe you are looking for

  • How to Track which Super user change the License Administration

    Hi Experts, My client recently encounter the License was allocated from a particular user id by an super user, resulting the end user unable to perform transaction when log onto SAP B1 8.8 PL19. Is there any way which we can trace and control which s

  • DVD Writer not working.

    I using Windows XPSP2 Professonal. My DVD Writer Read any CD/DVD but it cant write. I write that DV D/CD in other PC, Which DVD/CD are not write in my PC. I have one year warranty, 5 Month left.

  • Garageband clean up

    A simple request if anyone can have some idea. I find myself NOT playing much music due to the numbers of plug Ins and attachements that come with them in GB. Would like a complete wipe out with a brand new virgin, yet updated GB download devoid of a

  • TODATE function

    Hi, when i use todate function in the logical column TODATE(Core."Fact - HR - Payroll".PAY_ITEM_AMT, Core."Date"."Year") getting the following error. Query Status: Query Failed: [nQSError: 22046] To use TODATE function, the query level ('Year, Fiscal

  • CANNOT USE YOUR WEBSITE AT ALL!

    THIS WEBSITE IS DRIVING ME CRAZY!  IS IT THIS NEW ROUTER??? DOES ANYONE KNOW IF THERE ARE NEW DRIVERS/DOWNLOADS FOR WRT160N????  I CANNOT GET TO WHERE THEY MIGHT BE.  Version 3.1