Can anyone let me know; issue the material to Subcontract Vendor PO through delivery via shipment?
Present Scenario is,
Create the subcontracting PO (PO with Item Category L)
Issue the material with reference PO through MB1B transport positing using Mov.type 541.
Goods receipt with reference PO by subcontractor MIGO-Good Receipt and using Mov.type-101
MIRO to account for vendor's invoice for payment
Create New separate PO for Transportation of difference Vendor
Do the service entry through ML81N
MIRO to account for Transporter vendor's invoice for payment
Is it possible to Sub contract PO through issue the material via Delivery via shipment?
Please advice.
Regards,
Devendra

It is possible to provide the component to the vendor for existing purchase order through a delivery and shipment.
See below SAP documentation: http://help.sap.com/erp2005_ehp_07/helpdata/en/4d/2b906243ad11d189410000e829fbbd/content.htm
From the SC Stock Monitoring for Vendor list, you can also create a delivery via Shipping. The advantage of this procedure is that you have shipping documents and delivery notes for the shipment of the materials to be provided to the subcontractor
To create a delivery, the following data has to be maintained in the system:
the plant must be assigned a sales organization, a distribution channel, and a division. You can define this in Customizing for Purchasing, in the step Set Up Stock Transport Order.
A delivery type has to be defined for the plant from which the items are to be delivered. You can define this in Customizing for Purchasing, in the step Set Up Subcontract Order.
If you want to reference a reservation when you create a delivery, you also have to set the Predecessor necessary indicator to L (Provision to subcontractor necessary) when defining the delivery type. This means that the requirements generated by the reservations can be correctly offset against the deliveries created. You can define this in Customizing for Shipping, in the step Define Delivery Types.
The vendor for the stock with subcontractor must be entered as the customer in the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
The material to be provided has to be entered for the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
The combination of shipping condition (from the subcontractor’s customer master record), loading group (from the material master record for the components to be provided), and the plant have to be assigned to a shipping point. You can define this in Customizing for Shipping, in the step Assign Shipping Points.
To create a delivery, choose Edit → Create delivery. A dialog box appears, in which you can enter the data required to post the delivery. The system posts the delivery in the background and, after posting, it informs you in a dialog box how many items were posted.

Similar Messages

  • Error when run Process Chain via BPC NW

    Hi Gurus,
    I am implementing SAP BPC 7.5 NW in a customer and I´m facing the following error when try to run a process chain via Data Manager: "Failed to analyze instruction ,TAB,%TAB% ".
    Here is the scenario: we created a process chain that will be able to capture values recorded in a BPC application, load them into an DSO (make some transformations there) and finally send those transformed values to an specific table at ECC. This process will be started after some simulations at BPC and, when the user ends its simulation, start this process chain via BPC; this process chain is named as PC_ECC.
    We made a  copy of /CPMB/DEFAULT_FORMULAS and named it PC_FORMULA and, before step /CPMB/CLEAR, I assigned my process chain PC_ECC.
    So, at Data Manager, I add this process chain (PC_FORMULA) and in Advanced button, I put this statement:
    INFO(%EQU%,=)
    INFO(%TAB%,;)
    TASK(PC_FORMULA,TAB,%TAB%)
    TASK(PC_FORMULA,EQU,%EQU%)
    TASK(PC_FORMULA,SUSER,%USER%)
    TASK(PC_FORMULA,SAPPSET,%APPSET%)
    TASK(PC_FORMULA,SAPP,%APP%)
    //TASK(PC_FORMULA,LOGICFILENAME,DEFAULT.LGF)
    //TASK(PC_FORMULA,REPLACEPARAM,TESTE3%EQU%%TESTE3%%TAB%ASARENT%EQU%%ASARENT%%TAB%SOURCE%EQU%%SOURCE%%TAB%TARGET%EQU%%TARGET%)
    As we do not have any script logic to be executed, we commented the two last statements.
    When we run this package via DM, it gives us the message error:  "Failed to analyze instruction ,TAB,%TAB% "
    Looking through SDN forum we found two posts similar to this issues:
    But the suggestion to supress the statement TASK(PC_FORMULA,TAB,%TAB%) do not work; when we comment this statement, the message error gives us the message:"Failed to analyze instruction ,EQU,%EQU% "; when we comment the statement TASK(PC_FORMULA,EQU,%EQU%) and the previous (with TAB). the DM gives us the message: TASK(PC_FORMULA,SUSER,%SUSER%) and so on, until nothing has left to comment.
    Anyone of you view or has some similar case of error?
    Thanks in advance to you all
    Best Regards
    Adriano

    Hi Rich,
    Thanks for your answer.
    I checked the parameter at my process chain and it has a variant (/CPMB/DEFAULT_FORMULAS_LOGIC) with the parameters:
    TAB
    SUSER
    SELECTION
    SAPPSET
    REPLACEPARAM
    MEMBERSELECTION
    LOGICFILENAME
    EQU
    So, when I put in the task PC_FORMULA, TAB, %TAB%, it will be able to be recognized by the task...and the other parameters too. And when I take one of them off the task instructions, the system complains.
    Any other suggestion?
    Once again, thanks..a.nd best regards
    Adriano

  • Business Process Monitoring via MAI

    Hi Experts,
    Currently I am exploring the new Business Process Monitoring via MAI (Monitoring and Alerting Infrastructure).
    I have setup monitoring objects and I am getting the required alerts.
    Need your help for following questions:
    1. What is the configuration required to send data to BW? For Classic Business Proces monitoring we select 'Keep Data in BW' under Alert Reorganizations. Is there any such configuration in case of BPMon via MAI ?
    2. In which cube is the alert data saved in case of BPMon via MAI ? (For Classic BPMon it is 0SM_BPM)
    3. Is there any configuration guide available for BPMon via MAI ? I have already referred to the presentations on the same.
    Please help me to get the answers.
    Best Regards,
    Kavita

    Hi Keiji,
    As always, your answers have helped us. Thank you for the quick response. Can you help me with the name of the table where BPMon MAI alerts are stored (just like we have DSWP_BPM_ALERTS for classic BPMon alerts. I have searched this table but could not find the BPMon MAI specific alerts.
    FYI, BPMon MAI is configured and is working fine and I am able to see the MAI alerts for the configured Monitoring Objects.
    Thanks again for the information provided.
    Best Regards,
    Kavita Meswani

  • Syntax to launch an OWB process flow via shell

    Hi all,
    do you know what's the syntax to launch a process flow o a mapping via shell?
    I need it to schedule a process flow via crontab.
    Thanks in advance
    Steve

    Hi Steve,
    use SQL*Plus for executing OWB script sqlplus_exec_background_template.sql/sqlplus_exec_template.sql (these scripts are located in OWBHOME/owb/rtp/sql directory) or stored function WB_RT_API_EXEC.RUN_TASK.
    You need connect with SQL*Plus to any registered OWB user on target (DWH) database (for example, you can connect as target schema).
    For more details look at chapter [Using SQL*Plus to Schedule and Execute Jobs|http://download.oracle.com/docs/cd/B31080_01/doc/owb.102/b28225/api_4sqlforjobs.htm#i1064950] from OWB API and Scripting Reference (it is for OWB10gR2, for OWB11g procedure is slightly different).
    Regards,
    Oleg

  • Launch OWB Process Flow via shell

    Hi all,
    I need to know in wich way I can launch an OWB Process Flow via unix shell.
    Could someone drop me the syntax, please?
    Thanks in advance
    Steve

    Hi Steve
    See this prost here;
    sqlplus_exec_template.sql
    essentially .. use sqlplus and the script sqlplus_exec_template passing the parameters.
    Cheers
    David

  • Subcontract Process: Over Delivery is happening

    Hi Friends
    I have configured for  two delivery item categories in order to avoid  over delivery as below .
    ZTAN ;   B Situation rejected with an error mess
    Note: Delivery Item category u201CZTANu201D is for normal business scenario , first sales order followed by delivery .
    LBN : B Situation rejected with an error mess.
    Note: Delivery item category u201CLBNu201D  Subcontract process , first Purchase requisition and PO are created , followed by subcontract delivery, LB .
    Even though  I made this configuration setting for delivery item category , for avoiding over delivery , LB delivery is not throwing any error , it is simply accepting over delivery.
    I.e , when  are only 100 quantities in PO , at delivery level system is accepting 1000 quantities  despite over delivery configuration settings .
    Can I request you to  help on  how to control over delivery for subcontract process ?  . 
    Thanks In Advance
    Jaya

    Dear Jaya
    Subcontracting is basically a MM process and initiated by a purchase order and not by sales oder
    Thedelivery item category controls ( 0VLP) or zero VLP controls will not work at all
    Delivery item category controls will work only if the delivery process is triggered with sales order and will not work for purchase orders even the STO is also purchase order only there also over delivery can not be controlled by zero VLP controls
    So in your case also it will not work
    It needs to be done thro userexit or development
    But from MM side they have a lot of specific controls for delivery tolerances for purchase orders like over delivery tolerance and under delivery tolerance etc like some % defined
    Check with your MM colleague
    Hope this information helps you
    Regards
    Raja
    Edited by: ramanathan raja on Feb 16, 2009 6:06 PM

  • Third Party Subcontracting Process doubt

    Hello all Gurus,
    I have one doubt regarding the third party subcontracting process. I have created a PO with delivery address as that of SC vendor.
    Now how to do the GR for components if the SC vendor lets me know that he has received the materials from the 3rd party vendor??
    Can someone tell me the process after a PO is created for this scenario???
    Thanks and Regards,
    Umakanth.

    Hi,
    As I perceive you are speaking about the provision of subcontracting components from one of your vendor directly to another one,
    In this case you did well if you wrote the vendorID in the suitable field on 'Delivery address' tab of your PO. 'SC Vendor' thickbox should be also checked. This is not the subcontracting PO itself, it is only a PO to procure the components for subcontracting - your SC vendor receive the components directly. That's why there's no point in speaking about 'L' item category.
    After getting information from your SC vendor about the arrival of the goods (components) the only thing you have to do is to do a GR against your PO. The goods will get to your SC vendor's special stock via mvt 101 + 'O'.
    That's all.
    BR
    Csaba

  • Subcontract Process with vendor supplied component

    Hi,
    We have a subcontracting process, when we send 3 components to the vendor, the vendor apply another component and return the semi finished to me.
    I have a BOM of this semi finished Good that includes all the 4 components.
    We sent the 3 components via mb1b.
    We create a PO of the Semi Finished Good if we verified the components the 4 components are there.
    When we try to receive via MIGO and click in verify The 3 itens that I send is OK ... But the item that is supplied by the vendor show me an error message that there is no stock.
    What should I do to receive the component supplied by the vendor ?

    Hello,
    1. Create subcontracting with item category "L"  and second line item in same PO enter with Item cateogroy means STD.
    2. Item level of the  Delivery address tab, tick SC Vendor and enter the same Vendor code there.
    3.Go for  GR for only for  2nd line item first. This stock will automatically picks 101 O Mvt, and u can view this stock as Vendor stock.
    Check MMBE  stock overview , Material is showing provided to Vendor at plant level.
    4. Provide other 3 components with MB1B- 541 Mvt.
    5. Go for second GR for finished Product.
    4th Material shown as Material provided to Vendor in stock overview. if you want to get back that same material to your stock. reverse that stock use  t code MB1B with help of Movement type 542.
    Or else.
    Through subsequnet settelement you can send the 4th Material to your subcontrcator MB04.
    Regards
    Mahesh Naik

  • Subcontracting Process

    Hi
    If any one can explain in detail about scenario material vendor posting directly to subcontracting vendor
    It 's very urgent
    Thanks & Regards,
    Sadhish

    Hi Sadhish,
    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product )
    (material provided to Vendor is now charged to expense)
    (5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to becreated for the material(2) calling for material(1)
    4. Inforecord and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Hope it wud have answered ur question
    Reward if useful
    Aasif

  • What about scrap generated dooring Subcontracting Process

    Hi all
    Good Morning
    In Subcontracting Process(i am sending Components to vendor).What about Scrap generated, how can i enter dooring Migo - Goods Receipt
    Regards
    Manju

    hi
    frist ly u have to maintain the scrap quantity in -ve value in the subcon po then do the normal process of gr and at time of gr give the actual quantity of the scrap
    but at this stage the system will show the scrap quantity to the subcon stock ,so to make it to own stock do following
    1.
    Scrap
    What kind of scrap we are speaking about?
    a) If you pay the scrap you can get rid of it by MB1A + 551 + 'O' directly from SC vendor's special stock (I mean you can scrap the raw material (subcon-component)).
    b) If the scrap was delivered by your to SC vendor via MVT 541 you can use MB1B + 542 to bring it back. It may happen that the raw material was delivered by one of your other vendors to your SC vendor (in this case the goods got to the special stock via MVT 101 O) - if the situation is this you can create a return delivery (MIGO + PO reference + MVT 122) and ask for replacement. You can also use MB1A + 551 + 'O' or MB1B + 542 - it depends how you want to handle the situation from business point of view.
    2.
    by-product
    You write the by-product with negative qty in the BOM or directly into the component list of the subcon-PO (item level, material data 'tab' in ME2*N). This will be booked by 545 to special stock and if you want to receive this material you can use MB1B + 542.
    the simple process steps are
    1> create a bom tcode cs01 and mention the components and the scrap material but with -ive quantity
    2> creaet a info record with the subcontracting category tcode me11
    3> create a po with item category L tcode me21n
    4> do the good reciept tcode migo
    5> do the subsequent adjustment tcode migo but the display variant should be subsequnet adjustment
    6> do the gr of scrap tcode mb1b movement type 542
    7> do the invoice
    regards
    kunal
    award if helpful
    Edited by: kunal ingale on Aug 9, 2008 7:45 AM

  • Error M7019 BAPI_GOODSMVT_CREATE - Subcontracting process

    Hi,
    I am developing a subcontracting process and using the BAPI_GOODSMVT_CREATE to return the goods, but when I do the low inputs (mov 543) the BAPI returns the following message.
    TYPE       E
    ID               M7
    NUMBER      19
    MESSAGE Combination of movement type 543  and function selected not possible
    LOG_NO     
    LOG_MSG_NO     0
    MESSAGE_V1        543
    MESSAGE_V2     
    MESSAGE_V3     
    MESSAGE_V4     
    PARAMETER            GOODSMVT_ITEM
    I'm using GOODSMVT_CODE = "07" (MB04).
    When I run the same procedure via transaction MB04 I can create the document.
    Has anyone experienced this? Would have any suggestions?
    Thanks
    Sandra Avila

    Hi,
    Successfully execute the BAPI using the help of SAP
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/HowToGoodsMovementswith+BAPI#HowToGoodsMovementswithBAPI-MoreinformationonLINEIDandPARENTID
    Thanks to all
    Sandra Avila

  • Subcontracting Process in SAP

    Hi Friends,
    Please help me to make me understand of subcontracting process for Automotives.
    FYI our Plant is a 3rd party warehouse system. Our requirement is how (which triggers) the Delivery/Delivery Due list shipment of the components of the Subcontracting Assembly from Plant to Subcontractor can be done in SAP.
    How the Planning of the components of Subcontracting Assembly can be done with help of MRP at Subcontractor level. Also we want to keep the safety stock at all the locations including subcontractor for components.
    Any suggestions would be helpful..
    Thanks and Regards,
    Nabin

    Dear,
    There are two main options, I have not clearly understood your requirement, however please go through my explanantion, may be helpful
    The procedure you are talking about in you serial no 1 to 4 is the <b>material subcontract...</b>the procedure is as below
    Let us say you have a final product C.
    C needs B
    B need s A
    A needs raw material X and Y
    In the above case
    C and B is having routing
    In A material master MRP2 view....enter special procurement key as subcontracting(in STD sap the key is 30), procurement key = F
    A has a BOM having items X and Y. No routing for A
    When you run MRP
    System will create Pl order for C and B, SUBCONTACTING PR to A and PR to x and Y
    After you procure X and Y, You can convert PR of A to PO.
    Then you will send the material i.e. issue the material to subcontractor through 541 and special stock O.
    This stock you case see in MMBE with special stock O.
    Once you receive the material A, when you do GR, the materials are issued to A and A will be inventarised with mov type 101.
    The cost of serve and the cost of raw material is booked to cost center entered in subcontracting PO.
    The cost of this will be settled to production order later.

  • Delivery and shipment belong different company code

    Hi all,
    I do shipment via transportation planning point that has different company code to delivery order. the shipment can be done, but when i was doing for shipment cost, there's an error, that said "delivery and shipment belong different company code". can you help me, what happen with this?
    best regard,
    Hendry

    Hi Hendry,
    Please read SAP online help about this:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/f2ee344ecf11d2bf760000e8a7386f/frameset.htm
    Regards,
    Csaba

  • Returns Processing using Inbound delivery transaction VL31N or BORGR

    Hi Experts ,
    Our business Requirement is to use  VL31N /BORGR to process the return deliveries .
    The Standard Functionality of this transaction is restricted to manage the Inbound Processing (Deliveries from Suppliers u2013 Document Category u20187u2019 (Shipping Notification) .
    My question is can we enhance the SAP code to process the retuns delivery  .
    Is it possible to achieve this functionality via Customizing .
    If anyone had such business requirement  and if you a solution for this please help  << Moderator message - Everyone's problem is important >>.
    Regards,
    Rupa
    Edited by: Rob Burbank on Oct 19, 2010 3:25 PM

    Hi ,
    Which kind of return delivery are you speaking about?
    Yes the deivery  is return to vendor .
    Yes we will be  create the return delivery using VL01N  with reference to returns Sales Order .
    But after this oulbound deilvery is created Our business requirement to use BORGR transaction to process it further.
    The BORGR transaction is used for Admin Goods reciept multi GR Posting  and it used to handle only the inbound deliveries only .
    I want to know is it possible to completly process the oubound deliveries using an inbound dleivery transaction  if we modify the SAP code .
    Just want to know if i modify the SAP code using enhancements will the existing SAP code of this program support such deliveries .
    Regards ,
    Rupa

  • Serial numbers for subcontracting process

    Hello Experts,
    We are using SAP ECC 6.0 and trying to implement the subcontracting process with serial numbers. This scenario is focused on those materials that we need to keep track on how many times it has gone to repair (for example, a motor) by specific item. Suppose there's a material called "Material A". However, there are MANY "Motor A"'s, and thus, the need for serial number to keep track on the number of repairs each one has had.
    So, having said that, the scenario is working so far. However, the user CAN'T type in the serial number of the material at the REQUISITION LEVEL. This can be done at the PO level and at the goods receipt level.
    This brings a problem since the Purchasing dept. doesn't know the serial number. This information is known by the user, but there's "serial number" functionality in the requisition. Is there a configuration for this? Could it be possible for the serial number to be in the requisition and then inherit it to the PO?
    We want this in order to automate the process.
    The configuration we made was in the "Plant Maintenance and Customer Service" section, using procedures MMSL "Maintain goods receipt and issue doc." and POSL "Serial numbers in purchase orders". There's no procedure for purchase requisitions. If this can be also done from a Work Order, that will be just fine.
    Let me know if it is possible or if you have any idea on how to do this.
    Regards,
    Gilberto Gallardo.

    Hi,
    Serial no can be used for the following business transactions.
    1. Goods Receipt/Goods isssue and other inventory postings.
    2.sales orders and delivery notes
    3.maintenance orders
    4.production orders.
    Settings:
    1. create a serial number profile in customising.
    2. Assign the serial number profile in the material master record in work
    scheduling view for fert and raw material in plant data / stor2  view..
    Business procedures may be assigned in configuration to a serial number profile.
    The assignment to the serial number profile determines if serial numbers are required , can be assigned, must be assigned,are assigned automatically
    MMSL : Goods issue , receipts,stockj transfers,stock transport orders
    Thanks
    nandha

Maybe you are looking for

  • Recent tabs are not being saved

    I cannot restore my last session or tabs.

  • Audio playback speed too fast

    Please help. After installing Security Update 2010-002 on Leopard 10.5.8 all audio tracks play several bpm faster. This is true for pre created tracks in Logic and playing tracks in Toast or using quick preview. All iTunes material is also affected.

  • Data storage in aggregates,

    Hi Gurus,   Good morning. can any one help me in this issue please. aggregates are the subsets of our infocubes. then where the data is stored in the aggregates. do aggregates have fact tables. if fact tables are present in the aggregates then what a

  • Dependent selectOneChoice

    Hi, I have a table called Parish with attributes ParishId, CountryId, CityId and AreaId. i have created a custom method in my application module for creating records with parameters the table parameters. I build the dependent selectOneChoices using n

  • My screen is now long horizontally and short from top to bottom.

    so now all the cars I search for are long! my friend who is computer savvy tried to help. HELP, Stranded in looooongville, Duckydoodle PS i still have the buttons at the top.