I have a subcontracting process in which I want to forward a material, managed in order stock, to a subcontractor of mine.
I had an old release and I could not manage the material I send to a subcontractor in a MTO way. Now I have upgraded to 6.0 and I'm looking for a way that allows to do this.
can 6.0 help me? Have I manage in the same way?
Thanks a lot.
P.S. I sent a material code and I receive another code.

Dear Rajesha,
I supposed the answer was this....
I think to have understood SAP way, but I hoped SAP had developped something to do what I need and fit for the process.
Example: I built a boat but I have not machinary to weld kell's parts and to manufacture some high-tech tasks. I must to produce in project stock the parts of the kell and I have to forward those parts to a subcontractor to weld them and to do other operations. Then the kell returns to my plant.
To perform this in SAP, I can't use project or order stock till the kell has not returned from the subcontractor. Is It right?
Thanks a lot.

Similar Messages

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Difference between varient configuration and make to order

    hi friends please tell me what is the difference between variant configuration and make to order
    regards
    santosh

    Hi Santosh,
    [Variant Configuration|http://help.sap.com/saphelp_erp2004/helpdata/en/d8/fa9bd49ede11d1903b0000e8a49aad/content.htm]
    [Sales Order Management Make-to-order|http://www50.sap.com/businessmaps/092BF1DFEEB2456DADD0DD0284EBE8A2.htm]
    Assign Points if helpful.
    Thanks and Regards,
    Naveen Dasari.

  • New sales scenarios and Make to Order Process

    Hello,
    We have a plant where we manufacturer for the in group company.
    Now there is more demand from out of group companies and we want to implement make to order scenarios for the new customers. What are the configuration that needs to be done? What do we have to change in the MM, PP, and SD for this make to stock work? We want to implement the make to order process for the old and new customers.. Your help is greatly appreciated.
    Hakan

    Hi Dear,
    You have to do this with Variant configuration.
    configuration of mto
    You can check and search the forum for MTO and Variant config there are lots of Doc.
    Thanks,
    Raja

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Make to stock and make to order

    Hello,
    Is it possible , if we have a sales order (make to order sales order) when running MRP, to ready unrestricted stock. It means, there is a sales order for material A for customer B, in MMBE transaction there is not special stock for customer B, but there is unrestricted stock for material A. So, when running mrp, instead ECC/SAP creates a MTO purchase requisition for customer A, it reads unrestricted stock?
    thanks.
    Renato Rêllo Penna

    i think there is a slight confusion in ur question. material A, customer A??. can u elaborate abit more

  • Make to order and make to stock scenarios in prodcut costing

    Dear Co Experts,
    I am new to product costing, in product costing there are two way to estimate the cost of the product by using make to stock and make to order.
    Kindly tell me the scenario of make to order and make to stock
    In make to order scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
    In make to stock scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
    How we will defend the costing variant in make to order scenario
    I really appreciate for your early response
    pls tell me end to end cycle for both the scenarios
    Warm Regards
    Venkataswamy

    Hi
    In Cost Planning in Product Costing,We configure Cost variant
    Costing variant is a A tool that contains all control parameters for costing, including
    parameters that control how cost estimates are executed and the material
    prices or activity prices that are used to valuate the costing items.
    In Cost Object Controlling  category a)by order b)by period c) sale order
    a) BY Order,We create Co Production Order which will be used in Make To Order Production.
    b) By Period,We create Product Cost Collector which will be used in Make To Stock or Repetitive Manufacturing
    c) By Sale Order,We create sale order with linked to Co production order,We can use Make To Order Scenario.
    Re: Repitative manufacturing
    www.sap-topjobs.com/SpecialPP/samplepc.doc -
    Regards
    Edited by: Dublin on Oct 19, 2009 10:02 AM

  • Make to Order and Make to stock

    Hi Experts,
    I'm using make to stock and make to order scenarios for one material. For this i did the settings at the sales order level. Here we are creating External sales orders and Internal sales orders. In material master we maintained strategy 25 with requirement type KEK and class 046. For make to order, we are creating external sales orders. For this account assignment category is 'M'
    For internal sales orders means Make to stock, we maintained separate item category, Schedule line, Requirement type and Requirement class. Account assignment category 'B'. While creating sales order with requirement type say Ex: ZEK and requirement class say Ex: 007. It is not creating the requirements. and in this case i.e account assignment category, the different sales orders qty for a material are combining and creating the one planned order.
    How to get the requirements for make to stock and get planned orders individually.
    Plz help me?
    Naren

    Is there any option to create planned order from sales order directly in the case of make to stock. I tried for requirement class with account assignment category B and automatic planning. It is giving the error message.
    Account assignment category B does not result in make-to-order production
    Message no. VT372
    Diagnosis
    During automatic individual customer requirements planning, you selected account assignment category B which has value  as a special stock indicator.
    System Response
    Since this does not result in a make-to-order production, the system rejects the process.
    Procedure
    Enter a valid account assignment category. In the standard SAP system, the values 'E' and 'D' have been defined for this purpose.
    Is there any way to get automatic planning with B account assignment category.
    Naren

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

  • Make to stock, make to order issue,

    Hi
       can any body help me out, what are the configuration required in order to activate make to stok, and make to order,where exactly it reflects.
    Thanks

    then you can only ask your customer if he wants to wait or if he wants only 20 and cancel the 5

  • Make To Order With Credit Check.......

    Dear Expert,
    Could i know about Automatic Credit Check-Static and Make to Order with Credit Check...
    Thanking you,

    hi
    in simple credit check it considers only the current sales order with the value assigned to the customer
    but in automatic credit check we have two types
    1. Static: it compares the value assigned to the customer with the value of open sales orders + value of open delivery documents + value of open billing documents + value of billing doc's posted into accounting but for which we have not recieved the payment..
    2. Dynamic : the way of calculation is the same as static but the difference is we have horizon in dynamic credit check
    Example:  in static all the open doc's will be considered for credit check
    but in dynamic if i give the horizon as 2 months
    sales orders for which the delivery date falls after two months will not be considered
    similarly delivery doc's whose billing date is after 2 months will not be considered..
    etc
    even though its a make to order it will be processed using doc type OR
    you assing the credit group to the sales doc
    that is suffecient
    hope this helps
    regards
    ravi

  • Need proper sorting for 1b and 10b in order by close

    Dear friends
    i have a column which has data like this
    pos
    1b
    10b
    when i select this column and make an order by i get the data in following order
    Pos
    10b
    1b
    Techically this is right but logically not. i wan them to come in following way when i apply order by
    Pos
    1b
    10b
    Please advise

    col text format a10
    col ccc format a10
    select
    text
    ,to_number(substr(text,1,length(text) - length(ltrim(text,'01234567890')))) nnn
    ,substr(text,length(ltrim(text,'01234567890'))) ccc
    from
    ( select '1a' text from dual
    union select '10a' text from dual
    union select '3330b' text from dual
    union select '430b' text from dual
    union select '430a' text from dual
    union select '430' text from dual
    order by
    to_number(substr
    (text || 'z' ,1,length(text || 'z') - length(ltrim(text || 'z','01234567890')))
    TEXT NNN CCC
    1a 1 1a
    10a 10 10a
    430
    430a 430 430a
    430b 430 430b
    3330b 3330 3330b
    6 rows selected.

  • Subcontracting availibility check on make to order stock

    Dear All,
    I have a material let's say  'X' which with a BOM/routing which includes a subcontracting step of material "Y" which is a also a make to stock item. When I create a sales order for material X and run a Plannings run I first produce material Y. Because it's a make to order item the stock it will be customer specific stock. The next step is to send material Y away to the subcontrator, in order to complete material X. However when a create a subcontracting PO and wants to delivery it via transaction ME2O I get the error message that there is no stock available. The reason for this is that teh availibilty check doesn't check the Make to order stock quantities.
    I have treid several option but i am Not able to let sap to check the make to order stock when creating a subcontracting delivery. What I am missing or is this not supported by standard SAP?
    Thanks in advance.

    Dear All,
    Thanks for your replies but it doesn't solve my problem because when creating a delivery SAP still uses the normal availability check (B) and not the client specific availability check (BE).
    Just for the clarification the underlying material is a client specific item (with special stock indicator E) that needs to be send to the subcontractor. However the administrative stock of this material is stored as client specific and won't be picked up when we make a subcontracting delivery because the standard process use availability check B instead of BE.
    Like I mentioned maybe it is not foreseen in the standard functionality.

  • I have alot of loose photos at home (old) and I would love to make a bunch of iphoto books and make the pages like whole page collages?  How do I get my photos into iphoto in order to do this?  Can I make a DVD at the drugstore and add them to iphoto?

    I have alot of loose photos at home (old) and I would love to make a bunch of iphoto books and make the pages like whole page collages?  How do I get my photos into iphoto in order to do this?  Can I make a DVD at the drugstore and add them to iphoto?

    You can make the collages easily if you have iWork.  Just open a letter sized page in landscape mode and drag the photos onto the page, rotate and postiion as necessary.  Then do a Print ➙ PDF ➙ Save PDF to iPhoto to get a 200 dpi jpeg version of the Pages page into iPhoto.  From there you can add it to your book and use a blank page with the option to have an image as the backbround. 
    If you have a 3rd party image editor that supports layers you can create the collage with it. 
    OT

  • Sales order with ref to make to order and with ref to make to production...

    My requirement is as follows:
    Material code : Plant specific and MRP activated
    In one sales organization  the sales order should be created without limitation and with make to order type with ref to above material
    Another sales organization the sale order should be created if stocks are available and with ref to make to production with above material.
    The availability check rule  as no check for first scenario and  Individual requirement for second scenario.
    can it possible ...........

    Hi,
       functionality of availabity check is it checks the material as per order if it is avialable then it confirms quantity & if not then u have to procure or manufacture.
      Mts scenario works for sales from stock while mto to generate requirement via purchase requisition ir plan order.
      however you can configure availabity check for both the scenario by selecting suitable checking group, requirement class, requirement type & schedule lines.
    Reward if it helps u
    Regards
    Dev kumar