Subcontracting components and purchasing a finished product

We have a vendor that sells us the finished product.  However we have to supply them with 2 of the components. One of the issues is that we cannot tell our vendor how much we pay for those 2 components.  And we canu2019t give the parts to the vendor FOC otherwise the board cost will be minus those 2 components. In addition we need to make sure we drive demand for these 2 components.
So Iu2019m stuck. How do we do this in SAP  while driving demand for those two components and not informing our vendor how much those 2 components are and not to screw up costing?
Please note: That I do have a production BOM for the finished product and we only need to supply the vendor with 2 components out of the 100 components that take to build the finished product.

You can create a Subcontracting PO i.e. create a normal PO with Item Category L in ME21N.
Also the components that you need to provide to vendor can be maintained in the Item Details in Material data tab. Note, when the PO is printed vendor will not be able to see any prices of components provided.
You then issue the components to your vendor using T Code ME2O or MB1B (with mvt type 541).
You can receive the components using normal MIGO 101 route.

Similar Messages

  • Purchasing of finished product

    Hi Experts,
                   For finished product we have not maintained the purchasing view in material master. While creating purchase order i am not getting error that material is not maintained for purchasing. Msg no ME 046. But I have checked the system msgs there i have made it error. Still i am not getting. But in developement server error is coming. In production server it is not coming. Kindly help me out.
    Thank you
    Sap MM

    Hi
    First check it out for the material master purchasing views extended or not? Normally fiish product wont have a purchasing view. For this u select the SPRO-SAP IMG- LOGISTICS  GENERAL-bASIC SETTINGS- MASTER DATA -MATERIAL TPE- DEFINE ATTRIBUTES OF MATERIAL TYPE. and select the finish product view and save.
    Then it will appear.
    One more thing, while giving purchasing view in material master, u give the procurement type (both internal and external)
    Regards,
    Raman

  • Subcontracting Vendor and Purchase Vendor

    Dear All,
    I have created separate Pricing Procedure for Subcontracting PO, since the requirement is to calculate the price on issuing qty. I have put Formula Based Condition type.
    We issue 100 KG of material and receive less than 10 KG (say 90-95 KG) but the vendor charges for issuing qty (100 KG)...so I created a new condition type which calculates for total price for 100 KG and calculates for receiving qty...Suppose Rs. 10/KG then in this case its Rs.1000/- but system should calculate unit price for 90 KG i.e. 1000/90 = 11.11 ...this is working fine as long as Iam calling Subcontract Vendor where this Schema Group is assigned in the Vendor Master..
    My problem is, for some Vendors, he is both Subcontracting Vendor and Purchase Vendor...so Iam not able to calculate for Subcontracting calculation with this requirement...where as I have separate calculation schema for Purchase Vendors...
    How to meet this..
    Kindly Suggest
    Regards,
    Gopala.S

    Hi
    Thanks for your quick reply, please give me some brief info on routine, how and where we need to do settings.
    Regards,
    Gopala.s

  • Combination of plant SUNP and material type finished product does not exist

    HI i am  suneel
    my issue is  combination of plant SUNP and material type finished product does not exist  when i posting to material in t.code
    MB!C after entering materiel and qty in the selection screen i pressed enter on that time this massage is happening
    Thanks
    with regards
    suneel

    Hi lakshmi pathi ,
    Sorry for the inconvenience i am new for this sap sd and also this community . Actually  yesterday and today i got lot of solutions  from this community .really i feel very happy with this and i continuous searching for my issues and i got so many solutions. these are also i searched but i dint got any solutions so i posted here .
    sorry for the inconvenience
    any way thanking you for giving valuable suggestion.
    with regards
    suneel

  • Raw mat and procured finish product cost

    we need to run cost run for both raw material and product, we want have the following scenario:
    first mark the raw mat. cost run,  then our finished product will get the future price of raw mat and base on BOM to update the future price of finished product.
    after we mark finished product, we then release raw mat standard price and subsequently release finished product.
    is any solution we can define  costing variant for above scenario?
    we have another scenario, we need to run costing run for finished good A, but this product A 's BOM contain only one procured finished product B, B doesn't have BOM and purchase info record, how can we change product B 's price, so finally finished product A 's standard price will be updated upon costing run?

    Hi ,
    In Costing Variant .. we have a Tab for valuation variant . In the valuation variant type , we have seperate valuations for raw Materials , activities, subcontracting etc .
    Cost Estimate with Quanity Structure will refer to the Costing Variant and compute costs .. Hence , maintain Costing Variant and Valuation Variant properly..
    This will solve both your issues..
    Kindly revert back for any further questions..
    Regards
    Sarada

  • Raw material & its finished product link

    Dear All,
    How to get the raw material and its corresponding finished product link from SAP.Can you please provide the T code (if it is there) otherwise please provide the logic.
    Thanks in advance
    Regards,
    Rubin Luke.

    Hi
    You can verify any material at plant level from SAP standard table MARC using SE16N Tcode.
    else use MM03 display material - before entering the material press F4 and choose plant material selection and enter your plant you can see all the materials for that plant. then you can choose your required material
    then using the transaction CS15 - material where used list
    youu can find the FG materials for which thise material is used as component.
    in CS15 enter the material, flag Direct and flag Material BOM
    Hope this helps
    BR
    SK

  • Avoid posting of Goods receipt of finished product without consumption of components in Subcontracting process

    I have one requirement:
    I provide components using movement type 541 to the subcontracting vendor.
    Now system will allow the goods receipt of the finished product using movement type 101.
    If the components which are to be consumed using movement type 543 O are unchecked when doing goods receipt of the finished product then system will allow to do the goods receipt.
    As a result of which the component consumption will not be done.
    Subsequent adjustment can be done but,
    I want to have a check that without consuming the components the system will throw an error message when tried to do goods receipt using movement 101.
    Please advice if it can be done, if so how to achieve it.

    Hi,
    It depends on what you want your subcontractor to do with the faulty raw material stock - if you want them to scrap it you can scrap stock from subcontractor stock using movement type 551 and special stock "O" (the system should prompt you to enter the vendor code). If you want it returned for you to scrap it - movement 542 to return it then scrap it from your own stock.
    You shouldn't receive an additional 20 of the finished parts - as you only received 80 not 100. Close the purchase order off to close off the balance of 20 remaining.
    Thanks

  • Class for Purchase order item components and Production order components

    I'm looking for a some classes.   I'm very new to objects, so I could be searching for them incorrectly.
    The first class I'm looking for is a purchase order class that contains the item components.  I've looked at CL_PO_ITEM_HANDLE_MM and CL_PO_HEADER_HANDLE_MM.  I couldn't find components as a part of either of the classes.
    The second one I'm looking for is not as critical.  It is for the components for a production order.   I have a function module: BAPI_PRODORD_GET_DETAIL that gets the components for the order.  However, to take advantage of objects - I read somewhere - that if possible I should avoid calling a function module.
    Any help that you could give would be greatly appreciated.
    Thank you!
    Michelle

    Hello Michelle
    I do not think there are already classes available on ERP 6.0 for reading production order (yet I might be wrong...). However, regarding purchase order you are already on the right track.
    *& Report  ZUS_SDN_OO_READ_PO
    *& Thread: Class for Purchase order item components and Production order components
    *& <a class="jive_macro jive_macro_thread" href="" __jive_macro_name="thread" modifiedtitle="true" __default_attr="1206523"></a>
    "& NOTE: Coding adapted from BAPI_PO_GETDETAIL1
    REPORT  zus_sdn_oo_read_po.
    TYPE-POOLS: abap, mmpur.
    PARAMETER:
      p_ebeln   TYPE ebeln  DEFAULT '3000000045'.
    DATA: gs_document    TYPE mepo_document,
          go_po          TYPE REF TO cl_po_header_handle_mm,
          gs_header      TYPE mepoheader,
          gd_tcode       TYPE sy-tcode,
          gd_result      TYPE mmpur_bool.
    data: gt_items       type PURCHASE_ORDER_ITEMS,
          gs_itm         type PURCHASE_ORDER_ITEM,
          gs_item        type mepoitem.
    START-OF-SELECTION.
    *  prepare creation of PO instance
      gs_document-doc_type    = 'F'.
      gs_document-process     = mmpur_po_process.
      gs_document-trtyp       = 'A'.  " anz.  => display
      gs_document-doc_key(10) = p_ebeln.
    *  object creation and initialization
    **  l_ebeln = purchaseorder.
      CREATE OBJECT go_po.
      CALL METHOD go_po->po_initialize( im_document = gs_document ).
      CALL METHOD go_po->set_po_number( im_po_number = p_ebeln ).
      CALL METHOD go_po->set_state( cl_po_header_handle_mm=>c_available ).
    *  read purchase order from database
      gd_tcode = 'ME23N'.
      CALL METHOD go_po->po_read
        EXPORTING
          im_tcode     = gd_tcode
          im_trtyp     = gs_document-trtyp
          im_aktyp     = gs_document-trtyp
          im_po_number = p_ebeln
          im_document  = gs_document
        IMPORTING
          ex_result    = gd_result.
    *  there was a problem in reading the PO
      IF ( gd_result EQ mmpur_no ).
    **    l_messages = l_handler->get_list_for_bapi( ).
    **    PERFORM return TABLES l_messages return
    **                          poitem poschedule poaccount.
    **    CALL METHOD l_po->po_close( ).
      ELSE.
        gs_header = go_po->if_purchase_order_mm~get_data( ).
        WRITE: / gs_header-ebeln,
                 gs_header-bukrs,
                 gs_header-bsart,
                 gs_header-lifnr.
      ENDIF.
      gt_items = go_po->if_purchase_order_mm~get_items( ).
      LOOP AT gt_items INTO gs_itm.
        gs_item = gs_itm-item->get_data( ).
        write: / gs_item-ebelp,
                 gs_item-matnr,
                 gs_item-menge.
      ENDLOOP.
    END-OF-SELECTION.
    Regards
      Uwe

  • I tried to download Mavericks overnight and it never finished.  When I tried to download again I got this message "We could not complete your purchase.The product distribution file could not be verified. It may be damaged or was not signed." Help?

    I tried to re-download Mavericks after an apparent failed attempt and now I get the message "We could not complete your purchase.  The product distribution file could not be verified.  It may be damaged or was not signed."
    Can anybody help?

    Several causes for this problem have been reported. Please take each of the following steps that you haven't already tried. Stop when it's resolved.
    Step 1
    Back up all data.
    From the menu bar, select
     ▹ System Preferences... ▹ Network
    If the preference pane is locked, click the lock icon in the lower left corner and enter your password to unlock it. Then click the Advanced button and select the Proxies tab. If any proxy options are selected, make a note of them and then deselect them. You don’t need to change the bypass or FTP settings. Click OK and then Apply. Test. The result may be that you can't connect to any web server. Restore the previous settings if that happens.
    Step 2
    Rebuild the Spotlight index. If you try to search now from the magnifying-glass icon in the top right corner of the display, there will be an indication that indexing is in progress.
    Step 3
    Start up in safe mode and log in to the account with the problem. You must hold down the shift key twice: once when you boot, and again when you log in.
    Note: If FileVault is enabled, or if a firmware password is set, or if the boot volume is a Fusion Drive or a software RAID, you can’t do this. Ask for further instructions.
    Safe mode is much slower to boot and run than normal, with limited graphics performance, and some things won’t work at all, including sound output and Wi-Fi on certain models. The next normal boot may also be somewhat slow.
    The login screen appears even if you usually login automatically. You must know your login password in order to log in. If you’ve forgotten the password, you will need to reset it before you begin.
    Test while in safe mode. Same problem?
    After testing, reboot as usual (not in safe mode) and verify that you still have the problem. Post the results of the test.

  • Change in finished product inventories / cost components

    Hello,
    We are in the process of implementing SAP and couldn't get an answer to the following.
    Our understanding is that the production cost of each finished product is calculated by SAP based on cost components. After manufacturing, the finished products are transferred to the finished product inventory. The change in finished product inventory account (say 713000) is credited with the production cost of the product.
    Instead of having this single 713000 account impacted, we would like to have the change in finished product inventory broken down into several, say 713001 raw material component in finished product, 713002 labour cost component in finished product, 713003 subcontracting cost component etc. Can we get SAP to credit automatically each of these accounts based on the cost component (or group of cost components) information in the system ? How should we configure it ? (is there a link between the cost component or group of cost component and the account)
    Many thanks for your help
    Best regards

    Hi Vincent,
    In my understanding you are not clear with the requirement and therefore you are struggling with SAP. Please understand the following:
    1. The posting of GL accounts are determined by valuation class in material master. So if you want to post on different GLs please define those many valuation class in MM and assign the correct Valuation class to FG goods.
    2. When you confirm the production, SAP post the goods issue (i.e. material you define in BOM) by debiting the Material consumption account and credit  the invertory accounts. And also post the goods receipt posting by debiting the FG inventory account and credit the Factory output a/c.
    3. Here you have to convience your client that it is best pratice to have one inventory account for one material type, like RM inventory, SFG inventory and FG inventory. Normally we classify the consumption posting in different GLs like Material consumption, Labour consuption, Overhead utilization etc. and that you can define in your cost component structure by grouping the relevent GLs in given cost component items.
    4. You have to explain them how SAP works in product costing and how GL documents are posted. You have to also explain them the posting impact in P&L and BS.
    I will suggest that you should rediscuss the requirement and explain them the SAP way of valuation and posting. It is a big change management issue and as a CO consultant it is most challenging task.
    Thanks and all the best,
    Vivek

  • HT201304 Visa has changed for the purchase of Apple products, i did not know how I put the new MasterCard number to finish the process of buying products Thank you

    Visa has changed for the purchase of Apple products, i did not know how I put the new MasterCard number to finish the process of buying products Thank you
    i have ibad mini
    and iphone4
    laptop sony
    can you sent for me the anser

    Changing Account Information  >  http://support.apple.com/kb/HT1918

  • Function module to get the valid Subcontract BOM and components for Pur doc

    Hello Gurus,
    I need help to create a z report of subcontracting bom and their components exploded in Schedule agreement. Seems like there is no standard report which can give the boms from purcashing doc.  Can someone please tell me the name of the function module for it? any help will be highly appreciated.
    Regards,
    Owais

    hi
    u can use
    STPO BOM - item
    STAS BOMs - Item Selection
    STZU Permanent BOM data
    also check stko or mast or stpo
    or
    Perhaps you can run ST05 while run some transaction for display the
    BOM.
    Once the transaction for display the BOM gets finished, you need to stop the
    trace on ST05 and then display it, you will see tables readden in the
    transaction,
    not tried plz check*
    reward if helpful
    regards
    kunal
    Edited by: kunal ingale on Jul 22, 2008 6:21 AM

  • Purchase requisition generate for alternative bom use for finished product

    i hav alternative BOM for finished product in which different raw material component in both BOM of same finished product.But when i RUN MRP that time only one raw material requisition generate another alternative bom raw material requision not generate.
       Is there any option when i RUN MRP that time we select one of the alternative bom component of  raw material for generation purchase requisition.
    Thnaks in Advance

    Dear ,
    MRP will select the BOM based on the MRP4-BOM Explosion tab -Selection Indicator .It can eitehr of these ways :
    1.Maintain Production Version with  different Alternative BOM  and keep Selection Indicator -3 .So sysetm will look into only the Valaidty  and lot size of the Production version and select the correct BOM to explode  and generate PR for depednts based on stock situation
    2.If you maintain Blank -then it will look into order qty and select the BOM according ly
    As in your case , selection methods 3 will fit  and you need to maintain PV with correct validity and lot size in MMR-MRP4-PV option .
    Try in sand box with different lot size and validity with indicator-3 .Create Order and run MRP-MD02-1,,3,3,3,2
    Check and revert
    Regards
    JH

  • I have rented a movie on apple tv and wish to finish it on my mac book air. When I open iTunes on my mac book air I can not see the movie in iTunes. It is an authorised device and I can see other purchases just. How do I fix it?

    I have rented a movie on apple tv and wish to finish it on my mac book air. When I open iTunes on my mac book air I can not see the movie in iTunes. It is an authorised device and I can see other purchases just. How do I fix it?

    Rented movies downloaded to an Apple TV can't be transferred to any other device.
    (86941)

  • How to bifurcate production order and purchase order

    hi all,
    is it possible to bifurcate all open production order and purchase order quantity of items.
    ex:i have one item like ffp001 it is showing 100 order quantity.but i want only open purchase quantity.i checked (item master data-->righ click--->Avail to promise) its showing open production and purchase quantity.so i need only open purchase quantity.
    Plz tell me the process of Bifurcation of open orders.
    thanks&Regards,
    P.Pratap

    Hi,
    By default there is no option , as a workaround you can use below method,
    Create 2 warehouse , for example Purchase , Production
    When ever you create purchase order use "Purchase" warehouse, Use production warehouse in production
    In the "Available to Promise" Report you have warehouse filter option.
    Using this filter you achieve can achieve your requirement.
    OR
    Right click "Filter Table"
    Document -> Start with-> PO
    Now you can see only PO
    Refer below image

Maybe you are looking for

  • InDesign Middle Eastern CS4 copy/paste problem

    Hey guys, I usually work on the US version of InDesign CS4 on a Mac... But for a series of projects I need to do for Dubai, I am using the ME InDesign CS4 on PC. Sigh. Now, my problem is, when I copy/paste what our translator sent us from WordPad (I

  • Can't release layer in PS CS5

    I found a bug where every now and then when I'm dragging a layer around where it won't drop back into the layers menu, it's stuck on the cursor and won't realse, I end up having to quit photoshop. I've tried hitting the escape key but it won't diseng

  • ITunes not finding/syncing contacs

    Hi, i found my old iPod 1 and I'm trying to sync the contacs from my laptop with Windows 8 to the iPod but iTunes (latest version) can't find the contacts with Windows Contacts nor with Outlook. Please help! Thanks.

  • Import class

    Hi guyz... I'm a first time user of Jbuilder7, i have 4 classes, Queue (Stand alone class), Consumer (1st Thread), Producer (2nd Thread), QueueSystem(driver class). Inside Queue i have two methods, "Fetch & Deposit", to be used by both threads, Consu

  • Possible to combine Panther into one disk?

    Hello, I own my own set of Panther disks.. I wanted to know if its possible to combine all three disks into one DVD? Has anyone did that or ever attempted to do so? From Tiger onward all my disks have been DVD's naturally.