Hi
pp gurus
How to handle the subcontrating item scrap
my scenerio is like this "x " item will be send out side for subcontract for one operation while receiving "y" item plus some scrap "s" will come inside.
How to create the Bom and how to handle the scrap. I am sending halb type to subcontracting. Which item has to be marked as -ve quantity pl explain clearly
how to create this type of Bom what type of item category is required?
i am maintaning the material master data for scrap also.
regards
mohan

Hi,
Let us imagine halb is sent out & we receive FERT along with SCRAP.
create a Bom for FERT, usage 1.
Then in the item details enter HALB in the first row.
Then in the second row enter SCRAP(material) & enter as (Eg) 2- .
Then after mrp run you will get a pur req. Convert this as Pur ord & then use mb1b or me2o & send the halb to the contractor thro 541 movement.
Then after the work, do MIGO 101 movement.
Here you can see that along with the FERT, the scrap is also received.
Regards,
Senthilkumar

Similar Messages

  • Fixed quantity in BOM item

    Hi,
    Plz suggest me,
    we are having conductor div.n we req Drum to wind a wire coductor these drums having size of std lagging for dispatch but length is varied in coductor for winding.when i wan to fixed the quntity of lagging for perticular drum i used key fixed quntiy but at time conversion from pln order to prod order, system takes only fixed quantity for 10 drums also e.g.1 drum =65 lags & for 10 drum=65 lags after fixed key used.
      But my reqmt is that when i will make prod order at that time the system varies the lagging nos. with propertion to lenth of conductor & that shuld not happen lagging nos. shoul be fixed.So plz tell me the procedure for this thing
    thank u
    Regards-
    jagdish

    Hi jagdish
    Fixed quantity in BOM means. Always it will create proposal for that particulare quantity only irrespective of the order quantity
    For ex if you say for MAT A in BOM the quantity is 1 No and if you tick fixed quantity indicator. The system will always create proposal for 1 No irrespective of the BOM header quantity.
    This will be useful to create fixed quantity for a order for inspection or other purpose.
    If you want MRP to be exploded as per the BOM header quantity. Use alternate unit of purchase.
    Hope this is clear
    Regards
    J . Saravan

  • Decimal quantity in BOM

    Dear Gurus,
    Need Urgent help. We want to use decimal quantity in BOM componenets. If base unit of measurement PC is used then system not allowing to use but if PCS is used then system allows to use decimal quantity. Please let us know other repurcussions of using decimal quantity in BOM. We are having following concerns while using PC
    1. Practically issuing material in decimal to production order is not possible.
    2. if system round off the quantity then there will be variance in planned cost & actual cost
    What could be the effect in other modules if PCS is used.
    Regards,
    SAP CONS

    In SAP R/3 all quantity fields use the domain MENG13 so even though your unit PC is not allowing any decimals it is still storing the values with 3 decimal places. If you do not mention any value in decimal rounding in transaction code CUNI (Table T006-ANDEC) it will take the rounding value as 0 decimal places. If you do not mention any value in Decimal places CUNI (T006-DECAN) it will display zero decimals. BUT internally it storing it as 1.000. In the BOM you will just see it as 1
    So as per knowledge it should not affect anything. You  can go ahead and change the PC in CUNI and set both values "Decimal places" and "Decimal pl. rounding" to 3.
    Refer to this note to get more understanding
    https://service.sap.com/sap/support/notes/931971
    Also refer to this post.
    Re: Changing Decimal Places in CUNI

  • How to get calculated component quantity for BOM like in CS12

    Hi All,
    Please let me know how to get the calculated component quantity of BOM similar to the field in CS12.
    Regards
    Mahesh

    hi,
       [http://www.sap-topjobs.com/SpecialPP/overviewdoc1.pdf]

  • How to get Initial quantity in BOM

    Hi Friends ,
                     My requirement is to display the initial quantity and changed quantity of BOM , i am getting changed quantity but i am unable to display initial quantity in my report.I have searched all the BOM tables but initial quantity is not there in tables .
    please help.
    Regards,
    Sravani.

    Hi ,
    Change document tables means CDHDR and CDPOS you need to check if the history of the field you are looking for is activated with change logs then you can find the old values  ...also can you please check why do you want the value as for transaction data it is current value which matters not the history ...
    Pleas explain the field and where it comes in transaction so that we  can provide you exact way to get the history ..Also remember it must not be a calculated field to get from the table ...
    Thanks,
    Anjaneya

  • -ve quantity in bom

    Dear all,
    I am putting -ve quantity in bom for one component .As per proposation same quantity comes in Production order.then I do GI and GR .
    let me know when this -ve quantity component will be trigged? at time of GR or GI ? but in my case both thimes its not comming .
    so wht are the setting required?
    Kindly help

    Dear,
    i didnt get ur question that for what purpose u are putting -ve qty in BOM for particular component?
    As per my knowledge, when u put any -ve qty in BOM, then this qty marked as a bi-product..
    While doing GR for this component the negative quantity will be obtained through 531 movement in
    MB1C.
    Can u just eloaborate ur problem ? so that  we can discuss in detail..
    pls revert back soon...
    rgrds,
    RAVI

  • Can not put decimal quantity in BOM quantity

    Hi all,
                 while go to put decimal quantity in BOM quantity, sytem is not allowing me. It is only allowing me to put only integer number.
    with regards,
    partha

    Partha,
    Is it an error or warning message. Like Suhas said it might be due to User settings. Change the format for numbers to decimal (middle one) in User settings.
    IF it is a warning message it may be that the UOm does not support decimals as per customizing. Check in CUNI.
    Regards
    Ram

  • Base Quantity in BOM

    Hi all,
    I needed to change the base quantity in BOM for one of the materials, but I found out that after changing, the component quantity in BOM did not change accordingly.
    Is there any way to update the component quantity according to the ratio?
    Thanks all

    Hi there,
    Thanks for your prompt reply.
    I'll better be specific with my question with an example:
    I have this material, AA-XXXX that was in the following BOM settings:
    Base quantity: 1000 pcs
    Components:
    BB-YYYY - 23.6kg
    CC-YYYY - 10.2kg
    DD-YYYY - 234 pcs
    We're required to change the base quantity in bom header. After I changed it to 2000 pcs, I noticed that the qty for components remain unchanged in BOM. I know during creating production order, the qty for those components will be calculated/changed accordingly. But what happened now that the components shown in BOM did not change according to the change of base quantity?
    Thanks
    Edited by: TY Ng on Jun 4, 2008 10:46 AM

  • Negative quantity in BOM

    Hi Experts,
    I wanted to know is negative quantity allowed for BOM components? Is yes, why?
    Thanks,
    Gulshan

    hi,
      The following example is able to understood usage of negative quantity in bom material list.
    example:
    If you look at a petro chemical refining industry their main input material will be "Crude oil" during refining they get "Petrol", "Diesel", "Kerosene", "Naptha" & "Water" etc...
    So the whole of the production cost should not go to "Petrol" alone, as Diesel, Kerosene and "Naptha" are also sellable. Water is not sold out, but is being used internal for the operation.
    In this scenario "Petrol". "Diesel", "Kerosene" and "Naptha" are defined as co-products in the material master. And the cost which needs to be distributed among them are in the ratio 30:30:20:20, so in the joint production details we select the apportionment structure, and here we define the equivalence number by entering the materials and numbers as required by us as 30:30:20:20.
    Now BOM is defined for the main product "Petrol" and Diesel", "Kerosene", "Naptha" and Water are defined in -ve quantity. Here the definition of water goes as "BiProduct". Crude oil is defined as component in +ve quantity. Now during order costing/product costing/settlement considers the entire cost of production based on the crude oil cost and infrastructure cost and it splits into the ratio defined in the equivalence number.
    regards
    muthuraman.d

  • Fixed quantity in BOM during Backflush

    Hello,
    An assembly has a component in its BOM & this component has fixed quantity indicator set in BOM.
    When i execute MFBF for assembly, system do not post GI for  the component (fixed quantity indicator set in BOM).
    Please explain.
    Thanks in advance
    Keith

    Keith,
    This is standard behaviour in SAP.
    The explaination given by SAP is that for a planned order you can perform multiple times of backflush, so it may not make sense to bring up this component for posting the fixed quantity every time.
    So you need to follow a simple procedure to post Setup activity cost and Fixed quantity components. In the intial screen of MFBF transaction you would find a button "Details"(or press F5 button) click on this button "Details" pop-up screen would appear here you need to activate the check box for field "Post ordering Costs" and press enter key or green tick mark, you would be back in the Intial screen of MFBF now if you go to post with correction function you can find the fixed quantiy component also in the list.
    Hope this helps and also clarifies your doubt,
    Regards,
    Prasobh

  • Zero quantity in BOM

    Hi,
    I been through many thread for BOM component quantity zero, but i need suggestion for my specific case.
    some stock materials they treat as consumables (those have high price items used in shop floor)so they want category as consumables in BOM and want to enter specific material number with zero quantity.
    i can create "C" category by avoiding back flush option for them but how can we give zero as quantity.
    Any suggestions specific to consumables in BOM?
    Thanks in advance.

    SAP has been very backward in not recognizing the need for quantity zero in the BOM.  Every other system I have been exposed to over a 30+ year career in Materials Management allows this capability.  Oracle allows it.  Baan allows it.  APICS classes speak of the need for it.  Only SAP seems to not "feel the need".  I think this is because somebody at SAP 30 years ago said that because you can't divide by zero, we (the programmers) can't figure out how to calculate certain things.  Well in 30 years, I figure they could have written the code necessary to ignore calculations for costing and other things whenever you bump into quantity zero.  What, maybe ten lines of code would cover that?
    Reasons Why You Need Qty 0 in BOMs
    1.  A/R Materials (As Required):  Lubricants or Adhesives required to build a product are not rationed out by the drop, or by the bottle, but left to the assembler to determine the appropriate quantity based on SOE instructions.  On the drawings, Engineers will call out A/R (as required) in the qty box.
    2.  Variable qty items:  Shims or trimmer balance weights are issued as one each, but cannot be determined until the assembly of the product occurs.  As appropriate, differing quantities are issued to the product to fit the need for the specific machine being built.
    3.  REF Materials.  Quite often, assembly drawings will need to show the mating interface with other parts of the machine which are not actually part of the assembly.  In this case, we would show the interface as u201CREFu201D on one assembly, but as quantity u201C1u201D on another assembly.
    4.  Tooling:  Tooling needs to be tracked and linked to the assemblies that it is used on.  But it does not get consumed on a one-for-one basis with the assembly.  So we want to use SAP where-used capability by linking each tool within each BOM where it is relevant, but show the quantity as u201C0u201D.  On the drawing tooling is called out as REF.
    5.  Must Choose Optional Choices:  On u201Cassemble-to-orderu201D products, one of several different choices may be needed for various parts of the machine configuration.  These u201Cmust chooseu201D options are items where the machine will not be functional without one of the available choices (such as three choices of tires on a car.  The way these options are handled on the drawings is by showing them with Alpha characters in the quantity field where you u201Cmust chooseu201D one of the u201CAu201D items, one of the u201CBu201D items, and one of the u201CCu201D items to have a fully configured, workable machine.  On the BOMs, we call out all the choices as qty 0, with a note to refer to the customer sales order for which choice has been made.
    6.  May Choose Optional Choices:   On u201Cassemble-to-orderu201D products, in the case where an option is a u201Cmay chooseu201D option you may either order or the option or not; the machine will operate fine either way.  In this case the option would show on the drawing with an u201C*u201D in the quantity field and on the SAP BOM, you would call out quantity u201C0u201D with a note to refer to the customer sales order for which choice has been made.
    7.  Acceptable Substitute Items:  In some cases two interchangeable part numbers may be acceptable to use in the product.  For example, two manufacturers make RF drivers that are fully compatible and work fine in our machine.  But Field Service required the use of two distinct part numbers for reliability tracking, so the drawings allow for either part A or part B to be used.  Depending on the current cost/reliability/availability of the two parts, we will designate one item as quantity u201C1u201D in the SAP BOM and the other item as quantity u201C0u201D.  On the drawing, you call out one item as quantity u201C1u201D and the other as quantity u201C*u201D with a note explaining the ability to substitute one item for the other as desired.
    8.  JIT KIT support:  In order to efficiently procure and build product, we may create documents that are u201Csetsu201D of material that can be procured on a single PO.  So we end up with one set of drawings depicting way the machine is built and resides in the field for the next X years, and another group of drawings defining sets of material in special packaging aiding in efficient build of the product.  On both groups of drawings the quantity would be u201C1u201D (or whatever qty is needed on the machine) but in the SAP BOMs, only the JITKIT BOM would have a quantity >0.  The manufacturing BOMs would call out the u201Csetu201D as qty 1 but all the individual pieces of the set would be called out as qty u201C0u201D.  In that way when you look at the where-use of a component in one of the sets, you would be able to determine what assembly drawings the item appears on, and also which drawing is the u201Cactiveu201D driver of the material.
    9.  Request to move certain items to later in the build process:  Assembly drawings usually show the assembly in the finished state, as the assembly will look out in the field being used by the customer.  But internally in the factory we often desire the assembly to be built to an unfinished level with some pieces missing to allow for easier testing of the full product.  Or we may choose not to put the final cosmetic touches on a machine until close to the shipping point in order to avoid scratching or denting of exterior surfaces.  For example, a modulator assembly will be built with recyclable in-house panels and only have the finished panels swapped out for the recyclable tooling panels at the clean, pack, and ship operation.  Other assemblies will have access panels omitted altogether to allow for easy access for machine tuning in final test.  These missing panels would be added at clean, pack, and ship.  So in the SAP BOMs, we change the quantity from u201C1u201D to u201C0u201D in the assembly BOM, and create separate BOMs showing quantity u201C1u201D with the clean, pack, and ship items that complete the assembly built days or weeks earlier.
    Edited by: Jim Bathgate on Nov 22, 2010 5:13 PM

  • How to calculate  extended quantity in BOM IMPLOSION QUERY

    Hi guys,
    I have given an assignment to create BOM  item where used report, For this purpose I am using an BOM implosion API  (PACKAGE.PROCEDURE = BOMPIINQ.IMPLODER_USEREXIT)
    I am calling this API like this-
    declare
      V_SEQUENCE_ID    number;
      v_err_msg        VARCHAR2(80);
      v_err_code       NUMBER;
      V_DATE           VARCHAR2 (30);
    begin
    delete BOM_SMALL_IMPL_TEMP;
    -- V_SEQUENCE_ID:=142354;
    SELECT BOM_IMPLOSION_TEMP_S.NEXTVAL INTO V_SEQUENCE_ID FROM SYS.DUAL;
    SELECT TO_CHAR (SYSDATE, 'YYYY/MM/DD HH24:MI') INTO V_DATE FROM DUAL;
    BOMPIINQ.IMPLODER_USEREXIT (
            SEQUENCE_ID => V_SEQUENCE_ID,        
            ENG_MFG_FLAG => 1,                   
            ORG_ID => :org_id,             
            IMPL_FLAG => 1,                    
            DISPLAY_OPTION => 1,                    
            LEVELS_TO_IMPLODE => 10,             
            ITEM_ID =>:item_id,           --34077520002
            IMPL_DATE => V_DATE,
            unit_number_from =>null,
              unit_number_to=>null,               
            ERR_MSG => v_err_msg,
            ERR_CODE =>v_err_code,
            organization_option =>1,
            organization_hierarchy =>null,
            serial_number_from =>null,
              serial_number_to =>null
    end;
    Now I query the table BOM_SMALL_IMPL_TEMP and it shows the data as per the structure of the item where used.
    NOW ALL I WANT IS I WANT TO CALCULATE EXTENDED QUANTITY  (PARENT-QTY * ITS_CHILD_QTY)
    CURRENTLY IT SHOWS ONLY COMPONENT QUANTITY. HOW CAN I CALCULATE EXTENDED QUANTITY LIKE WE DO IN BOM EXPLOSION?
    Can any one help me on this?
    Thanks,
    Himanshu Gupta

    Thanks , Yes it works but need to work out.
    I have used rather calling API and then query using this-
    select t1.*,
    DECODE(T1.PART,T1.PART,(SELECT DISTINCT SEGMENT1 FROM MSI WHERE INVENTORY_ITEM_ID = T1.PART)) LOWEST_ITEM,
    DECODE(T1.PART,T1.PART,(SELECT DISTINCT DESCRIPTION FROM MSI WHERE INVENTORY_ITEM_ID = T1.PART)) LOWEST_ITEM_DESC,
    t2.segment1 PARENT_ITEM,
    T2.DESCRIPTION PARENT_DESCRIPTION,
    T2.ITEM_TYPE PARENT_ITEM_TYPE,
    DECODE(T2.ORGANIZATION_ID, 125, 'MU1', 126, 'MU2') ORG_CODE,
    T3.ITEM_COST,
    T1.QTY*T3.ITEM_COST EXTENDED_COST
    from
    (select t.*
             from (WITH t AS (SELECT distinct SYS_CONNECT_BY_PATH(a.parent_item_id, '\') || '\' || a.current_item_id || '\' as path,
                                              a.component_quantity qty_per_assembly
                                FROM BOM_SMALL_IMPL_TEMP1 a,
                                     mtl_system_items_b      b
                               where a.parent_item_id = b.inventory_item_id
                                 and b.organization_id = a.organization_id
                               START WITH b.item_type IN ('SA','FG MFG')
                              --CONNECT BY  a.current_item_id = PRIOR a.parent_item_id
                              CONNECT BY nocycle a.parent_item_id = PRIOR
                                         a.current_item_id)
                    SELECT root_part, part, SUM(qty) AS qty
                      FROM (SELECT SUBSTR(t1.path,
                                          2,
                                          INSTR(t1.path,'\', 1, 2) -
                                          INSTR(t1.path, '\', 1, 1) - 1) as ROOT_PART,
                                   SUBSTR(t1.path,
                                          INSTR(t1.path, '\', -1, 2) + 1,
                                          INSTR(t1.path,'\', -1, 1) -
                                          INSTR(t1.path, '\', -1, 2) - 1) as PART,
                                   (SELECT EXP(SUM(LN(t2.qty_per_assembly)))
                                      FROM t t2
                                     WHERE t1.path LIKE t2.path || '%') AS qty
                              FROM t t1
                             GROUP BY t1.path)
                     GROUP BY root_part, part) t
                   where t.part = :lt_part
           ) t1,
          mtl_system_items_b t2, CST_ITEM_COSTS T3
    where t1.root_part = t2.inventory_item_id
    AND T1.PART = T3.INVENTORY_ITEM_ID
    AND T2.ORGANIZATION_ID = T3
    .ORGANIZATION_ID
       --and t2.item_type = 'FG MFG'
       and t2.organization_id = :lt_org;
    and now it is running perfectly

  • Direct Production - Fixed quantity in BOM

    Dear PP Gurus,
    Need your expert on this question, we have a direct production in a Pharma process. The scenario is that we have a fixed loss quantity in the mixing which we setup in the filling BOM.
    With the direct production, each requirement is pegged to a planned order. There will be two planned order.
    So, one planned order is the actual requirement order and the other is the for the fixed quantity for mixing process.
    Is it possible to consolidate the two planned order quantity in one process order and the additional planned order,can it be delete automatically by MRP run or some method?
    Appreciate for any feedback
    Thanks & Regards
    Pooja.

    Dear Girish,
    In the Mixing material wiht a master data with a special procurement key = 52 (Direct Production) in te material master and select the collective order. = 2 in the MRP 4
    In Mixing, there is a fixed loss of the certain quantity wen the solution passto te next Filling process. In the Filling process, BOM, there a fixed quantity indicate.
    So, usng the Direct Production, the mixing material will be proposed two planned order with different segment.
    The other remain te same.
    By consolidating the fixed quantity and order quantity in one process order, but the fixed quantity planned order is not going to deleted when you run MRP.
    So, the question is there a way to handle this requiremen with the order and fixed quatity, can be consolidate and the additional planned order to be deleted (or manual deletion )
    Appreciate yur assitance
    Regards
    Bee Lee

  • Migo GR subcontracting 543 error quantity for BOM

    Hello,
    i have a BOM with 1 material and with quantity 1 to 1.
    i have a schedule agreement....
    we use ME2O for subcontractor send composant...
    when i use migo for reception...i have a problem with the quantity of composant
    for exemple
    BOM
    Maratial A ==> Material B with quantity 1 to 1PC
    at Migo
    code movement 101 ==> Material A =10PC
    code movement 543 ==> Material B = 2PC
    why i have this error?
    BOM has no  modification and as universal BOM( code 3)...
    some others reception= ok
    thx a lot
    Edited by: Driss Ait-hassoun on Mar 21, 2011 4:21 PM

    Hi All
    Is it right that the MIGO will try to make the GR into the same storagelocation as it was send from.
    the sceneraio is that I have send some goods from our main storage location and want to do the GR in our GR storagelocation, but when I try to make a GR in MIGO there is two lines one for GR into main storage and one for GR into GR storage location
    Is this normal or did I need to change anything, the problem is that I got a error if I try to GR into main storage.
    Jakob

  • Problem with item/component quantity in BOM

    Dear All,
    Our requrement for few BOM components are 6,250FT and 1.540,123 FT respectively.(i.e.  six point two five zero foot and One thousand five hundred and fourty foot and point one two three inches). This unit is perfect in transaction CS02/CS03.
    But ,when look at the same units in transaction CS11,  6,250FT has been rounded off to 7 FT (seven) and 1.540,123 FT has been rounded off to 1.541 FT.
    Kindly let me know, if this is the standard behaviour of SAP, or else should i make any configuration change, so that the units are same in both the transactions ?
    My requirement is that the units in CS03 and CS11 should be same.
    Best regards,
    K.Kumar.

    Dear
    In SAP standard , BOM qty will be upto 3 decimal points .If you  have BOM Qty as 1.2345  , CS11/CS12/CS13 all of this will populate as 1.235  which means it is rounded up to three decimal points because in SAP-T-code CUNI -Slect  UOM-Hit of on UOM tan  -Seleclt the UOM -Double Click  -Goto Decimal Place Rounding option -Here it will upto 3 DECIMAL POINT
    Based on this Alloable set up in SAP Stanard , it will roundede till 3 decimal point .
    If you want to make it more , then you need to have change in base QTY of BOM so that it will be both the same but larger .