Hi,
I am loading data from two DSO's (let's call them A and B) to another DSO (B) in BI 7 with a BW3.5 delta infopackage.
Now I want to know where I can find information on the timestamp or last request from the last delta load from A and B to C.
So in fact I would like to know how the system knows which requests in A en B have not been loaded to C yet at the next delta load.
In which table can I find the information for ODS A and B that is used by the system to define what data in the change log has been loaded or not to ODS C or other targets. (In fact I should have a comparison table in BW as ROOS* in R3)
Thanks in advance!
Kind regards,
Bart

Hi Guys,
Thanks for the answers.
I know how to check everything in the Workbench, but I want to know where the information of the delta is stored technically.
Just for the sake of completeness:
Due to some issues; several successive loads from A and B were correctly loaded into DSO C (the 'new' table), but could not be activated. It is not possible to do a repeat or anything else. I am not going into too much detail, but just take this for granted.
The only way we can 'solve' the problem is to make the system believe that the 3 last loads (activated data) in A and the two last loads in B have not been loaded to C yet. Just deleting the last delta's in C and do a new delta from A and B to C will not work.
Therefore I want to 'manipulate' the table that is being read by a delta load. If I can change the timestamp or request numbers in that table, I can make the system believe that some requests have not been loaded to C yet.
Dirty, but it should work I think. But I am still figuring out what table contains information about the datamart data source (8A and 8B) and the last delta load to the targets.
Hope this is more clear.
Thanks in advance!
Kind regards,
Bart

Similar Messages

  • Problem loading from DATA MART to ODS, SERVICE-API

    Hi gurus,
    I have a problem loading data from data mart to ODS, full load.
    But, if i try extractor itself (test in RSA3) it works fine.
    I already replicated, generated,check transfer rules....datamart but when i try to load data, I get this to messages:
    Message no. R3005
    "The InfoSource 8TEST_MM specified in the data request, is not defined in the
    source system."
    Message no. RSM340
    Errors in source system.
    BTW: This test system was copied from production system. And so far I had no problems with system, but i never tried loading from data marts.
    Any ideas?
    Regards, Uros

    Thanks, for your answer.
    I already did that and everything is fine, I see the infosource, and if I test the extractor it works fine, but the infopackage gives me above mentioned errors.
    I already looked through notes and I couldn't find anything useful.
    I forgot to mention that I generated export data source from transacional ODS.
    Regards, Uros

  • Automatic loading from data marts

    Hi All,
    I have a cube which has a data flow wherein I have an ODS1 which gives data to ODS2 and then finally to the cube.
    I have put this entire process in a process chain.
    But many a times due to an erroneous record,. the ODS1 loading fails and then I have to manually correct the PSA and do a manual activation too in ODS1.
    I
    I now want to know whether the system will pick up the processes again from the process chain and do further loading automatically OR if there is a possibility of automated loading settings be defined in the infopackage so as to do subsequent data targets once I have done it successfully in ODS1???
    Also, if I do such a setting, then the job will be done in my username or BWALEREMOTE??
    Thanks,
    Sharmishtha Biswas

    Thnaks for ur reply,
    But it is possible that the data mart does it automatically??
    As I have observed that some of the subequent infoproviders get loaded automatically after I manually load and activate one data mart.
    I wanted to find an explanation for this..
    Thanks,
    sharmishtha

  • Error in delta loading from a planning cube

    hi all,
    I am using a delta load from one planning cube to another.When the changed records are of a magnitude of 100 then it is successful but when the records are of magnitude of 100000 then it stays yellow with no data records sent and eventually fails.the packet size is 20000.
    any help is appreciated.

    Hello Ajay,
    Have you checked that your Request is closed in the planning cube? FM RSAPO_CLOSE_TRANS_REQUEST will do it
    It is a customizing issue to tell the infopackage to end "green" when it has no data.
    Transaction Spro ==> SAP Netweaver ==> SAP Business Information Warehouse ==> Automated Processes ==> Monitor Settings ==> Set Traffic Light Color. There you have to set the Traffic light on green if no data is available in the system.
    Hope that helps
    best regards
    Yannick

  • TSV_TNEW_PAGE_ALLOC_FAILED - BCS load from data stream task

    Hi experts,
    We had a short dump when executing BCS Load from Data Stream task. The message is: TSV_TNEW_PAGE_ALLOC_FAILED.
    No storage space available for extending an internal table.
    What happened? How we can solve this error?
    Thanks
    Marilia

    Hi,
    Most likely, the remedy for your problem is the same as in my answer to your another question:
    Raise Exception when execute UCMON

  • Delta load from planning area to third party system

    Hi All,
    Generally we sent full data load from DP planning area to back up cube in BW system..But suppose we are to send delta load from DP planning area to third party BW system, then what changes we need to do on the DP planning area side so that we send all the changed data from livecache. Can this be done in a standard way?
    Thanks

    Hi Tarun,
    It's not possible to extract delta loads from the APO planning areas. The delta loads are only possible with standard BW objects,  and planning area is not a BW object.
    SAP doesn't provide the functionality to have delta loads when you use export data source based on the planning area.
    PS: From backup point of view, anyway having delta load would not make much sense. We take the backup as a snapshot of a particular time, and if restoration is required, based on the request numer or the date of extraction, we restore the relevant data from cube to the planning area.
    Thanks - Pawan

  • Can we use 0INFOPROV as a selection in Load from Data Stream

    Hi,
    We have implemented BW-SEM BPS and BCS (SEM-BW - 602 and BI 7 ) in our company.
    We have two BPS cubes for Cost Center and Revenue Planning and we have Actuals Data staging cube, we use 0SEM_BCS_10 to load actuals.
    We created a MultiProvider on BPS cubes and Staging cube as a Source Data Basis for BCS.
    Issue:
    When loading plan data or Actuals data into BCS (0BCS_C11) cube using Load from Data Stream method, we have performance issue, We automated load process in a Process Chain. Some times it take about 20 hrs for only Plan data load for 3 group currencies and then elimination tasks.
    What I noticed is, (for example/) when loading Plan data, system is also reading Actuals Cube which is not required, there is no selection available in Mapping or selection tab where I can restrict data load from a particular cube.
    I tried to add 0INFOPROV into databasis but then it doen't show up as selection option in the data collection tasks.
    Is there a way where I can restrict data load into BCS using this load option and able to restrict on cube I will be reading data from ?
    I know that there is a filter Badi available, but not sure how it works.
    Thanks !!
    Naveen Rao Kattela

    Thanks Eugene,
    We do have other characteristics like Value Type (10 = Actual and 20 = Plan) and Version (100 = USD Actual and 200 = USD Plan), but when I am loading data into BCS using Load from Data Stream method, the request goes to all the underlying cubes, which in my case are Planning cubes and Actual Cube, but I don't want request to goto Actual Cube when I am running only Plan load. I think its causing some performance issue.
    For this reason I am thinking if I can use 0INFOPROV as we use in Bex queries to filter the InfoProvider so that the data load performance will improve. 
    I was able to to bring in 0INFOPROV into DataBasis by adding 0INFOPROV  in the characteristics folder used by the Data Basis.
    I am able to see this InfoObject Data Stream Fileds tab. I checked marked it to use it in the selection and regenerated the databasis.
    I was expecting that now this field would be available for selection in data collection method, but its not.
    So If its confirmed that there is no way we can use 0INFOPROV as a selection then I would suggest my client for a redesign of the DataBasis it self.
    Thanks,
    Naveen Rao Kattela

  • Process for Flat file delta load from Application server to transactional??

    I want to do a flat file extraction in delta loads from application server and that should be loaded into a transactional cubes scheduling a process chain.
    Can any one help with ABAP code and step by step process for this?
    Thank you
    Devi

    Hi Devi,
    As per your explaination, you want to load a list of files from application server using process chain.
    You can do this with below steps.
    1) Create a Event and call event to run Process chain multiple times.
    2) Put all filenames in a file say, source-File
    3) Write a rooting to read filename from Source-File and trigger InfoPackage
    4) At the end of the process chain create new customized program which will delete first line from Source-File so that it will take next file in next run as well as delete currently loaded file. Once this is done trigger event again to start process chain again.
    Regards,
    Ganesh

  • Historical Data with it's delta loading from PSA to ODS in 3.x model

    Hello ,
    I want to load the one year back historical data with it's delta's to ODS object in BW 3.x model .
    So can you please give steps to load historical data from PSA table into ODS object(not from the source system).
    Thnaks alot
    Regards
    BI Beginner

    Hi
    Run the full load IP from PSA to ODS with selections on 0CALDAY(give one year selections)
    make this full load as repair full request.In display mode of IP, in menu bar click on scheduler --> select repair full --->check the option and click ok.
    now execute the IP.
    If you run like this, your init which has between your PSA and ODS will no get disturb.
    Regards,
    Venkatesh.

  • Issue in loading data from data mart

    Actual load is from APO to BW is happening, but load gets failed when it is loaded from base cube to target cube (data mart), this flow is in 3.5.
    Attached document contains the system msg.

    Your load is still in process.
    Where load failure mesasge?
    Try to activate source 8DSO/Cube and later actiavte update rules thru prorgams.
    Can you check your job details from SM37.
    From info pack monitor, copy request id.
    Go SM37,Job name - <enter copied request id>.
    Use job status - Active/cancel/finished.
    Use proper data ranges.
    User - *

  • Issue with delta load from R/3 to BW

    Hi frnds,
    There is a standarded D.S  2LIS_05_ITEM in R/3. Evereday We extraceted data from R/3 to BW based on this standard Data Source with delta load.There are two fields ZX and ZY in BW ,some times the data haven't extracted for this 2 fields in BW with the delta update.But some times this 2 fields properly extracted in to BW with the same delta update.
    Why is it happen like this ? Please give some inputs on this.
    Regards,
    Satya.

    Hello,
    if its a standard field then its getting populated in correct way.
    if its custom field then you need to analyze the records for which its getting populated and for one which its not.
    Quite possible that some cutomization in CMOD results in this behaviour.
    Also,check underlying tables to see the correct values.
    Regards
    Ajeet

  • Delta load from r3 to bw ?

    i have one question on the mechanism of data transfer from r3 to bi 7.0. the followings is my concerns:
    scenario:
    The total numer of data is 1000 rows and these rows are seperated into 10 data package , each package contains 100 rows.
    Now bw is trying to recieve these 10 packages from r3 in sequence.
    When 5 data packages have been transfer to bi psa. the network is broken and the tranfer is canceled at the 6th data package.
    What i want to know is when the network is reconnected ,Does the transfer start from the 6th data package?
    How to find out whether its a delta load or a full load if a transfer is scheduled from r3 to bw ? For both CUBE & ODS.
    How to find out how many records have been transfered from r3 to bw while the transfer has ended in
    the middle ? I mean how to check how many records have been successfully transfered from r3 to cube/ods .Please tell me for ods as well as cube.
    Is the continuation of transfer process is same for both ODS & INFOCUBE, if it ends in the middle ?
    What is the procedure for full load & Delta load in case of CUBE & ODS ? I mean how to reschedule the transfer.
    And if the whole scenario is is in the support, SO I will be handling these issues on the live production server. Am I right ? So in this case my user id should have access to all the production r3 and production bw to do these change status to red and delete the request and reload the request etc., So I should be logging on to the production server and do all the manipulation, Am I right ?
    Last doubt, what is repair request and so if the transfer stops in the middle we change the status to red and reload the request again , Is it called repair request ?
    What is the difference between repeat delta & repair request & repair delta ? When do we choose these options, In which scenarios ?
    How do we schedule a daily load job from r3 to bw without the use of process chains ? I mean daily it should fetch the records from r3 to bw from the SD datasources at 10.00 PM ,how do we do that ?
    Please I am having all these doubts and I want you SAP experts to answer them please so that I can clear my doubts in production support . I really appreciate if someone explain me the scenarios here. It will be a really great help if someonce clears these doubts.

    Hi......
    What i want to know is when the network is reconnected ,Does the transfer start from the 6th data package?
    If your connection is broken in between......inspite your load is through PSA...........you have to delete the request from the target(after making the QM status red)............then you have to reload it again............But before repeating the load check the connection is ok or not in SM59........
    How to find out whether its a delta load or a full load if a transfer is scheduled from r3 to bw ? For both CUBE & ODS
    This you can check in IP scheduler in the Update tab...........whether it is delta or full load.......
    or you can also check in IP monitor(You can go here through RSMO..........IP monitor screen will open directly here............or you can also go through RSA1>> Find your IP >> Double click on it >> Click on the monitor icon in the top >> From the you will go to the IP monitor>> the under the Header Tab you can see whether it is a delta or Full update...........
    Or you can check the datasource also..........
    If it is a generic datasource go to RSO2..........and check...........If it is a standard datasource check it in RSA5...........
    How to find out how many records have been transfered from r3 to bw while the transfer has ended in the middle ? I mean how to check how many records have been successfully transfered from r3 to cube/ods .Please tell me for ods as well as cube
    Your load cannot be ebded in the middle.........it can failed.............if it fails then you have to delete the request from the target..........and then repeat the load.......
    Is the continuation of transfer process is same for both ODS & INFOCUBE, if it ends in the middle
    Yes.........
    What is the procedure for full load & Delta load in case of CUBE & ODS ? I mean how to reschedule the transfer
    If a full or delta load fails after extraction got completed due lock issue or SID issue.....etc..........and if you load is through PSA.............then just delete the request from the target without making the QM status red.......and reconstruct the request.........no need to repeat the whole load again........
    But if you r load is not through PSA..........then make the QM status red........delete the request from the target........and repeat the load...........
    And if the whole scenario is is in the support, SO I will be handling these issues on the live production server. Am I right ? So in this case my user id should have access to all the production r3 and production bw to do these change status to red and delete the request and reload the request etc., So I should be logging on to the production server and do all the manipulation, Am I right ?
    Yes.......
    What is repair request and so if the transfer stops in the middle we change the status to red and reload the request again , Is it called repair request or reload request?
    Suppose you delta load has failed ............and you have deleted the request from the target without making the QM status red............In this case your data will be lost and your delta mechanism will get corrupted............In this situation.............
    1) Delete the init flag........
    2) You have to do Full repair..........(After filling the set up table)
    3) Init without data transfer to set back the init flag
    4) Then Delta upload.............
    In case of an ODS............you cannot load Full update and delta upload parrallely..............Your ODS activation will fail...........suppose you want full upload in the ODS..............then you have to go for Full repair............
    What is the difference between repeat delta & repair request & repair delta ? When do we choose these options, In which scenarios ?
    I think Full repair concept is now clear............
    Suppose your delta load fails...........After that you delete the request after making the QM status red............Then system will ask for a repeat delta when you will try to repeat the load...........which means it will pick the same delta records of the failed load..........
    How do we schedule a daily load job from r3 to bw without the use of process chains ? I mean daily it should fetch the records from r3 to bw from the SD datasources at 10.00 PM ,how do we do that ?
    This you can do via infopackage or infopackage group...........schedule it at the specific time.....
    Check these links :
    http://help.sap.com/saphelp_nw04/helpdata/en/20/ad673844a7114be10000009b38f842/frameset.htm
    Re: Schedule Infopackage for last day of a fiscal period
    Hope this helps you.........
    Regards,
    Debjani...........

  • Delta load from netezza to sql server

    i have 20 million rows in a table and 100 million rows in another table in netezza
    Very first time, i got all the rows from netezza to sql server....
    Say in a week, we have new rows of data and updated rows in those tables in Netezza,
    how would i go about in doing the delta to sql server??
    should i use
    1) SCD
    2) Merge Statement using T-sql
    3) Lookup
    Not able to decide
    we also need to think about performance as well right
    Can somebody point me to the right resource
    Thanks

    So this is what you load, you require to have 2 tables to make the incremental logic on your side
    a) Load_Log: Here you would capture the load start time/ End time/ max date(modified date) from the Nettiza tables.
    b) As ione suggested load this data to a staging table( this table would be used for comparison against the main table), this step is required as SSIS merge wouldn't be suited for million records, so the comparison is best served in a SP via a merge or classic
    UPSERT 
    Next time the load is run fetch the max date from Load_Log table and pass this as parameter on the source query something like where modified date> param.
    if its a weekly load you might want to run it as daily on source or modify the source query to be like modified date between max date and mas date+1 doing some iterations, though best would be to run on daily basis. a million records would be fine to be
    processed.
    Abhinav http://bishtabhinav.wordpress.com/

  • Delta loading from ODS to InfoCube

    Hai
    Im extracting the data from the custom table into ODS and doing full load everytime for loading delta.
    how can load the only delta from the ODS to InfoCube. what are the setting for this one
    pls let me know
    kumar

    Hai <b>Ravi</b>...
    <u><b>Load the Data From ODS to InfoCube</b></u>:
    Clck as right Click in the Specified ODS.....
    Select the Option " Update ODS Data in Data Target "......
    Then You able to load the Data to any type of DataTarget's(either ODS, InfoCube)
    <i><b>removed</b></i>...
    <u><b>BalajeeKannan</b></u>

  • Delta Load from SAP R/3 to XI

    Hi Experts,
    Please let me know your how can I send the following data using IDoc from R/3 to XI :
    DELTA LOAD
    1.New or changed WBS Elements/Networks (T Code: CJ02, perhaps others)
    2.New or changed Orders (T Code: KO02 (internal), IW32 (PM))
    3.Transaction Data  for capital objects (Not thru XI)
    4.New or changed Cost Elements (T Code: KA02, perhaps others)
    5.New or changed Cost Centers (T Code: KS02, perhaps others)
    Thanks,
    Anirban.
    Moderator message: please do some research before asking.
    Edited by: Thomas Zloch on Mar 21, 2011 10:11 AM

    You must see this in WE05 or BD87. Just release the idoc and have a look at we05 or bd87 and limit down the time where to search. in sm58 you can only see the idoc ith the system can not log on to the remote system. Did you check sm58 in the target system? did you check bd87 in the target system?