For a given production order, I need to get the below mentioned two values for the header material of the production order:
1. Planned or Target finish value
2. Actual confirmed value
will this value be calculated like: 
Target finish quantity x standard price of the material (maintained in MBEW-STPRS)  = Target Finish Value
Actual confirmed quantity x standard price of the material (maintained in MBEW-STPRS)  = Actual confirmed Value
OR
I can get these required value directly in DB table.
Please guide here.
Thanks & regards,
Ravish
Edited by: Ravish Kumar Ojha on Oct 28, 2009 5:41 AM
Edited by: Ravish Kumar Ojha on Oct 28, 2009 5:41 AM

CO03- go to Costs-- Analysis should give you these details.
if you are not OK with the columns appearing, you can change by selecting the change Layout and selecting the required options.
Regards
Ratan

Similar Messages

  • Creating Materials for the Header items and component items

    Hi MM Experts,
    I am doing configuration for the KIT items Sales Processing.
    For that I need to create Materials for Header materials & component materials in MM01.
    I need few inputs regarding for this:
    What Material type ,I should give for the header material and component material in MM01?
    What Item category should used for these Header & components items in the Sales Order ?.
       I am using a Price at Header Level ,so will TAQ suffice me for the Header item ??
    Do i need to maintain separate condition records for the Header material and all the item materials in 
      VK11 ?
    Thanks for your answers in advance.
    Thanks and Regards,
    Umesh Karane.

    Hi
    Any material type... depending on your requirement Normally Finished product.
    Item category Normally use NORM, if u want to use third party slaes then use BANS
    Check it out
    Regards,
    Raman

  • Multiple BOM Explosion in MD04 for the same material

    Dear PP Gurus,
    Scenario is make to order. BOM is created for production usage (1) & sales usage (5) for a Header material. Routing also exists for the same.
    Once i run MRP at plant level or material level after creating sales order , BOM is expoded multiple times i.e. 3- 4 times but proposals ( planned orders) are created as per requirements.But BOM explosion when we click on show overview tree is happening multiple times which should not happen.
    Our client business is not getting hampered by this but still he doesnt want explosion multiple times and to be precise it should not happen.
    Can anyone pls. throw some light on this .
    Thanks in advance . Answers will be rewarded for sure.
    regards,
    Nagraj Vasmate

    Hello Nagraj,
    In MD04, On overview tree, it explodes all possible BOM for the header material.
    System will explode all valid BOM's with usage 5 and 1 for that specific material.
    Reg
    Samson

  • Getting an error while activating a planning area "Enter values for planning horizon From and planning horizon To for the storage time profile level"

    Dear S&OP community,
    I am getting following error while creating a planning ares in a newly installed sandbox. "Enter values for planning horizon From and planning horizon To for the storage time profile level".
    This what I did...
    1) Created new attributes and master data objects and activated them successfully.
    2) Time profile created and activated successfully
    3) Trying to create planing area by assigning  time profile in step 2 and assigned master data from step1..Unable to save the data and system returns 
    this error - "Enter values for planning horizon From and planning horizon To for the storage time profile level"
    My understanding is time profile needs to be active  but doesn't have to have values...
    Any help is appreciated.
    Thanks,
    Krishna

    YS,
    Here are my time profile settings
    Level       Name          Display Horizon - Past  Display Horizon - Future
    1             Monthly     -6                                       11         
    2             Quarterly     -2                                       3
    3             Yearly        -1                                       2
    Time profile is active and but time profile data is not loaded
    Thanks,
    Krishna

  • Display Report Level Filter value and Input Controls Value

    Hi,
    Please let me know how to display Report Level Filter value and Input COntrol values in the report.
    I have 2 tabs in the WebI Report. The first tab has the summary details about the other tabs like reprot desc, prompt values, reprot filter values,etc.
    In the 2nd tab I have the actual report which has input controls defined, prompt values and global level report filters.
    Can anyone please tell me how to display the Report level filter values and the Input Control values in the first tab report.
    For ex: Tab 2 has a Report level filter: Region = NA
    I need to display in Tab 1 in as Region: NA
    I used the function ReportFilterSummary but that is giving me other details, I want only the object name and the value.
    Also how to dispaly the Input Control values in the tab 1.
    Please let me know if you have any suggestions for this issue.
    Thanks

    did you try
    =ReportFilter([Year])
    if you are making report filter over the year, it will return the value of the filter
    by the way, the filter should be applied over all the report not to a specific block to be able to get the correct value
    the Input control also considered as report filter, only if you're applying them on the level of the report, if you applying an input contron over a specific block or chart, you will not get the values for ReportFilter
    good luck

  • How to get po delivered value and po invoived value?

    HI experts,
    i need to create bex query with PO total value,  PO NET VALUE Item wise, po delivered value,
    po still remaining value and po invoiced value.
    AFter extensive search i got 0net_po_val for PO net value item wise.
    Remaining 4. Fields am unable to search in bw targets. So how to proceed?? Any inputs?
    Thanx in advance.
    br,
    Ravi kiran

    Hi Ravi,
    Please find the logic for the same:
    PO Delivered Value
    EKBE (BEWTP = E and SHKZG) SHKZG = S   is positive  and
    SHKZG = H is negative.
    PO Still Remaining Value
    PO Value- PO  Delivered Value
    PO Invoiced Value
    EKBE(BEWTP = Q and SHKZG) SHKZG = S   is positive  and
    SHKZG = H is negative.

  • Sales order net value and invoice net value differ

    Hi Gurus,
    i placed  sale order 03/08/2009 the net value of the order is 30000 USD, the same day i have done some price modification (manually i entered the header condition with value of 50 USD) after entering the header condition sales order net values is showing 50 USD. then delivered and invoiced. in the invoice net value is showing 30000 USD. my requirement is the invoice also has to show the 50 USD only. why it is not showing the sales order net value? is there any setting need to be done  regarding this problem?
    Thanks in advance

    i changed the pricing type as D
    From your comments, I presume in copy control, a different alpha value would have been maintained and with that settings, sale order, delivery and billing were generated.
    What I would suggest you is that you create a sale order once again for the same customer and 5 materials, make same changes in pricing, do PGI and billing.  See how it works.
    thanks
    G. Lakshmipathi

  • The value 1 is not allowed for the field variace key

    Hi experts,
               When i was creating material master i was getting the status message as "the value 1 is not allowed for the field variance key" , but its stopping there its not moving out of that screen and creating the material record. When i see this field in the material master configuration its an optional field. Can you give me suggestions, where it can go wrong.
    Thanks & Regards,
    Ravi.

    Hi
    Can u tell me the field name . I cant get that field ref key. In which view does it come.
    Reg
    Raja

  • How can i get difference in base plan and actual/current plan for a project

    Hi PS Experts,
    How can i get difference in base plan and actual plan .
    For example-
    Project1 is created for 10 days (start and end date difference).
    Now in between -project is extended/changed for 12 days .
    What is the way to get 2 days as a difference in base plan and current plan.
    Thanks
    Suraj prakash

    Hi Suraj,
    You can follow a convention that -
    (1) Forecast Start/Finish dates: Used only for Primary planning, once initial planning is done you should not change these dates.
    Now, you will copy the same dates in Basic Start/Finish dates also.
    (2) Basic Start/Finish dates: Whatever changes are done after the initial planning, you will make the changes only in Basic Start/Finish dates.
    So, in Project Planning board, if you enable Forecast and Basic dates with different color coding, you can clearly see the variation in the Project schedule.
    Hope this helps.

  • I want to set a variable with default value and can be changed by the user

    hi,
    i want to set a variable with default value and can be changed by the user, so i new a variable with setting : customer exit, single value, optional, ready for input.
    in my customer exit code, i set a default value, eg. 20070530
    when the variable screen popup, it display the default value 20070530, i changed it to 20070529, but it doesn't work , it still display the data in 20070530, how can i solve this problem? 
    your help is appreciated.

    Liu,
       As mentioned by Anil, you need to restrict your customerr Exit code to I_STEP = 1.
    or.
       <u>Open your Variable in change mode, in the Last Page os the Variable Maintenance you can provide default value. Note: you are doing same thing in Customer Exit. In your case no need of Customer Exit.</u>
    Nagesh Ganisetti.
    Assign points if it helps.

  • How can I findout the coulm value contains 0 through 9 for the table

    could u plz suggest me how can I findout the coulm value contains <> 0 through 9 for the table...

    Well I am going to give it a shot, because I believe I am looking for the same thing.
    I have a value that is of type varchar2. How can I determine if it has special characters or alpha characters in it? In other words, I only want the value to consist of numbers. (Initially it had been thought that Letters would be used as well, but now they just want numbers and the datatype of the column cannot be altered since there is data in it.)
    I have gotten this far, but I do not know what else I can use besides '[:alpha:]'? I cannot seem to find this documented anywhere...I can find the regexp package reference, but not the character classes...
    select regexp_instr('1a23456', '[[:alpha:]]',1,1,1, 'i') x
    from dual
    This works fine = returns 3, so I know there is an alpha character.
    select regexp_instr('1$23456', '[[:alpha:]]',1,1,1, 'i') x
    from dual
    This returns 0 - what do I need to change so that it detects the '$' and returns 3?
    Thanks!!
    Janel

  • Keep Filter Value and Remove Filter Value

    Hi BI/BW Experts
    Can anyone explain me the concept of Keep Filter Value and Remove Filter Value in Business Explorer Analyzer and the Web Analyzer with a real time examples?
    Thanks
    BI Curious

    Hi,
    Check this links:
    http://help.sap.com/saphelp_nw04s/helpdata/en/43/28d5be53706021e10000000a422035/frameset.htm
    http://help.sap.com/saphelp_nw04s/helpdata/en/45/d45cdc487f6f75e10000000a1553f6/frameset.htm
    http://help.sap.com/saphelp_nw04s/helpdata/en/43/0b532390e96e96e10000000a11466f/frameset.htm
    Hope this helps..........
    Rgs,
    Ravikanth.

  • Who to get Actual Shipment Date for the Sales Order

    Dear All,
         How to Get Actual Shipment Date for the given sales order.
    REgards
    sudheer

    Hai,
    If you want the actual shipment date of an order call the function module RV_ORDER_FLOW_INFORMATION and pass the order number as vbeln in the structure COMWA.select the values from the return table which corresponds to 'J' type which are delivery and get thedate.
    THis will give the actual delivery date (if created).
    Oher way is to look for vbeln in table LIPS using VGBEL = order number as the selection criteria.
    Cheers,
    Sandeep

  • Issue in Exporting the Sales Price List and Purchase Price List for the Materials from SAP Business ByDesign (SAP Cloud)

    Hello Everyone,
    I would like to have a discussion on the issues, which I am facing at the time of Exporting the Sales Price List and Purchase Price List for the Materials from
    SAP Business ByDesign (SAP Cloud).
    (1). Sales Price List :
    We have maintained Customer Group Specific Sales Price List for the Materials in the following Location.
    Location :         Product and Service Portfolio Work Center > Pricing > Price Lists > Customer Group Specific Price List (Type of Price List)
    Target :             We want to export the entire records in some reports or excel sheet.
    Records :          Number of Materials in the Customer Group Specific Price List is more than 2,00,000
    Issues : 
                                         (A). In the SAP Business ByDesign Screen we can filter by number of records but we can export till  50,000 records.
                                                 And if we are trying to export records more than that limit, then it throws "HTTP 500 Internal Server Error".
                                         (B). We could not find any SAP standard reports in Product and Service Portfolio and/or Business Analytics Work Center
                                                for getting the entire record set of the Sales Price List, so that we can have the entire set of records together.
    Searching For :
                                          (A). Is there any SAP reports or data source available for getting the entire Sales Price List records?
                                          (B). Can we have any other filter conditions for exporting the Sales Price List records in a single shot or module wise?
    (2). Purchase Price List :
    We have maintained the Purchase Price List for the Materials in the following Location.
    Location :           Product Portfolio Work Center > List Prices > Active List Prices (Type of Price List)
    Target :               We want to export the entire records in some reports or excel sheet.
    Records :            Number of Materials in the Purchase Price List is more than 4,00,000.
    Issues :  
                                           (A). In the SAP Business ByDesign Screen we can not see more than 10,000 records and the actual number of
                                                   records are more than 4,00,000. We could able to download the records till 10,000 but that is not sufficient.
                                                   We want to export the entire records in an excel sheet.
                                           (B). We could not find any SAP standard reports in Product Portfolio and/or Business Analytics Work Center for
                                                  getting the entire record set of the Purchase Price List, so that we can have the entire set of records together.
    Searching For :
                                           (A). Is there any SAP reports or data source available for getting the entire Purchase Price List records?
                                           (B). Can we have any other filter conditions for exporting the Purchase Price List records in a single shot or module wise?
    Please go through the attached screen shots for the references and more clarity on the issues.
    I am waiting for the valuable responses.
    Thanks and regards,
    Susanta Dey Sarkar
    Bangalore, India
    19th March, 2015

    Dear Michael,
    The number of records :
    2 Million (Approximately) is for the Sales Price List Material Price Data
    4 Million (Approximately) is for the Purchase Price List Material Price Data.
    Regards,
    Susanta Dey Sarkar

  • Actual Time bar for the activity duration in Gantt Chart

    Hi all,
    The Actual time bar for the elapsed activity duration in Gantt chart is not appearing. The same is true for all the activities i.e. activities which are not yet confirmed and activities which are partially confirmed.
    Is there any customizing for the same? ( I am getting the bar in IDES, but not in DEV/QAS/PRD )
    Any Help in this regards will be highly appreciated
    Warm regards,
    Srinivas Potluri

    Hai Srinivas
    Got the solution.
    1)For this first check in the project profile of the Hierarchry graphic -
    Time scheduling profile - check the colour patterns which been assigned.
    2)open the project - Cj20N - go to planning board - bar chart - under settings - Planning board assistant - Gantt chart - check the dates display for Project definition , WBS , Acitivity - try to change the colour and check.
    while changing can see - basic date of the acitivity. based on the confirmation can see the bar confirmed activity with respect to basic date. the bar confirmation will show withrespect to duration.
    3) If the bar chart need in daily /hourly - can check in CNE5 . click on the graphics -bar chart - which u will get the bar chart - in this choose the Time Axis - where can select the monthly /weekly/daily /hourly format .
    Award points if clear and got the solution.
    Regards
    PP

Maybe you are looking for

  • After installing SP3 for BO XI R1 - Crystal Reports taking forever to run.

    Hello, We are running BO XI R1 SP3.  Ever since installing SP3 a number of our scheduled Crystal Reports are taking forever to run.  The Business Objects server resources are okay, CPU never really gets above 50% so I figure perhaps it's our SQL Serv

  • How do i get my "on the go" playlists from ipod to library.

    I have an ipod classic that I manually sync. For speed I make playlists using "on the go" and now have a number of these that I want to transfer from ipod to my library.  The only way I can think of doing this is to revert to automatic syncing. When

  • Error building source distribution of a project containing real-time utility VIs

    I'm using Labview 8.0. When building the source distribution of a project I get the following message: An error occurred while building the following file: C:\Program Files\National Instruments\LabVIEW 8.0\vi.lib\real-time\rtutility.llb\FPC pad/strip

  • Need to renew dhcp lease often

    to use the internet (wireless network) i must renew the dhcp lease every time i click a link or open a window. ive reset internet preferences and removed filesharing software. any ideas?

  • Oracle 9i and windows 2003 R2 installation issues

    Hi All, I have a windows 2003 R2 server with oracle 9.2.0.8 installed both OS and DB are 32bit. The server has 12gb ram and I therefore use AWE and /PAE, however when ever the number of connections exceeds >60 memory errors start to appear and sessio