Templates in Tcode SOLAR_PROJECT_ADMIN

Hi!
I would like to use the templates from Tcode SOLAR_PROJECT_ADMIN --> Project --> Projectstandards --> Documentation types --> Project templates
for the documents in Tcode SOLAR01, SOLAR02.
The problem is that many of them are empty.
<b>How can I use the  templates with content?
Is there some integrated Knowledge management system?</b>
Thank you
regards

Axel
SAP only provides you with some templates.  Not all of the documentation types have templates assign to it & that is why it is "empty". 
You can assign your own company-specific document templates to the existing document types or alternatively create new documentation types & assign the templates there.
Then ensure that these documentation types are assigned to your project so that it is accessible in SOLAR01/SOLAR02.
Regards
Danell

Similar Messages

  • How to delete a maintenance project in tcode solar_project_admin

    Hello!
    I would to delete a maintenance project from tcode solar_project_admin that is involved in Change Request management.
    The problem is that I get the error "The project is already used in Change Request Management".
    My question is:
    - how to delete task list and
    - deactivate the flag change request management
    and to delete the whole project.
    Thank you very much for any helpful information!
    regards
    Thom

    Hi,
    Kindly ensure that the IMG steps has been fulfilled; also the transport domain, domain links and transport routes need to be configured correctly too.
    For solving issue, I would propose you, to complete the maintenance
    cycle by switching the project phase to "in completion" and close the
    tasklist by closing the IMG and CTS projects, and create a new project,
    assign a new maintenance cycle.
    Hope this helps.
    Cheers,
    SH

  • Not able to create project using tcode solar_project_admin

    Hi,
    In solution manager, in tcode solar_project_admin - when creating project, say (SOL200), I got message saying that (Project SOL200 already exists) .
    from tcode solar_project_admin --> Project -> create. 
    I can not create any project, whenever I tried to create a project, I get error  message saying  already exists !! .
    Please suggest on how to create project.
    Thanks and Regards,
    Faris

    SAP Note 1540274 will fix this for you.
    This error happens when the module SPROJECT_CHECK_EXISTENCE has an error in it.
    Plz implement the note to fix the issue.
    The error message you get is : SPROJECT303

  • How to publish template via tcode SE80?

    Hi,
    How to publish template via transaction code SE80 in R/3 to ITS, I could not find correspond buttions or menu path, will anybody tell me more detailed with a sample.
    Thanks a lot.

    Hello tt,
    When in SE80 go to Internet Services, specify an internet service then right click on the service (or template or mime if only one file is to be published) from the tree and select publish.  You can specify where to publish to by going to the menu in SE80: Utilities > Settings > Internet Transaction Server tab > Publish tab.
    Edgar

  • Documents Templates for SOLAR01

    Hi!
    I would like to use document templates via Tcode SOLAR01, such as Business Blueprint.
    Unfortunately some of these templates are blank and do not contain some information (e.g. business blueprint, scenario documentaion)
    It is possible to upload the templates in Tcode SOLAR_PROJECT_ADMIN
    How can get these templates?
    Thank you
    regards

    Hello Aaron,
    If you know the solution to my problem kindly give me the information about it.
    I will award you points, if it will solver my problem
    Thank you very much
    regards

  • Document templates not visible in Complaints transaction

    Dear CRM gurus,
    CRM 5.0
    I created an MS word document template using tcode CRM_KW_TEMPL in CRM 5.0 for the business object type BUS2000120 which is a complaint. However, after saving the template when I go into CRMD_ORDER for creating a complaints transaction type & try creating a new document based on the template, the name of the template is not shown in the window which opens up for selecting the template.
    I have done the background config for setting up the document template profile, folder template & assigning these to the transaction type header. Can someone please let me know what could I be missing?
    Thanks
    Ritwik Sharma

    Please confirm if you see URL as http:localhost:99/_layouts/images. or http//:localhost:99/_layouts/images.
    Is it same behavior on all sites or just 1 site
    What do we see in Fiddler traces
    Did you made any changes in DOCICON.XML
    or some where else
    If this helped you resolve your issue, please mark it Answered

  • CHANGE REQUESTS tab missing under SOLAR_PROJECT_ADMIN

    Hello All,
    Am trying to configure CHARM in our SolMan system. I referred to the below link for configuration.
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    I am trying to create a project under tcode: SOLAR_PROJECT_ADMIN
    while creating project with in SYSTEM LANDSCAPE tab we can see FOLLOWING
    SYSTEMS /\ CENTRAL OBJECTS /\ IMG PROJECTS .
    But am unable to see CHANGE REQUESTS tab which should be at last in the above mentioned sequence .
    can any 1 tell me why its not there. Do i need to configure anything more to get the CHANGE REQUESTS tab
    Regards,
    Ravi

    Hello,
    i had the same problem few weeks ago. I couldn't find the Change request Tab in Solar_project_admin
    I fixed it by following : SAP note : 802793
    The note explain how to re assign the client to manage change request management.
    We folow the note, then the missing tab appear
    Regards

  • Questions regarding Project Creation - SOLAR_PROJECT_ADMIN

    Hi,
      I went to tcode SOLAR_PROJECT_ADMIN and created a project called ZTEST. Internally there is a tab IMG project from where i created a project named ZTEST for development system.
    Questions:
    1) Is the project created from SOLAR_PROJECT_ADMIN is a SMI project ?
    2) IMG project created is what we are seeing in SPRO_ADMIN of solution manager .. is this right or is it the one creating in development system SPRO ?
    3) Where can we can see the CTS project created for the SM1 or IMG project ?
    4) Also do we need to create IMG project from SOLAR_PROJECT_ADMIN for the quality and production system type also ? or required only for development system ? if so what is the reason ?
    5) I tried one project creating IMG project for quality and production but the project is not creating, but if i doonly for development system it is creating ok and maintenance cycle underneath it is creating... Any idea why ?
    Thanks,
    Murali.

    Thanks for the reply.
    So if understood correct, basically only one IMG project needs to be created that too for Dev System. Also this is the stage CTS project also got created is it correct ? which again means only one CTS project overall per SMI project.
    One more question which i missed earlier:
    A SMI project created with only Dev and QA in the landscape and some reqs has been assigned to it and may or may not imported some of them to QA also, later i created a Prod system and made the logical component to configure for the same and it got reflected in the SMI project also. But if i go to scheduler it is not showing the PRD system, is it something to be done manually ?
    Thanks,
    Murali.

  • Solar_project_admin to transport whole project

    We have some documentation in Solution Manager (in transaction "solar02"). It is version 3.1 we are using.
    We have to transport Documentation of project "smart" to a newer Solution Manager(version 3.2). However project "smart" exists aso on newer Solution Manager system but can be overwritten.
    I am pritty new in Solution Manager.
    I wander if transport function (track icon) can be used in transaction "solar_project_admin" to transport whole project to transport files and then import them to newer Solution Manager

    Hi,
    check this
    http://sap.ittoolbox.com/groups/technical-functional/sap-solution-manager/where-are-uploaded-office-documents-physically-stored-in-sap-2647587?cv=expanded
    as per above link u can try with option
    1.
    use Tcode - SOLAR_PROJECT_ADMIN
    1. Select the project in the project overview.
    2. Choose the Transport Project pushbutton or Project ® Transport.
    3. Specify the transport scope in the following dialog box. To transport the project without project documentation, reset the With Notes flag. The project documentation is transported by default.
    4. Specify a transport request or create a new one.
    5. Save your entries.
    Regards,
    Ravi

  • How to transport changes made on Workflow Template to other cleint

    We have make changes to Workflow template via tcode PFTC_CHG (Change Task), with workflow builder screen, we make changes on the standard task, work item text etc, save the changes to workflow template WS90000XXX. However the changes we make is not save under a Transport Request number.
    How to make the changes on workflow template to save under a transport request and transport it to other client. ?

    Hi Eric,
    All development and customization of workflwo are saved in a transport request.
    If while making the changes it did not prompt you for a TR then check the TR in whcih the task was created.
    To port TRs follow the below procedure:
    1. Go to t-code SCC1.
    2. Select the transport request number and enter the source system (client)
    3. Click on 'Including Request Subtasks.
    4. Click on button 'Start immediately'
    This would port the TR.
    Please note to port workbench TRs before the customizing TRs.
    Regards,
    Saumya

  • Where to perform SOLAR_PROJECT_ADMIN

    Hi Friends,
    i have some doubts to clarify:
    1. Do we require seperate client to be created, i am talking about the client where i would use Tcode SOLAR_PROJECT_ADMIN
    2. Do i require a seperate client for Maintenance Optimizer,
    3. can i configure Maintenance Optimizer in the same Client where i would create my project by Tcode SOLAR_PROJECT_ADMIN.
    Your assistance would be highly appreciated.
    Regards
    Ayush Johri

    Hello Ayush,
    You can go ahead and use the same single client for all your configuration. You need two clients one for development and one production only if you have more customization.
    Regards
    Farzan

  • SOLAR_PROJECT_ADMIN project deletion

    Dear Experts,
      Is it possible to delete the project defined in the tcode SOLAR_PROJECT_ADMIN .
    We can hide the comlpleted project but how to delete it.
    Regards,
    Umesh

    Good day:
    Is  there a way to delete a project that is associated to ChaRM, but which has no RfCs, or change documents associated, yet.
    Thanks.
    Juan

  • Template Project Usage in Implementation Project

    hi,
    I have defined the Template project in Solar_project_admin. Now how I can use this template project in Implementation project.
    What are the steps of copying the template project into implemenation project.
    Regards
    PK

    Hi Aditya,
    Many Thanks. I am new to this feature ( Template project & roll out).  My requirement is like, I need to define one template project & same has to be rolled out in other contries implementation projects. This is in a broder sense.
    Now what are the steps to go about. How to proceed.
    Will there be only one Solution Manager or different countries will have sepearte Solman. Will one Solman will do all rollouts.
    Can you give me some useful stuff as a biginner, how the project management is used  ( especially Template project & roll out )
    Regards
    PK

  • Is there any function module to trigger workflow template

    Hi,
    I have created a workflow template in tcode PFTC, which i am using to send email, this workflow needs to be triggered once the document is posted, there are no events being triggered at that stage, My query is 'Is there any function module to trigger this workflow template from the user exit'?.
    Thanks in Advance
    Santosh

    Use FM
    SAP_WAPI_START_WORKFLOW.
    or if you have triggering event for the wflow use
    SWE_EVENT_CREATE
    SAP_WAPI_CREATE_EVENT
    Thanks
    Arghadip

  • CharM Tcode /TMWFLOW/PROJ

    Hello!
    I have following questions regarding CharM functionality:
    Tcode /TMWFLOW/PROJ --> Scheduling --> push "Advance"
    or tcode SCMA
    I am getting the error "There is no task list for this project"
    Question: How can task list be created?
    Tcode /TMWFLOW/PROJ --> Project Structure
    CTS project --> status in task list LOCKED
    Question: How to unlock the project?
    Tcode /TMWFLOW/PROJ --> System change options
    Cross Sys. Obj. Lock  -- inacative
    By doblecklicking is it unfortunately not possible to activate this function
    Question: how to fix this error?
    Tcode /TMWFLOW/PROJ --> CTC Status Switches
    Warning: The Solution Manager project does not have an active CTS project yet
    Question: how to fix this error/warning?
    The Solution Manager project does not have an active CTS project yet
    Thank you very much!
    regards
    Thom

    Hi,
    1.Creation of Task list:
    Go to tcode solar_project_admin->system landscape tab->change management tab->create maintenance cycle which will create a task list/maintenance cycle.
    2.Before creating the task list go to img project tab,create a project in the development system.
    Once the project is properly cretated and task list is created,other errors will be resolved.
    Check and Revert back for clarifications.
    Regards,
    Avinash

Maybe you are looking for

  • Can we configure a sharepoint integrated SSRS instance as reporting service in configmgr 2012 R2 ?

    Hello Guys, Can we install reporting services role a server hosting SSRS instance in share point integrated mode ?  Thanks,  Delphin. Kindly mark as answer/Vote as helpful if a reply from anybody helped you in this forum. Delphin

  • How do I get my Mac screen to stop rolling up????

    Please help me it is driving me crazy.

  • Render BarChart with many bars

    Hello, I have a BarChart that has over 15000 bars to render within a chart. The problem is that, once the number of bars grow, the bars actually fades out and become invisible. I have recreated this issue with the ensamble2.jar file that comes with J

  • Coming from Android and....

    I am looking for an app like Dindy for Droid. It basically lets your phone be on silence and when someone calls you will send them a text message and tell them to call back if an emergency. Then on second callback phone will go to full volume and rin

  • Can't move desktop icons around

    Hello, I have a MacBook Pro with OS X 10.10.2 Yosemite, and when I try to move my desktop icons around the desktop they snap back to where they were before I tried to move them.  I have tried changing settings and restarting my computer. Cheers, Adam