Third party plant

Hi All,
Of late, I heard a term "Third party plant".
What is meant by "Third party plant"?
Is it a word to refer our consignment vendor?
Kindly clarify.
Regards,
Raja Durai

Dear Raja,
Yes you can create a Plant as a customer. But just think in a way that if in future multiple dealers will be there then are you going to create all of them as Plant?
Another point why you would like to create is Excise registered? It is not a physical plant correct?
When you will show material movement from your Manufacturing Plant to this Third party plant via STO at that time itself excise will be applied correct?
I have a view that you can maintain Plant as DEPOT with RG23D register maintenance when it is actually a physical location. In this case, it is like a logical plant so Excise registration should not be needed.
If my understanding is wrong please correct me.
Regards,
MJ.

Similar Messages

  • Are there any third party pacakages for plant maintenance that can be interfaced with

    are there any third party plant maintenance packages that interface with OPM? does Oracle apps have a module for plant maintenance?

    I'm working for a leading Food Industry in Kuwait (The Kuwaiti Danish Dairy Co.) We have a massive implementation of OPM with 24 modules, BI tools (OSA, OFA) and Maximo (The only third party package) integrated with Oracle. OPM version is 11.0.3 on database 8.0.5. Now you have option of 11i (eAM) with POC (PM) or Maximo 5i integrated with 11i (and of course any other 3rd party solution which can be integrated with OPM).
    You can write to me on: [email protected] or call me on: +965-9650172 for details.
    All the best.

  • Plant Determination for Third Party Material as Child Item in Sales Order

    Hi All,
    We have an issue with the Plant Determination for Third Party Material as Child Item in a Sales Order.
    Even when a Delivering Plant is maintained for the child item which is a Third Party Material, the plant of the Parent Item is only populated as the Default plant in the Sales Order
    Can someone explain the reason behiind this determination.
    P.S.- For all non -Third PartyChild Items (with non-Third Party Item Catefory & Material Type), the Plant is population correctly as per Delivering plant in Material Master.
    TIA.
    Regards,
    Sridhar

    Hi,
    Thanks everyone for the feedback.I agree with Samir Danish.It is a standard functionality of SAP which does not allow free goods for BOM material.
    However, can someone suggest work around to deal with this issue.I mean if any one has been doing any work around for this issue then please let me know.It s becoming critical for me.
    Regards,
    BM

  • Third party with sto from supplying plant

    Hi,
    When i am trying to convert Third party purchase requisition NB created through Sales order
    to Stock transport order to transfer the material from other plant i am getting following error
    Error Message
    Third-party not defined in the case of vendor with plant assignment
       essage no. 06769
        You are entering a purchase transaction involving a vendor to whom a
        plant has been assigned. Normally, this will involve the transfer of
        materials from one plant to another.
        This process necessitates a delivery and a billing document in the SD
        system. The PO appears directly in the delivery due list of the issuing
        plant (vendor) and therefore does not need to be transmitted.
        However, an item with the procurement form "third-party" (triangular
        business deal) cannot appear in the delivery due list.
        An item with the procurement form "third-party" can only be ordered from
        vendors without a plant assignment.
    Anybody has any suggestions on this scenario
    Diwakar

    Hi Niel,
    You don't need to create an STO. If you create a normal sales order with delivering plant B, they will see it in their delivery due list or MD04 or whatever. And it doesn't matter for this purpose that the plants belong to different comp. codes. This will only matter after the delivery to the customer - VF01 (or VF04) with reference to the delivery will bill the customer (comp. code A is billing); then another VF01 will generate inter-company billing document where company B charges comp. A.
    So why do you insist on having a STO?
    BR
    Raf

  • Third-party not defined in the case of vendor with plant assignment ?

    We use a Third-Party Vendor to direct-ship some products directly to our Customers.
    When transfers third party order form's PR STO PO, prompts the following information
    Third-party not defined in the case of vendor with plant assignment
    Message no. 06769
    Diagnosis
    You are entering a purchase transaction involving a vendor to whom a plant has been assigned. Normally, this will involve the transfer of materials from one plant to another.
    This process necessitates a delivery and a billing document in the SD system. The PO appears directly in the delivery due list of the issuing plant (vendor) and therefore does not need to be transmitted.
    However, an item with the procurement form "third-party" (triangular business deal) cannot appear in the delivery due list.
    Procedure
    An item with the procurement form "third-party" can only be ordered from vendors without a plant assignment.
    how should solve?
    Many thanks,  Adny.
    Edited by: Andy Yao on Feb 8, 2010 3:58 AM

    Hi Andy
    Why u doing stock transfer order,in third party sales there is no stock transfer
    Follow below procees for third party sales( Vendor ship materials directly to customer)
    Create Sales order(Use item category TAS) >>> Purachase requisition(Automatically from order) >>> Purchase order >>> Vendor Invoice Verification >>> Invoice to customer
    Kapil

  • How  to map the Third Party materila for Job Wok process in our Plant

    Dear All,
    please guide me how  to map the  Third Party  Subcontracting in Our Plant Means Customer materials to be Processed  in our Plant and  then we have to sent to customer after processing.
    please  Brief me  with the Proces sflow
    Reagrds
    kishore Edagali

    1) create a 2 material as non valuated (one incoming material "A1"& after processed material"B1")
    2) create a BOM. for A1
    & assign the B1 and maintain respective conversion
    3) create a routing for A1 and assign the relevant work center
    4) create a manual PO to receive the material from customer and store it in storage location
    5) create a production order and release the order  in co01
    6)issue the material :B1 to the order 9 in MB1a, 261 movement)
    7) and confirm the order (so that cost incurred for order is captured)
    8) create a  sale order and maintain service price in PR00 and send the material A1 to customer.

  • Third Party as Plant (Manfacturing Unit).

    Dear Experst,
    Now we are implementing SAP for our client, Our client have total Business proces i.e., from Manfacturing to till its reach to end user. But our client is asking now, their Manfacturing Unit make as a Total Third party, for manfacturing proces was continue with  existing system only. Now they want SAP for Finished Goods to till Distiribution and they want link only finacial statment of Manfacturing unit to SAP. They are inform that they dont want more Interfaces between SAP and Legacy sytem.
    In this situation which areas i have to study and how it link to SAP.

    Hi:
    Could it be the Schedule line Category should not be MRP relevant?
    Regards
    Aaon

  • Automatic po creation third party order

    Hello Gurus,
    In case of automatic po creation from third party order we have attach purchase organization and vendor to sales organization. This restrict only one vendor against sales organization.
    Is any BADI available which we can use which to change vedor dynamically ?
    Best Regards,
    Vasant

    Dear Vasant,
    For automatic PO at the time of GR following are the prerequisites:
    1) In Customizing
    a) Auto PO generation must be activated in Mov. Type 101 & 161
    b) the plant for which GR is entered must be assigned to standard Pur. Org.
    c) Default Document type for PO must be specified in GR ( MB 01)
    2) Application - Front end side
    a) material must be valuated material
    b) Purchasing Info record must exist for vendor , material & standard Pur Org.
    c) Conditions in Info Records must be valid.
    d) Applicable for stock items & not consumable items
    e) you cannot enter any movement in GR block stock
    f) Material Master & vendor master records must.
    If you ensure all above settings then it is possible to have auto PO during GR.
    Please try,
    Vivek

  • Stock is increased and FI entry is posted in statistical GR for third party

    Hello
    I was trying to activate the functionalty for statistical GR in third party but STUCK due to following issues. For enabling this functionaltity I have checked "Goods Reciept" and "GR Non-Valuated" check in "Delivery tab" of PO.
         1. After creating Statistical GR through MIGO (101), stock has been posted in plant. I was expecting no movement in Stock .
         2. I was hoping there should not be in FI posting but FI entry is posted through statistical GR .
    We are using third party process from many years but without statistical GR. Requirement from client is to post statistical GR without FI entry and no stock should be updated. Please advise if anyone has idea on this.
    FYI--We have item category TAS and schedule line category CS in customisation. Also advise if above two settings in PO are enought to turn ON the statistical GR functionality.
    Thanks for your help.
    Regards
    Arvind

    Thanks AKPT for reply
    As advised , pleae find enclosed screens for OMS2, PO and FI entry. FI entry might be wrong as while posting MIGO ..I was getting error "WE etnry is missing in table YFTFI_SUBST236 and I maintained some dummy GL accounts.
    Regards
    Arvind

  • Return process in third party

    Hi sap gurus,
    please find one senario mentioned below
    i have raised a sales order with 630 units of a third party material, followed by
    630 units of Tata Swach Crystal were sold to M/s Friendu2019s Combine Indore (Madhya Pradesh) through third party sale order from TWGZ plant (Uttarpradesh) on 30/11/2011.
    It was a CST sale. Here all the sales are made against advance payment.
    Materials were purchased from The Supreme Industries Noida. Since it was a third party sale, initially Third Party Sale order (SO No - 2010209914) was created. Order type ZTPS.
    From the sale order Purchase requisition was generated (PR No -3900009137 ) and then PO was generated (PO No - 4100007931).Based on the PO vehicle was loaded and GR (GR No -  5105605330) and Miro was done  and then invoice (Invoice No u2013 2644001743) was generated in the warehouse (TWGZ plant).
    Invoices were handed over to the driver and vehicle was dispatched for delivery of goods to Indore. Goods are invoiced on delivered basis (Vehicle is arranged by company).
    Now on the way to Indore (in MP) vehicle met an accident and 50% of the materials got damaged.
    50% good stocks were kept at transport go down for about 1 year where it took time for investigation to complete for insurance claim. In the mean time company has come up with a new warehouse at Indore (TWID plant).  Now that the investigations are over, company wants to take GR/build up  50% good stocks in TWID plant.
    Also note that after the accident to cater customer requirement, credit for 630 units were given to the customeru2019s account. Now it is also important to normalise customeru2019s account as because customer had already paid the amount in advance. 
    Now please suggest the ways to build up the 50% good stock in TWID plant.

    Hello,
    Firstly, let me request you not to disclose the Client's business details (like Customer Name, Vendor Name, Material Name, Plant codes, etc) on Public Forums.
    Now, coming to your question, there are many angles to your question.
    1. The Transaction has happened sometime in November 2010 & you too would know that MM & FI Periods would be closed by now.
    2. Your client would have already filled Excise & Sales Tax Returns to espective authorities by now.
    3.  You have mentioned that after accident Credit of 630 Units was given to Customer? What do you mean by this statement? Was a Credit Memo was issued? or the Advance Payment received Entry was reversed? or another Delivery of 630 units was made to Customer?
    4. What about Vendor? Has he already beed paid?
    You will have to throughly discuss this matter with client & ask them what is that they exactly require to be done now & then explore the options.
    Hope this helps,
    Thanks,
    Jignesh Mehta.

  • Third Party Process

    Hi
    I have already posted MIRO without any error and 5600142351 no. generated.
    Now i am mooving towards VL10G and putting all value but sytem not accepting the value and giving any determination rule.
    even i gone for VL04 but system not supported .
    please advise me what sort of procedure i have to follow next with transaction codes.
    Wishes ur Kind reply.
    treat urgent
    thanks in advance
    m,k.

    Dear Mahesh
    The Process of third party is as follows:
    Customer gives order to our company and the product which he ordered is dispatched through one of our vendor or supplier directly to customer place and once we receive pod from Customer we charge him.
    Steps in SAP:
    1. Create sales order
    2. W.r.t to Purchase Requistion create Purchase order.
    3.Do Statistical MIGO and then MIRO
    4.Do Billing W.r.t Sales Order
    As Materials are not coming to plant need not to do any Delivery Document in SAP.

  • Third party process:Billing relevance 'B' order related and 122

    I am facing the following problem: in Order related Billing according to order qty, the sales order bills what has been received on the third party PO in MM.
    The following situation occurs: When I order 100, receive 100 and Bill 100: The sales order is fully billed. When I later return a quantity to the vendor in MM with a 122 referring to the PO, the sales order remains fully billed. There is no way I can find out which Sales order needs to be take action on (credit). Can someone help me finding out how I can select these sales orers after a 122?

    Ok, no problem.
    At the client we have a very specific flow where receipts on a third party PO need to be billed daily when they happen and every receipt (better: any goods movement) needs a seperate billing document.
    This is not covered in SAP standard. I wrote a program (functional) how SAP should find the billing relevant movements:
    1) Go to the billing due list daily at 0:00
    2) Check all related third party PO's and the movements
    3) Check the sales flow of the relevant SO. Check which material doc has been billed (via reference field in the billing doc)
    4) For all items not yet billed call function module GN_INVOICE_CREATE. (bill in case of 101 and 123 and credit in case of 102 and 122)
    This works all fine until I found above issue: Fully billed items are removed from the billing due list even if there is a 122 or 102 afterwards on the PO. So I redesigned the program.
    1) at 0:00 Select all movements on the system date for the specific flow (PO type and plant) via Material documet header and segment.
    2) Via the account assignment in the material doc you have the Sales order. Then the same applies:
    3) Check the sales flow of the relevant SO. Check which material doc has been billed (via reference field in the billing doc)
    4) For all items not yet billed call function module GN_INVOICE_CREATE. (bill in case of 101 and 123 and credit in case of 102 and 122)
    Here I am not using the due list and it solved my problem.

  • In Third party sales, Part of MM..?

    Hi guru's
    Can explain about third party sales and what is major part of work for MM in that.
    1.Please send me the overall flow in Third party sales process  with Transaction codes.
    thanks
    sap-mm

    THIRD PARTY SCENARIO
    in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing:-
    if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    i think this will be helpful to you

  • Third Party Process in Materail Management (No SD)

    Hi,
    Our Business would like to outsource the Stationary materials to supply the required materials directly to requester.
    I believe the best possible solution for this requirement is to implement third party process in Material management as we do not have SD Module.
    In this scenario, which material type we need to use (Item category group, Field ref, Sref material type and field ref) and the config part.
    Secondly, does it have any effect on MRP, Stock levels? Also please explain the process involved in Goods returns
    Appreciate, if you could share your experiences.
    Regards
    Kumar

    Creating a Third-Party Item Manually
    To enter a third-party item in a purchase order without an SD order or purchase requisition, proceed as follows:
    Enter a third-party item manually in the same way as the purchase requisition.
    After entering the account assignment, you receive a screen in which you can enter the address of the sold-to party.
    Enter either the customer number or a delivery address.
    Check whether goods receipts can be made for the third-party item. Goods receipts are possible if the goods receipt indicator is set in the item.
    Save the purchase order.
    Setting the Goods Receipt Indicator
    The account assignment category X in the Customizing system of Purchasing determines whether a goods receipt can be posted for a third-party item. Here you define whether a goods receipt is possible, not allowed or compulsory.
    If a goods receipt is possible, the GR indicator in the purchase order item is changeable. When you enter the purchase order, you decide if a goods receipt is to be posted or not.
    Mat Type can be use ROH or Trading
    For Return you can do return to your plant or ask vendor to pivk and replace the goods or issue the creadite to customer and take from vendor

  • Third party process in MM

    Hi friends,
    i need all your help in configuring third party process in MM.please guide me by giving step by step process with t-codes.
    your advise is considdered more valuable.
    Regards,
    william

    Hi,
    Process Flow for Third party process with SD-MM Integration
    Customiztion requires is
    1) Defining the Purchasing org,Purchasing group,
    2) Assign the Purchase org to company code
    3) Assign Purchase org to plant,
    Material type used should be Trading goods -- HAWA
    1. Create Vendor XK01
    2. Create Material with  Material Type as "Trading Goods" & Item category group as "BANS".
    3. Assign Item Category TAS to Sales Order type
    4. Sale order is created and in the background a PR is generated
    Note down the PR number along with Sale order no
    5. With reference to PR a PO is created (ME21N).
    PO will be sent to the Vendor with delivery address as your Customer.
    6. Vendor delivers the goods to the Customer and raises Invoice to the Plant. 
    7. Goods receipt MIGO & stock update in the Plant ( Not physically)
    8. MIRO for Vendor to clear the Payment
    9. Create the outbound delivery for sales order
    10. Post Goods issue for delivery
    11. Billing for the customer
    rgds
    gsc

Maybe you are looking for

  • Losing events on iCal after syncing

    Hello. I'm having some really frustrating problems with my iCal events. I keep losing them after syncing my iPhone to iCal on my iMac. If I put a date into my iPhone and later sync it to my computer, sometimes it works. However, after other subsequen

  • No Stations Showing Up In iTunes Radio?

    After making the switch to a Mac, I've been trying to put my favorite radio stations back into a playlist in my iTunes. However, when I click on the "Radio" tab, the radio genre list doesn't show up. The window just stays blank. Am I doing something

  • Java is not working in safari

    Since the last update of safari I have been experiencing problems with websites that use Java. Many say "missing plugin" and the one that I ant to use badly - http://support.ford.com/tools/account/update-center?step=download to download the latest Sy

  • How to avoid printing an additional blank page at the end of the report

    I have a report which has 3 panels in the main section of the report, about 3 pages in size. 1st & 2nd panels are enclosed in a repeating frame, and 3rd panel in a different repeating frame. The vertical panels per page in the property inspector of t

  • Interactive Forms and NWDI

    We are having difficulty finding answers on how to control code management and promotion for our Interactive Forms by Adobe projects. We have tried to load our projects into the DTR and are having some issues, but we haven't even found anything that