To Control status of the operations of maintenance orders individually

Hi,
To Control status of the operations of maintenance orders individually
Anyone know how to control individually the operation status of maintenance orders?, see the image below?
Exsample: I need complete (TECO) only the operation 0010
Thanks,
Adilson Delfino

Adilson Delfino
The system-statuses cannot be set manually by the user (like you can with user-statuses).
You need to process a function to make these statuses change, e.g. releasing the order header, TECOing and order or dispatching operations. Alternatively you can develop a solution that may be able to change these statuses (see above post).
I don't think you will be able to set the TECO status on individual operations.
Have you considered user-statuses on the operations?
PeteA

Similar Messages

  • Function module to get PRT for the operation in Maintenance Order

    Hi,
    Please tell me the function module to get PRT document for the all operation in Maintenance Order? and also tell me the FM to get all details of those PRT Docs so that I can Print those documents.
    Thanks.

    Hi,
    Please tell me the function module to get PRT document for the all operation in Maintenance Order in TCode IW31/32/33? and also tell me the Function Module to get all details of those PRT Documents so that I can take Print out of those documents.
    Thanks,
    Jay.

  • Is there a replacement for the old device control/status in the visa format?

    I'm tring to control the serial lines individually and can't seem to do it in labview 6.1. I have done it using device control/status in the older version of labview 5.0

    Yes, this is easy to do in LabVIEW 6. I am attaching a simple VI that monitors the line states and lets you control DTR and RTS.
    This example VI is one we plan to add to this Developer Exchange site in the near future, so if you have any feedback, please let us know.
    Dan Mondrik
    Senior Software Engineer, NI-VISA
    National Instruments
    Attachments:
    Troubleshooting_Serial_Line_Monitor.vi ‏51 KB

  • How to manage the operations on service order ?

    Hello,
    Do you know some bapi or MF to manage the operation on service order  (IW32).
    I have to create some operation, and in dialogue mode Iu2019m using 
    "Task list selection,  to reference object."
    But I need to do it by a bapi or MF.
    Tks a lot.
    R.

    Hi,
    Check with the following FM:
      MAINTENANCE_ITEM_POST
    Regards,
    Venkat.

  • Need help on to set User status for Operations in Maintenance order

    Hi experts,
    i am new to PM module.
    i need to do BDC for IW31. i want to know some inforamtion
    on user status for each opertaion.
    my problem is ,, what is user status.
    why it is saying order is not yet released when saving and status can not set.
    in this cases how can i do BDC.

    User status are something set in the configuration and specific to the company which SAP hasn't given in the system status.
    May be in your system user status are configured to set only  after the release of the order.
    For doing the userstatus you may need to release the order, you can release the order thru bdc and then do bdc for user status. Also see below link
    http://www.sap-img.com/plant/user-status-set-date-in-maintenance-order.htm

  • Set up correlative numbers of operations of maintenance orders

    Hello.
    I need set up the numbers of operations of an maintenance order, now the system assign the operations numbers(vornr) of the task list.
    It is making huge gaps in the counter, raising overflow in the top number (9999).
    I need that the system set up (1,2.3.4 ...) .
    This issue is very urgent for me.
    Best Regards.
    advice: I'll give many points!!

    To send the spreadsheet to others, open Numbers on your iPad, tap the share icoun (box with upward facing arrow), select Send a Copy, tap the spreadsheet you want to send, tap Mail, choose the format you want send, then address the email.

  • Assigning Components to Operations in Maintenance Orders

    Dear Masters,
    I want to assign the component reservation to the operation number in the maintenance order (i.e., In a breakdown order if I reserve a material component it should ask me for the operation number to which I want to link it to). Can anybody help me with this?
    Please do help its a bit urgent. Thanks in advance.
    Chin2

    Hi Pushpa,
    Thanks for taking time to reply to my question. I thinking you might be laughing at this stupid question of mine but sometimes the mind stops working.
    Thanks once again.
    Chin2

  • System status and user status don't appear in maintenance order

    I can't see the user status or the system status in the maintenance order header or equipment header or any report although when pressing the button information you can see it

    Hi Michael Nawar ,
    Please check have you define Status profile and status in T code OIBS ?  , and for object like PM order whether you have assigned it to your defined order type in T code OIOG ?
    and for equipment check in SPRO Master Data in Plant Maintenance and Customer Service >> Technical Objects >> Equipment >>Assign User Status Profile to Equipment Category.
    Riyaj

  • How to assign the budget to maintenance order

    Dear PM Guru's,
    I like to know the how to assign the budget for a maintenance order. how we control the expenses from a maintenance order. suppose for a small work manangement assigns budget as 2lacs. now i like to restrict if any thing purchased once budget reached to 2lacs system should populates the error message to restrict the creation of Purchase orders / material requisitions and some other issues. Please suggest me how i can map in SAP? if any one have full documentatioin regard this please send through mail.
    thanks in advance to all of PM Guru's.
    regards
    Jalu

    Hi,
    There are different approaches for budget control in PM orders.
    1) Option1: In koab transaction maintain commitment managemen active and in budget profile (oioa) you must tick total values ,annual values,activation type should be 1-automatic activated when budget allocation done. Then distribute budget in PM order through KO22.
    2) Option2:You can also opt for Investment management approach but it is mainly done in case of capital work/projects/internal orders. In this approach you need to activate IM for orders(done by CO people). Investment programs are created and budget distributed through IM52. For details you may consult your FICO consulatnt.
    3) Option3: Fund Management approach enables you to monitor budget-relevant plant maintenance processes. enables you to monitor budget-relevant plant maintenance processes in FM.
    The link between the plant maintenance process and FM is established by entering an FM account assignment (commitment item, funds center, and fund) when you create a plant maintenance order.
    You have to enter the FM account assignment manually. If, however, you have maintained the assignments of FM account assignments to CO account assignments, the system determines the FM account assignment from the cost center of the technical object (functional location, equipment) which is assigned to the plant maintenance order.
    FM takes care of budget related processes from creation of maintenance order till settlement.
    Hope this helps you to decide an appropiate approach.
    Regards,
    S.Basu
    Edited by: S Basu on Nov 10, 2011 5:34 PM
    Edited by: S Basu on Nov 10, 2011 5:34 PM

  • OSP Resource is defaulted to the operation in Job Order

    Hi
    The OSP resource is not attached to any of the operation in my routing for an assembly.But When i create a discrete Job Order for that assembly,OSP resource is attached automatically for one of the operation in the Job Order.
    Can someone explain me how this is happening?.From where this OSP resouce is getting attached or derfaulted.
    Regards
    Deepak

    Like Sandeep mentioned it cannot have an OSP resource unless
    1) Routing is referenced with another assembly which has OSP
    2) Has a an alternate routing which has OSP and is used in Job creation
    3) Manually adding OSP resource to a the specific job
    If none of these are true please check for customizations done.

  • Relation Between PR item and Operations Maintenance Order

    I have a PR from Maintenance Order.
    there are 2 Operation External in Maintenance Order. usually it will create 2 item PR Service. but in my case it's create 3 PR item Service.
    I look on the IW33(Display Maintenance Order).
    Operation 10, becomes PR Service Item 10
    Operation 20, becomes PR service item 30
    and there is 1 another PR service item 20.
    I see in the Tab Account Assignment. it's refer to the same order. but i don't know where is the Operation. the question is How to delete this Item when we don't know the Operation in Maintenance Order. or maybe how to know what is the Operation.?
    Thanks.

    Hi Ajit Kumar.
    No i'm sure that PR item 20 is not with a delte flag. Actually user want to delete the PR item 20. so he try to delete the Operation 10 in Maintenance Order. but when he do this, PR item 10 was deleted and not PR item 20.
    Thanks for your Reply.
    Hi Jürgen L.
    Yes i know how to display Deletion in Maintenance Order. and i'm sure when i do that. the operation for PR item 20 are not listed.
    BTW. do you know  how to undelete the operation.
    Thanks for your Reply.

  • To update user status of an operation in Plant maintenance

    Hi
          I ma trying to update the user status of an operation of an order using function module status_update but it is not working properly. Although the same function module is working fine for updation of user status of order. Can somebody please tell me some other function module to update the user status of operations?
    Thanx in Advance.
    Richa.

    Hi Richa,
    I have the same requirement like which you had. updating the operation user status in work order.
    How did you attend this requirement. Please let me know your solution.
    Thanks in advance.

  • Skip the Creation of Maintenance Notification

    I would like to know the effect if i will skip or remove the process of creation of Maintenance notification in SAP PM. The process will start with the creation of Order, if there's an external service required the Maintenance Order will be converted into PO if no external service or material will close the Order.
    Since the Creation of Maintenance Order will generate Notification, we were thinking that creation of Notification is redundant if the system allows to create order and notification in one transaction.
    What would be the effect of this, thanks and God bless.

    Greetings Peach,
    As the experts, who had already answered observed, this is purely a business process consideration. If your (Client's) organization supports a "streamlined" process in which direct Order creation is beneficial you can go for it.
    As you've written "Since the Creation of Maintenance Order will generate Notification, we were thinking that creation of Notification is redundant if the system allows to create order and notification in one transaction." I assume you are still using Notification and Order integration. But as Yogesh Dhokne mentioned, this is optional as well.
    If you choose to create a Notification in the background, you can still register breakdown times for MTTF/MTBF calculations, Catalog Codes for tracking and any additional information once the Orders are created.
    But consider this: How is work requested, released for execution and reported? If you only create Orders, you have only Orders to go on. Therefore, you might require more verbose User Status management, and you may find yourself with Orders that are being created unnecessarily and have to be closed, Orders being released prematurely... You have to have a very "flat" process around this immediate Order creation.
    On the other hand, consider that having Notifications created prior means a more "deep" process and more overhead, but you can have a step to filter works to be released on the Notification level before Orders are created, if you have more than one Notification  for the same work, you can assign it to a single Order, and you have more options when designing roles and authorizations, since you can separate access and business transactions for Notifications and Orders for your Operations and Maintenance users, if necessary.
    Please ask further questions if you have any!

  • Make Deletion Status for Operation in Prodcution Order

    Hello Experts,
    Is there any Function Module or BAPI to make status for Operation as deletion in production order. i.e I0013 is the status for the operation.
    Thanks In Adavnce
    Dhiraj Dangore.

    Hello,
    Thanks for reply..
    Let me explain the process we are following
    I have two operations in an order.
    Operation 1) Control Key M111(Internally Processed) - One component attached for this operation ( its a not stock item)
    PR, PO and GR has been done and no issues in that.
    Operation 2) Control key M222( Externally Processed) -
    a) One Service attached with this operation which i want to delete from the order.
      b) One Component also attached ( non stock item) and PR , PO, GR has been done for same.
    For point a : Service is present in PR but not released therefore no PO , GR is done.
    Now when i try to delete this serive from the operation then system does not allow me to do so. Also i want to delete from PR too and again i was not able to delete from it.
    Please let me know how this can be possible.
    Rgds
    Himanshu

  • PM: how to track the operations in prev.maint order against object list

    Dear PM Guru's.
    i have one issue in my preventive maintenance scenario. i clubed the same type of machines in one maintenance order under object list tab. and i mention the list operations in maintenance order. suppose in one preventive maintenance order 10 operations are maintained and 5objects are mentioned in that order. Now i like to mention all these 10 operations activities against to 5 objects. how i can assign sequentially? i required like 10operations one by one row wise and 5objects side by side column wise. i would like to update the each operation activity against each machine column? how i have to do this one?
    Please suggest me and help me.
    regards
    Jalendhar Merugu

    Using Object functionality, we can maintain many equipments in the order.
    But the constraint is that one operation can be assigned to only one equipment. In your case, you have 5 objects. If all 10 operations will be performed on 5 objects, then you have to maintain 50 operations & you should assign the objects.
    In other words, if one operation will be performed on 5 objects, then you should define that one operation 5 times & you have to assign to technical objects. You can't share one operation to many equipments.

Maybe you are looking for

  • PLEASE HELP..A FEW MINOR (HOPEFULLY SIMPLE) BUT SERIOUS PROBLEMS

    I just started cleaning my comp out after MUCH TIME.....I accidentally delted the iMovie that came with the comp, the iMovie HD 6 i downloaded for it since the new ones layout isnt pro at all, iPhoto, DVD Player and I think thats it. So I need help g

  • Which One Would You Buy?

    Hello to All - My brother already has a 240GB Crucial M500 installed in one laptop, and now he wants to buy a new Crucial SSD around 250GB in size for another machine. He wanted to buy another M500, but they're no longer available, and he isn't too s

  • Migrating an existing application to Cocomo

    We've developed a business application that uses a synchronised data model, live webcams, recorded video, interactive apps. We use Flex for the client, and FMS/.Net for the servers. We currently put about 150 users per week through a 3-hour session u

  • Download photo from ipad to ipad????

    I want to download photo's from one ipad to ipad??????

  • Itunes does not work me in the pc

    itunes does not work me in the pc, it gives me an unknown error 0x80090330