Total Production Cost calculation

Dear all,
Anybody know where  / at which tableI can see the breakdown calculation of Total Product Cost / Production receipt amount, that should inform us about
1. What is component cost
2. Quantity
3. Price
Thank you very much in advance.
Best regards,
Surya

Dear Rahul,
[Rahul] 
Now if I issue 500 of CH00, 250 of CH002, 250 of CH003 then my component price will be ((50010)+(25015)+(250*20))=13750
Correct?  [Surya]  YES
[Rahul]  
Now if I receive 1000 of FG001 then my product cost will be 13750/1000=13.75
Correct?   [Surya] YES
[Surya]
I tested your sample here. The result is correct same as I expected.
So when I receipt FG qty < FG plan qty the FG cost is not changed it is still same with 13.75
This is exactly correct. Same as what I'm expect.
But why in my case the result is not correct.
Test case :
BOM for FG-001 qty 120, the child are :
- PFILM qty 10 Roll , unit price 1,500,000
- INK01 qty 5 kg       unit price 75,000
- INK02 qty 2 kg       unit price 60,000
- INK03 qty 1 kg       unit price 65,000
- INK04 qty 1.5 kg    unit price 65,000
- INK05 qty 7.5 kg    unit price 50,000
- INK06 qty 4 kg       unit price 55,000
- SOLVENT qty 25 ltr unit price 10,000
I create production order # 73 with plan qty 120 and production order # 74 qty 120
Production order #73:
- plan qty FG-001 : 120
- good issue : actual component qty = plan qty = bom component qty
- good receipt FG-001 qty 120
- Result for item cost FG-001 : 137,520.83
Production order#74:
- plan qty FG-001 : 120
- good issue : actual component qty = plan qty = bom component qty
- good receipt FG-001 qty 110
- Result for item cost FG-001 : 137,524.96 -
> WHY ?
I expect FG-001 cost should not change even though Receipt Qty <> Plan Qty.
I expcet FG-001 cost is 137,520.83
Thanks Raul for your help.

Similar Messages

  • Production cost calculation for non discrete manufacturing

    There is a problem I am facing in B1.
    We are into manufacturing of chemicals, wherein your output is never exactly same as what you have given in Bill of materials or at the time of 'issue to production'. For example, I issue goods for a product X thinking that I will get 10 kgs output, but after actual production, the output may be 9.9 kgs or 10.1 kgs or 9.7 or 10.2 or whatever. The output will be close to expectation, but never exactly same. Now, the problem is, the cost of finished product is calculated at the time of issue, and so irrespective of how much output I get, the cost of producing it per unit remains the same, which is not the right way of doing it. It should calculate based on the output received (ie. total cost of inputs divided by output quantity), so when I get more output, the cost of manufacturing will be less, and vice versa. This is also resulting in incorrect journal entries between raw materials to work in progress (WIP) in 'issue to production' document and WIP to finished product in 'Receipt from production' document.
    How do I solve this??

    The process is:
    1. Write a production order and based on it print the production instructions. (I assume it will be a repetitive process with more then one receipt from production.)
    2. When the production of a portion is ends, copy the original order, modify the quantities in it according to the actual component and result quantity, make a receipt from production based on it and close this order.
    3. For the next portion repeat the process described in the point 2.
    4. When there is no more production based on the original order, you can close it.
    (Probably there is no need for any stored procedure. )

  • Product Cost Calculation - WIP calc. - Using Program - SAPKKA07

    Dear All,
    When we are running the program SAPKK07,We are getting the ABAP Dump.
    The errror is given below.
    ===========================================================================
    Information on where termination occurred
    The termination occurred in the ABAP/4 program "SAPLKARS " in                 
    "COSLA_1".                                                                    
    The main program was "_SAPKKA07_ ".                                                                               
    The termination occurred in line 203                                          
    of the source code of program "LKARSF26 " (when calling the editor 2030).     
    The program "SAPLKARS " was started as a background job.   
    ==========================================================================
    Please advice.
    With Best Regards,
    Raghu Sharma

    Dear All,
    We have applied the OSS notes.
    The issue is solved.
    The question can be closed.
    With Regards,
    Raghu Sharma

  • Product Costing - Standard Cost Component Split on Multi Level BOM's

    Hi,
    We are the process of introducing SAP for all back office and manufacturing activities.
    I am currently trying to verify that the product cost calculation for Multi-Level BOMs in our Legacy system matches the cost roll up or cost estimate in SAP at not only a Total Cost Level but the cost component split must be accurate also. So far, all the costs roll up correctly at a total cost level but I have noticed one issue:
    When I run a cost estimate for a single level BOM the cost estimate will split the components accurately into Material, Labor, Fixed Overhead and Variable overhead, However, when this component is then used in the next level of manufacturing all the Labor, Fixed Overhead and Variable Overhead Cost is grouped under Material.
    Q1.) Is there a SAP setting or config change that will keep the previous Labor, Fixed OH and Variable OH cost in these categories as the material is rolled up to finished product level?
    Q2.) Is there a standard report / view where I can see the Finished Goods Standard Cost split by each of there rolled up Components? This would need to split the Total Material, Total Labor, Total Fixed OH and Total VO required to make the Finished Product. 
    Q3.) Is there a standard report / view where I can see the added value (Absorption) by component split (Labor, Fixed OH, Variable OH) for every Manufactured Part?
    Any help you can provide would be greatly appreciated.
    Thanks & Regards,
    Brian

    Actuall I just tried again and it did ask for me S number and I put it in and I did not have "authorization" to access
    Error Message - Access denied (R/3)
    What happened?
    You do not have permission to access this Object
    What can you do?
    Please contact a consulting adminstrative
    Error code: WEBSMP106-20080214172231-0015
    Error details: 2491DD9-702/1A053/3162-71A9CFA5-3CB9265-2992F9
    Service Name: SAPIDB
    Service Server: WEBSMP106
    Process-ID: 4640
    Thread-ID: 6020
    Sorry for any inconvenience.
    Your SAP Service Marketplace Team

  • Product Costing  - Message CK 318 ()

    Hi Experts,
    While executing product cost calculation for material YYY we had warning message CK318 - Cost estimate for material XXX contains errors -> Planned price). XXX is a component used in YYY and the message was issued because we did not have price for XXX. We are now able to proceed with standard cost release for YYY.
    As I remembered previously, if you have an error in lower level, the higher level material would have been costed with error too. Seems that this is no longer the case. 
    I am not sure if this has changed in standard system in ECC 6 or we have to change message control for this message from Warning (W) to Error (E) but it seems the system reaction is not logical to me.
    Thanks for shedding insights into this.
    Teck

    HI Teck,
    Can you go to OKKN, and quantity structure tab and check out the 'transfer active std cost meates if material costed with errors check box?
    Best Regards
    Vimal

  • Transfer of Costs in Product Cost Collector to COPA

    Dear Experts,
    Please can you advise me on this current issue I'm having. Below is a description of problem:
    Customer is currently using report designed in COPA (KE30) to derive P&L report for using Plant as a characteristic.
    This was being done at a time when Product Costing functionality was not being used
    All costs (administrative, sales and production costs) were being collected in cost centers
    At end of month assessment of cost center values to COPA is executed (KEU5)
    Customer is then able to derive P&L report per Plant characteristic
    However with implementation of Product Costing, all Production related costs are captured in Product Cost Collectors and not Cost Center
    Hence we have no way of assessing or transferring total production costs from Product Cost Collector to CO-PA
    We have tried to configure FI/MM PA transfer structure (KEI1) and default account assignment (OKB9) for automatic transfer of costs on goods receipt/issue, however this is not working because the product cost collector is used as the default account assignment for the transactions
    So far only material cost valuation of sales/billed materials are possible (which does not address concern)
    As a result we have a gap and customer is unable to derive P&L by Plant from CO-PA.
    Can you advise if there is a way out, in order to have all Production Cost transferred to CO-PA.
    Thanks,
    Ola.

    Hi Ola
    Your Cost centers would be categorized as below
    1. MFG Cost Centers (In Plant)
    2. Service Cost Centers (In Plant)
    3. Few Cost centers (outside plant) Eg: Sales, Marketing, Sales offices etc
    At period end
    1. Allocate the Costs from SER CC to MFG CC using Distribution / Assessment cycle.
    This will make SER CC as zero
    2. Calculate actual activity price in MFG CC (KSS2 / KSII)
    3. After this, do revaluation of PCC using CON2.. This will make balance in MFG CC as zero
    4. Allow the Variances to be updated to COPA by ticking the "Variances to Costing based COPA" in your settlement profile
    5. In short, what remains for you to allocate to COPA is the 3rd category of CC.. i.e. you should allocate those CC to COPA whose cost is not included in the cost of product using COPC module
    Br. Ajay M

  • Rem product cost collector

    Hai gurus,
    I have one doubt in REM product cost calculation.
    1) when I am running PCC for REM I met with following error as  - Routing does not match with selection
        ID 01.
    How to correct the error.
    Regards,
    sekar chand.

    Dear Sekar,
    1.While creating product cost collector,use Production version as the controlling level.
    2.Check RM01 is the order type and ensure your production version is without any errors.
    3.Ensure you have selected rate routing in the task list type in the production version.
    4.Check what routing selection id is assigned in MRP parameters in OPPQ and also in the scheduling
    parameters in OPU5 for the order type PE.
    5,Your routing selection id should be a one which gives the first priority to the rate routing R.
    Now check and come back with your further queries.
    Regards
    Mangalraj.S

  • Difference between product costing and cost collector

    Hello experts:
    Can anybody tell me wich is the difference between the product costing calculation and the preliminary cost estimate for cost collector?
    Thanks
    Laura

    Hi,
    Product cost collector is a cost object which collects actual cost which are incurred in the production of materials periodically.  This is normally used in product product cost by period.  Whereas, product cost calculation is wider scope.
    Best Regards,
    Madhu

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Total of  actula product cost to  total of target cost

    Hi
    all
    Total of  actula product cost to  total of target cost .... How can we get data for this report  plz provide me , is there any standard report available for considering this data
    Many Thanks
    MvNr

    guess..........due to lack of full information in your thread, it is not answered.
    Total of actual product cost to total of target cost...........??
    which object ?? production order?? sales order?? wbs element??.......can u clarify?

  • Error in cost calculation for production order

    Dear All,
    I got error of cost calculation while release of Production Order due to price of some material is not mantain .
    What will happen if I release , save the Order with error & do Good Issue ???
    Ishwar

    Dear Ishwar,
    Check the log's created for costing and rectify the same.
    I feel its better to rectify the cost related errors and then release the production order and proceed to Good's Issue.
    Check whether there is a MAP for all the Raw-materials and an origin group in costing 1 view.
    The Finished product must be having a standard cost estimate that's valid for the current period.
    Revert back in case of any more help needed.
    Regards
    Mangalraj.S

  • Product costing - Variance calculation, Information system,

    Hi,
    I have an issue reconciling variances in product costing when I run S_ALR_87013139 - Cumulative. For instance I am getting results like below
    Tgt (Dts)     Actual (Dbts)     Scrap     Variance     WIP     Control Costs
    33946      183020     0     27248     -95034     0
    I was expecting
    Variance = (Actual Debits - WIP credited) - Target Debits.
    But it is not so. Am I missing something here
    Would also appreciate if someone could tell
    1. What does the target cost mean/how is it different from planned costs.
    2. When is the target cost calculated? Is it only after the order is complete and variance calculation in KKS2. I also fing that whenever a production order is created I dont get target costs. Only planned costs are there.
    Thanks for your help.
    Ram

    Hi Ram
    Following are explanations for clarifications u asked for
    1)  Target costs = Actual qty delivered X standard costs ( as per standard cost estimate for the material).  This means standard costs for actual goods delivered to stock.  Planned costs means standard cost for planned qty of production order
    2)  Variances are calculated if the status of the order is either DLV or Teco and if material is issued and activities are confirmed.  WIP is cancelled and variances are calculated
    3)  When u create production order - system only calculated planned costs of the order for planned quantities.  Target costs are calculated only when goods are delivered to stock for the order either partially or full.  Even if one qty is delivered to stock target costs gets calculated
    Hope the above clarifies and do your checks with above
    Pls assign points for the above clarifications provided

  • Rework Production Order not able to confirm and no cost calculation

    Hi Guys,
    During rework production order confirmation system giving error message as below:
    [Item category 01001 not allowed in accounting transaction 0000/0001
    Message no. GLT2001
    Diagnosis
    The online document splitting is active in your system. Here, each document is assigned to a accounting transaction variant and each document row to an item category. You determine for each business transaction variant which item categories can or must be posted here.
    The following error occurred for the document you entered:
    Item category 01001 in accounting transaction 0000, variant 0001 is no allowed.
    System Response
    The document cannot be posted.
    Procedure
    Check the document entered, the derivation of the business transaction variant, the derivation of the item category, and the assignment of the item categories to the business transaction variant.
    Procedure for System Administration]
    This error relating to New G/L split functionality such as the document type and G/L accounts document type. Doc type is using as same as normal production order and normal production order confirmations and other activities are posted successfully. Iu2019m in a puzzle, regards to this behavior of rework order?
    Back ground for rework order:
    Rework order was created through trigger points.
    Rework order doesn't have any material, it has to pick and settle to original production order; the same was defined at re-work order settlement.
    Rework order not doing any cost calculations at production order level itu2019s giving a message as below:
    Object was not costed
    Message no. CK060
    Diagnosis
    The system could not find any entries that are relevant to costing.
    System Response
    The system did not cost the object.
    Procedure
    Check whether the following objects should be flagged as relevant to costing:
    - Items in the BOM
    - Display BOM
    - Operations in the routing
    - Control key in the routing
    1.  Look at the message log.
    2.  Check whether a quantity was specified in the confirmation.
    Will some one throw some light to come out from this situation and what I missed out and what need to be maintained exactly Plz.
    Thanks in advanceu2026Vyas

    Hi Mangalraj,
    Have check the BOM & Routing for Parent production order costing check box is for both. Coming to rework order doesn't have any material, though it has pulled the some material cost from parent production order. The same can see at production order costs>analysis, but where as costs>itemization not able to see and mesage issued like: object was not costed.
    as early mentioned, confirmation level same error.
    Hope this may give some idea on this case, thanks for your time on this.
    Looking forward some light.
    Thanks...Vyas

  • WIP Calculation without implementing Product Costing

    Hi Gurus
    Can you tell me how to calculate WIP cost without implementing Product Costing.
    Thanks and Regards
    Rahul Jain

    Hello Rahul,
    What was the answer for your concern?  would be interesting to know.
    Regards,

  • Flow of product costing

    Hi All,
    Iam new to controlling area. I want to know the entire process flow of product costing and what are journal entries reflect in this flow.
    Thanks,
    chandu

    Hi,
    The requirement of batch wise capturing of costs can be achieved by creating a separate production order for each batch of production. The production order captures all the cost, which are incurred during the production process. The details of each cost are as below.
    1.For every batch of production a production order is raised in the production department. The production order contains the details of BOM and recipe.
    2.The Bill of Material (BOM) details the raw material and packing material in the required portions that are required for production.
    3.The recipe contains the detail process of production activity including resource such as manufacturing machineries, equipment. Each operation is assigned to its resource and each resource assigned to relevant activities such as Labour, fuel, power etc. (maximum of six parameters for each resource). Each resource is attached to a cost centre.
    4. The recipe and BOM are copied to production order automatically when the order is created. The quantities of materials and activities are determined at standard levels (Planned costs).
    5. A production order may contain several phases and each phase requires individual confirmation.
    6.Once a phase in production process is complete the production person gives his approval by the way of confirmation.
    7. At the time of giving confirmation he inputs the actual quantities incurred for material and activities. Using these inputs the Actual Cost can be arrived.
    8. From controlling module, the planned rates of activities are uploaded on periodical basis. monthly or annually. The cost of material is taken at Moving Average price.
    Once the batch production is complete the production person gives his final approval to the order as u201CTechnically completed (TECO)u201D.
    9. At the month end / period end all these process orders are settled at the costing department.
    10. The settlement results in calculating the overheads on predetermined rate and transferring the total cost of the production on to the finished product. The following entry is generated
          Finished goods stock Account    Dr
              To factory output Account       Cr.
    11.The work-in-process is calculated based on the status assigned to production order. If the order has a status of u201Cu201CTechnically completed (TECO)u201D. the work-in-process is not calculated, but the order will be totally settled.
    12.The standard cost of finished product is released at the beginning of every month. The standard cost is calculated based on the Bill of Material and recipe defined independently for each finished and semi finished product.
    13.The variance is calculated on the difference of standard cost of material and the actual cost incurred in the production.
    14. When the actual cost of power, fuel, Labour are accounted against respective cost centres in the month end, the system automatically determines the under absorption or over absorption of production costs. This difference cost will be apportioned to all the batches on a predetermined basis.
    Revaluation of Production orders
    Initially cost planned in cost centre accounting against activity types are used for valuating the materials that are produced. At the month end when actual cost are booked from financial accounting, revised activity price calculation is carried in cost centre accounting and with this prices the production orders are revalued. The revaluation is carried to the extent of difference between planned vs. actual activity prices. The revaluation production orders will not be carried, as production orders will be settled Immediately.
    The actual cost of every batch is determined using above process. A report is generated to know the cost for each batch.
    The standard cost fixed with each customer for each product is maintained in a separate database. The Costing department should compare these details with the actual cost of production and identify the difference. Accordingly a Debit/Credit note can be generated.
    Once a standard cost estimate is created, it updates the material master with that rate.
    Cost Object Controlling is an area in cost accounting that assigns the costs incurred in the production of company activities (such as internally manufactured materials) to those activities. Cost Object Controlling supports you in:
    Reaching make-or-buy decisions
    Determining price floors
    Performing complex cost analysis (such as target/actual analysis)
    Determining inventory values
    Cost component Structure:
    A control of how the results of activity price calculation or material costing are stored.
    In Product Cost Controlling (CO-PC), the cost component structure determines the attributes for passing on the following costs:
    Material costs passed on to material valuation as the standard price or inventory price
    Product cost components are
    Material
    Accessories
    Power
    Fuel
    Sal & wages
    Depreciation
    R&M/ Stores
    Others
    Admin OH
    Standard Cost Estimates (Applicable for trading activity)
    At the start of the fiscal year standard cost estimates will be released based on the planned raw material prices and planned manufacturing overheads. These standard prices are updated in the respective material master. These cost estimates are run only for make-to-stock materials.
    The various components of cost are incurred in producing a product is captured. The following cost components are considered for materials cost, consumables and fuel, direct
    Labour cost, utilities. Repairs and maintenance gases, depreciation, administrative overheads. A costing sheet will be created to capture administrative overheads cost which are not absorbed in the products as activity cost but are to be considered for inventory valuation In the first step planned activity outputs for each cost centre are planned, then planned cost that will be incurred against each activity type and primary cost element are planned, by carrying out activity price calculation the planned price of each activity is arrived. These activity types are entered in the work centers and routings. When cost estimates are created, system captures material cost from the prices mentioned in material master. The manufactured overheads are updated from the activity cost planned in cost center accounting.
    Sadashivan

Maybe you are looking for

  • Synchronous File Read in a High Availability Scenario

    Hi All, We have Oracle SOA Suite 10.1.3.4 which is a High Availability instance. As per Oracle's doc Id 730515.1 we have edited the bpel.xml file with the property for Adapter cluster only in the cases where a BPEL process was polling for a file and

  • Help on refreshing...

    I am using the code from http://jeffkemponoracle.blogspot.com/2006/10/apex-tip-page-auto-refresh.html It works great when my form opens up( i can see the curser moving every 60 sec). let me explain the problem. my application is a simple one, one pag

  • Ireport 2.0 doesn't start

    hello everyone: i've just installed jdk1.5 on my pc.when using the java -version command on DOS,it's really the 1.5.0_12 that appears. the problem is that the java web start icon has disappeared on my start menu,not only that the ireport 2.0 applicat

  • How to open a word document in safari?

    How do I open a Microsoft Word document on my ipad using Safari?

  • Maximum number of Arguments in Javascript function

    Is there a way to handle large number of arguments to a Javascript function ? abhay