There is a problem I am facing in B1.
We are into manufacturing of chemicals, wherein your output is never exactly same as what you have given in Bill of materials or at the time of 'issue to production'. For example, I issue goods for a product X thinking that I will get 10 kgs output, but after actual production, the output may be 9.9 kgs or 10.1 kgs or 9.7 or 10.2 or whatever. The output will be close to expectation, but never exactly same. Now, the problem is, the cost of finished product is calculated at the time of issue, and so irrespective of how much output I get, the cost of producing it per unit remains the same, which is not the right way of doing it. It should calculate based on the output received (ie. total cost of inputs divided by output quantity), so when I get more output, the cost of manufacturing will be less, and vice versa. This is also resulting in incorrect journal entries between raw materials to work in progress (WIP) in 'issue to production' document and WIP to finished product in 'Receipt from production' document.
How do I solve this??

The process is:
1. Write a production order and based on it print the production instructions. (I assume it will be a repetitive process with more then one receipt from production.)
2. When the production of a portion is ends, copy the original order, modify the quantities in it according to the actual component and result quantity, make a receipt from production based on it and close this order.
3. For the next portion repeat the process described in the point 2.
4. When there is no more production based on the original order, you can close it.
(Probably there is no need for any stored procedure. )

Similar Messages

  • Weighted avg Unit Cost calculation for COGS

    Hi friends,
    Has any body done weighted avg unit cost calculation for inventory valuation and COGS calculation. In a way we need to mirror ECC material ledger functionality based on the APO data in side the planning tool.
    Any ideas on the above!!!
    Kind Regards,
    Krish

    Hi Jerry,
    Thanks for the tip. I actually needed to clean the spreadsheet up and put bogus values in to comply with company policy. Anyhow, here is a sample of the spreadsheet
    http://dl.dropbox.com/u/7499586/junk.png
    Just imagine about 100 products and several hundred raw materials, a dozen types of labor and about 30 types of packaging. It's a monster spreadsheet.
    The "units" under each product is the number of units per batch. You can see each product has two columns. One where you put in how much of a raw material, package type, and labor type go into each batch, the next calculates the cost for each item. Then it gets summed at the top for the total unit cost for that product.
    Let me know if you have any other questions about it. Thanks so much for your help!

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Direct GRN (non order items) to cost center for Non Stackable Materials

    Hi All,
    We can do direct GRN (non order items) to cost center for Non Stackable Materials.
    If it is possible.Please advice me
    Thanks In adance

    Hi,
    Your question is not clear.
    Ok.
    If you want to issue goods to cost center you can use 201 movement type.
    If you want do create automatic PO in back ground during goods receipt, you can do it with customization. For automatic PO creation during goods receipt, you can search in SDN, you can get the answer.
    Regards,
    Biju K

  • Product cost collector for sales order related production

    Hi Friends,
    This is Azam and here i am new to this discussion forum.
    we are in situation that use diffrent variant for configurable material in sales order related production,
    I would like to have some information about use product cost collector for this kind of sales order related production,
    also I want to know difference between prelimanary cost estimate or cost estimate for sales order?
    Please co-operate me.
    I would be highly appriciated if you can respond at the earliest.
    Thanks
    Azam

    Hi,
    Here, for each sales order item, you will have sales order cost estimate. This enables the system to compute the variances once the actual costs are booked against the production.
    In the case of preliminery cost, we get the preliminery cost for production order as a plan cost and is not being used for the computation of variance but only for comparision purpose which is very marginally used.
    Trust this helps much and do encourage our efforts!
    Cheers!

  • Error in cost calculation for production order

    Dear All,
    I got error of cost calculation while release of Production Order due to price of some material is not mantain .
    What will happen if I release , save the Order with error & do Good Issue ???
    Ishwar

    Dear Ishwar,
    Check the log's created for costing and rectify the same.
    I feel its better to rectify the cost related errors and then release the production order and proceed to Good's Issue.
    Check whether there is a MAP for all the Raw-materials and an origin group in costing 1 view.
    The Finished product must be having a standard cost estimate that's valid for the current period.
    Revert back in case of any more help needed.
    Regards
    Mangalraj.S

  • Total Production Cost calculation

    Dear all,
    Anybody know where  / at which tableI can see the breakdown calculation of Total Product Cost / Production receipt amount, that should inform us about
    1. What is component cost
    2. Quantity
    3. Price
    Thank you very much in advance.
    Best regards,
    Surya

    Dear Rahul,
    [Rahul] 
    Now if I issue 500 of CH00, 250 of CH002, 250 of CH003 then my component price will be ((50010)+(25015)+(250*20))=13750
    Correct?  [Surya]  YES
    [Rahul]  
    Now if I receive 1000 of FG001 then my product cost will be 13750/1000=13.75
    Correct?   [Surya] YES
    [Surya]
    I tested your sample here. The result is correct same as I expected.
    So when I receipt FG qty < FG plan qty the FG cost is not changed it is still same with 13.75
    This is exactly correct. Same as what I'm expect.
    But why in my case the result is not correct.
    Test case :
    BOM for FG-001 qty 120, the child are :
    - PFILM qty 10 Roll , unit price 1,500,000
    - INK01 qty 5 kg       unit price 75,000
    - INK02 qty 2 kg       unit price 60,000
    - INK03 qty 1 kg       unit price 65,000
    - INK04 qty 1.5 kg    unit price 65,000
    - INK05 qty 7.5 kg    unit price 50,000
    - INK06 qty 4 kg       unit price 55,000
    - SOLVENT qty 25 ltr unit price 10,000
    I create production order # 73 with plan qty 120 and production order # 74 qty 120
    Production order #73:
    - plan qty FG-001 : 120
    - good issue : actual component qty = plan qty = bom component qty
    - good receipt FG-001 qty 120
    - Result for item cost FG-001 : 137,520.83
    Production order#74:
    - plan qty FG-001 : 120
    - good issue : actual component qty = plan qty = bom component qty
    - good receipt FG-001 qty 110
    - Result for item cost FG-001 : 137,524.96 -
    > WHY ?
    I expect FG-001 cost should not change even though Receipt Qty <> Plan Qty.
    I expcet FG-001 cost is 137,520.83
    Thanks Raul for your help.

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • Costing view for non valuated, non stock material type

    Hi,
    can anyone help me in understanding if a costing view is necessary to be maintained in the material master for non stock, non valuated material types.
    if it is not necessary then why it is not?
    thanks a lot in advance.

    Anyone??? This is kinda urgent?

  • GR value calculation for non-valuated material

    Hi,
    Please help me for the below scenario.
    Invoice : 1 is posted with Qty : 1 and Amount: 499520 EUR
    Invoice : 2 posted with Qty : 10 and Amount: 499520 EUR
    Now when the GR is posted at this point, the GR value is calculated 1,375,360.00. I would like to know the logic on which the system arrived this value.
    Qty
    Value in EUR
    PO Price
    1
    11200.00
    PO Price
    44.6
    499,520.00
    Ist Invoice
    1
    499,520.00
    2nd Invoice
    10
    499,520.00
    Total Invoice
    11
    999,040.00
    GR
    44.6
    1,375,360.00
    Thanks and Regards
    Senthilnathan

    in general you have to reverse your posting in opposite sequence.
    so you have to bring all those movements and invoice postings in timely sequence, then you need to reverse it from the youngest to the oldest posting. I added the sequence to your screenshot.
    but this is just under the assumption that the world stood still.
    From this purchase order history we cannot know if there were other postings that had already affected inventory and its values.
    Always keep OSS note 49995 - MMIM: Valuation of return deliveries and GR revrsls in mind.
    I think a reversal would even make this situation worse and recommend to leave it as is and clear it via the difference postings and material master price adjustments with MR21.
    It would be good if you could try the reversal in a test system before you do it in a production system.

  • Cost Calculation for Sales Order Collectively

    Hi,
    We need to recalculate sales Order cost. We can recalculate Sales order cost in SAP T Code VA02 for individual sales order. I am having approx 1000 sales order of which cost needs to be recalculated. Can any one help me How to recalculate Cost of these sales order Collectively.
    Thanks in Advance,
    Pawan Kumar

    Hi,
    I guess you should select B (carry new pricing). Although the system would try to reprice, in fact I guess that no pricing value would be change. If this doesn't fit your requirements then SD expert should answer your question (there are some ways you can control the pricing calculation, the ultimate way is some coding under REQUIREMENTS, but I would use it as last option).
    Benni

  • Product Cost Calculation - WIP calc. - Using Program - SAPKKA07

    Dear All,
    When we are running the program SAPKK07,We are getting the ABAP Dump.
    The errror is given below.
    ===========================================================================
    Information on where termination occurred
    The termination occurred in the ABAP/4 program "SAPLKARS " in                 
    "COSLA_1".                                                                    
    The main program was "_SAPKKA07_ ".                                                                               
    The termination occurred in line 203                                          
    of the source code of program "LKARSF26 " (when calling the editor 2030).     
    The program "SAPLKARS " was started as a background job.   
    ==========================================================================
    Please advice.
    With Best Regards,
    Raghu Sharma

    Dear All,
    We have applied the OSS notes.
    The issue is solved.
    The question can be closed.
    With Regards,
    Raghu Sharma

  • Product Costing - Standard Cost Component Split on Multi Level BOM's

    Hi,
    We are the process of introducing SAP for all back office and manufacturing activities.
    I am currently trying to verify that the product cost calculation for Multi-Level BOMs in our Legacy system matches the cost roll up or cost estimate in SAP at not only a Total Cost Level but the cost component split must be accurate also. So far, all the costs roll up correctly at a total cost level but I have noticed one issue:
    When I run a cost estimate for a single level BOM the cost estimate will split the components accurately into Material, Labor, Fixed Overhead and Variable overhead, However, when this component is then used in the next level of manufacturing all the Labor, Fixed Overhead and Variable Overhead Cost is grouped under Material.
    Q1.) Is there a SAP setting or config change that will keep the previous Labor, Fixed OH and Variable OH cost in these categories as the material is rolled up to finished product level?
    Q2.) Is there a standard report / view where I can see the Finished Goods Standard Cost split by each of there rolled up Components? This would need to split the Total Material, Total Labor, Total Fixed OH and Total VO required to make the Finished Product. 
    Q3.) Is there a standard report / view where I can see the added value (Absorption) by component split (Labor, Fixed OH, Variable OH) for every Manufactured Part?
    Any help you can provide would be greatly appreciated.
    Thanks & Regards,
    Brian

    Actuall I just tried again and it did ask for me S number and I put it in and I did not have "authorization" to access
    Error Message - Access denied (R/3)
    What happened?
    You do not have permission to access this Object
    What can you do?
    Please contact a consulting adminstrative
    Error code: WEBSMP106-20080214172231-0015
    Error details: 2491DD9-702/1A053/3162-71A9CFA5-3CB9265-2992F9
    Service Name: SAPIDB
    Service Server: WEBSMP106
    Process-ID: 4640
    Thread-ID: 6020
    Sorry for any inconvenience.
    Your SAP Service Marketplace Team

  • Product Costing  - Message CK 318 ()

    Hi Experts,
    While executing product cost calculation for material YYY we had warning message CK318 - Cost estimate for material XXX contains errors -> Planned price). XXX is a component used in YYY and the message was issued because we did not have price for XXX. We are now able to proceed with standard cost release for YYY.
    As I remembered previously, if you have an error in lower level, the higher level material would have been costed with error too. Seems that this is no longer the case. 
    I am not sure if this has changed in standard system in ECC 6 or we have to change message control for this message from Warning (W) to Error (E) but it seems the system reaction is not logical to me.
    Thanks for shedding insights into this.
    Teck

    HI Teck,
    Can you go to OKKN, and quantity structure tab and check out the 'transfer active std cost meates if material costed with errors check box?
    Best Regards
    Vimal

  • Error during variance calculation for production order "NO cost estimate "

    hi all,
    I'm gettin this error message while trying to calculate the variance for a production order. error is "No cost estimate for material xxxx for 01.10.2008.
    when i look at material xxx in MM02, under cost estimate for current period there is a value but nothing for previous period. So i'm guessing the the Cost estimate was not run of this material? am i correct here?
    Now if i try to run cost estimate for material for the missing periods using CK11N, i get an error "cannot save for past period"
    Could some one tell me how can i get a prior year estimate into the material master?
    I tried CK40N and CKN1 but just cant get it to work...
    Thanks heaps

    Hi Tom
    unfortunately there is no easy way to get a product cost estimate for a past date. One of the reasons for this would be inconsistant product valuation.
    You could in theory create a cost estimate in a current date and use an ABAP or manually adjust the valid from and to dates directly in the tables (e.g. KEKO). To do this in a production environment would be restrictive off course.
    The standard cost estimate is the basis for the target costs so as an alternative you could look to change the configuration of the target cost version in OKV6 to either of the following:
    - Plan Cost/Preliminary Costing (that is the plan calc done on your production order)
    - Alternative Material Cost Estimate (one that is not necessarily a product costing that is set for marking and release).
    I hope this is of some help.
    Elaine

Maybe you are looking for

  • Help with Usb Audio interface

    Hey guys,  just having major issues setting up my recording software to work in boot camp  my usb audiophile seems to be connecting and functioning with Windows 7 but the audio quality is really poor with distortion, i have seen that this is a regula

  • Mails are not generated in background Jobs and not shown in SOST.

    Dear All, I have facing issue regarding to system mails. I want to send mails the various reports automatically from SAP System to different recipients. So I scheduled that reports at background and in their spool list recipient I have added distribu

  • Dreamweaver and XHTML Strict

    This is a multi-part message in MIME format. ------=_NextPart_000_000E_01C73E2A.4BF5FFB0 Content-Type: text/plain; charset="iso-8859-1" Content-Transfer-Encoding: quoted-printable Hi have dreamweaver mx 2004 and need to convert a site to XHMTL strict

  • What do i get charged for?!

    just got a nokia n95 and i am unsure of what i am being charged for when using the mapping system. do i get charged for planning a route, finding places like the restaurants or local hotels etc. i have searched everywhere and found lots of different

  • Failed to load resource: the server responded with a status of 404 (Dropped by firewall)

    We have never been able to contact www.aplcomp.com Apparentlly they have blacklisted our network, and chat support is unable to handle the problem. We are a registered user of CS6  (did it by mobile modem), and have never learned about beiing listed