Track material change in process order.

I have one process order
In this process order some buddy has change the material quantity &order is save Now  again same change to previous one and order is save.
Now I want to track this changes. Is there any way out Plz help
Regards,
Parag Save.

Hi,
Check whether you have activate the OCM ( Change Management for Production Order ) in your system (In tocde : OPL9 and OPL7), if it is activated then only you can see the changes carried out in an order other wise you can only check the High level like when the last change was carried out and by whom.
Hope this will help you.
regards
radhak mk

Similar Messages

  • Change material code in process order or delete process order

    Hi experts,
    While creating a process order in COR1 transaction code, wrong material code was entered.
    Can we change the material code in process order.  If not, what is the complete procedure to cancel or delete the process order.
    Request you to revert.
    Thanks in Advance.
    Regards,
    Farha.

    Dear ,
    One the Process Order has been created with any material either it is wrong code or correct code , it can not be deleted .If it wrong code , then do not  perfom goods Issue -MIGO-261 or through Backflash  and also operation confirmation etc .
    If Goods Issue , Confirmation happend then you need to reverse those txn once again .
    In that case the best oiption will be goto COR2-Enter the Process Order -Select Process Order from Header -Restrict Processing -Choose Technically Complete .
    Now , once you did TECO , then there will not be any farther txanationl posting like Goods Issue , confirmation will not be possible .Likewise , you can also Lock or make set CLOSE  from COR2 in case there is no WIP , Variance .
    Hope this is clear
    Regards
    JH

  • Material list layout need to be changed in Process Order

    Hi All,
           I am using 4.6 B , here I want to change the process order material list layout .In the later version (4.7 & ECC 5.0) I could able to find the option 'Change Layout'  in the process order itself. Incase of 4.6B no such like option found .So could anyone know me where shoud I can change the layout .
       Particulary I need to change the sequence of columns in layout.
    Thanks in advance.
    Anil

    Hi Amit,
         I have tried the option already , but could not able to alter the sequence of the fields apart from the hiding of fields .I required to alter into customer defined sequence of fields in the layout , so would appreciate your suggestions on this .
    Thanks
    Anil

  • Raw Material Consumption to Process Orders

    Hi Friends,
    I need help with changing the way how we consume raw materials in our manufacturing organization.
    Current Process:
    A.     Receive product A in Warehouse, movement type 101. Debit Inventory Account, and Credit GR/IR.
    B.     Move product A to a storage location (out of Warehouseu2019s custody). Movement type 311. No impact to P&L, as no accounting entries.
    C.     Consume product A in a u2018Process Orderu2019 from that storage location 311. Debit Consumption Account, and Credit Inventory Account.
    Product A is listed in Bill of Materials and has to be issued to process orders for final consumption u2013 to give production variance as we are on standard costing system.
    Desired Process:
    We want to have stronger controls in our organization. We want to hit P&L in step B, as soon as Warehouse issues items out. This can be done using movement type 201 GI for Cost Center.
    But we also desire to see final consumption happening in process orders, as all our BOMs and standard costs account for the consumption of product A.
    Please advice how do we issue items to a process order that have already been issued to a Cost Center. What is it that I am missing?
    Thanks,
    Meet A

    I believe we will stick with our current process. See Ajay's reply on the link below:
    Raw Material Consumption to Process Orders
    Thanks and regards,
    Meet A.

  • Log creation for changes in Process Order

    Hi,
    We need a feature in which we need a log to created for any changes to process order. For example if qty of a component is changed, the log will records the old qty, time of change & who changed it. Similarly it should record other things like inserting/deletion of a component, insertion of a new resource etc.
    Note that the log of status change in process order does not serve the purpose.
    Please provide some solution to this.
    regards,
    Mohit

    Hello Mohit,
    You need to implement Order change management  (OCM).  Explore detail functionality and capabilities of it in help.sap portal . Also there are tons of material on it in SDN forum . Refer SAP note 390635 for more information
    If you have any query on any particular area on it then let us know .
    I hope the information helps
    Cheers
    Kaushik

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • User exit or FM to change the process order

    Hi All,
    I want to know any FM or user exit to change the process order.
    Any help will be appreciated.
    Regards,
    Seema
    Edited by: Seema Naharia on Dec 10, 2009 8:41 AM
    Edited by: Seema Naharia on Dec 10, 2009 8:42 AM

    Hi Nihad,
    I couldnot find this BAPI.
    Regards,
    Seema

  • Changing material number when Process Order is released

    Hello,
    We have a scenario in which the material number of a process order may need to be changed after the process order is released.  We will have both in process and post production inspection types assigned to this order, and both inspection lots are created at process order release.  We also will have a batch number created at process order release. 
    When recording test results in the inspection lot before a process order has been confirmed, the users may identify that the material number should be different.  We would like a way to be able to either change the material number in the process order (and inspection lots).  We know this involves a lot of updates (master data changes to the existing process order and inspection lots).  Currently, there is no way to transfer information to a new material number without receiving product in and performing a usage decision in the post production inspection lot to transfer to a new material number. 
    The client has implemented all modules, except PP (which we are in the process of now).  We know that Variant Configuration would have been the right solution for this, but this is not an option since MM is already implemented. 
    If you have any suggestions, please reply. 
    Thanks in advance.

    Hi Prasobh,
    The exact scenario is as follows:
    1. A semi finished good will be used as a component to produce the finished good.
    2. This semi finished good will have treatments added to it, and quality inspection will be performed as treatments are added. 
    3. Inspections will occur several times as treatments are added.  If during one of these inspections, material is out of spec, and the blend should be transferred to another material number, we need to be able to change to another material number.  To have a customization where material number is changed in all of the relevant PP and QM tables seems risky. 
    This is why we can't really use material classification.  We also do not have the option to use VC bc the MM module is already implemented. 
    Thanks.

  • How to track changes for Process Order

    Dear All,
    how can i have change documents for a process order like , which user have done Batch determination, order release,  operation confirmation and GI and GR.
    if i can understand  there is an option in process order GOTO->LOGS->....... to view some of these information but that is not working on my side saying "There are no entries in the release log ". how to activate these logs...
    thanks to all
    Zeeshan

    Dear,
    You can find Changes Details in Order Status tab(Blue Ikon)
    GO to that Ikon ---> Extras --> Change Documents --> All ---> Then Press All Changes
    Please refer  SAP note 390635 .
    But if you want change document in details or restrict changes then you have to use OCM :-Order Change management.
    Regards,
    R.Brahmankar

  • Changes in process order against actual/standard bom

    Dear GURUS
    We are from Process Industry.
    Suppose there is finished material A. Components of A (BOM) for qty - 1
    Component    qty.
       X                 1
       Y                 2
       Z                  3
    One process order is created of A for qty 1.
    Then I had deleted the component Z from the created po and change the qty Y from 2 to 3 or any one.
    How can I track these changes against standard bom? Is there any report for same.
    I would also like to know the deviation in process order against standard bom and issued qty against BOM.
    I try Tcode COOISPI . Table STPO and RESB but not getting success.
    Also try MCRX, MCRE but it show actual issed against process order qty. But I would like to see diff. bet. Actual BOM , Process order and actual qty.
    Regards
    Rajan

    Hi Rajan,
    I think that this kind of control is designed in SAP through CO, meaning that in product cost controlling you have 3 sets of costs: standard as per BOM, target as per the definition in the the production order (e.g. after you changed the components), and actual as per the actual goods issues.
    These sets contain not only costs data, but also quantities.
    There's also very nice functionality to do a variance analisys between the three, again, not only cost but also quantity.
    Regards,
    Mario

  • Material Code for Process Order Settlement document

    HI,
    When Process Order to a material having Standard Price is settled, the following entry is passed.
    Inventory Change A/C Debit/Credit
    Price difference A/C Debit/Credit
    It is being obeserved that in the line item of FI document for the Inventory Change the material code appears in the Price difference line items whereas for Inventory Change line item the material code does not appear.
    I want to know why this happens ?
    Regards
    Partha

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • Material staging during Process Order..TR issue

    Hello,
    For creating a TO I am going to transaction LB13 for a Process Order but I am not able to see the TR.
    When I went in the Process Order and manually clicked WM staging I found that there is an error as mentioned below. The problem is it is an issue for only some Process Order as most of the other Process Orders are getting the WM staging(TR created automatically) and I can see in the LB13.
    Can you tell me based on the error what the issue would be.
    Is it something to do with the config in Production Scheduler Profile for TR creation?
    No picking request was generated for operation 0020 due to incompleteness
    Message no. LP133
    Diagnosis
    The pick requirement created for the pick parts ( material staging indicator "1") is incomplete. Errors occurred while the system was staging goods for WM. Therefore, the system could not convert all the relevant components into pick requirements. For this reason, no pick requests were created since material staging of only part of the components would cause problems in production.
    Let me know ASAP
    Thanks
    SAP Fans...

    Hi,
    For the operation 0020 check what is the resource used. Now check what is the supply area you have maintained for that resource or in material master.
    use transaction LPK3 and check out the control cycle set-up. the staging indicator should be 1.
    Also check the component screen of the process order and make sure the storage location is the same that is used in production supply area.
    Also make sure the material has been correctly assigned to that operation for which you are getting issue.
    Once you do these changes....you might have to create a new order to test this.
    Try and revert back.
    Swapnil

  • Quantity Change At process order?

    Dear Guruji
    I am Realse Process order as per Std BOM. But at conformation Tranziction I am Changed Planed Quantity.How Can I tressiblae That only that Process order Which is change in planed quantity at Goods Issue?

    Dear,
    There is no tracking mechanism in SAP. If you dont want users to change the component during confirmation, then you create a transaction variant for CO11N transaction, and define in such a way that Component quantity field is greyed out and also delete button is also removed.
    If you search this Forum you will find suitable threads explaining the process of creating transaction variants.
    Regards,
    Prasobh

  • Material Availability in Process Order

    Hi Gurus,
    In process order, (scheduled in Current date) before release I was checked availability of in-put materials.
    System thrown a message that Allchecked materials are availble.
    But, in actual  one material is shortage in stocks.
    I checked the controls in COB1 all are OK
    Please any body help me in this
    with regards,
    Anand.M (Hyderabad)

    Hi Anand,
    It depends on  Checking criteria maintain in your  checking rule in T.code OPJJ.
    - First of all select your order type and plant in along with Transaction type (1 creation or 2 Release) and find out which checking rule you have maintain in it.T.code is OPJK
    - Then go to t.code OPJJ and find the checking criteria for that Checking rule.
    Regards,
    Dhaval

  • Changes in process order BOM

    Hello,
    I have a problem in process order. In the process order the quantity of one of the BOM item is different than the actual BOM.
    I have checked that BOM has not been changed.
    How do I find whether it was MRP that has exploded wrongly or there was any manual changes to the planned order or process order.
    We do not have OCM.
    Thanks,
    Rajesh

    Rajesh,
    You will only be able to get a clue, whether any manual change is done or not. In the Component overview screen of the order scroll to the right side and check the defination of the Column with heading "<b>Chng Proc</b>." if this is with value <b>"1",</b> it means the order Component has been changed Manually.
    Hope this helps....by the way were you on ABB-project couple of years back?
    Regards,
    Prasobh

Maybe you are looking for