Transactional behaviour in third party - XI idoc scenario

Hi,
a third party system is sending an idoc via TRFC-call with the function module "IDOC_INBOUND_ASYNCHRONOUS" to the XI-system.
The scenario is working fine, but one day the XI table space was full.
The third party systems gets the following error message:
<b>RFC_ERROR_SYSTEM_FAILURE Problems found during the EXPORT to specified key in table.</b>
For the sending third party system that is an error and the internal status is set to mode "rollback". That means the third party systems is going to send the idocs again after a specified period of time.
If i look in transaction SXMB_MONI i can see that the inbound queues were stopped (XI tried to open more than one queue, but all queues were stopped).
After getting more table space available for XI all (stopped) inbound queues were activated manually, and <b> now all messages waiting in XI were processed!</b>. To me that means XI was able to receive all messages, even the table space was full???!!!!
But this behaviour is wrong in a transactional view of the whole process. The sending system is going to send the idocs again and so the idoc's were processed twice in the XI system and respective in the receiver system.
How to handle that?

Hi Udo,
what is the effect of setting that value to 1??
I dont understand how can the message be in the XI system, if the database is full??? More queues will be opened but cannot be processed, but the message seems to be in the XI system...and if so (the message is in XI) the error message to the sending system is wrong!?
Should i delete the messages (after solving the database problems) in transaction SXMB_MONI (is that possible?)and tell the sending system to send the messages again?? I am quite confused...
Regards,
Christian

Similar Messages

  • Cost in invoice in the case of third party drop ship scenario

    Hello ALL
    We have third party drop ship scenario where vendor drop ships the goods to customer on our behalf and once we get the confirmation from vendor we bill the customer.  The sales order line has TAS item category.  When we raise the invoice the cost and billing quantity (because billing quantity is 'E' in copy control) comes from the goods receipt.  The PO is an import PO and has custom duty (delivery cost conditon) as well.  The custom duty is significant and hence when we create billing doc from sales order we want the custom duty also to come along with the material pirce as cost to the billing doc. Currently, the billing doc has material price from goods receipt as cost. 
    Can we get both price and custom duty as cost through some config or some change in PO pricing schema?  Or is there an user exit that can be used to manipuate the same?
    This is a common scenario in India and hence if anybody has come across this already and can share the solution, it will be great.
    Thanks in advance.
    Rajeev Jain

    Hi,
    You can do like this.
    Create a cost condition type ( copy of VPRS) and place it properly in the pricing procedure. sub total field must be B to collect the cost. Place a account key and maintain the G/L account for it also.
    In the requirement you can develop a new requirement saying that in case of TAS item category system should check for the cost of the item from a PO, and you can get the total of customs and price to by writing a logic. To develop the program and logic discuss with your developer.
    Thanks,
    Venkat Cheedalla

  • Third Party Intercompany Export Scenario in IS Retail

    hi experts
    scenario is like this
    cutomer 1234(foreign customer e.g.USA customer) is order goods for company code 2001 company code 2001 transfer the requst to another company code 1001
    now company code 1001 issue goods to customer and raise bill to company code 2001and company code 2001 will raise bill to foreign customer 1234
    please guide how to map this scenario
    thanks in advance

    Hanumant Nimbalkar,
      1. a) How Can we inter-Link the respective transactions between Plant B001 to A001
               Plant B001( Company Code 2000 ) will raise P.O to Plant A001 ( Company Code 1000 )
    We use the Inter Company stock Transfer with Billing
    Partis involved:
    1. End Customer
    2. Supplying Plant
    3. Receiving plant
    2. from A001 to External Vendor
         Plant A001 ( Company Code 1000 ) will raise P.O to the External Vendor.
      We use Third Party process
    Process.
    1. First Company code 2000 - Plant B001 will raise a P.O to Company Code 1000 - Plant A001
    2. The Company code 1000 Receives the PO and Finds it has not stock within its plant
    3. The company code 1000 will raise a new PO with reference to PO sent by Company code 2000 to its vendor.
    4. The Company code 1000 asks the vendor to deposit the material in their plant site.(by providing plant A001 Address)
    5. The Vendor will raise an invoice to the Company code 1000
    6. Now From the company code 1000, from plant A001 STO will be performed keeping receiving plant as 2000
    7. An Intercompany invoice will be raised by plant 1000 to plant 2000
    8. The Plant 2000 after the receipt of the material / invoice will pay to Company code 1000
    9. The Company code 1000 in return will settle the vendor invoice.
    Regards
    Sathya

  • Capture cost of procured materials in a third party sales order scenario

    Dear Experts,
    I'm developing a third party sales order solution to my company following the recommended third party scenario by SAP.
    Everything is working fine from creation of sales order, automatic creation of purchase requisition, create purchase order using the purchase requisition ect...
    The problem I have is the in the Sales order, the cost of the material is not getting captured correctly. The condition maintained in the sales order is VPRS and it is deriving the material cost from the material master record. Ideally it should be deriving the material cost from the invoiced value or else from the purchase order(which is the actual amount we are spending to buy the items). Deriving the cost from material master depicts an incorrect profit in the sales order.
    Can someone please advice me how to derive the cost(to be shown in the sales order under VPRS condition)from the invoice or the purchase requisition and Not from the material master.
    I'll be grateful if you can describe in a step by step proceedure.
    Thanks in advance

    Hi Lakshmipathi
    Thanks alot for your response.
    As u mentioned, at the point of sales order creation the price does gets picked up from the Material Master.
    But during Billing, it does NOT get updated to reflect the purchase order price. If that happens, then its perfect.
    I did a complete testing cycle and the material master price remains unchanged throught the process upto billing.
    Is there any special parameter that I should maintain in VPRS condition for this to happen?
    Anyway thanks again for ur reply, appreciate it alot. Let me know your views on this.
    As u advise I'll post it on the sales forum as well.
    Regards,
    Randika

  • Third party -- XI -- SRM Scenario,

    Hi SRM experts,
    We have a third party sending XML PO Request with external reference ID to XI, map it to SRM PO Request, and send to SRM. What we would want the SRM to do is to process the incoming request, generate  a PO number, and send back an XML PO confirmation with the external reference ID and newly generated PO number.
    In R/3, I know we have to set up partner profiles, ports, and message control to automate the creation and sedning of order response for an incoming order request. Are there equivalent configurations we can do in SRM? If yes, where can we do that? Basically I would like to create an output determination when a PO is created in SRM, so that the PO is sent to the third party application via XI.
    Has anyone have any suggestion on this? or encountered similar scenario?
    Your feedback is greatly appreciated.
    Thanks
    Karma

    Hello Karma,
    What is the "PO Request" ? Is it same scenarion with this ?
    External system to SRM
    Regards,
    Masa

  • Third Party logistics and scenario

    Hello all,
    I am working on WM and would like to know more about third party processing. i would like to know the WM scenarios in which third party
    logistics is used. is there any specific examples for third party logistics. Pl. advise in detail.
    Thanks,
    Maxx

    Hi,
    The meaning of Third party process in SAP is that you fulfill the demand of your customer by ordering the goods from your vendor and arranging the shipment from your vendor directly to your customer.
    Since in this process your goods won't received in your WH, there's no point in speaking about WM scenario of third party processing.
    Did you think of this third party process:
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/560287545a11d1a7020000e829fd11/frameset.htm
    Csaba

  • Cost value for third party sales order scenario

    Greetings, I have a cost question involving the Third Party Sales Order (Item category TAS).
    At billing (VF01), the cost being picked up by the system are the value from the PO (PBXX condition type). I would like the system to pick up the entire  COGS value (inclusive of freight values) posted at MIGO.
    Ex. If Purchase price is 100 and freight is 20, I want 120 (the COGS value) to be shown in the cost field. It currently shows 100.
    The steps I follow are
    1) Create OR sales order (item category TAS)
    2) Create PO referencing PR
    3) Goods Receipt  D 120 COGS/ C 100 GRIR /C 20 freight
    4) Outbound Delivery (Confirmation only)
    5) Billing (Costs showing 100?!)
    Again, only the PBXX condition type value (From MM Calculation Schema) is being picked up.
    How can I get the system to pick up the freight value as well?
    Regards
    Ken

    Hi,
    If you bring the Freight condition after PBXX and include in the net value, your problem will be solved.  so it will be 120 in MIGO, MIRO, Dellivery and VPRS in billing.
    We have the same situation and its working fine for us. 
    Thanks
    Krishna.

  • THird party sales complete scenario

    Can any one send me the configuration details of Third party order.
    Regards,
    Rajneesh

    Hi,
    Please find the configurationsetting and reward point.
    è     Based on the purchase order sent by the customer, SD department will raise a sales order.
    è     Based on the general item category group of material entered by the system, the system will come to know that the material is a third party material.
    ·     General Item Category Group (BANS)
    ·     Item Category (TAS)
    ·     Schedule line Category (CS)
    è     Based on the settings done for CS the system will automatically raise a Purchase Requisition and sends it to External Vendors.
    è     Now MM Department based on the Purchase Requisition will raise Purchase Order and sends it to External Vendor
    è     Now the Vendor will deliver the goods to the Customer and at the same time will send an Invoice to MM Dept.
    è     As Physical goods received is by the customer and not by MM Dept, so Statistical goods receipt is done by MM for Document Purpose
    è     Then Customer sends the Proof of Delivery (PoD) to the Company
    è     MM dept compares the quantity received by the customer based on the PoD and the Corresponding Invoice received from the Vendor (Logistic Invoice Verification)
    è     Now finally SD Dept send an invoice to the customer (Order Related Billing)
    Note: In TAS category Billing Field is u2018Fu2019, which is billed for target quantity.
    Third Party order process configuration
    Step 1: Creation of material
    Go for the SALES : SALES ORG 2 . view and give the BANS
    Step 2 : Item Category  TAS setting  T.Code: VOV7.
    Billing Relevance :F:     Order-related billing doc. - status according to invoice qty
    Step 3: Schedule line Category CS setting.
    Settings are      1.Order type: NB:
              2. Item Category: 5
              3. Acc. Assign. Cat 1:
    Step 4:  create a sales order
    The sales order will pick up the item category: TAS
    The item category TAS is picked because of the configuration done in the material master. Item category group BANS.
    The schedule line category is CS.
    Standard Order 43 11528 has been saved
    Step 5:
    Go for change mode of sales order (VA02). Select schedule line icon, in the new
    Screen selects the procurement tab page. Note the purchase requisition and save.
    Step 6: Create A purchase order ( Me21n). based on the purchase requisition.
    in the above screen select the document overview on buttion. U will find the below screen.
    when u select the variants , list will be displayed. In that select purchase requisitions, again a list will displayed of purchase requisition , select your purchase requisition and drag and drop in the net obove
    When you drop the PR automatically the data will be picked up for the PR to PO and then save the PO.
    Standard PO created under the number 4500017018
    Step 7: now mm create a invoice base on the po: ( MIRO)
    Post invoice
    Document no. 5105608630 created
    Invoice posting document
    Step 8: Now create a billing vf01
    In this billing document give the order no. it is order related billing.
    Billing document generated based on the invoice posting
    Document 90035796 has been saved
    Accounting document      
    thansk
    Kuntla

  • Filtering Material while sending it to third party using IDoc

    Hi Guys,
       I have a requirement to sent material using BD21 or rather scheduling the program RBMIDOC to third part via XI. But there is a need to filter material based on MTART and WERKS. Using Program I understand it is acheivable..but when user wants to schedule the prog in backgroung using Message Type MATMAS, how to acheive the requirement....
    Any thoughts or suggestions are highly appreciated
    Thanks
    Debasis Roy Chowdhury

    Well.. I can suggest you a work around ..  where you can effectively use filter and customization....
    1. Enhance the message type MATMAS and include a new segement with a field XFIELD( Flag).
    2. The new Segment should a mandatory segment- IMP.
    2. Now fill this segment in BADI BADI_MATMAS_ALE_CR based on you valid material type. If it is valid then fill 'X'. else. space.
    3. Go to BD95 and maintain the entries create a custome ALE Object type. Now go to BD59 and maintain the entries ther as well.
    4. Now go toBD64 and create a Filter group. You can see that the custome field XFIELD is visible there. Set the filter value 'X'. That means if the material is valid then only it will send the IDoc else it will get filtered.

  • Simple IDOC - Third party szenario

    Hello,
    I just want to custumize the following simple szenario:
    Sending an IDOC from SAP 4.6c via XI to a third party system, that is accepting IDOC.
    I have configured the szenario in XI so far. IDOC customzing and RFC settings are done.
    In XI i have defined two Business Systems. No mapping is necessary. I have just entered one communication channel for the third party system (IDOC channel) and one receiver agreement. For the third party component i have imported the IDOC description.
    Is there more to do in XI?
    Do i need a receiver determination?
    Do i need interface determination?
    Regards,
    Christian

    Hi Chris,
    yes you do
    please use the integration directory wizzard it will create all the objects that your scenario requires
    try it and let us know if it works
    regards,
    michal

  • Reg: Third Party Flow Setup

    Hi Guru,
    i need Customizing and flow of Transaction for the Third Party setup Document. please provide the valid information on this.
    Thanks
    BR
    Siva

    THIRD PARTY SCENARIO
    In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    The processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally, can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing
    If a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    When you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    You process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Goods receipt will be posted when ever the vendor ships the goods to our customer.
    We will do this transaction in SAP using MIGO.
    Invoice receipt is done when the Vendor sends us the invoice.. ( I.e Billing ).
    It can be done using MIRO.
    THe above two steps are standard and manual. There are many other ways that the actual process can happen. If the client follows EDI standards then the Goods receipt and Invoice receipt can be done through IDOCs automatically.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save
    Third party order processing is as follows:
    Assume three companies X, Y and Z
    X - The company,
    y - The customer
    Z - Vendor
    When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
    If he is procuring the goods, there are two methods that are generally followed:
    Method 1) After receiving the PO from Y, X creates a sales order against Y.
    Now at the same time he also creates a PO to a vendor Z to produce the goods
    Z produces the goods and supplies to X
    X receives the goods from Z
    Then X delivers the same goods to Y.
    After that X invoices Y and Z invoices X.
    Note : Here there is no direct/ Indirect relation between Z and Y.
    This process is known as Trading Process. and the Material here is created with Material type HAWA.
    The other method is a Third party order processing method:
    Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
    X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
    Now Z supplies the material to Y and acknowledges the same to X.
    Z will send a copy of delivery acknowledgement and invoice to X.
    After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
    The next step for X is to create an invoice and submit to Y
    Only after the invoice verification document is posted then only X can create an invoice for Y.
    This is the business flow that is followed for third party order configuration.
    There are few steps that have to be configured to enable the system to function as mentioned above.
    Step1)
    If you are always following a third party process for a material then you have to create the material using item category group BANS.
    The procurement type should be marked as External procurement (F) in MRP 2 view of the material master record.
    if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurement ( in house manufacturing and external procurement).
    Step 2)
    the item category in the order should be manually changed as TAS.
    For that you need to configure the item category determination
    Order type + item cat Group + Usage + High level = Item cat + Manual item cat
    OR + NORM + + = TAN + TAS
    OR + BANS + + = TAS
    Step 3)
    make sure that during the item category configuration for TAS you need to mark relevant for billing indicator as F
    step 4)
    The schedule line category for this type should be CS.
    make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requisition order immediately after the creation of the sales order and the PO to vendor is created against this purchase requisition.
    http://help.sap.com/bp_blv1600/V5600/BBLibrary/HTML/114_EN_IN.htm
    regards,
    indranil

  • Interface with third party service desk..

    Hi,
    I am looking into different options to integrate SolMan Service Desk functionality with third party interface. 
    Scenario includes, <b>sending attachments</b> and <b>receiving attachments</b> through SolMan Service Desk functionality.
    Please share/throw some light on the interface.  I have already gone through "ServiceDesk_WebServiceAPI" document, but not much info/help in that.
    I would really appreciate.
    Thanks,
    -Mike.

    Hi,
    This might help you
    IDOC/BAPI for SM help desk
    Regards
    Agasthuri Doss

  • How to configure purchase requistion in third party sale pls send me detail

    dear expert
    how to configure purchase requistion in third party sale pls send me details. waiting your valuable reply
    vicky

    you can find the details in the below links
    Re: THird party sales complete scenario
    http://wiki.sdn.sap.com/wiki/display/ERPLO/PROCEDURETOCREATETHIRDPARTY+SALES
    http://www.sap-img.com/sap-sd/process-flow-for-3rd-party-sales.htm
    Regards

  • Third Party : Sales order Header text should copy to PO Header text

    Hi,
    I need to copy sales order header text to PO Header text
    in the third Party sales order scenario.
    Can anybody suggest how to do it.
    Thanx in advance.
    Regards,
    RRS.

    I doupt that this is possible without using a user exit.
    The 3rd sales order will create a PR, the PR has no header text (just a header note = internal use), the PO is created in reference to the PR. And it is not possible to copy PR header text to PO header text.

  • Cross Company Third Party Sales related problem

    Dear All,
    I have the following Third Party Intercompany Sales Scenario -
    Company Code : A100 -> Plant : T001
                               B100 -> Plant : P001
    Customer : 1001 under Company Code B100
    Business Case -
    Customercode 1001 of Company Code B100 will place a sales order to Delivering plant P001. Upon saving the sales order a purchase requisition will be generated & subsequently converted to a PO for Delivering Plant P001 from vendor T001 under company code A100.
    Vendor T001 will deliver the goods to the customer 1001 with respect to PO & raise an inter-company invoice to plant P001 under Company Code B100.
    After that plant P001 will do MIRO & raise the final commercial invoice  to the customer code 1001 with respect to the sales order punched at the beginning.
    Please suggest what are the steps along with configurations needed to achieve my requirement.
    Thanks & Regards
    Animesh Chakraborty

    Dear Animesh,
    Please refer following links for your setup.
    http://www.sap-img.com/sap-sd/inter-company-sales-process.htm
    http://www.sap-img.com/sap-sd/configure-intercompany-stock-transport-order.htm
    3rd Party Sales Configuration
    In case of any issues further, please revert with updates & details.
    I will try to help you.
    Good Luck,
    Anubhav

Maybe you are looking for

  • Windows XP 32 bit SP3 and Windows 7 64 bit

    Can I use Network Magic Pro to share files, and the printer between the two operating systems?

  • Can't drag and drop files onto Applications in Dock since upgrading to 10.6

    Ever since my wife upgraded her iMac (2 GHz, 2 gigs) to 10.6, she can no longer drag and drop files onto certain applications in her dock to open the file. She has to go into the application and go to "open file" or whatever. For example, if she has

  • HT201335 Use of Airplay mirroring

    airplay mirror audio is not working on my tv; i only hear audio on my macbook pro

  • No Help in BPC 7.5 NW

    I noticed there is no Help under available interfaces in BPC NW 7.5 ramp-up. Do you know how to install this important component?

  • Map Loader not seeing device :(

    installed Nokia map loader v2.0.2, i got my N95 connected via USB and on PC suite mode, but i get the "waiting for device" message in map loader, also in bottom left corner it says "no drive selected". Tried it with Maps running, same result, i've go