Triggering automatice correspondence for downpayment

Hello all,
I am trying to configure standard SAP18 correspondence in order to print down payment receipt via F.61.
My question is how entries in table BKORM are updated automatically?
I have done all the customizing and customer master field KNB1-ZAMIM is also set.
If I use transaction code FB12 then an entry is updated in table BKORM for incoming payments for downpayments but I want that an automatic entry is updated in table BKORM at the time of saving incoming payments for customer down payment via F-29 just like automatic entries are updated in this table for other incoming payments (i.e. if T.Code F-28 is used). Am I missing any customization or any other change required like user exit. 
Thank you in advance to everyone.
Best Regards
Javed

ok, but while running the transaction I want to display a message that if,
down payment is less than 25%:  " downpayment is less than 25%",
if installment plan length is more than 366 days:  " the length of installment plan is longer than a year".
if installments are less than 3% then :   "At least one installemnt is less than 3% of total amount".
an authorization request has been send to " &primary approver".
Is this possibe in workflow, or do I need to use user exits.

Similar Messages

  • Adding of new column in report for downpayment

    Dear Experts,
    We want to add column for downpayment in report S_ALR_87013019 for which we have created a new report with the help of GRR2, (report)602 - (Description)internal orders and have selected its sub category 60BU-001 - Budg/act/commitm, also we have created a new column for downpayment and have assigned valuation type - 61(Downpayment) and valuation - zero(Legal valuation).But while posting downpayment the report is not getting updatedwith the downpayment values. The internal order that is being created is a statistical order but even if real orders are assigned still the values are not getting displayed.
    Please tell us the combination of valution type and valuation or any other characteristic that requires to be made for updating the downpayment column.
    Thanks & Regards
    Edited by: Aniruddha B. Mahalle on Feb 21, 2012 11:25 AM

    hi
    check cost element is created also check is there any exclustion of cost element setting done.
    Edited by: AP on Feb 21, 2012 11:50 AM

  • Aging for Downpayment paid to vendor -reg

    Dear All,
    I want to do  ageing analysis for Downpayment/Advance paymet, Vendor balance   made to the vendors.  How can i Do this.
    Whether this will tally with the balances  of the vendor.
    Thanks and Regards,
    C.M.SATISH KUMAR.

    I want whether we can  do  ageing for the Special GL Down payment  account straightaway,rather than doing the ageing via vendor account.
    Thanks and Regards,
    c.m.sathish kumar
    [email protected]

  • Standard workflow for downpayment request approval

    Hi,
    Is there any standard workflow for downpayment request approval?
    Please suggest.

    Hi,
    There is no standard flow for the down payment request generally in many projects down payment requests are rarely created process starts with Down payment request F-47 then Down payments F-48
    then clearing of Down Payment f-54
    Down PAyment request is just a template.If you want to use then use then u can skip this step.
    regards
    Deepa

  • Using indicators other than "A/F" for Downpayment transaction F-37

    Scenario-- We need a one -sided entry(noted items) where will send "invoice like" document to customer for the amount agreed in milestone related to contract(not exactly milestone functionality).
    We want to use transaction Downpayment Payment F-37 For this but want to use a different set of Special indicators (e.g. J, T) to keep it separate from the special ind A,F which we use for the regular payment process.  having separate Sp G/L indicator will enable AR team to different the items for the Mile stone process.
    There are also separate GL account involved for this special process.
    I changed the available special GL incators-J,T. But when I changed the properties of the sp ind "T" to "noted items" I get the message below.
    How  can I use a different set of special GL indicators for downpayment process?
    ===================================
    Down payments and noted items not possible for special G/L indicator T
    Message no. F4089
    Diagnosis
    You selected the noted items as the attribute for the special  G/L indicator T. This special G/L account indicator is a down payment/down payment request indicator. This combination is only permitted for special G/L indicator F.
    System Response
    The system cannot accept this setting.
    Procedure
    Change your setting for the special G/L indicator.
    Edited by: MN on May 8, 2011 8:57 PM

    Hello,
    Have you find any solution for this. I have the same requirement.
    Thanks in advance for your feedback,
    Emmanuel

  • SAP workflow -SAP error WL210 -Error triggering default method for object &

    Hi Experts,
    User is encountered with the error message "Error triggering default method for object &" when he is performing approval action in SES workitem .
    Could you please advise me how to avoid this issue.
    Thanks in advance for your valuable help.
    Rajani
    Edited by: Rajani SAPABAP on Sep 13, 2011 4:50 PM

    Hi Rajani,
    I think that it's an authorization issue.
    Please check if u find which authorization object is violated in SU53.
    Regards,
    Asit

  • ERROR TRIGGERING DEFAULT METHOD FOR OBJECT (INCOMING INVOICE).

    When trying to open invoices in my ERP inbox to authorise I get the following message.
    ERROR TRIGGERING DEFAULT METHOD FOR OBJECT (INCOMING INVOICE).
    . There might be an authorisation issue. but i am not confirm.
    I have checked the authorisation in SU53 also.
    is it possible that there is some other reason for it.
    If so then what are they?
    please help.

    Hi Naval,
            Is it a custom business object....make sure that the status of all object components are set to Implemented or released..and  regenerate the Object...
    Thanks
    Srinivas

  • Reg : change pointer mechanism for triggering the IDOC for delivery note

    Hi ,
    I am working on a change pointer mechanism for triggering the IDOC for delivery note and will be using this message class DESADV.
    So SAP has suggested for assigning the message class DESADV with the function module in MASTERIDOC_CREATE_SMD_DESADV in BD60 transaction code.
    So I was looking to create this MASTERIDOC_CREATE_SMD_DESADV function module in SAP and SAP suggesting that  we should create this MASTERIDOC_CREATE_SMD_DESADV function module as same as the function module MASTERIDOC_CREATE_SMD_MATMAS.
    So do anyone knows that is there any tool has been provided by SAP for creating this function module MASTERIDOC_CREATE_SMD_DESADV in SAP system for triggering the change pointer mechanism for outbound Delivery.
    Thanks !
    Regards,
    Kiran

    Hi,
    When you are change pointer the system itself will take care of sending the changed master data to your partner system and the user will not have any intervention.  If you really wanted to have that then you need to use the change pointers to read the master data which is modified in a custom program and then display that on the screen.  Once the user selects that master data records then trigger an IDOC for creating the idoc for that master data and also flag that master data record as processed in the SAP BDCPS standard table, so that the same record will not be picked. If you wanted to know how the change pointers piece of code is written go through the program RBDMIDOC and you can understand how the change pointers logic is written.
    Thanks,
    Mahesh.

  • Triggering and Recording for specific duration

    Enclosed is the VI which I am using to trigger a electrical circuit for generating a spark.
    My system is very simple wherein I am generating spark in a vessel (by a triggred electrical pulse to HV generator) and measuring the pressure and temperature for a specified time of X and Y seconds after the spark.
    Part A:
    On a single Boolean input (TRUE) I would like to have following:  
    1. The Trigger pulse (USB 6009 device) should start and last for say 1.5 sec. which is input to my electrical circuit. Two DAQ max is used since current from one port is not sufficient to trigger the HV generator - electrical circuit.
    2. At the same time the pressure inside the vessel should be recorded for X sec. only (writing to file)
    3. Simultaneously the temperature should also be recorded for Y sec. only (writing to file)
    In the present VI, I have to keep the “Auto fire and record” button pressed to write the data to file. I have set up preset time for the trigger pulse.
    After triggering and recording for specific time 1.5, X and Y sec. the Boolean should go to FALSE position since long duration pulse to electrical circuit can be damaging.
    *** REQUEST SOME-ONE HELP ON THIS MATTER ASAP. ****
    Part B:
    Later I have to record the values of current and voltage measured at three locations by Tektronix TDS 3034B Scope (channel 1, 2  and 3) for a duration of 300 nano-seconds after the spark has occurred (i.e. say P sec. after trigger pulse and recording till P + 300 duration)
    This simple logic seems to be more difficult than, I expected, can some one please help
    / suggest in the right direction. (**VI attached**)
    Sorry for the language – New to Labview and not an electrical engineer. So pl. explain.
    THANKS
    Email: [email protected]

    Hi xseadog,
    Sincere apologies for inordinate delay in reply.
    Was blocked up with actually setting up the experiment in physical sense. Keeping all the bits and pieces in right place.
    The pressure sensor / transducer is Omega PX219 with output 0 – 5 V. Recording pressure reading every 0.001sec. immediately after the spark trigger (USB 6009 signal) is switched ON. (through labview)
    The temperature is K type thermocouple. Recording temp every 1/12 sec.(0.0833 sec) after spark.
    I have made a provision to trigger the spark manually – through push button. But this mode requires me to start recording press and temp., before pushing the button to generate spark. Hence keen on using the trigger initiated through Labview.
    Regarding relay controlled by the 6009, I understand that circuit is similar to that. The HV is generated through an EHT pulse generator, which is ready now, the only thing is it requires a trigger of 5 V and more than 10 mA.
    Manually when we generate spark, we do not require the USB 6009, so we get spark every time when button is pushed, it was only during the Labview trigging we diagnose this prob. And hence clubbed the two channels of 6009.
    As of now the loop time “Auto fire and record” which is the key for firing –spark generation –runs every 1.011 sec. can you suggest, how to reduce the loop time ?.
    Does the DAQ’s consumes time or which step consumes more time. I would request your comments.
    Thanks for the continuous help / replies.
    nnnsh

  • Correspondence for Fx Deals

    Hi
    While trying following path to create correspondence for outgoing message , getting following Error.
    'An error occured while creating the original attribute for TRM'
    Path : CTF_COMONI-select one entry with status 'Initiated' . Go to status Function . Select 'Create Message and send.
    Can anyone help
    Regards
    Vimal

    I am having the same issue. Can you please share how you resolved the issue.
    Thank you
    Mahi

  • What triggers the prompt for memory test during boot up of WLC.

    I have a controller that sometimes does and sometimes doesn't prompt for memory test at boot up. What triggers the prompt for memory test at boot up?

    We have the same behaviour with a 4402 controller.
    After a software upgrade from 4.2.130.0 to 4.2.176.0 the controller didn't reboot automaticly during the first restart with the new software. I connected via console and saw this message:
    Airespace 4200 Wireless LAN Switch Board - Memory Test
    Invalid Option...Press any key to continue
    Airespace 4200 Wireless LAN Switch Board - Memory Test
    1. Restricted [4kB per MB]
    2. Entire Range [512M]
    3. EXIT
    Then I choosed option <3 Exit> and the controller started correct.
    Regards
    Hendrik

  • Triggering print program for shipment creation

    Hi All,
    I have created a new print output type 'ZEDF',which should ideally generate a spool at the time of saving the shipment. But unfortunately, this is not happening.Whenever I save a newly created shipment,this output type is not getting triggered,but when I repeat the same output type through VT02,a spool is generated automatically.I have maintained all the condition records properly in the system. Please help me on this.
    Thank you,
    Archana

    Hi,
    Have you checked the settings in NACE tcode?
    Pls check the same and amde the configuration according to your Device Type.. Pls have a look on below points.
    Hi,
    1. Goto in NACE
    2. You need to ask your functional buddy to let you know about Application area, I suppose u need to take EF.
    3. Select EF from the list and than click on Output Types, select any output type (Which you wud like to give to your script)
    4. Else if you like to create a new one for your script, then on same screen click on change button, then click on New Entries
    And give all the detailed info.
    5. To use existing output types, select a output type like "ZEDI", at the left hand side double click on Processing Routines.
    6. In the Processing Routines block , Give the Program name as print program and here you need to give your SAP scrip name in Form option.
    save it.
    Regards,
    Lokesh.

  • Workflow for Downpayment at header level

    Hi,
    I have a scenario like
    Step 1 :  A Purchase order will be raised for a vendor with multiple line items with down payment maintained at header level.
    Step 2  : Down payment request will be raised through ME2DP which invokes F-47 in the back ground . Business requires to send a mail to the approver                   once Down payment request is saved  at header level i.e., with total down payment amount of all items instead of sending mails item wise.
    Currently business is triggering workflow 's at Item level of down payment request and they want to change it to header level.
    I was wondering is there possibility of  triggering work flow  at header level for down payment request .
    Please advise on this.
    Thanks,

    Jaya,
    Unfortunately there are no tolerance keys designed to work in the manner that you desire. All the standard tolerance keys work at the item level.
    The only solution I can think of would be do some sort of validation on the unplanned delivery cost field via a user exit/BADI in MIRO.
    Hope this helps {or probably not:)!}
    H Narayan

  • Block settlement to auc for downpayment

    Hi SAP Friends,
    There is a specific requirement in one of our project.
    In an investment project, advance payment is issued against a service PO with ref to WBS. The requirement is to block the settlement to AUC for this advance payment only until service entry acceptance is made. Other commitment in the WBS should go as usual without problem with regular path of setlement to AUC and from AUC to Fixed asset.
    Regards
    Srinivasan

    Hi Srinivasan,
    Please check if this could be of any help to you.
    Specify Capitalization of AUC/Down-Payment
    In this step, you determine how the system will deal with down payments on AuCs and their closing invoice during the settlement (capitalization) of the AuC. This system setting is particularly relevant for respresenting down payments from previous years in the asset history sheet.
    Standard Settings
    The system capitalizes down payments as follows in the standard system:
    If you capitalize a down payment from the previous year and the closing invoice from the current year together, the amount of the down payment is transferred with the transaction type for asset data from previous years, and only the difference between the closing invoice and the down payment is transferred with the transaction type for current acquisitions.
    Activities
    If you want to change the default setting, you must set the indicator for the capitalization of assets under construction without down payments. If this indicator is set, the system ignores down payments during the line item settlement of assets under construction. The total amount of the closing invoice is always transferred with the transaction type according to its posting year.
    SPRO -  Asset Accounting - Transactions - Capitalization of Assets under Construction - Specify Capitalization of AUC/Down-Payment
    Indicator transfer down payments from previous years
    When you set this indicator, the system ignores downpayments during the line item settlement of assets under construction. The total amount of the closing invoice is then always transferred to the capitalized asset using the transaction type based on the year of the closing invoice.
    Use
    This has the following result:
    There is an opposite effect when the indicator is not set, and you capitalize a downpayment from a previous year along with the closing invoice from the current year. In this case, the system transfers the amount of the downpayment from the previous year using a transaction type for old assets data. It transfers the difference between the total amount of the closing invoice and the downpayment using a transaction type for new acquisitions.
    Regards
    Vinayak.

  • Triggering event from for-each

    Hi,
    I have a process that takes long to execute, I want to be
    able to send a progress notification to the user with the hope of
    not getting him bored or impatient, for some reason I can't achieve
    it and I don't know where to go for help, if you know how to solve
    this, any help will be greatly appreciated.
    I have some code like this:
    <code in mxml for my application>
    - component declared .. onXEvent="showProgress()"
    - script for showProgress calls refresh for ProgressBar
    Component
    </code in mxml for my application>
    <code for my component>
    for each (var myObject:xObject in MyCollectionOfMyObjects)
    // do some complex logic and calls methods for this item
    // creates and triggers event for progress notification
    </code for my component>
    I would expect to see my ProgressBar advancing as the process
    is completed, but for some reason the process seems to take control
    of the execution and no onProgressEvent is fired until the foreach
    finishes execution. It will run perfectly in the debugger (step by
    step) but it doesn't work at runtime.
    Is there any way I can achieve this in Flex?? Is there any
    event class I can use to solve this issue?
    maybe anyone has done this before or knows a link to more
    information on this subject?
    Thanks in advance
    William Vega
    MCSD / Beginner Flex Developer

    Flash functions execute within a frame. They finish before
    any UI rendering is done. You will have to use callLater , somehow,
    within your loop to give the UI a chance to draw.. There is a more
    detailed answer to this thread somewhere else.
    Tracy

Maybe you are looking for

  • Error RE: add method in GUI application

    I'm trying to put three circles (red, yellow, green) in a sub panel called "trafficLight." Unfortunately, I keep getting the following error message that prevents me from compiling the program: *.\TrafficPanel.java:36: cannot find symbol* symbol  : m

  • Xalan XPathAPI selectNodeIterator help

    so i got xml something like this <abc>  <bcd>    <cde/>    <cde/>  </bcd>  <bcd>    <cde/>    <cde/>  </bcd> </abc> so i parse the doc tree using xerces which seems fine, and i pass the root element to XPathAPI with xpath /abc/bcd and it gives me bac

  • TV Tuner

    I wanted to buy the MSI TV@nywhere, but after reading the forum... do you think I should get the Winfast TV2000 Deluxe or the Asus TV Tuner?

  • Sum Based on The Value of Another Group

    I'm using RS 2005 and trying to accomplish the following: Here is the detail data for those customers with negative balance. For example cust2 = -50 and cust3 = -30 Cust ID    Ord #   Balance cust1        1          30 cust1        2          80 cust

  • HTML Article with YouTube iframe gets an error

    I am coding the articles in the folio using HTML and CSS. When I upload the article to the folio producer I receive an error that the article is "Missing or unable to load layout." When I try and download the folio using the Adobe Viewer app I receiv