Trx KKPHIE: assigning single objects to cost objects hierarchy through BDC

Is there a way to assign single object to cost object hierarchy.
The ALV TREE button "Assignmnet single objs on/off" does not seem to trigger an OKCODE since it is managed in the abap object (class).
Is there is way to make a BDC. Or other ways to enter that data in BG, like a BAPI.
- Tried the BDC recorder without success
- Did not find a BAPI
- Did not find anything interesting in SWO1 business object BUS2076.
Any clue ?

Ok, we found the solution. Simply use the old transaction "KKP2" instead of "KKPHIE"

Similar Messages

  • Assignment of Materials to Cost Object Nodes in Cost Object Hierarchy

    We have defined a Cost Object Hierarchy. In the Cost Object Hierarchy , there are multiple cost object nodes. These cost object node represents each Prodcution line.
    There is a requirement that any material can be produced in any production line.
    The issue I am facing is if I am assiging one material to one Production line, and again if I am trying to assign the same material to other production line, the system is not allowing me to assign it.
    How Can I resolve this issue.
    kindly help.
    regards

    Hi
    Ideally, each prod line should be represented by a Production Version in PP... You can assign a combination of Material + Prod Version to each Cost Obj Node... You cant assign just a Material No to more than 1 node
    The Prod Version Field might appear in Grey Mode.. But, it will allow you to select the Prod Version in that Field....
    You can also use BADI workorder_update to check while creating production order that the Prod Version being used in the Prod Order must be assigned to Cost Obj Node... Cost Obj Nodes are stored in the table CKPE
    br, Ajay M

  • Mass Material Assignment to Cost Object Hierarchy

    Hi,
    I have to assign the materials to Cost Object Hierarchy. I know that it is done thorugh TC- KKPHIE.
    But if I have to assign more than 1000 materials at a time , I cannot do that in mass.
    I tried to do it thorugh LSMW. The system is not allowing it to create LSMW.
    I am stuck. Please let me know is there any other method of material assignment in mass.
    Or any other transaction code.
    Hoping to hear

    Hi Ravi,
    I have tried using LSMW and BDC. Its not working.
    Is there any other transcation of material Assignment to Cost Object Hierarchy.
    regards
    Kami

  • Assign Cost Object to Bal. Sheet Account???

    Hi experts;
         I found at my customer site that they set the fields of WBS element, Cost Center, Profit Center and Network are applicable with Bal. Sheet accounts at the time of Document entry like F-02.
         When I discussed with them that the B/S accounts should not be linked to any cost object and cost objects are only for the P/L accounts they said yes that is right in general, but they do that with some certain accounts like the Accrued Revenue to know exactly how much is expected to be collected from each project.
         But also as far I know that through the Document Split function on system I can get such result because if we assigned a Cost Obj. to a P/L account the system assign it to the other line of the document entry if it is B/L account, but I did not practice the Doc. Split before.
         So can someone kindly advice wither such process is correct or not? and if not, does it has any wrong impact if they insisted to do it? And does the Doc. Split can really help in such matter?
    Many thanks in advance;
    Best regards;
    Ahmad Mahmud;

    Hi Ahmad Mahmud,
    The below is taken from SAP Note 75978 - Cost element type 90
    "Cost elements of category 90 were introduced with 3.0 to enable an availability control on an internal order assigned to a fixed asset even with directly activated asset acquisitions. This functionality is guaranteed by SAP and will be enhanced by the planning of these cost elements in Release 4.0.
    The check, however, that cost elements of category 90 can only be created for asset reconciliation accounts, has only been made since Release 3.0F. Before, it was possible to create any balance sheet accounts as cost element of category 90. Since cost elements created this way were not covered by functionality provided by SAP, various errors may occur when you post to these cost elements."
    As you can see SAP does not support cost element type 90.
    However I used them on e few projects and never have any problems.
    Just to give you an example of the reasons they are sometimes needed:
    - you need to record production quantity in CO-PA. You will create cost element type 90 for your inventory account. Every GR from production order will update quantity in CO-PA.
    The question about splitting is quite ineteresting.
    Maybe one of the NewGL experts can help you here.
    Regards,
    Szymon

  • General Cost Object

    Hi there,
    Anyone familiar with the General Cost Object out there please? (referring to KKC1  - under "Intangible Goods and Services" from the SAP menu.
    *Background*
    I am looking to a further dimension (cost object) to breakdown/attribute costs; a cost is now attributed at a GL account, a cost center and an internal order; for some reason i need to have a further cost objective; i found the "general cost objective" and thought of them as a solution altought they are indicated for "intangible goods and services" which is not my case...
    *So far..*
    I have created cost object with Tcode KKC1, quite straightforward and posted a journal to a GL account / Cost center / Cost Object (I left to one side the internal order for the time being)
    *Issue 1*
    - the KKC1 is asking for a Profit Center as part of the Cost Object master data (mandatory field);
    Question: can this field be customisable in the IMG and be left blak? we have a 1 to 1 association betwen CC and PC, the same cost object should be used on many CC;
    *Issue 2*
    When I try to build the report in report painter to extract the info from the journal using Table CCSS, the 3 caracteristics ( GL account, Cost Center, Cost Object ) are not available whithin the same report; I can only extract GL and Cost Center or Cost center and Cost Objct; same problem using KSB1 ( single posting for cost center ) or KKCS (single posting for cost object)
    *Question*: is there a table or some setting i am missing in creating a report painter to extract simulaneously values by GL, Cost Center and Cost Object?
    *General Question*
    Is there any other "object of CO" i can use to achieve the goal highlithed above?
    TA!
    Domenico

    HI,
    question 1: if the cost object is used for different cost center/profit centers, assign the general profti-center to this cost object (or Dummy PRCTR). Even if its possible to leave it "blank" it does not solve your problem.
    question 2: don't know, but sounds not so easy...
    question 3 (general question): No
    I used cost objects once for the same reason you are describing it and it was helpful, but I never had the issue with report painter...
    BR Christian

  • Two cost objects Sales order , OKB9 business area +order

    Hi All,
    While posting intercompany IR system thronging below error messageu2026
    Enter only one true account assignment
    Message no. KI249
    Diagnosis
    You made assignments to several objects in CO (cost center, order, project etc.). 2 of these have been created as true objects.
    System Response
    You are allowed only one account assignment for each cost-relevant account.
    What we found in our system:
    Conflict:  Actual Sales Order 3487909 is linked to PO via account assignment category 4& IC dummy sales order (OKB9 config Business area 3000 + order 807898 assigned.
    Due Two cost objects cannot be linked to one IR G/L account booking.
    What is the best solution for this to post Intercompany IR with conflict two cost objects.
    Regards,
    Adi

    Hi All,
    we facing an  issue with sales order cost objective vs OKB9 cost object.
    For IC PO service material, we assigned account assignment category 4.Reasonis Service material was not showing on G\R account.
    The G\L account 7898788, we assigned to Service Item (material type DIEN)  , for G\Cost 7898788 cost element is assigned in OKB9. Combination business + order 3478787.
    Now conflict with sales order cost objective vs OKB9  internal order cost object.
    While posting intercompany IR posting system thronging below error messageu2026
    Enter only one true account assignment
    Message no. KI249
    Diagnosis
    You made assignments to several objects in CO (cost center, order, project etc.). 2 of these have been created as true objects.
    System Response
    You are allowed only one account assignment for each cost-relevant account
    How to resolve this issue.. Do I make any config changes in the system to overcome this issue?
    Or any sub account to assinment  in VKOA config for internal orderu2026
    Regards,
    Adi

  • Cost object Hierarchy nodes

    Actually I need to change profit center in cost object node but does not allow changes, do you have some suggestion?

    Hi,
    Once u assign profit center in Cost Object before values posting system allow u do changes. Once u made postings against Cost Object System not allows you for Change Profit Center.
    For the do one thing Create new cost object with proper Profit center and settle ur old Cost Object to New cost object.
    Thanks
    PBR

  • Assign cost object by condition type for accounting

    Hello All,
    Our scenario is that we have a single billing line with a service order assigned as the cost object on the line item.  This line has multiple condition types going to different GL accounts on the RV document.
    Once the service order is on the billing line all of the RV document lines get the same service order for cost object assignment  We want to assign different cost objects (service order, internal order) to the different lines on the RV document based on the GL account.
    Example:
    Billing document line 10
    Material 123456
    Service order 999999
    Condition type           GL                      Desired Cost Object
    ZZ01                      480000                  999999 - service order
    ZZ03                      560000                  11111 -  internal order
    ZZ04                      470000                  999999 - service order
    ZZ05                      440000                   22222 - internal order
    We have the multiple GLs getting assigned, it is just the cost object on the RV document that is a problem.  Is there a way to do this in config...or is a user exit the only option?
    Thanks in advance!
    Edited by: Allison Sains on Jan 20, 2012 7:01 PM

    Thanks for the response.  It looks like we're going to try and rework the account assignment so a user exit is not required (use OKB9 instead).

  • Check on Cost elements assigned to cost objects

    Hi,
      In my program, I need to check whether cost elements assigned to cost objects or not.
      Is there any function module available to check whether cost elements assigned to cost objects?
      Please provide the code for check on cost elements assigned to cost objects.
    Regards,
    Tintu

    Check table with CSK*

  • In VFX3,error is for GL requires an assignment to a cost object eventhough

    In VFX3, while releasing billing docu for Accounting  error is for GL40000000 requires an assignment to a cost object
    The below are Checked points :
    1.In OKB9 for this cost element  40000000 cost center assignments are there with Business area wise.
    2.Cost center Valid period is from 1.4.2007 to 31.12.9999
    in the begining  while releasing in VFX3, system throwed  error as that cost center  blocked for revenue postings,
    We deselected that check box(Actual Revenues in KS02)
    now the error is GL 4000000 requires  an assignment to a cost object
    Even though cost center assignments are there but why system is asking cost object  not able to understand.
    Please any one help me to solve this issue.
    Thanks

    Nope, no other ways.
    The cost center in question will receive a statistical posting - revenues aren't costs, and can't be carried in CCA as primary postings.  If they could, they'd be able to be included in rate calculation, allocations, etc, which is nonsensical.
    You'll have to have another receiver in CO that can receieve a real posting.  That's pretty much an internal order, WBS element, or profitability segment.  Profit center doesn't count; all postings to PCA are statisticial (PCA is a special-purpose special-purpose-ledger, if you get my meaning.)
    Two questions:
    1) Do you have costing-based CO-PA active in your system?
    2) Have you verified the business scenario?  Why do you want to record revenues in CCA in the first place?

  • Cost assignment-Multiple cost objects being selected by default from the EP

    Hi,
    I have created an expense report from the Portal and entered the cost object - a WBS element and saved the report. Now, when I check in table: PTRV_SCOS, it shows me the cost object assigned are - both - the WBS Element as well as the Cost center. This is incorrect as there should be only one cost object - either the cost center or the WBS element. However, when I book the expenses from the backend, it works fine. Only the WBS or cost center is displayed in the table mentioned above. Anyone has any idea as to why this is happening?
    Many thanks in advance for your efforts.
    Cheers guys.
    Hope to hear from you soon
    Best regards,
    Tanmay Dhingra
    Edited by: Tanmay Dhingra on May 17, 2011 10:05 AM

    Hi All,
    First of all, thanks for your responses..
    Right, about the issue, what I explained here was that I am indeed assigning only one cost object: the WBS element. The issue was that even though I am assigning only the WBS element, it was also assigning the cost to the cost center by default. I did some R&D and found the solution to the issue (I was also asked to look for OSS notes but was not satisfied that this issue needs an OSS note to be applied so tried my solution). The issue was in table: T788M (allocate costs to variable account assignment). Here, I created an entry and called it USERGROUP_2 (just a random name) and assigned the variable cost objects (only the WBS and the Cost center) to be displayed. In the next step, I assigned this usergroup to the country in quesion feature (TRVCO). By doing this, I tell the system that only these cost objects are to be considered when an employee wants to assign the cost object. If the system sees that there is no value from the drop down to choose from, it picks up the default cost object (cost center). This was a simple issue that I had to rattle my brains on... but the solution I mention above worked like a hot knife going through butter...
    If you guys face this issue, please try this else feel free to get in touch with me on my number below.
    Once again, thanks for your responses.
    Best regards,
    Tanmay Dhingra
    +91 880 6666 606

  • Account Assignment - Derivation of Cost Object

    Hi All,
    On doing payment through transaction F-58, automatic line item of exchange rate gain n loss (P&L Account) is added automaticallly due to configuration done in FBKP -> Excng Rate Difference. The problem is, is there a possibilty to derive cost object which is used in Invoice of which the payment is being processed.
    Regards,
    Nayab

    Thanks Eli for your reply.
    Yes, I found the same i.e. the best practice is to assign CO through OKC9 on particular G/L Accounts. The issue is reports in Joint Venture Accounting "GJRG_5J1B" that shows all cost on particular job (cost center, wbs, network etc.) doesn't potray the right result after settlement of network. For instance
    Invoice is booked and cost element is charged on Network
    CJI3 show all amount
    GJRG_5J1B show all related amount.
    When payment is processed and in automatic RXD line item, constant Cost Center of Other Income is provided
    CJI3 doesn't show RXD amount
    GJRG_5J1B show RXD amount
    On settling Network, i.e. Roll up its cost to WBS level following happens
    CJI3 is settled, gross amount is 0.
    GJRG_5J1B show 0 as well other than RXD amount which still needs to be settled.
    The solution we found is to charge automatic line item to particular cost object so it will get settled while rolling up network amount to WBS
    The other solution is to settle such cost at period end but to do such activity I'm in search of standard way.
    Thank you again for your response.

  • Sale of Material - Assignment to Cost Object Error

    Dear Forum,
    The users while trying to do the PGI, encountered the error - "Account xxxxx requires an assigment to Cost Objet". However, when we check the Material Master, for doing the OKB9 maintenance, we get the message 'Costing View' not maintained for thie material. How could be the reason and how can we address this issue.
    Another issue is that the posting is going to the wrong GL Account, which is mentioned in the aforesaid error message. How can we check the MM Account Determination to verify the correctness of the GL Account for posting of the Cost of Sales at the time of PGI.
    Thanks for the help.
    Regards

    Hi,
    Use transaction code: KA02: enter G/L account xxxxx(Cost element) and in default acct assinmt TAB,assign the Cost Center and save.
    Now try ur transaction.
    OR
    Check the field status of the account in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost center, cost element, WBS element
    OR
    Use t.code OKB9 and assign G/L account to cost object with ur company code and save.
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    For 2nd issue
    Check VAY in OBYC under GBB
    For more check the link:
    http://www.sap-img.com/financial/difference-between-primary-and-secondary-cost-element.htm
    Regards,
    Biju K

  • FX Revaluation with default Cost Object Assignment

    Hello,
    When we run the FX revaluation program FAGL_FC_Val, SAP books one side to
    the balance sheet account and the other side to the P&L account for
    unrealized FX Loss/Gain. Since this account is also created as a cost
    element, it requires a cost object. However, FX revaluation program posts
    the entry without a cost object. We have tcode OKB9 - Default Cost Center
    Assignment but SAP does not take values from it.
    We are on ECC 6.0
    Any assistance is sincerely appreciated.
    sumit

    Hi,
    if the P&L account for unrealized FX Loss/gain is created as cost element a posting can only take place if there is a cost object assigned.
    You wrote "However, FX revaluation program posts the entry without a cost object" but thats not possible. There must be a cost object, maybe not the one you are expecting...
    Maybe the OKB9 entry is maintained for comp. code A the FX valuation is done for comp. code B? Maybe there is a substituion rule created that changes the OKB9 default cost object?
    Please check, and come back.
    best regards, Christian

  • Error in Distribution of Actual cost in Cost Object Hierarchy

    Hi,
    I am getting an error while doing the Distribution of Actual cost from Cost Object Node to the assigned Order.
    Cost element/origin 630000 could not be distributed
    Message no. KZ468
    Diagnosis
    The cost element/ origin 630000 could not be distributed because there are no target costs for this cost element/origin or for cost element group CO-PC-TOT.
    Procedure
    Check the calculated target costs and cost element group CO-PC-TOT assigned to the target cost version.
    Procedure for System Administration
    Proceed
    Although the Cost element is Present in cost element group CO-PC-TOT.
    One more information, the order  that is assigned in Cost Object Hierarchy is of CO-Product orders.
    I have searched in the forum but I havent got any solution.
    Kindly help.
    regards
    Kami

    Hi,
    Concerning error message KZ 468, it has the following origin: In the  customizing of the cost object category (transaction okz5), check if the 'single object selection' is set to 'Control through variance key'. If you consider the F1-Help for this option you will find the following  explanation:
    if the indicator Control through variance key is turned on, the production order, process order, or product cost collector can only be assigned to the cost object hierarchy if:
    -> The material is assigned to the lowest node of the hierarchy
    -> No variance key is specified in the order
    The important point is, that orders that have a variance key are excluded from the cost distribution.
    In transaction KKF8 you will find that all these orders do indeed have  a variance key. Hence, all of these orders are included, there are no target costs from the orders and the costs cannot be distributed. Thus the error message kz 468.
    Please consider that and check the customizing again.
    Not having target costs in the distribution indicates either a wrong set up of the hierarchy or, more likely, no valid cost estimate for a certain material of a production order or product cost collector could be found.
    Did you check whether for this cost element/origin target costs exist, and also for the cost element group? If not the message KZ468 is correct and probably the cost element group has to be maintained properly.
    The distribution of actual costs calculates target costs on-the-fly and the variance calculation does not have to be carried out before. Quite the opposite than the variance calculation requires the distribution as a preceding step. Furthermore it is not sufficient that one cost element is in a cost element group but the interval where the cost element has been assigned to has to have some target costs. Otherwise this won't work and message KZ468 is issued.
    regards
    Waman

Maybe you are looking for

  • How to create a Display template for people search results

    Hi, I've just installed Sharepoint 2013 and started to play around with it. Seems to be many improvements - among these are the ability to create Display templates. On my publishing page there is a default "employee lookup" app which returns prefferr

  • Best way to connect CF10 DB Connection to FoxPro?

    In previous versions of CF this was a pain. Now in CF10 it seems even more so. I need to connect to a Microsoft Visual Fox Pro database from ColdFusion 10 running on Windows Server 2008 R2 64 bit edition. Can someone point me to a tutorial on how to

  • Comparative Pricing in IS Retail

    Hi Gurus, I have activated the Contents tab in MARA, Which has four fields net weight, gross weight, comparative unit and comparative unit price, can anyone suggest how to send these details in Assortment List Idoc. Example scenario is, price of 330

  • Bridge Slide Show Blank White screen (NEW)

    I get a blank white screen when I hit Apple L.(same when I go to VIEW click slide show) I have reinstalled CS3 3 times. Upgraded driver for Video card. Very thing else works OK. this is driving me crazy. I am using a G 5 Pro,operating system 10.5, 5

  • Surface Pro3 Logging Agent does not work

    Hey Guys! I am developing mdm for surface pro3. I want to get the client mdmagent log for my mdm debugging. By following the steps mentioned in the section Agent Logging of Win8.1 Enterprise Device Management Protocol, I add the content which is "Ena