Unable to Reverse Postgresql

Hi,
connected to a Postgresql db and created the model in the Designer.
When I try to reverse I get this error:
The technology or the driver used does not support Reverse Engineering.
with this as the beginning of details java.sql.SQLException: ORA-00001: unique constraint (ODIWR01.PK_REV_JOIN_COL) violated
Is there a fix to this?
I am using the latest JDBC for Postgresql.
Thanks
Fabio D'Alfonso

I do not know much about postgresql. The standard reverse uses certain JDBC standard methods to get the database objects. If a particular driver did not implement some of these interface methods (and I do not know if the particular driver under discussion supports them or not), then you may get this error. If you know the system tables of postgresql, start by duplicating a standard Oracle RKM and then modify them accordingly to fit into the postgresql.
Alternative would be to access the database using ODBC and JDBC/ODBC bridge driver from Sun if the database supports ODBC. This would be slow, but workable.

Similar Messages

  • Unable to reverse the GI of non-valuated material in Vl09

    Hi All,
      My user is unable to reverse the GI for the non-valuated material . The error message occurs " doc 4901151816 does not contain any selectable items".The given below the doc .flow.
    The user did GI for 901 mov.type in VL02n . I have observed that there is no reverse mov.type for 901 in the system . Is the error occurs due to non-exist of the reversal mov.type?
    Please advise.
    Free of Charge 70219835 / 10
    . Purchase order 2245102298 / 10
    . Delivery Standard 80323135 / 10
    .. WMS transfer order 11216908 / 1
    .. Handling unit 348260 / 1
    .. GD goods issue:delvy 4901151816 / 1

    Hi,
    Go to OMJJ and here for movement type "901", under option "Reversal/follow-on movement types" assign the reversal movement type as 602 or (902 copy of 602) and Type of Posting as "2" (Reversal(qty cannot be entered; gener.of matchcode))
    And Reverse in VL09.

  • Unable to reverse Service entry sheet posted in earlier prds

    Hi All,
    We are unable to reverse the service Entry sheet created via Shipment cost document. As the Shipment cost document was created in the month ofJanuary 2011. And now that period is closed. But I am looking the way wherein by changing the posting date to current month date. So that system should allow me to reverse the cancellation of service Entry sheet
    by ticking the cancellation tick mark under the Settlement Tab.
    I need inputs for reversing it in current month. in the similar lines. as we reverse the service entry sheet in ML81N and have an option to change the Posting date. But in VI02, Date Cancellation field is greyed out and we are unable to tried it out.
    So basicaly how to change the posting date in shipment cost document, sothat cancellation should happen in date which is being entered by user.
    Thanks
    Nitin

    Hello there,
    I had the same problem yesterday and we were able to do the reverse of the ship cost provision and the repost using posting dates from this month. Here is what we did:
    For reversing using a different date.
    Go to VI02, double click on the position, go to "settlement" tab and select "Cancellation" box, then use the menu bar in the "Item" -"Redet. settlement date option" , you will have an information pop up message "Redet. settlement date not possible - account
    already assigned to item" ,  just hit enter and the "date cancellation" field will be now available to modify. Put the date you desire and save.  If you go to the document flow, you will notice the cancellation is done and the posting document is in the FI period you desire.
    To repost the same shipment cost with the new date (current period).
    Go to VI02, double click on the position, go to "settlement" tab , Hit the button "delete account assigment" and the settlement date field will be available for change. Modify the date, save and leave the transaction.
    Enter again and from the menu go to "Item - account assigment", and you will notice the system already redetermine the account assigment, go back (F3) and the "Transfer" field is not available to select and save.
    Then you have the new service acceptance posted with the current period.
    I spend some time and couldn´t find the answer in other websites, now that i have the answer, I hope this help somebody else,
    Rgds,
    Sara

  • Unable to reverse interest accrual in tbb5 - message flows does not exist

    Hi All,
    for few particular company codes, i am unable to see any flows which were posted earlier using tbb4 while executing tbb5. hence i am unable to reverse those flows. Is there any place wherein we activate update type for reversal company code wise.

    Hi,
    first of all I would propose to check with the help of TPM20, using as selection criteria 'Reversed Business Transactions' to see whether there were some reversals, relevant to your accounting entries observed.
    regarding your mentioned transactions:
      TBB4 is used for accrual (which could be imediately reset next business day - depends on accrual procedure, specified in Customizing -> SPRO -> ... -> TRM -> Transaction manager -> General settings -> Accounting -> Accrual/Deferral -> Money Market: Define Accrual/Deferral -> choose required Flow type, for which accrual is calculated and posted), so depending on the definition you will result in 1 (accrual) or 2 (accrual and reset of accrual) postings;
    TBB5 would reverse the accrual postings, generated by TBB4 - the same as above, 1 or 2 postings, just opposite to previous ones.
    I'm not pretty sure about your scenario, however if we talk about accrual TBB4 and possible reverse TBB5 due to some errors (e.g. nominal interest was wrong), then from process point of view once you executed reverse it is not possible to reverse TBB5. What you can do is just run accrual again, after inputs (nominal amount, interest rate, date of running accrual, etc.) for accrual are corrected.
    So, if some doubts for you still exists, please provide your scenario and requirements in more details. Otherwise, I hope this will help you.
    Rgds,
    Renatas

  • TS1702 I'm unable to reverse my calculator when opening the app help

    I'm unable to reverse my calculator when opening the app.

    Turn off Portrait Lock.
    Double tap the home button.
    Slide to the left, then tap the lock icon to turn off Portrait Lock

  • We unable to reverse the Doc... Profit center error

    Dear Sir
    We are unable to reverse the Doc No.
    106210204
    Error :
    Profit center 7279000 is locked on the date specified.
    the above error what i want to do.
    Please look into the same
    Thanks & Reagrds

    Hi,
    Use the tcode KCH5N
    Select your profit center click on indicator tab page check whether the lock indicator is clicked or not. if it is clicked then unclick it.
    Regards
    Meenakshi

  • I am unable to reverse print for t shirts

    i am trying to make a t shirt using iron on paper and I'm unable to find reverse or mirror image in my printer settings

    Hi, not all printers have the mirror option.
    Use the free IrFanView program and select under Image the Horizontal Flip option.
    Please mark the post that solves your issue as "Accept as Solution".
    If my answer was helpful click the “Thumbs Up" on the left to say “Thanks”!
    I am not a HP employee.

  • Unable to reverse GR for subcontract PO

    Hi expert,
    When i try to reverse GR using 102 for subcontract PO,it prompt error Message no.M7389 Of the required quantity of material xxx,xxx PCA remain(s) open
    Any idea on what is the causes?

    Hi,
    The same problem was faced by me and unable to get any reasons.
    But, I was managed to cancel the doc. thro' MBST.
    Please try this out.
    Regards,
    Siva

  • Unable to reverse Hyperion planning app in ODI

    Hi,
    The following error is coming up in ODI while reversing planning application. I could see only Account dimension but i dont see any other columns and other dimensions.
    java.sql.BatchUpdateException: ORA-02291: integrity constraint (PLANAPP4.FK_TXT) violated - parent key not found
    Please let me know if anyone have come across this issue and its resolution.
    Thanks,
    Praveen

    Hi John,
    ODI version is - 10.1.3.5
    Planning version is - 11.1.2.0
    I tried many times before but it did not work.. just before posting this message i wanted to give a try and to my surpise it reversed the planning app.. not sure what was the problem earlier?
    Thanks,
    Praveen

  • Unable to reverse goods ..using vl09

    Hi Experts,
    we have created order , bill and delivery in production and we made one small mistake and cancelled the bill when we try to cancel the delivery using vl09 - goods movement reverse i am getting the message  no data available when i check the  billing status it says C-completed and also movement status aslo C.  how can i  reverse the goods its there any other way ....
    Thank you for your help in advacne....
    Regards,
    Venki

    Hi
    one small mistake and cancelled the bill
    If you are sure that  your first bill is cancelled there will be another bill having the cancelleation number
    Are you seeing that in document flow
    If that has happened the original invoice will have a posting status as E and not C as per your thread
    when i check the billing status it says C-completed
    I feel that your cancellation process has not been done properly
    Once this is cancelled properly the delivery status will be set to BEING PROCESSED from COMPLETED
    Then you can reverse it in VL09
    Make sure that you have executed cancellation properly
    Regards
    Raja

  • Unable to reverse GR

    Hi All
    When trying to cancel the goods receipts prior before final close the PO. Posting dated stated is 7 April 2009, as other period have been closed. Please guide me.
    The asset periods are open for the month of March 2008 (Period 12).
    Error Message Details
    Balance for transaction type group 10 negative for the area 01
    Message no. AA629
    Asset affected: 000000107102-0000
    Diagnosis
    With the transaction entered, the balance for the transactions in group 10 in area 01 will be negative in this fiscal year. However, the balance of transaction type group 10, according to its definition, must be positive in each fiscal year.
    System Response
    The system rejects this posting.
    Procedure
    Check the transaction type, the amount and the fiscal year in your posting. If you want to post a credit memo to an acquisition from the previous year, then use a transaction type for a retirement. If necessary, you can change balance rules after talking with your SAP consultant.

    Hi AP
    Already depreication area settings specified as "all valued Allowed" in OADB,
    still i am not able to do the reversal.
    Please advise.

  • Unable to reverse Depreciation

    Hi,
        We have created one asset in the year 2008, Month -- Sept. Our fiscal year starts and ends from Oct-Sept. So for this asset the first Acquistion was done on Sept 2008 which was the last period of our 2008. After this the depreication being posted for Oct and now for Now.
    Now we want to reverse the Depreciaton which posted for the month of Oct and Nov. So to do so, we are first changing our Depreciaton key to 0000(No depreciation). But when we are changing this dep. key, then it is giving us an error that Fiscal year 2008 is already closed.
    Can anybody suggest how can we reverse the depreciation posted for Oct and Nov which are 1st and 2nd period of 2009.Any alternate solution is always welcome.
    The error message i am getting when i am changing the Dep. key.
    Fiscal year 2008 is already closed in Financial Accounting.
    Message no. AA669
    Diagnosis
    You have initiated a recalculation of asset values for fiscal year 2008. However, fiscal year 2008 is still open is Asset Accounting, but not in Financial Accounting.
    System response
    Due to this inconsistency between the General Ledger and the the subsidiary ledger, processing is terminated.
    Procedure
    Close fiscal year 2008 in Asset Accounting as well.
    Earliest reply will be appreciated.
    Regards.
    J.

    Whether you are interested in changing the last year depreciation as well?
    There is a setting - how you want to post the depreciation in such cases. You can check that - whether it is smoothing, or catch-up. If you make it as catch up it will allow the same.
    or else
    please open the last years posting period - if you have not closed. then change the rate and please run the depr run again - it will post correctly,
    Hope this is clear

  • Unable to reverse idleTimerDisabled.  Is that normal?

    I have an app that I want to sometimes keep from going to sleep. I do this:
    <pre>
    self.application.idleTimerDisabled = YES;
    </pre>
    to keep the device from going to sleep, which works great.
    However, when I want to keep it from staying away, I tried this:
    <pre>
    self.application.idleTimerDisabled = NO;
    </pre>
    Which didn't seem to do anything.
    I also tried this, thinking that maybe my pointer was no longer the real-deal:
    <pre>
    UIApplication *ObjAppSingleton = [UIApplication sharedApplication];
    ObjAppSingleton.idleTimerDisabled = NO;
    </pre>
    but still no luck. The app seems to be in permanent stay-awake mode.
    Has anyone successfully reversed a call to idleTimerDisabled?

    Some observations that might help others:
    * I recently upgraded to firmware 2.0.1 (5B108)
    * idleTimerDisabled = YES worked when the phone was tethered, but not while untethered, so, after some digging...
    * I found that once I copied the application pointer for later calling, then it would suspend sleep the first time the app was installed, but not after re-launching the newly installed app (via springboard instead of xcode).
    * Doing this in my app deleagate was reliable (for tethered, untethered, and subsequent relaunches):
    <pre>
    - (void)applicationDidFinishLaunching:(UIApplication *)application {
    application.idleTimerDisabled = YES;
    </pre>
    * Trying to set idleTimerDisabled = YES via a copied pointer to the application or referencing the singleton wasn't reliable (only tested from different area in the code, not in applicationDidFinishLaunching)
    <pre>
    UIApplication *ObjAppSingleton = [UIApplication sharedApplication];
    ObjAppSingleton.idleTimerDisabled = YES;
    </pre>
    Your mileage will definitely vary.
    Hope this helps.

  • Unable to reverse subcontracting challan J1IF13

    Hi,
    I have a scenario where I am trying to reverse a subcontracting challan using J1IF13 Tcode but an error is coming that Assesseble value of material is 0.
       The assesseble valu is 0 in subcontracting challan (created using J1if01).However the entry was maintained in J1ID.
    Please tell me how to reverse the challan now.
    Regards,

    hi,
    The excise details and assessable value was maintained in J1ID,but I dont know why the value was not picked when creating subcontracting challan using J1IF01.I have already saned the challan with 0 assessable value.
    But now I want to reverse the challan using J1IF13,but it is giving an error that the assessable value is 0.
    Please tell how to reverse the challan now.
    Regards,

  • Challan has reconciled but unable to reverse the challan

    Hi,
    We have reconciled the challan and when we are reversing the challan the challan after 180 days then it is giving the error
    Challan has to be reconciled for the year 2009 .
    So can anybody tell what is the error how can we resolved this problem?
    Thanks
    Richa Agarwal

    Can anybody give solution?

Maybe you are looking for