Usage Probabilty in production order

Hi All,
I have query regarding Usage probabilty in production order.
I have maintained usage probabilty in BOM for 2 raw materials , with 92% & 8% for other.
Manual maintainence option has been selected.
Now while changing production order user can change these values which causes consumption differerences.
In MCRE we can not detect this as production order is confirmed with these values.
In What way we can restrict user apart from creating transaction varient?
Awaiting
Milind.

Hi SAP Experts,
Any Clue?
Rd,
Milind

Similar Messages

  • Usage of rounding profile in manual created production order

    Hi,
    We are making usage of various static rounding profiles.
    For each of the materials produced, the rounding qty can be different, depending on the workcenters used to produce the materials (but for one material, there is only 1 rounding profile possible)
    This works fine as long as we create planned orders via MRP runs (rounds up according the values set)
    However, this rounding value is not taken into account (proposal, warning, error,..) when a user creates a planned order manually via MD11 or a production order via CO01.
    Furthermore there is no warning message or whatever at the moment a user is converting a planned order (with a correct calculated rounded value) into a production order and manuaaly adapts the order qty.
    As were are talking about a few 1000 different materials, the production planner cannot know all by heart and the rounding proposal would be excellent.
    Anybody an idea how to implement this ?
    Thanks and regards?

    Hello again,
    thanks for you prompt answer.
    This would certainly solve our problem in case we would have always one and the same quantity to produce for a given material; but this is not always te case.
    Perhaps it was not clearly explained in my first mail, but we would like to work with one (1) ROUNDING PROFILE per material.
    Example, material A can be produced in multiples of 14; as such it should be possible for the production planner to create production orders for 14, 28, 42 , 56,..... pieces. When entering a order for eg. 25 pieces (= example the qty needed for a certain sales order), the system shpuld round to 28.
    Other materials (having another rounding profile) are produced in multiples 3, im mulitples of 5,...
    For this particular plant we have about 50 different rounding profiles in place.
    So it somewhat logic that a production planner does not know all these by heart.
    If you have a solution for this as well, please let me know.
    Anyway already my thanks for feedback.
    Regards.
    Danny

  • Production Order Receipt Block before Usage Decision is Made

    Dear all,
    I have a requirement to block production order receipt through MIGO into any storage location before the usage decision has been made for that production order.
    This should be the rule for all non serial items, meaning that it should only apply to batch controlled and neither batch nor serial controlled materials.
    Could someone please help me on this?
    Thanks,
    Sergiy

    Hi,
    Is it possible through by maintaining the inspection type for the material master. Then the material will be moved to quality stock after usage decision then you can move that material to unrestricted material.
    For Batch managed or serial number profile defined material don't activate the inspection type.
    Hope this might help you.
    Regards
    Ravi shankar.

  • Production Order Usage Probability should not be allowed to change after GI

    Dear Gurus,
                  pls tell me how to do this ,Production Order Usage Probability should not be allowed to change after Goods Issue (GI) done against Prod Order . pls tell me procedure or any UserEXit for this.
    Thanks in Advance,
    Regards,
    Dev

    Hi,
    Can you elaborate little bit more?
    Regards,
    Sankaran

  • Alt bom components with ATP check - production order resets usage prob.

    Hello,
    I have searched many threads for this answer.  Here is my scenario
    BOM for finished good X  has the following components
    Component   |    Usage Prob   |    Strategy    |  Alt Item Group   |   Priority
    A          |             55%         |         2         |         1             |              1
    B          |              45%        |         2         |          1            |               2
    When I create the production order for 100 units, components A and B are proposed respectively (per usage probability, as expected)   - like so
    Production Order 
    Component A = 55 units
    Component B = 45 units
    Here is the requirement - Component B at any given time is restricted by federal law to not be used for material X for more than 45% of its make up. Therefore my client cannot build X with more than 45% of component B.  However, we always want to use at most 45%.  IF component B is not available, transfer all or partial confirmation to Component A.
    Issue:
    ATP and usage probabilities will not work.  Whenever I run ATP check for production order, the component with the highest priority get all the reqirements (if inventory permits).  The production order master data is 'reset' by the ATP check (the usage probability on the component will change from 45% to 100%)
    Any help is greatly appreciated!
    ~S
    Edited by: futsol on Jun 29, 2009 10:41 PM

    futsol ,
    Maintainance is not required, it say manual maintainance is possible if required.
    if you set it 1 system will check the proportion and do the reservation accordingly , if even in production order if you check availabity it will not change the quantity proportion, if its 2 , its meant for alloting the 100 % available component.if A is not 100% available it will replace it with B , if B is availabe to cover total quantity and vice versa.
    by giving 1 it gives you option to change proportion as per your wish , if the any of the alternative is not available to fullfill rerquirement., for example in your case component B , if its available you want to use it 45% all the time , but if its not availabe the you can change the proportion or quantity for A in that specific production order only.
    I dont know if there is any other way.
    Check again with strategy 1 .
    Hope it helps you .
    Regards
    Ritesh

  • Usage value not getting calculated for equipment PRTs in production order

    Dear PP Gurus,
    I have assigned a PRT equipment to pouring production routing.
    I have assigned the followings:
              1. control key as "1" in the operation.
              2. usage value as 1 ea in standard value in the operation
              3. Formula maintained in the operation as ZAPF02= SAP_09 * SAP_16
                              SAP_09 (Operation quantity) -> general operation value , field name- MGVRG
                              SAP_16(PRT std value) -->  Value from PRT allocation , field name- EWVGW
    The production order is calculating the planned consumption of PRT usage, but when I confirm the operation, it is not calculating the actual usage usage value. Actual usage value should be number of moulds confirmed in the molding operation confirmation.
    Kindly help me urgently.
    Regards
    Amar

    Hi,
    I got the issue.
    In IE02- equipment measuring point change, we need to assign the same in the PRT screen also.
    But now a new error coming-
    Document 3 already entered for the measurement time specified
    Message no. IR027
    Diagnosis
    You are trying to enter a measurement document for a measuring point that has been defined as a counter.
    However, a measurement document that has not been reversed already exists at the measurement time you have entered.
    The system must be able to determine a unique sequence for the measurement documents to be able to recalculate the counter readings if necessary.
    System Response
    The system will not allow the existence of two measurement documents for a measuring point where the measurement times are the same to the exact second. The system must be able to order the measurement documents in a sequence if it has to to recalculate the counter readings.
    Procedure
    Check your entry.

  • We want the Engg BOM ( usage 2 ) to be exploded in Production Order.

    Hi Gurus,
    We want the Engg BOM ( usage 2 ) to be exploded in Production Order.
    Please let us how this could be done.
    Regards,
    Ram

    Dear Ram,
    1.Check what selection ID is maintained in OPPQ for the plant for BOM selection.
    2.For this selection ID set the first priority to Engg BOM for BOM usage - 2 in OS31.
    Check with this and revert back.
    Regards
    Mangalraj.S

  • Production order variances due to missing usages of overheads

    Hi Team
    We have noticed production order variances due to missing usages of overheads (labour, personnel, consumables, scrap). Where do those kind of variances come from and how they can be prevented/corrected.
    Br, Kiran Unde

    Hi Kiran,
    This is because those Activity Types are not entered during Confirmations for Production Order. To correct those field, you need to perform Confirmation and enter the values for those Activities.
    To prevent this in the future and to ensure those fields are entered during confirmation, you can do the following:
    Make the system propose values for Activities automatically based on Standard Values.
    Go to transaction OPK4
    Select appropriate Order Type and Plant
    Select tab "Individual Entry of Operation with Initial Screen"
    In the "Services" section, tick "Propose"
    Make the fields mandatory
    Go to transaction CO86
    Set related Activity to Confirm fields as mandatory by placing the radio button under "Req" column
    Regards,
    Julian

  • Production order usage for external vendors

    Hi Guys,
    I am working on a scenario where the company is orderiing to manufacture from external vendors involving different stages. There is no material sent to the vendor and the vendor manufactures the first stage and sends to next vendor, there are four stages involved.
    We are planning to use production order for the purpose and 4 operations thorugh which 4 purchase orders will be sent to four vendors and services or materials will be posted. I am just thinking how the final GR for finished product will be posted to the inventory. The requirement is track the cost at each stage...
    Please let me know of your thoughts on this...
    Thanks and regards,
    Sid

    Hi
    I dont think you will have any issues with the tracking of the cost and GR of the finished product.
    You have 4 operations each resulting into a PO for different Vendors each component/service of the opertaion will be received against each PO that you might have issued and so will be the cost collected actual cost for each operation.
    Final GR can be posted for the header material against the Production order. I would request you to complete a full scenario and review it with your FI/CO team for any issues. I dont think you will have any.
    Please let us know if you need any more info
    Thanks

  • Usage probabilty for phase out item.

    Hi
    Can you please help me in usage probability issue:
    I have FG material A and X and Y are child items. Now my X is going to be phased out and Y is phase in. X is having some stock so I want to consume that stock of X first but simultaneously I want to procure Y also but I will not use it in production till my X stock gets fully consumed.
    Now I tried this with usage probabilty and put the details like this in the BOM:
    X Item:
    Alt group = A
    Pririoty = 1
    Strategy = 2
    Usage probabbilty = 0 %
    and for Y item:
    Alt grp = A
    pririoty = 2
    Strategy = 2
    usage probabilty = 100 %.
    Now when I ran the MRP , I got no requirement for X and requirement for Y is coming. This is ok to me.
    Now when I created one production order for FG A" with 100 qty then in component overview screen X is having 0 qty and Y is coming 100.
    If my pririoty for X is 1 then why it is coming 0 and Y as 100 in production order?
    Does this effect of pririoty comes in Co11n in goods movement tab? where can I see the effect result of pririoty?
    Regards
    Deepak Sharma

    Deepak,
    When you say X is phased out for some FG & some it is in still use.
    Then one thing you need to keep in mind that it will be effective if you maintain effective out date in material master of X & you maintain the discontinuation data in the respective BOM.
    Let's take an example there are twoFGs, P & Q in which X is used.
    For P, X is phased out & Y will be used. For Q, X is still in use.
    Now don't maintain effcet. out date in material master of X.
    In BOM of P maintain the discontinuation data as described in the last reply.
    In BOM of Q don't maintain any discon. data.
    Now create order for P as well as Q.
    The data will be effective for P & not for Q.
    In the order of Q, X will be picked as normal material only.
    Try it out & revert.
    Check this out in your development server first.
    This will certainly solve your problem.
    Alternative group won't help you in this case.
    Hope this helps you.
    SmanS

  • Confirmation of a production order

    Hello,
    I have a question regarding the confirmation of a production order.
    Is it possible to confirm part of a production order into a temporary special stock in 4.6b? The reason is that we have to perform inspection before posting it into final unrestricted stock. The confirmation into the 'temporary' stock should not book any values of the stock. The value should be booked after the inspection.
    Looking forward to your feedback!!

    Hi,
    If you have QM module implemented, maintain inspection type 04 in material master & upon posting GR for the production order an inspection lot will be created. You can then do a results recording & a usage decision on the inspection lot. If it passes the QC it will be posted to unrestricted stock.
    If you do not have QM module then alternatively create a SLoc which is not included for MRP & specify this SLoc in your order header & when you do GR it will be posted to this SLoc. You can then a SLoc to SLoc transfer. Or if you dont want to create a SLoc, check in MIGO while posting GR for this order if you can specify that it is to be treated as a QC stock.
    Regards,
    Vivek

  • Inspection lot with Production Order

    Hi friends,
    I am PP consultant and need some help in setting up a scanario of Production order with inspection lot.
    I need to setup a scenario where a inpspection lot is created from production order manually (not at the time of release). The purpose is to post few quantity of production order to scrap storage location. Inspection lot needs to be created only in certain production orders where some of the quantity has to be declared as scrap and that needs to be rejected with usage decision.
    can any one please suggest the overview of such scenario.
    Regards,
    Rohit

    Dear Rohit,
    You want to create a manual inspection lot only for the purpose of Scrapping and also want it to be done with Usage Decision.
    You can not use inspection type 89, as it is not stock relevant (Inspection type for Miscellaneous inspection),
    There is one another solution with inspection type 08( inspection for Material Movement), but it might look Lengthy.
    1. Release a Production order. say 100 qty.
    2. If during process, 10 is scrap, then perform Partial Confirmation of 10 Qty.;  Stock will be in Unrestricted.
    3. Now, through MB1B, transfer 10 qty from Unrestricted to QI.
    4. As you have inspection type 08 active, System will create an Inspection lot for 10 Qty.
    5. You can post this whole 10 qty to Scrap while giving Usage Decision.
    I think, in your process, Scrapping is not done frequently, that is why you do not want inspection lot at every production order.
    in that case this solution may solve your problem.
    regards,
    Amol
    Edited by: Amolbook on Jan 12, 2012 3:13 PM

  • HOW CAN WE ASSIGN THREE TASK LIST TO THREE DIFF PRODUCTION ORDER

    Respected All
    we have one material which is used for three places FIRST IN MILL1, 2ND IN MILL2 AND THIRD IN TRIMMER MILL.
    the only thing which differentiate this single material is  the production order. we have 3 different production order but one single material. for this we have created 3task list. my problem is when we create batch and confirm it through co15, the lot reflects in QA32. but is not allowing for USAGE DECESION. For that we have to go to QA02, assign the task list and then again go to QA32 and do the usage decesion. is there any method by which we can assign three task list to three production orders so that qa02 step could be avoid.
    pls reply
    thanks
    abhay

    sir
    thank you for the reply could you please tell me in which transaction we find this user exit.
    thanks
    abhay

  • Serial number error while creating the production order

    Hello frds,
    I am getting the following error while creating the production order.
    "Item 000000 requires exactly 100 serial numbers for the asset".
    If i give 100 serial numbers in the order, the error is solved. But i do not want to assign 100 serial numbers, i want to assign only 2 numbers.
    I have tried using the new serial number profile also, but it is giving same error.
    Kindly guide.
    Regards,
    Narendra Bora

    Dear Narendra
    Select the serial number profile and go to serialization procedure and set the ser. usage status 02 - Optional as below.
    Procd Procedure description Ser.Usage
    PPRL PP order release 02
    since the serail number creation is optional for order relase this will allow you to relase with out error and with serail number assigned in partial.
    Regards
    Soundar

  • Inspection lot is not shown Production order Even after GR.

    Hi Gurus
    My scenario is involved with of Inspection after taking  GR From Production order.i have maintained following settings :
    1.Inspection Type 04 Assigned for relevant Order type.
    2.In Material Mastr Inspection Type 04 Maintained.
    3.Quality plan created with relevant material code with usage -GR(05)
    while i am taking GR Inspection lot is generated.every thing working fine.But inspection lot no.is not displayed in production order (ASSIGNMENT TAB) after taking the GR.
    Am I missing Any settings?
    Regards
    Bala

    Hi
    while i am taking GR Inspection lot is generated.every thing working fine.But inspection lot no.is not displayed in production order (ASSIGNMENT TAB) after taking the GR.
    What is the status of the the lot generated'
    is it REL & CRTD??
    Since You have maintained usage 5 in task list & generally usage should be 1 (for production order ) it will as per my knowledge remin in CRTD state.
    Thenyou have to use QA02 to attach the task list
    This might be a reason that lot is visible.
    I hope this will add some value.
    Regards
    Sujit