Variance Analysis for chemicals/Raw material

Hi guys
What u mean by variance analysis....
How we can achieve in SAP
- Pithan

You can create a custom query on your material or purchasing cube containing all your variances required. You can use APD functionality to identify the deviations you want to analyse. Please look 0PP_C01 and  0PP_C05 for planned and actual versions...

Similar Messages

  • Quality info records: different pack configurations for same raw material

    how can i differentiate different pack configuration for same raw material in quality info records, as one might approved and the other not? that is, besides creating different material master for each packaging?
    thanks
    Alisa

    You need to use the MPN profile functionality that is a standard part of SAP.
    In Config under the purchasing define the MPN profile.  There are several options you can turn on/off including info records.
    You assign the MPN profile to your material. It now is considered by SAP to be an internal material number. 
    You then create a HERS material type for each separate manufacturer material number you have.  You only need the purchasing view for these materials.  You can also create purchasing text views, classification and some others if you wish.
    In the SAP approved vendors list (AVL), you then assign each manufacturer vendor(s) with the HERS material created.
    You create a Q-info record for each manufacturer/HERS material combination.
    Now, when you specify the internal material number in a PO, the system will tell you to order the MPN material.  When you do the drop down for the material now, it will show you the approved manufacturers allowed in the AVL for the ordering plant.
    When the 01 inspection lot is created you will have a vendor number as well as a manufacturer's number in the inspection lot.  The DMR can be done by the manufacturer or the vendor depending on how you set up the inspection plan. Q-info record will be used accordingly.
    Take a look at it and research it.  It's not hard to set up.
    FF

  • List of process order for particular raw material

    Dear PP Gurus,
    Suppose we have one raw material said - X and this is used to create finished product A, B, C an D.
    Now I would like to know, In particular period how many process order is created for raw material X?
    Ex. for one month only 2 process order usind raw material X are created. 1(finished product - A and 2 (finished product- B)
    I tried COOISPI but not getting success.
    Through MB51 I can get report of process order against which material is issued. (261 is done)
    But my basic req. is to know the process order created.
    I am from MM side so no much more idea in PP area.As working for SAP support we have to look little bit in PP ara.
    Thanks all
    Rajan

    Hi Rajan,
    You can use COOISPI and select Documented Goods Movement and give the Basic Start date range as you want and execute.
    You can use filters in Movement types and get your desired result. 261 is for Goods issue of the components and 101 is for Goods Receipt of the header material.
    Hope it clears your doubts.
    Regards
    Suri

  • Query for calculating raw material requirements for the remaining quantities in sale order.

    Dear SAP Experts,
    Clients requirement :
                                         Client wish to know the quantities of raw materials needs to run the production order inorder to complete the remaining quantities in sale order.
    Need Clarification:
                                  I"m using the below query for this requirement. I wish to know whether this query suits for my clients requirement or not. If its so, I need to know how to group by T4.[Code] (Raw material Name)   and need to get the sum of    T4.[Quantity]  (BOM quantity)      and  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY under each raw material group
    SELECT T0.[DocNum], T0.[DocDate], T0.[CardCode],T0.[CardName], T1.[ItemCode], T1.[Dscription], T1.[Quantity] as salesorderQty , T1.[OpenQty], T2.onhand, T4.[Code] as Raw material Name,T4.[Quantity] as BOMQTY,  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY FROM ORDR T0  INNER JOIN RDR1 T1 ON T0.[DocEntry] = T1.[DocEntry] INNER JOIN OITM T2 ON T1.[ItemCode] = T2.[ItemCode] INNER JOIN OITT T3 ON T2.[ItemCode] = T3.[Code] INNER JOIN ITT1 T4 ON T3.[Code] = T4.[Father] WHERE  T0.[DocStatus] ='o' 

    You're posting in the Portuguese B1 space.
    You might want to post in the English one: SAP Business One Application

  • Single PR for Total Raw Material ( RM) Demand

    Hi,
    Business requirement is to plan the raw material requirement qty yearly based on the FG demand for the year. But problem is RM planning will not be for the current year. RM based on FG demand is planned one year ahead. How to generate the PR without considering the current year demand of FG qty. If 'A' is a raw material which is used in manufacturing of FG B,C,D etc. Requirement is to generate one PR which equals to the total qty of 'A' raw material requirement for manufacturing B,C,D etc. Also, in PR the total qty of 'A' should display the drop down of how much qty is required for B,C,D etc.
    Thanks & Regards,
    Ramagiri.

    Hi,
    Try using Long Term Planning.
    In the planning scenario maintain 'Do not consider current stock'.
    Tarang

  • For production - Raw material & WIP after system Live

    Hi All,
    I have taken the cutover data with WIP value for GOLIVE; we have put the value in WIP in GL for trial Balance;
    After System Live, we are facing the two scenarios to map in system.
    u2022     Open production which has no needed more raw materials (all included in WIP) to completion of production order.
    We have uploaded the finish product with movement type -521 and reduce the value from WIP with help of manual entry; but below scenario have confusion how to map.
    u2022     Open production which needs more raw material (apart of WIP) to complete the production,
    Please guide to me how to map in system.
    Thanks
    Rajesh Tiwari

    Hi,
    The best practice followed is you need to close the legacy system production order and you need to create a new production order in SAP. Against the new SAP production order number, you can issue the raw materials.
    Regards,
    V. Suresh

  • Production Variance Analysis for External Process Cost

    Dear all,
    We are on 4.7 R3.
    In production order we have routing/operation with mutliple external processes. The problem is production order cost analysis (CO03) displayed the external process cost variance in lump sum (it adds multiple external processes cost into a single line).
    We need to be able to analysis the external process cost variance by each process. We want to generate a report that displayed the external process cost variance for each processes, however in table COSPA there is no information of the external process name, it also displayed the cost in a lump sum amount.
    How to enable the external process cost variance by each process? What table capture the external process cost with the information of the external process name/ID?
    Thank you very much in advance for your kind assistance.
    Rgd,
    Dahlia Tan

    Hi
    Use KKO0 reports..
    Assign Cost Comp Structure in OKN0 and choose Prod Group = Material Group in OKN0
    Transport these settings across to all clients...
    Run KKRV to collect data and then run KKO0 reports
    Br, Ajay M

  • In prod order multiple batch selection for my raw material /sf possible

    Dear All,
    One of problem I am facing is regarding multiple batch selection .
    Scenario is like this
    Finished prdt _ FMBLD003         
    RAW matl  -      2RCH001
    In prodn order my BOM requirement quantity for 2RCH001 IS 75 kg , I have material available in stock in  three diffrent batches
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg  
    I can select any one batch at a time. Is there any option or possibility available wherein we can select multiple batches .
    or Is there possibility that system should automatically split bom quantity as per the batch quantity available shown below
    40       0000111
    15       0000112
    20       0000113
    I tried but didnt found possible solution.
    Please suggest .
    Edited by: sapitheprabhu on May 3, 2011 7:28 AM
    Edited by: sapitheprabhu on May 3, 2011 7:48 AM

    Dear Prabhu,
    When do batch determination you maintain req qty against to batch number in batch determination co: select batch.
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg
    Jainashu

  • Spectrum analyser for USB raw

    Hi,
    I am new to Labview. I have a 3rd party RFID device which i intend to acquire the frequency waveform from the device through using Labview. Since as a beginner, i use the spectrum analyser in the "example" section to start off with and now has error in getting the correct Visa USB raw to connect my device. The program intiallly used Visa instrument as the visa resource name but when i changed the input to the USB raw input there is a class conflict error that says "You have connected a refnum of one type to a refnum of another type and both types are members of some class hierarchy, but there is neither a simple up cast nor type cast between the two classes." 
    For the USB raw setting, i have already configured the device using the NI-driver wizard to install the USB raw and tested it through the MAX. So now i believe the problem should be wiring of USB raw to the entire spectrum analyser example. Attached is the spectrum analyzer example. Really hope to get help on this matter. Thank you. 
    Attachments:
    Template - Spectrum Analyzer Acquire Trace.vi ‏25 KB

    duplicate post: http://forums.ni.com/ni/board/message?board.id=170&message.id=489189

  • Purchase requisition after MRP for Semifinished & raw material

    Hello Gurus,
    Please guide me in following scenario :
    FERT - X ---> HALB (subcontracting) - Y ---> ROH - Z
    Requirement : X - 1000 , Y - 1000 & Z - 1000
    In this case, when I will take the MRP for X ,then MRP will generate PR for Y & Z.
    But in my case, client purchase the Z & sell it to vendor & then vendor will sell the Y to my client.  He wants the requirement of Y & Z both after MRP run of X .
    FERT - X ---> HALB (Purchase) - Y ---> ROH - Z
    What can I do to map this in SAP?
    Thanks & Regards,
    Sagar

    Hi Sagar,
    It can also be maped in following way. Please take your MM and FI Consultant with you.
    It could be map in following way:
    Create BoM for Z (FG) and add Y (SFG) & X (RM). Keep the procurement type for both as F. Use special procurement key as 30 for Y (SFG). Mark NOT RELEVANT TO COSTING indicator for X in BoM. Maintain MRP type = ND for X (RM).
    Now when you run MRP system will only create Dependant requirement for X (RM) and it will check stock of Y (SFG) as well. If stock of Y (SFG) is not available, Subcontracting PR will be generated for Y (SFG).
    MRP will not be accurate for X (RM) since it has got dependancy on Y (SFG) which is going to be subcontracted from some Vendor. You can look for Re-order point planning or you can adopt the way suggested by Satish or you can make a new Infostructure in MM which will be updated for consumption movements for X (RM) which later can be used to make its PR directly to Vendor.
    Regards,
    Shoyeb

  • Diff stock GL account for raw material

    Hi,
    We have raw material under 2 different location, one is under raw material warehouse, another one is under staging area which belongs to production. From time to time, we will issue stock from RM warehouse to staging area.
    The stock GL account (either debit or credit) for the raw material is RM Stock (140001) when we do any movement.
    But we do not want like this. We want that when there is any movement from raw material warehouse location, it will charge to GL account 140001 (RM Stock). And when the movement is from starging area location, it will charge to another GL account (140002 - production stock).
    We want to seperate out the GL account for the raw material if they are under different storage location.
    Can this be done?
    Kindly please advise. Thank you.

    Hi Sim
    Valuation of Stock is done at Plant level and not Storage Location Level. Within a Plant, you can differentiate the G/L accounts based on the Valuation Class assigned in the Accounting view in Material Master.
    The above settings enable automatic account determination at the time of GR. If you want different G/L accounts for different areas, there are 2 options:
    1. Configure and Activate Split Valuation. This will enable you to give different Valuation Classes for different Storage Locations in Matl Master.
    2. The better option is to make the 2 locations as 2 different plants and extend the materials to both these plants.
    However, pls mention your purpose of differentiating the G/L accounts. If it is only to view the stocks in the 2 areas, there are many reports like MB52, etc.
    Hope this clarifies.
    Thanks

  • Report for raw material usage

    Hi All,
    i need to take the report for the raw material that used in the finished product.
    in the finished products, how much the raw materials are used .

    Hi Raj,
    Option 1. You can get the data from MARD, MAST & STPO tables.
    From MARD you can read the unrestricted stock i.e. LABST field.
    From MAST, read the finished product i.e. MATNR & WERKS (Material & PLant)
    From STPO read the component i.e. IDNRK & MENGE (Component & Qty).
    Option 2. You can get the data from MARD, AFKO, RESB tables.
    This would give you an exact consumption feedback.
    AFKO for production order details. (PLNBEZ for header material).
    RESB for components (qty consumed) for the order - Fields MATNR (Component), BDMNG (Req. qty), ENMNG (Withdrawn qty).
    You can now build the logic with the required multiplication i guess. If any further info is required, revert back.
    If helpful award points
    Regards,
    Vivek

  • QM for raw material 103 mv. type

    Hello QM Gurus,
    Please help me in following senario,
    When I am doing GR for the raw material, I am posting the stock to blocked stock through 103 mov. type.
    In system the inspection lot is being created but it is not in released status, although inspection plan is properly defined, hence I cannot do the result recording for the lot.
    If anybody can suggest where the problem is.
    Your king suggestion are expected.
    Regards,
    Amit Shirsath.

    I'm listing out some common mistakes because of which the Lot wont be in REL status.
    First in MM03 QM view -check for the inspection type(01) and 05 for other GR to be active.This should be fine in ur case since your are saying the lot is created.Make sure the check mark Automatic assignment to be checked ,Check characs and also Insp with task list.
    Second-Make sure the inspection Plan(QP01 display) was created with the same Key date as the Insepction lot or even earlier .The key date can be checked under qa03 to display Insp lot.
    Third-make sure the Usage is the same as in the Inspection lot.The usage is the one which links the Plan to the Lot .It should be 5 for GR from PO and 53 for other GR in the insp plan. You can check the Inscpetion lot usage by going to QA03.
    Check all these, ur problem should be solved.Please let me know if there is any furthur problem.And also reward if helpful and close the thread.
    regards,
    Naik

  • Cost object for raw material consumption posting

    the raw material cosumption posting is done in the background when the goods issue is done. so where do we assign cost object for the primary cost element of raw material consumption account. since we create primary cost element for raw material consumption account, it will expect us to give cost object, so where we assign cost object for the raw material consumption cost element

    hi
    since the raw material cost is relevent for cost accounting u need to maintain primary cost elment accounts.When ever u confirm goods, the rm issue will take place automatically and will be debited to either product cost collector or production order. so u need not to assign any cost object for these consumption accounts why bcoz issues will take palce aganist a production order or product cost collector which is a cost object .
    regards
    siva

  • CK24 error for raw material

    Dear All,
    We have executed CK11N of current period for single Raw Material ( w/o quantity struc. Selected in material master) and saved it, but when try to mark & release the material for the current period, the system  displays a message as u201COf 0 materials, 0 cost estimates were updated successfullyu201D. Its newly procured raw material.
    When we check in KEKO, KEPH & CKIS table the entry exists, but we are not able to execute the standard price for this raw material. In the start of this period we have executed CK40 for all the material (including raw materials) has been updated with standard price.
    We have deleted the costing run couple of times and recreated the cost estimation,but of no use.
    We have activated Material Ledger and this raw material has price control u2018Su2019 with price determination u20183u2019. We are in ecc 6.03
    Do suggest.

    Hi ,
    We are facing this problem for all type of material. Once we save cost estimation in CK11N  and when we try execute once again CK11n for the same material system is calculating Cost estimation again without error message and we are not able to Mark & Release the Cost estimation.
    Normally the system will not allow to calculate the cost estimation,if the cost estimation has been already calculated.
    We have currently changed price control S from V for all type of material to maintain Standard cost from Actual cost.
    Do suggest,if we have left out any config settings.
    We are facing this issue in production client.
    Do revert.
    Regards,

Maybe you are looking for

  • How can I close my Time Machine Sparsebundle so Time Capsule can do a scheduled backup?

    "Time Machine couldn't complete the backup to "Your Time Capsule". The backup disk image "/Volumes/Steven Weinberg's Time Caps-1/Steven Weinberg's MacBook Pro (4).sparsebundle" is already in use." I have both a Time Capsule and a 2Tb external drive u

  • Problems with Install: Full Version / Full - JDK

    It's been a long day but ... Trying to install both the full version and full -JDK. Both extracts contain several duplicate file versions some with same date/time, others different file sizes and date/time stamps. The creation of the folder: sqldevel

  • Acrobat 7.0 Standard

    Greetings, My XP box gave up the ghost and I've had to replace it with a Windows 7 machine. My license for Arcobat 7.0 is a upgrade from version 5.0.5.  I have been able to reinstall 5.0.5 on the new machine but not the 7.0 upgrade.  I get all kinds

  • How do i get imessage to go to an email address?

    How do I get an imessage to go to an email address on an iphone 4s?

  • Time machine to external USB vs. indexing of that USB

    Time machine to external USB vs. indexing of that USB To all who plans to use external USB as Time Machine destination. Problem was found with 10.9.5. Other versions possibly affected as well. No idea if external storage connected through cable of ot