Hi All,
I have taken the cutover data with WIP value for GOLIVE; we have put the value in WIP in GL for trial Balance;
After System Live, we are facing the two scenarios to map in system.
u2022     Open production which has no needed more raw materials (all included in WIP) to completion of production order.
We have uploaded the finish product with movement type -521 and reduce the value from WIP with help of manual entry; but below scenario have confusion how to map.
u2022     Open production which needs more raw material (apart of WIP) to complete the production,
Please guide to me how to map in system.
Thanks
Rajesh Tiwari

Hi,
The best practice followed is you need to close the legacy system production order and you need to create a new production order in SAP. Against the new SAP production order number, you can issue the raw materials.
Regards,
V. Suresh

Similar Messages

  • Quality info records: different pack configurations for same raw material

    how can i differentiate different pack configuration for same raw material in quality info records, as one might approved and the other not? that is, besides creating different material master for each packaging?
    thanks
    Alisa

    You need to use the MPN profile functionality that is a standard part of SAP.
    In Config under the purchasing define the MPN profile.  There are several options you can turn on/off including info records.
    You assign the MPN profile to your material. It now is considered by SAP to be an internal material number. 
    You then create a HERS material type for each separate manufacturer material number you have.  You only need the purchasing view for these materials.  You can also create purchasing text views, classification and some others if you wish.
    In the SAP approved vendors list (AVL), you then assign each manufacturer vendor(s) with the HERS material created.
    You create a Q-info record for each manufacturer/HERS material combination.
    Now, when you specify the internal material number in a PO, the system will tell you to order the MPN material.  When you do the drop down for the material now, it will show you the approved manufacturers allowed in the AVL for the ordering plant.
    When the 01 inspection lot is created you will have a vendor number as well as a manufacturer's number in the inspection lot.  The DMR can be done by the manufacturer or the vendor depending on how you set up the inspection plan. Q-info record will be used accordingly.
    Take a look at it and research it.  It's not hard to set up.
    FF

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Product problem in CRM after system copy

    Hi,
    W made CRM system copy - created test system from production system.
    after this we have problems with replication of sales orders from test R/3 to test CRM.
    Product IDs were not replicated, but the rest of order yes.
    I think this is problem with logical systems on products due to system copy.
    What should I do to correct it?
    run BDLS for all product tables , to change logical system production R/3 to test R/3 ?
    Regards
    Radek

    Hi Radek,
        Check the values for Logical System in COMM_PRODUCT CRM table. If its still pointing to your production system, just run the BDLS again. You need to run BDLS for two times. First one to change CRM Old Logical System to CRM New logical system and second one for ECC Old Logical System to ECC new logical system.
    You need to run two times, because for some products ECC is the source system and for some CRM is source system.
    //Bhanu

  • List of process order for particular raw material

    Dear PP Gurus,
    Suppose we have one raw material said - X and this is used to create finished product A, B, C an D.
    Now I would like to know, In particular period how many process order is created for raw material X?
    Ex. for one month only 2 process order usind raw material X are created. 1(finished product - A and 2 (finished product- B)
    I tried COOISPI but not getting success.
    Through MB51 I can get report of process order against which material is issued. (261 is done)
    But my basic req. is to know the process order created.
    I am from MM side so no much more idea in PP area.As working for SAP support we have to look little bit in PP ara.
    Thanks all
    Rajan

    Hi Rajan,
    You can use COOISPI and select Documented Goods Movement and give the Basic Start date range as you want and execute.
    You can use filters in Movement types and get your desired result. 261 is for Goods issue of the components and 101 is for Goods Receipt of the header material.
    Hope it clears your doubts.
    Regards
    Suri

  • Derivation rule for Product from Material Group

    Dear All,
    Is it possible derive product from Material Group. The scenario is as below.
    We executed KE30 report (Classic Drill down) for Product, the we are able to see the profitability for different products, when we click on the list button (Find button) againist the product at the bottom we found not assigned, we selected that and we found there are some un assigned amounts (without product). when we see the line items for the same the line items are coming with out product ( product field is emply)
    Another observation is we created profitability assessment cycle (KEU5) in which cost center is the sender and material group is the receiver. when we run this cycle system is not distibuting the costs to the products, in the sender and receiver its executed with zero values.
    In derivation rule KEDR we gave the logic to derive product from material group.
    please guide the way which we are following is correct or not. can we derive product from material group.
    Thanks,
    Siva Reddy.S

    Hi
    Yes you can derive using "Derivation" method in KEDR and maintain a mapping of Mat Grp to Product... But that is not the right way
    You need to find out why some lines are posted w/o products.. They can be genuine cases....
    Also for assessment, either specify the Product as receiver or run KE28 Top Down Dist in order to allocate values from Mat group to Products..... Deriving Product from Mat group does not seem to be the nice way
    br, Ajay M

  • Query for calculating raw material requirements for the remaining quantities in sale order.

    Dear SAP Experts,
    Clients requirement :
                                         Client wish to know the quantities of raw materials needs to run the production order inorder to complete the remaining quantities in sale order.
    Need Clarification:
                                  I"m using the below query for this requirement. I wish to know whether this query suits for my clients requirement or not. If its so, I need to know how to group by T4.[Code] (Raw material Name)   and need to get the sum of    T4.[Quantity]  (BOM quantity)      and  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY under each raw material group
    SELECT T0.[DocNum], T0.[DocDate], T0.[CardCode],T0.[CardName], T1.[ItemCode], T1.[Dscription], T1.[Quantity] as salesorderQty , T1.[OpenQty], T2.onhand, T4.[Code] as Raw material Name,T4.[Quantity] as BOMQTY,  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY FROM ORDR T0  INNER JOIN RDR1 T1 ON T0.[DocEntry] = T1.[DocEntry] INNER JOIN OITM T2 ON T1.[ItemCode] = T2.[ItemCode] INNER JOIN OITT T3 ON T2.[ItemCode] = T3.[Code] INNER JOIN ITT1 T4 ON T3.[Code] = T4.[Father] WHERE  T0.[DocStatus] ='o' 

    You're posting in the Portuguese B1 space.
    You might want to post in the English one: SAP Business One Application

  • Single PR for Total Raw Material ( RM) Demand

    Hi,
    Business requirement is to plan the raw material requirement qty yearly based on the FG demand for the year. But problem is RM planning will not be for the current year. RM based on FG demand is planned one year ahead. How to generate the PR without considering the current year demand of FG qty. If 'A' is a raw material which is used in manufacturing of FG B,C,D etc. Requirement is to generate one PR which equals to the total qty of 'A' raw material requirement for manufacturing B,C,D etc. Also, in PR the total qty of 'A' should display the drop down of how much qty is required for B,C,D etc.
    Thanks & Regards,
    Ramagiri.

    Hi,
    Try using Long Term Planning.
    In the planning scenario maintain 'Do not consider current stock'.
    Tarang

  • Projected Stock for a given Material and Location (System: SCM-APO)

    Hello Experts,
    Appreciate, if anybody can help me in getting a time-series key-figure data (Stock-On-Hand for a given Material and Location) for a given period.
    I am working on a report to display the projected stock (Material & Location are known) for a given period (1 month).
    I am able to view the above data in my planning book.
    Thanks in advance.
    Regards,
    Prasanna
    Edited by: Prasanna Gunji on Apr 9, 2010 3:42 PM

    Hi Prasanna,
    9ASOQMQTY - Stock in quality inspection
    9ASOTRSQTY - Stock in transit
    9AAVLSTCK - Projected Stock
    Hope this helps
    Regards
    R. Senthil Mareeswaran.

  • Purchase requisition after MRP for Semifinished & raw material

    Hello Gurus,
    Please guide me in following scenario :
    FERT - X ---> HALB (subcontracting) - Y ---> ROH - Z
    Requirement : X - 1000 , Y - 1000 & Z - 1000
    In this case, when I will take the MRP for X ,then MRP will generate PR for Y & Z.
    But in my case, client purchase the Z & sell it to vendor & then vendor will sell the Y to my client.  He wants the requirement of Y & Z both after MRP run of X .
    FERT - X ---> HALB (Purchase) - Y ---> ROH - Z
    What can I do to map this in SAP?
    Thanks & Regards,
    Sagar

    Hi Sagar,
    It can also be maped in following way. Please take your MM and FI Consultant with you.
    It could be map in following way:
    Create BoM for Z (FG) and add Y (SFG) & X (RM). Keep the procurement type for both as F. Use special procurement key as 30 for Y (SFG). Mark NOT RELEVANT TO COSTING indicator for X in BoM. Maintain MRP type = ND for X (RM).
    Now when you run MRP system will only create Dependant requirement for X (RM) and it will check stock of Y (SFG) as well. If stock of Y (SFG) is not available, Subcontracting PR will be generated for Y (SFG).
    MRP will not be accurate for X (RM) since it has got dependancy on Y (SFG) which is going to be subcontracted from some Vendor. You can look for Re-order point planning or you can adopt the way suggested by Satish or you can make a new Infostructure in MM which will be updated for consumption movements for X (RM) which later can be used to make its PR directly to Vendor.
    Regards,
    Shoyeb

  • In prod order multiple batch selection for my raw material /sf possible

    Dear All,
    One of problem I am facing is regarding multiple batch selection .
    Scenario is like this
    Finished prdt _ FMBLD003         
    RAW matl  -      2RCH001
    In prodn order my BOM requirement quantity for 2RCH001 IS 75 kg , I have material available in stock in  three diffrent batches
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg  
    I can select any one batch at a time. Is there any option or possibility available wherein we can select multiple batches .
    or Is there possibility that system should automatically split bom quantity as per the batch quantity available shown below
    40       0000111
    15       0000112
    20       0000113
    I tried but didnt found possible solution.
    Please suggest .
    Edited by: sapitheprabhu on May 3, 2011 7:28 AM
    Edited by: sapitheprabhu on May 3, 2011 7:48 AM

    Dear Prabhu,
    When do batch determination you maintain req qty against to batch number in batch determination co: select batch.
    0000111   40 kg
    0000112   15 kg
    0000113   30 kg
    Jainashu

  • Authorization concept for the operating SAP staff after Go-live

    Dear all,
    we are implementing SAP FI and CO. We will have three systems (development, Quality, Production).
    1)Customizing is supposed to be done in development only. However, we will need to be able to view the customizing in the production client as well. What is best practice to achieve this? Is there a role /authorization object which only can configure "IMG-allowed to read"?
    in the development client, we will need to distiguish the following roles: developer including transports, customizer, and authorization administrator.
    2) Are there any SAP standard roles with which you can distinguish these roles?
    thank you very much for your support.
    best regards Timo

    There is no standard IMG display only role.
    Even with all of the SOX  requirements out there so I guess you will need to build this from scratch.
    You also need to make sure you look at all of the information and not just at a t code level as you need to make sure the authorization levels are display rather than maintain.

  • Variance Analysis for chemicals/Raw material

    Hi guys
    What u mean by variance analysis....
    How we can achieve in SAP
    - Pithan

    You can create a custom query on your material or purchasing cube containing all your variances required. You can use APD functionality to identify the deviations you want to analyse. Please look 0PP_C01 and  0PP_C05 for planned and actual versions...

  • Photoshop CS4 "licensing for product has stopped working" after restoring backup to new laptop

    I purchased a new macbook pro running os x 10.9.3 and restored from a Time Capsule backup from my older laptop also running the same OS version.  (Migration assistant was not working and this was Apple's recommendation).  Now Photoshop CS 4 gives the following error "150:30 licensing for this product has stopped working". I've tried the Adobe recommended steps i found on their site short or reinstalling.
    So my question is "what's the phone number for adobe support?"

    800-833-6687  Monday—Friday, 5am—7pm PT
    I have had this same problem before. The problem is that restoring from backup or migrating Photoshop CS4 breaks the licensing.
    You normally get a 150:30 error.
    Two ways to fix this:
    10.7 and above: Run the python script in Terminal to repair this, or reinstall CS4 from your disks.
    If you need help on this let me know.

  • CK24 error for raw material

    Dear All,
    We have executed CK11N of current period for single Raw Material ( w/o quantity struc. Selected in material master) and saved it, but when try to mark & release the material for the current period, the system  displays a message as u201COf 0 materials, 0 cost estimates were updated successfullyu201D. Its newly procured raw material.
    When we check in KEKO, KEPH & CKIS table the entry exists, but we are not able to execute the standard price for this raw material. In the start of this period we have executed CK40 for all the material (including raw materials) has been updated with standard price.
    We have deleted the costing run couple of times and recreated the cost estimation,but of no use.
    We have activated Material Ledger and this raw material has price control u2018Su2019 with price determination u20183u2019. We are in ecc 6.03
    Do suggest.

    Hi ,
    We are facing this problem for all type of material. Once we save cost estimation in CK11N  and when we try execute once again CK11n for the same material system is calculating Cost estimation again without error message and we are not able to Mark & Release the Cost estimation.
    Normally the system will not allow to calculate the cost estimation,if the cost estimation has been already calculated.
    We have currently changed price control S from V for all type of material to maintain Standard cost from Actual cost.
    Do suggest,if we have left out any config settings.
    We are facing this issue in production client.
    Do revert.
    Regards,

Maybe you are looking for

  • Follow-Up Transaction grayed out

    Hello experts - We are attempting to enable follow-up transactions in certain scenarios. The follow-up transaction in the Web UI is grayed out. Please advise where we can enable this feature. Does anyone have any good documentation to make this happe

  • Using SO Write to play a continuous waveform using PC sound card. (Circular Buffers?))

    How can I play a continuous, repeating waveform using SO VI's (that isn't choppy)? I gather that I need to buffer the waveform, and I see examples using AO VI's, but how do you buffer using SO Write? What are Circular Buffers and might I use this tec

  • Low Resolution

    Have anyone notice the low quality pictures on there iPhone from time to using the safari browser and in some apps?

  • Syncing & Streaming

    I just got a TV because I have a large library of music (400 to 600 GB of Apple Lossless) plus a bunch of movies. I got the 160 because of the movies and I was told that I can stream and sync from the same computer. Is this true? If so, how? Thanks

  • PLA Rgd and GL balances not tally

    Hi Gurus, We done so many mistakes in the system for excise transactions of PLA due to it the PLA register and PLA GLs are not matching with correct values. At least this FY onwards we need to use PLA & PLA GL Acs with correct values. For this we hav